Commitments and Contingencies
6 Months Ended
Jun. 30, 2016
Commitments and Contingencies Disclosure [Abstract]  
COMMITMENTS AND CONTINGENCIES
COMMITMENTS AND CONTINGENCIES

We and our subsidiaries have significant commitments and contingencies arising from our operations, including those related to unconditional purchase obligations, environmental matters, and enforcement and litigation matters.

Energy Related Purchased Power Agreements

Our natural gas utilities have obligations to distribute and sell natural gas to their customers, and our electric utilities have obligations to distribute and sell electricity to their customers. The utilities expect to recover costs related to these obligations in future customer rates. In order to meet these obligations, we routinely enter into long-term purchase and sale commitments for various quantities and lengths of time. Our minimum future commitments related to these purchase obligations as of June 30, 2016, including those of our subsidiaries, were $12,345.8 million.

Environmental Matters

Consistent with other companies in the energy industry, we face significant ongoing environmental compliance and remediation obligations related to current and past operations. Specific environmental issues affecting us include, but are not limited to, current and future regulation of air emissions such as SO2, NOx, fine particulates, mercury, and GHGs; water discharges; disposal of coal combustion products such as fly ash; and remediation of impacted properties, including former manufactured gas plant sites.

Air Quality

Sulfur Dioxide National Ambient Air Quality Standards

The EPA issued a revised 1-Hour SO2 NAAQS that became effective in August 2010. The EPA issued a final rule in August 2015 describing the implementation requirements and established a compliance timeline for the revised standard. The final rule affords state agencies some latitude in rule implementation. A nonattainment designation could have negative impacts for a localized geographic area, including additional permitting requirements for new or existing sources in the area.

In March 2015, a federal court entered a consent decree between the EPA and the Sierra Club and others agreeing to specific actions related to implementing the revised standard for areas containing large sources emitting above a certain threshold level of SO2. The consent decree required the EPA to complete attainment designations for certain areas with large sources by no later than July 2016. SO2 emissions from PIPP are above the consent decree emission threshold, which means that the Marquette area required action earlier than would otherwise have been required under the revised NAAQS. However, we were able to show through modeling that the area should be designated as attainment. Based upon this modeling, the state of Michigan recommended to the EPA that the Marquette area be designated as attainment. In July 2016, the EPA finalized its recommendation and published a notice in the Federal Register designating Marquette County, Michigan, as unclassified/attainment, effective in September 2016.

In June 2016, we provided modeling to the WDNR that shows the area around the Weston Power Plant to be in compliance. Based upon the submittal, we believe the WDNR will recommend by January 2017 that the area be designated attainment. We expect that the EPA will consider the WDNR's recommendation and finalize their own recommendation by the end of 2017.

We believe our fleet overall is well positioned to meet the new regulation.

8-Hour Ozone National Ambient Air Quality Standards

The EPA completed its review of the 2008 8-hour ozone standard in November 2014, and announced a proposal to tighten (lower) the NAAQS. In October 2015, the EPA released the final rule, which lowered the limit for ground-level ozone. This is expected to cause nonattainment designations for some counties in Wisconsin with potential future impacts for our fossil-fueled power plant fleet. For nonattainment areas, the state will have to develop a state implementation plan to bring the areas back into attainment. We will be required to comply with this state implementation plan no earlier than 2020 and are in the process of reviewing and determining potential impacts resulting from this rule.

Mercury and Other Hazardous Air Pollutants

In December 2011, the EPA issued the final MATS rule, which imposes stringent limitations on emissions of mercury and other hazardous air pollutants from coal and oil-fired electric generating units beginning in April 2015. In addition, both Wisconsin and Michigan have state mercury rules that require a 90% reduction of mercury; however, these rules are not in effect as long as MATS is in place. In June 2015, the Supreme Court ruled on a challenge to the MATS rule and remanded the case back to the D.C. Circuit Court of Appeals, ruling that the EPA failed to appropriately consider the cost of the regulation. The MATS rule remains in effect until the D.C. Circuit Court of Appeals takes action on the EPA's April 2016 updated cost evaluation.

