Regulatory Matters [Text Block] Regulatory Matters
Regulatory Assets

Regulatory assets represent costs that are expected to be recovered in future regulated rates. The Company's regulatory assets reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Employee benefit plans(1)
15 years$722 $667 
Asset retirement obligations13 years640 445 
Asset disposition costsVarious347 391 
Deferred income taxes(2)
Various283 223 
Demand side management10 years197 
Deferred net power costs1 year139 110 
Deferred operating costs11 years124 134 
OtherVarious988 902 
Total regulatory assets$3,440 $2,881 
Reflected as:
Current assets$283 $115 
Noncurrent assets3,157 2,766 
Total regulatory assets$3,440 $2,881 
(1)Represents amounts not yet recognized as a component of net periodic benefit cost that are expected to be included in regulated rates when recognized.
(2)Amounts primarily represent income tax benefits related to certain property-related basis differences and other various differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.

The Company had regulatory assets not earning a return on investment of $1.6 billion and $1.4 billion as of December 31, 2020 and 2019, respectively.
Regulatory Liabilities

Regulatory liabilities represent income to be recognized or amounts to be returned to customers in future periods. The Company's regulatory liabilities reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Deferred income taxes(1)
Various$3,600 $3,611 
Cost of removal(2)
26 years2,435 2,370 
Asset retirement obligations31 years305 241 
Levelized depreciation29 years281 304 
OtherVarious854 785 
Total regulatory liabilities$7,475 $7,311 
Reflected as:
Current liabilities$254 $211 
Noncurrent liabilities7,221 7,100 
Total regulatory liabilities$7,475 $7,311 

(1)Amounts primarily represent income tax liabilities related to the federal tax rate change from 35% to 21% that are probable to be passed on to customers, offset by income tax benefits related to certain property-related basis differences and other various differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.
(2)Amounts represent estimated costs, as accrued through depreciation rates and exclusive of ARO liabilities, of removing regulated property, plant and equipment in accordance with accepted regulatory practices. Amounts are deducted from rate base or otherwise accrue a carrying cost.
PacifiCorp [Member]  
Schedule Of Regulatory Assets and Liabilities [Line Items]  
Regulatory Matters [Text Block] Regulatory Matters
Regulatory Assets

Regulatory assets represent costs that are expected to be recovered in future rates. PacifiCorp's regulatory assets reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining
Life20202019
Employee benefit plans(1)
20 years$432 $422 
Utah mine disposition(2)
Various117 125 
Unamortized contract values3 years42 60 
Deferred net power costs1 year78 106 
Unrealized loss on derivative contracts2 years17 62 
Asset retirement obligation24 years252 140 
Demand side management (DSM)(3)
10 years196 
OtherVarious261 200 
Total regulatory assets$1,395 $1,123 
Reflected as:
Current assets$116 $63 
Noncurrent assets1,279 1,060 
Total regulatory assets$1,395 $1,123 

(1)Represents amounts not yet recognized as a component of net periodic benefit cost that are expected to be included in rates when recognized.

(2)Amounts represent regulatory assets established as a result of the Utah mine disposition in 2015 for the United Mine Workers of America ("UMWA") 1974 Pension Plan withdrawal and closure costs incurred to date considered probable of recovery.

(3)At December 31, 2019, DSM regulatory assets were substantially offset by amounts billed to Utah retail customers under the related Utah STEP program. In accordance with the Utah general rate case order issued in December 2020, $185 million of amounts billed to Utah customers under the Utah STEP program were used to accelerate depreciation of certain coal-fueled generation units as discussed in Note 3.

PacifiCorp had regulatory assets not earning a return on investment of $707 million and $609 million as of December 31, 2020 and 2019, respectively.
Regulatory Liabilities

Regulatory liabilities represent income to be recognized or amounts to be returned to customers in future periods. PacifiCorp's regulatory liabilities reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining
Life20202019
Cost of removal(1)
26 years$1,125 $1,019 
Deferred income taxes(2)
Various1,463 1,653 
OtherVarious254 297 
Total regulatory liabilities$2,842 $2,969 
Reflected as:
Current liabilities$115 $56 
Noncurrent liabilities2,727 2,913 
Total regulatory liabilities$2,842 $2,969 

(1)Amounts represent estimated costs, as accrued through depreciation rates, of removing property, plant and equipment in accordance with accepted regulatory practices. Amounts are deducted from rate base or otherwise accrue a carrying cost.