We believe that the WE and WPS fleets are well positioned to comply with this regulation. Controls for acid gases and mercury are already in operation at the Pulliam units, and our compliance plans currently include capital projects for WPS's jointly owned plants to achieve the required reductions for MATS. In April 2013, WE received a one year MATS compliance extension from the MDEQ for PIPP through April 2016. The addition of a dry sorbent injection system for further control of mercury and acid gases at PIPP was placed into service in March 2016, and PIPP is now in compliance with MATS. Although WPS received a one year MATS compliance extension from the WDNR for Weston Unit 3 through April 2016, this unit is on a planned outage to complete the construction and start-up of the ReACTTM system. Construction of the ReACTTM multi-pollutant control system at Weston Unit 3 is complete and startup/commissioning work is underway with an expected in-service date in 2016. Once Weston Unit 3 comes back on line, it is expected to be in compliance with the MATS emission requirements.

Climate Change

In 2015, the EPA issued the Clean Power Plan, a final rule regulating GHG emissions from existing generating units, a proposed federal plan and model trading rules as alternatives or guides to state compliance plans, and final performance standards for modified and reconstructed generating units and new fossil-fueled power plants. In October 2015, following publication of the final rule for existing fossil-fueled generating units, numerous states (including Wisconsin and Michigan), trade associations, and private parties filed lawsuits challenging the final rule, including a request to stay the implementation of the final rule pending the outcome of these legal challenges. The D.C. Circuit Court of Appeals denied the stay request, but in February 2016, the Supreme Court stayed the effectiveness of the rule until disposition of the litigation in the D.C. Circuit Court of Appeals and to the extent that review is sought, at the Supreme Court. In addition, in February 2016, the Governor of Wisconsin issued Executive Order 186, which prohibits state agencies, departments, boards, commissions, or other state entities from developing or promoting the development of a state plan.

The final rule for existing fossil-fueled generating units seeks to achieve state-specific GHG emission reduction goals by 2030, and would have required states to submit plans by September 6, 2016. States submitting initial plans and requesting an extension would have been required to submit final plans by September 2018, either alone or in conjunction with other states. The timelines for the 2022 through 2029 interim goals and the 2030 final goal for states, as well as all other aspects of the rule, may be changed due to the stay and subsequent legal proceedings.

The goal of the final rule is to reduce nationwide GHG emissions by 32% from 2005 levels. The rule is seeking GHG emission reductions in Wisconsin and Michigan of 41% and 39%, respectively, below 2012 levels by 2030. Interim goals starting in 2022 would require states to achieve about two-thirds of the 2030 required reduction. The building blocks used by the EPA to determine each state's emission reduction requirements include a combination of improving power plant efficiency, increasing reliance on combined cycle natural gas units, and adding new renewable energy resources. We are in the process of reviewing the final rule for existing fossil-fueled generating units to determine the potential impacts to our operations. The rule could result in significant additional compliance costs, including capital expenditures, could impact how we operate our existing fossil-fueled power plants and biomass facility, and could have a material adverse impact on our operating costs.

Draft Federal Plan and Model Trading Rules were also published in October 2015 for use in developing state plans or for use in states where a plan is not submitted or approved. In December 2015, the state of Wisconsin submitted petitions for reconsideration of the EPA's final standards for existing, as well as new, modified, and reconstructed generating units. A petition for reconsideration of the EPA's final standards for existing generating units was also submitted jointly by the Wisconsin utilities. Among other things, the petitions narrowly ask the EPA to consider revising the state goal for existing units to reflect the 2013 retirement of the Kewaunee Power Station, which could lower the state's carbon dioxide equivalent reduction goal by about 10%. In May 2016, the EPA denied the state of Wisconsin's petition for reconsideration related to new, modified, and reconstructed generating units, except that the EPA deferred the portion related to the treatment of biomass. In addition, the EPA has not issued decisions yet regarding the above referenced petitions for reconsideration of the final EPA standards for existing generating units. In December 2015, Michigan state agencies announced modeling results that suggest that the state will be able to meet existing source requirements until 2025, based on planned coal plant retirements, along with a continuation of state renewable standards and current levels of energy efficiency.

Water Quality

Clean Water Act Cooling Water Intake Structure Rule

In August 2014, the EPA issued a final regulation under Section 316(b) of the Clean Water Act, which requires that the location, design, construction, and capacity of cooling water intake structures at existing power plants reflect the Best Technology Available (BTA) for minimizing adverse environmental impacts from both impingement and entrainment. The rule became effective in October 2014, and applies to all of our existing generating facilities with cooling water intake structures, except for the Oak Creek expansion units, which were permitted under the rules governing new facilities.

Facility owners must select from seven compliance options available to meet the impingement mortality (IM) reduction standard. The rule requires state permitting agencies to make BTA determinations, subject to EPA oversight, for IM reduction over the next several years as facility permits are reissued. Based on our assessment, we believe that existing technologies at our generating facilities, except for VAPP Unit 1, Pulliam Units 7 and 8, and Weston Unit 2, satisfy the IM BTA requirements. For VAPP Unit 2, a project to install fish protection screens to meet the IM BTA standard was completed in 2015. The same types of screens are scheduled to be installed on VAPP Unit 1 starting in the third quarter of 2016. We plan to evaluate the available IM options for Pulliam Units 7 and 8. We also expect that limited studies will be required to support the future WDNR BTA determinations for Weston Unit 2. Based on preliminary discussions with the WDNR, we anticipate that the WDNR will not require physical modifications to the Weston Unit 2 intake structure to meet the IM BTA requirements based on low capacity use of the unit.

BTA determinations must also be made by the WDNR and MDEQ to address entrainment mortality (EM) reduction on a site-specific basis taking into consideration several factors. We have received an EM BTA determination by the WDNR, with EPA concurrence, for our proposed intake modification at VAPP. BTA determinations for EM will be made in future permit reissuances for Pulliam Units 7 and 8, Weston Units 2 through 4, Port Washington Generating Station, Pleasant Prairie Power Plant, PIPP, and Oak Creek Power Plant Units 5 through 8. 

During 2016–2018, we will be completing studies and evaluating options to address the EM BTA requirements at our plants. With the exception of Pleasant Prairie Power Plant and Weston Units 3 and 4 (which all have existing cooling towers that meet EM BTA requirements), and VAPP, we cannot yet determine what, if any, intake structure or operational modifications will be required to meet the new EM BTA requirements at our facilities. We also expect that limited studies to support WDNR BTA determinations will be conducted at the Weston facility. Based on preliminary discussions with the WDNR, we anticipate that the WDNR will not require physical modifications to the Weston Unit 2 intake structure to meet the EM BTA requirements based on low capacity use of the unit. In addition, the rule allows the EM BTA requirements to be waived in cases of pending facility retirements, which we are currently considering for PIPP. Based on discussions with the MDEQ, if we submit a signed certification with our next National Pollutant Discharge Elimination System permit application stating that PIPP will be retired no later than the end of the next permit cycle (assumed to be October 1, 2022), we believe the EM BTA requirements will be waived. Entrainment studies are currently being conducted at Pulliam Units 7 and 8 and are also underway at PIPP.