(2)Amounts primarily represent income tax liabilities related to the federal tax rate change from 35% to 21% that are probable of being passed on to customers, offset by income tax benefits related to certain property-related basis differences and other various differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.
MidAmerican Energy Company [Member]  
Schedule Of Regulatory Assets and Liabilities [Line Items]  
Regulatory Matters [Text Block]
Regulatory Assets

Regulatory assets represent costs that are expected to be recovered in future regulated rates. MidAmerican Energy's regulatory assets reflected on the Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Asset retirement obligations(1)
6 years$298 $223 
Employee benefit plans(2)
15 years66 26 
Unrealized loss on regulated derivative contracts
1 year— 
OtherVarious28 33 
Total$392 $289 
(1)Amount predominantly relates to AROs for fossil-fueled and wind-powered generating facilities. Refer to Note 11 for a discussion of AROs.
(2)Represents amounts not yet recognized as a component of net periodic benefit cost that are expected to be included in regulated rates when recognized.

MidAmerican Energy had regulatory assets not earning a return on investment of $389 million and $286 million as of December 31, 2020 and 2019, respectively.
Regulatory Liabilities

Regulatory liabilities represent amounts expected to be returned to customers in future periods. MidAmerican Energy's regulatory liabilities reflected on the Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Cost of removal accrual(1)
29 years$466 $572 
Asset retirement obligations(2)
32 years300 241 
Deferred income taxes(3)
Various263 478 
Pre-funded AFUDC on transmission MVPs(4)
52 years35 35 
Employee benefit plans(5)
9 years20 32 
Iowa electric revenue sharing accrual(6)
1 year— 22 
OtherVarious27 26 
Total$1,111 $1,406 
(1)Amounts represent estimated costs, as accrued through depreciation rates and exclusive of ARO liabilities, of removing utility plant in accordance with accepted regulatory practices. Amounts are deducted from rate base or otherwise accrue a carrying cost.
(2)Amount represents the excess of nuclear decommission trust assets over the related ARO. Refer to Note 11 for a discussion of AROs.
(3)Amounts primarily represent income tax liabilities primarily related to the federal tax rate change from 35% to 21% that are probable to be passed on to customers, offset by income tax benefits related to state accelerated tax depreciation and certain property-related basis differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.
(4)Represents AFUDC accrued on transmission MVPs that is deducted from rate base as a result of the inclusion of related construction work-in-progress in rate base.
(5)Represents amounts not yet recognized as a component of net periodic benefit cost that are to be returned to customers in future periods when recognized.
(6)Represents current-year accruals under a regulatory arrangement in Iowa in which equity returns exceeding specified thresholds reduce utility plant upon final determination.
MidAmerican Funding, LLC and Subsidiaries [Member]  
Schedule Of Regulatory Assets and Liabilities [Line Items]  
Regulatory Matters [Text Block] Refer to Note 5 of MidAmerican Energy's Notes to Financial Statements.
Nevada Power Company [Member]  
Schedule Of Regulatory Assets and Liabilities [Line Items]  
Regulatory Matters [Text Block] Regulatory Matters
Regulatory Assets

Regulatory assets represent costs that are expected to be recovered in future rates. Nevada Power's regulatory assets reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Decommissioning costs(2)
3 years$230 $241 
Deferred operating costs9 years119 136 
Merger costs from 1999 merger24 years115 120 
Asset retirement obligations6 years70 67 
Employee benefit plans(1)
8 years50 87 
Legacy meters12 years45 49 
ON Line deferrals33 years43 45 
Deferred energy costs1 year39 — 
Abandoned projectsNone— 12 
OtherVarious83 44 
Total regulatory assets$794 $801 
Reflected as:
Current assets$48 $
Noncurrent assets746 800 
Total regulatory assets$794 $801 

(1)Represents amounts not yet recognized as a component of net periodic benefit cost that are expected to be included in regulated rates when recognized.

(2)Amount includes regulatory assets with an indeterminate life of $11 million and $104 million as of December 31, 2020 and 2019, respectively.