Steam Electric Effluent Guidelines

The EPA's final steam electric effluent guidelines rule took effect in January 2016 and applies to discharges of wastewater from our power plant processes in Wisconsin and Michigan. Unless pending challenges to the final guidelines are successful, the WDNR and MDEQ will modify the state rules and incorporate the new requirements into our facility permits, which are renewed every five years. We expect the new requirements to be phased in between 2018 and 2023 as our permits are renewed. Our power plant facilities already have advanced wastewater treatment technologies installed that meet many of the discharge limits established by this rule. However, these standards will require additional wastewater treatment retrofits as well as installation of other equipment to minimize process water use. The final rule phases in new or more stringent requirements related to limits of arsenic, mercury, selenium, and nitrogen in wastewater discharged from wet scrubber systems. New requirements for wet scrubber wastewater treatment will require additional zero liquid discharge or other advanced treatment capital improvements for the Oak Creek and Pleasant Prairie facilities. The rule also requires dry fly ash handling, which is already in place at all of our power plants. Dry bottom ash transport systems are required by the new rule, and modifications will be required at Oak Creek Units 7 and 8, the Pleasant Prairie units, the PIPP units, Pulliam Units 7 and 8, and Weston Unit 3. We are beginning preliminary engineering for compliance with the rule and estimate a total cost range of $95 million to $130 million for these advanced treatment and bottom ash transport systems.

Valley Power Plant Wisconsin Pollutant Discharge Elimination System Permit

The WDNR issued a Wisconsin Pollutant Discharge Elimination System (WPDES) permit for VAPP that became effective in January 2013. The permit contains several additional requirements including effluent toxicity testing and monitoring for additional parameters (phosphorous, mercury, and ammonia-nitrogen), and a new heat addition limit from the cooling water discharges that all took effect immediately. Other long-term compliance requirements include thermal discharge studies, phosphorous evaluation and feasibility for reduction, mercury minimization planning, and the installation of new cooling water intake fish protection screens. Installation of wedge wire screens for fish protection on the VAPP Unit 2 cooling water intake structure was completed in 2015. An identical modification for VAPP Unit 1 is scheduled to begin in 2016. We are also working on updating the WPDES permit to reflect acceptance of VAPP process wastewater by the Milwaukee Metropolitan Sewage District, which addresses the permit conditions for phosphorous, mercury, and ammonia-nitrogen.

Manufactured Gas Plant Remediation

We have identified sites at which our utilities or a predecessor company owned or operated a manufactured gas plant or stored manufactured gas. We have also identified other sites that may have been impacted by historical manufactured gas plant activities. Our natural gas utilities are responsible for the environmental remediation of these sites, some of which are in the EPA Superfund Program. We are also working with various state jurisdictions in our investigation and remediation planning. These sites are at various stages of investigation, monitoring, remediation, and closure.

In addition, we are coordinating the investigation and cleanup of some of these sites subject to the jurisdiction of the EPA under what is called a "multisite" program. This program involves prioritizing the work to be done at the sites, preparation and approval of documents common to all of the sites, and use of a consistent approach in selecting remedies. At this time, we cannot estimate future remediation costs associated with these sites beyond those described below.

The future costs for detailed site investigation, future remediation, and monitoring are dependent upon several variables including, among other things, the extent of remediation, changes in technology, and changes in regulation. Historically, our regulators have allowed us to recover incurred costs, net of insurance recoveries and recoveries from potentially responsible parties, associated with the remediation of manufactured gas plant sites. Accordingly, we have established regulatory assets for costs associated with these sites.

We have established the following regulatory assets and reserves related to manufactured gas plant sites:
(in millions)
 
June 30, 2016
 
December 31, 2015
Regulatory assets
 
$
686.6

 
$
697.0

Reserves for future remediation
 
617.7

 
628.0



Enforcement and Litigation Matters

We and our subsidiaries are involved in legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although we are unable to predict the outcome of these matters, management believes that appropriate reserves have been established and that final settlement of these actions will not have a material effect on our financial condition or results of operations.