Nevada Power had regulatory assets not earning a return on investment of $288 million and $303 million as of December 31, 2020 and 2019, respectively. The regulatory assets not earning a return on investment primarily consist of merger costs from the 1999 merger, AROs, deferred operating costs, a portion of the employee benefit plans, losses on reacquired debt and deferred energy costs.
Regulatory Liabilities

Regulatory liabilities represent amounts that are expected to be returned to customers in future periods. Nevada Power's regulatory liabilities reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Deferred income taxes(1)
Various$647 $681 
Cost of removal(2)
32 years340 332 
Impact fees(3)
2 years54 72 
OtherVarious172 171 
Total regulatory liabilities$1,213 $1,256 
Reflected as:
Current liabilities$50 $93 
Noncurrent liabilities1,163 1,163 
Total regulatory liabilities$1,213 $1,256 

(1)Amounts primarily represent income tax liabilities related to the federal tax rate change from 35% to 21% that are probable to be passed on to customers, offset by income tax benefits related to accelerated tax depreciation and certain property-related basis differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.

(2)Amounts represent estimated costs, as accrued through depreciation rates and exclusive of ARO liabilities, of removing regulated property, plant and equipment in accordance with accepted regulatory practices.

(3)Amounts reduce rate base or otherwise accrue a carrying cost.

Deferred Energy

Nevada statutes permit regulated utilities to adopt deferred energy accounting procedures. The intent of these procedures is to ease the effect on customers of fluctuations in the cost of purchased natural gas, fuel and electricity and are subject to annual prudency review by the PUCN. Under deferred energy accounting, to the extent actual fuel and purchased power costs exceed fuel and purchased power costs recoverable through current rates that excess is not recorded as a current expense on the Consolidated Statements of Operations but rather is deferred and recorded as a regulatory asset on the Consolidated Balance Sheets and would be included in the table above as deferred energy costs. Conversely, a regulatory liability is recorded to the extent fuel and purchased power costs recoverable through current rates exceed actual fuel and purchased power costs and is included in the table above as deferred energy costs. These excess amounts are reflected in quarterly adjustments to rates and recorded as cost of fuel, energy and capacity in future time periods.

Regulatory Rate Review

In June 2020, Nevada Power filed an electric regulatory rate review with the PUCN. The filing supported an annual revenue reduction of $96 million but requested an annual revenue reduction of $120 million. In September 2020, Nevada Power filed an all-party settlement for the electric regulatory rate review. The settlement resolved all but one issue and provided for an annual revenue reduction of $93 million and required Nevada Power to issue a $120 million one-time bill credit, composed primarily of existing regulatory liabilities, to customers beginning in October 2020. The continuation of the earning sharing mechanism was the one issue that was not addressed in the settlement. In October 2020, the PUCN held a hearing on the continuation of the earning sharing mechanism and issued an interim order accepting the settlement and requiring the one-time bill credit be issued to customers. The $120 million one-time bill credit was issued to customers in the fourth quarter of 2020. In December 2020, the PUCN issued a final order directing Nevada Power to continue the earning sharing mechanism subject to any modifications made to the earning sharing mechanism pursuant to an alternative rate-making ruling and to use the weather normalization methodology adopted for Sierra Pacific in its 2019 regulatory rate review. The new rates were effective on January 1, 2021.
Natural Disaster Protection Plan

In May 2019, Senate Bill 329 ("SB 329"), Natural Disaster Mitigation Measures, was signed into law, which requires Nevada Power to submit a natural disaster protection plan to the PUCN. The PUCN adopted natural disaster protection plan regulations in January 2020, that required Nevada Power to file their natural disaster protection plan for approval on or before March 1 of every third year. The regulations also require annual updates to be filed on or before September 1 of the second and third years of the plan. The plan must include procedures, protocols and other certain information as it relates to the efforts of Nevada Power to prevent or respond to a fire or other natural disaster. The expenditures incurred by Nevada Power in developing and implementing the natural disaster protection plan are required to be held in a regulatory asset account, with Nevada Power filing an application for recovery on or before March 1 of each year. Nevada Power submitted their initial natural disaster protection plan to the PUCN and filed their first application seeking recovery of 2019 expenditures in February 2020. In June 2020, a hearing was held and an order was issued in August 2020 that granted the joint application, made adjustments to the budget and approved the 2019 costs for recovery starting in October 2020. In October 2020, a modified final order was issued after Nevada Power and the Bureau of Consumer Protection filed for reconsideration. Intervenors have filed a petition for judicial review with the District Court in November 2020. In December 2020, the PUCN issued a second modified final order approving the natural disaster protection plan, as modified, and reopened its investigation and rulemaking on SB 329 to address rate design issues raised by intervenors. The comment period for the reopened investigation and rulemaking ended in early February 2021 and the matter is ongoing.

2017 Tax Reform

In February 2018, Nevada Power made filings with the PUCN proposing a tax rate reduction rider for the lower annual income tax expense anticipated to result from 2017 Tax Reform for 2018 and beyond. In March 2018, the PUCN issued an order approving the rate reduction proposed by Nevada Power. The new rates were effective April 1, 2018. The order extended the procedural schedule to allow parties additional discovery relevant to 2017 Tax Reform and a hearing was held in July 2018. In September 2018, the PUCN issued an order directing Nevada Power to record the amortization of any excess protected accumulated deferred income tax arising from the 2017 Tax Reform as a regulatory liability effective January 1, 2018. Subsequently, Nevada Power filed a petition for reconsideration relating to the amortization of protected excess accumulated deferred income tax balances resulting from the 2017 Tax Reform. In November 2018, the PUCN issued an order granting reconsideration and reaffirming the September 2018 order. In December 2018, Nevada Power filed a petition for judicial review with the district court. The district court issued an order in March 2020 denying the petition and affirming the PUCN's order. In May 2020, Nevada Power filed a notice of appeal to the Nevada Supreme Court of the district court's order. Nevada Power agreed to withdraw the notice of appeal as a part of the Nevada Power electric regulatory rate review settlement. In December 2020, the PUCN issued a final order accepting the settlement. In January 2021, Nevada Power filed their withdrawal and the matter was dismissed by the court.

Energy Efficiency Program Rates ("EEPR") and Energy Efficiency Implementation Rates ("EEIR")

EEPR was established to allow Nevada Power to recover the costs of implementing energy efficiency programs and EEIR was established to offset the negative impacts on revenue associated with the successful implementation of energy efficiency programs. These rates change once a year in the utility's annual DEAA application based on energy efficiency program budgets prepared by Nevada Power and approved by the PUCN in integrated resource plan proceedings. When Nevada Power's regulatory earned rate of return for a calendar year exceeds the regulatory rate of return used to set base tariff general rates, it is obligated to refund energy efficiency implementation revenue previously collected for that year. In February 2020, Nevada Power filed an application to reset the EEIR and EEPR and to refund the EEIR revenue received in 2019, including carrying charges. In August 2020, the PUCN issued an order accepting a stipulation requiring Nevada Power to refund the 2019 revenue and reset the rates as filed effective October 1, 2020. The EEIR liability for Nevada Power is $8 million, which is included in current regulatory liabilities on the Consolidated Balance Sheets as of December 31, 2020 and 2019.

Emissions Reduction and Capacity Retirement Plan ("ERCR Plan")

In November 2019, the Navajo coal-fueled generating facility was retired. Nevada Power owned 11% of the facility and its net owned capacity was 255 MWs. The decommissioning was approved by the PUCN in May 2014 as a part of the filed ERCR Plan. The remaining net book value of $12 million was moved from property, plant and equipment, net to noncurrent regulatory assets on the Consolidated Balance Sheet in November 2019, in compliance with the ERCR Plan. Refer to Note 13 for additional information on the ERCR Plan.
Sierra Pacific Power Company [Member]  
Schedule Of Regulatory Assets and Liabilities [Line Items]  
Regulatory Matters [Text Block] Regulatory Matters
Regulatory Assets

Regulatory assets represent costs that are expected to be recovered in future rates. Sierra Pacific's regulatory assets reflected on the Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Employee benefit plans(1)
8 years$81 $107 
Merger costs from 1999 merger26 years68 71 
Natural disaster protection plan1 year45 
Deferred operating costs11 years27 23 
Abandoned projects6 years22 24 
Deferred energy costs1 year22 
Losses on reacquired debt15 years15 17 
OtherVarious54 41 
Total regulatory assets$334 $295 
Reflected as:
Current assets$67 $12 
Noncurrent assets267 283 
Total regulatory assets$334 $295 

(1)Represents amounts not yet recognized as a component of net periodic benefit cost that are expected to be included in regulated rates when recognized.