Weston Title V Air Permit

In May 2014, the WDNR issued a NOV alleging that WPS failed to maintain a minimum sorbent feed rate prior to the Continuous Emissions Monitoring System certification and included an issue related to reporting NOx emissions from the Weston Unit 4 auxiliary boiler. In June 2015, the WDNR issued a NOV alleging that WPS failed to comply with mercury reporting requirements related to challenged matters in the 2013 Weston Title V permit. In June 2016, the WDNR issued a letter closing both the May 2014 and June 2015 NOVs with no further action.

Consent Decrees

Wisconsin Electric Power Company Consent Decree

In April 2003, WE entered into a Consent Decree with the EPA, in which it agreed to significantly reduce air emissions from its coal-fired power plants. Under the terms of the Consent Decree, WE could request its termination after December 31, 2015. WE made this termination request in March 2016. In July 2016, the United States informed WE that neither the EPA nor the State of Michigan objected to the termination request. WE, along with the United States and the State of Michigan, intend to request formal termination of the Consent Decree by the court shortly.

Wisconsin Public Service Corporation Consent Decree – Weston and Pulliam

In November 2009, the EPA issued a NOV to WPS, which alleged violations of the CAA's New Source Review requirements relating to certain projects completed at the Weston and Pulliam plants from 1994 to 2009. WPS entered into a Consent Decree with the EPA resolving this NOV. This Consent Decree was entered by the United States District Court for the Eastern District of Wisconsin in March 2013.

The Consent Decree contains requirements to refuel, repower, and/or retire certain Weston and Pulliam units. Effective June 1, 2015, WPS retired Weston Unit 1 and Pulliam Units 5 and 6. In March 2016, WPS submitted a proposed revision to the EPA to update requirements reflecting the conversion of Weston Unit 2 from coal to natural gas fuel, and also proposed revisions to the list of beneficial environmental projects required by the Consent Decree. These proposed revisions were approved by the EPA in May 2016. The revisions to the environmental projects are not expected to materially impact the overall cost required of $6.0 million.

WPS received approval from the PSCW in its 2015 rate order to defer and amortize the undepreciated book value of the retired plant related to Weston Unit 1 and Pulliam Units 5 and 6 starting June 1, 2015, and concluding by 2023. Therefore, in June 2015, WPS recorded a regulatory asset of $11.5 million for the undepreciated book value. In addition, WPS received approval from the PSCW in its rate orders to recover prudently incurred costs as a result of complying with the terms of the Consent Decree, with the exception of a $1.2 million civil penalty.

Also, in May 2010, WPS received from the Sierra Club a Notice of Intent to file a civil lawsuit based on allegations that WPS violated the CAA at the Weston and Pulliam plants. WPS entered into a Standstill Agreement with the Sierra Club by which the parties agreed to negotiate as part of the EPA NOV process, rather than litigate. The Standstill Agreement ended in October 2012, but no further action has been taken by the Sierra Club as of June 30, 2016. It is unknown whether the Sierra Club will take further action in the future.

Joint Ownership Power Plants Consent Decree – Columbia and Edgewater

In December 2009, the EPA issued a NOV to Wisconsin Power and Light, the operator of the Columbia and Edgewater plants, and the other joint owners of these plants, including Madison Gas and Electric, WE (former co-owner of an Edgewater unit), and WPS. The NOV alleged violations of the CAA's New Source Review requirements related to certain projects completed at those plants. WPS, along with Wisconsin Power and Light, Madison Gas and Electric, and WE, entered into a Consent Decree with the EPA resolving this NOV. This Consent Decree was entered by the United States District Court for the Western District of Wisconsin in June 2013. WE paid an immaterial portion of the assessed penalty but has no further obligations under the Consent Decree.

The Consent Decree contains a requirement to, among other things, refuel, repower, or retire Edgewater Unit 4, of which WPS is a joint owner, by no later than December 31, 2018. In the first quarter of 2015, management of the joint owners recommended that Edgewater Unit 4 be retired in December 2018. However, a final decision on how to address the requirement for this unit has not yet been made by the joint owners, as early retirement is contingent on various operational and market factors, and other alternatives to retirement are still available.