Sierra Pacific had regulatory assets not earning a return on investment of $149 million and $168 million as of December 31, 2020 and 2019, respectively. The regulatory assets not earning a return on investment primarily consist of merger costs from the 1999 merger, a portion of the employee benefit plans, losses on reacquired debt, AROs and legacy meters.
Regulatory Liabilities

Regulatory liabilities represent amounts that are expected to be returned to customers in future periods. Sierra Pacific's regulatory liabilities reflected on the Balance Sheets consist of the following as of December 31 (in millions):
Weighted
Average
Remaining Life20202019
Deferred income taxes(1)
Various$249 $263 
Cost of removal(2)
37 years197 217 
OtherVarious51 58 
Total regulatory liabilities$497 $538 
Reflected as:
Current liabilities$34 $49 
Noncurrent liabilities463 489 
Total regulatory liabilities$497 $538 

(1)Amounts primarily represent income tax liabilities related to the federal tax rate change from 35% to 21% that are probable to be passed on to customers, offset by income tax benefits related to accelerated tax depreciation and certain property-related basis differences and other various differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.

(2)Amounts represent estimated costs, as accrued through depreciation rates and exclusive of ARO liabilities, of removing regulated property, plant and equipment in accordance with accepted regulatory practices.

Deferred Energy

Nevada statutes permit regulated utilities to adopt deferred energy accounting procedures. The intent of these procedures is to ease the effect on customers of fluctuations in the cost of purchased natural gas, fuel and electricity and are subject to annual prudency review by the PUCN. Under deferred energy accounting, to the extent actual fuel and purchased power costs exceed fuel and purchased power costs recoverable through current rates that excess is not recorded as a current expense on the Statements of Operations but rather is deferred and recorded as a regulatory asset on the Balance Sheets and would be included in the table above as deferred energy costs. Conversely, a regulatory liability is recorded to the extent fuel and purchased power costs recoverable through current rates exceed actual fuel and purchased power costs and is included in the table above as deferred energy costs. These excess amounts are reflected in quarterly adjustments to rates and recorded as cost of fuel, energy and capacity in future time periods.

Regulatory Rate Review

In June 2019, Sierra Pacific filed an electric regulatory rate review with the PUCN. The filing supported an annual revenue increase of $5 million but requested an annual revenue reduction of $5 million. In September 2019, Sierra Pacific filed an all-party settlement for the electric regulatory rate review. The settlement resolves all cost of capital and revenue requirement issues and provides for an annual revenue reduction of $5 million and requires Sierra Pacific to share 50% of regulatory earnings above 9.7% with its customers. The rate design portion of the regulatory rate review was not a part of the settlement and a hearing on rate design was held in November 2019. In December 2019, the PUCN issued an order approving the stipulation but made some adjustments to the methodology for the weather normalization component of historical sales in rates, which resulted in an annual revenue reduction of $3 million. The new rates were effective January 1, 2020. In January 2020, Sierra Pacific filed a petition for rehearing challenging the PUCN's adjustments to the weather normalization methodology. In February 2020, the PUCN issued an order granting the petition for rehearing. In April 2020, the PUCN issued a final order approving a weather normalization methodology that changed the additional annual revenue reduction from $3 million to $2 million with an effective date of January 1, 2020. Customers billed under rates using the initial revenue reduction were issued credits in the fourth quarter of 2020.
Natural Disaster Protection Plan

In May 2019, Senate Bill 329 ("SB 329"), Natural Disaster Mitigation Measures, was signed into law, which requires Sierra Pacific to submit a natural disaster protection plan to the PUCN. The PUCN adopted natural disaster protection plan regulations in January 2020, that required Sierra Pacific to file their natural disaster protection plan for approval on or before March 1 of every third year. The regulations also require annual updates to be filed on or before September 1 of the second and third years of the plan. The plan must include procedures, protocols and other certain information as it relates to the efforts of Sierra Pacific to prevent or respond to a fire or other natural disaster. The expenditures incurred by Sierra Pacific in developing and implementing the natural disaster protection plan are required to be held in a regulatory asset account, with Sierra Pacific filing an application for recovery on or before March 1 of each year. Sierra Pacific submitted their initial natural disaster protection plan to the PUCN and filed their first application seeking recovery of 2019 expenditures in February 2020. In June 2020, a hearing was held and an order was issued in August 2020 that granted the joint application, made adjustments to the budget and approved the 2019 costs for recovery starting in October 2020. In October 2020, a modified final order was issued after Sierra Pacific and the Bureau of Consumer Protection filed for reconsideration. Intervenors have filed a petition for judicial review with the District Court in November 2020. In December 2020, the PUCN issued a second modified final order approving the natural disaster protection plan, as modified, and reopened its investigation and rulemaking on SB 329 to address rate design issues raised by intervenors. The comment period for the reopened investigation and rulemaking ended in early February 2021 and the matter is ongoing.

2017 Tax Reform

In February 2018, Sierra Pacific made filings with the PUCN proposing a tax rate reduction rider for the lower annual income tax expense anticipated to result from 2017 Tax Reform for 2018 and beyond. In March 2018, the PUCN issued an order approving the rate reduction proposed by Sierra Pacific. The new rates were effective April 1, 2018. The order extended the procedural schedule to allow parties additional discovery relevant to 2017 Tax Reform and a hearing was held in July 2018. In September 2018, the PUCN issued an order directing Sierra Pacific to record the amortization of any excess protected accumulated deferred income tax arising from the 2017 Tax Reform as a regulatory liability effective January 1, 2018. Subsequently, Sierra Pacific filed a petition for reconsideration relating to the amortization of protected excess accumulated deferred income tax balances resulting from the 2017 Tax Reform. In November 2018, the PUCN issued an order granting reconsideration and reaffirming the September 2018 order. In December 2018, Sierra Pacific filed a petition for judicial review with the district court. The district court issued an order in March 2020 denying the petition and affirming the PUCN's order. In May 2020, Sierra Pacific filed a notice of appeal to the Nevada Supreme Court of the district court's order. Sierra Pacific agreed to withdraw the notice of appeal as a part of the Nevada Power electric regulatory rate review settlement. In December 2020, the PUCN issued a final order accepting the settlement. In January 2021, Sierra Pacific filed their withdrawal and the matter was dismissed by the court.

Energy Efficiency Program Rates ("EEPR") and Energy Efficiency Implementation Rates ("EEIR")

EEPR was established to allow Sierra Pacific to recover the costs of implementing energy efficiency programs and EEIR was established to offset the negative impacts on revenue associated with the successful implementation of energy efficiency programs. These rates change once a year in the utility's annual DEAA application based on energy efficiency program budgets prepared by Sierra Pacific. When Sierra Pacific's regulatory earned rate of return for a calendar year exceeds the regulatory rate of return used to set base tariff general rates, it is obligated to refund energy efficiency implementation revenue previously collected for that year. In February 2020, Sierra Pacific filed an application to reset the EEIR and EEPR and to refund the EEIR revenue received in 2019, including carrying charges. In August 2020, the PUCN issued an order accepting a stipulation requiring Sierra Pacific to refund the 2019 revenue and reset the rates as filed effective October 1, 2020.The EEIR liability for Sierra Pacific is $2 million, which is included in current regulatory liabilities on the Balance Sheets as of December 31, 2020 and 2019.
Eastern Energy Gas Holdings, LLC [Member]  
Schedule Of Regulatory Assets and Liabilities [Line Items]  
Regulatory Matters [Text Block] Regulatory Matters
Regulatory Assets

Regulatory assets represent costs that are expected to be recovered in future regulated rates. Eastern Energy Gas' regulatory assets reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted Average Remaining Life20202019
Employee benefit plans(1)
Various$70 $— 
Interest rate hedges(2)
Various— 32 
OtherVarious12 16 
Total regulatory assets$82 $48 
Reflected as:
Current assets$$
Noncurrent assets74 40 
Total regulatory assets$82 $48 

(1)Represents costs expected to be recovered through future rates generally over the expected remaining service period of plan participants by certain rate-regulated subsidiaries.

(2)Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt.

Eastern Energy Gas had regulatory assets not earning a return on investment of $10 million and $46 million as of December 31, 2020 and 2019, respectively.
Regulatory Liabilities

Regulatory liabilities represent income to be recognized or amounts expected to be returned to customers in future periods. Eastern Energy Gas' regulatory liabilities reflected on the Consolidated Balance Sheets consist of the following as of December 31 (in millions):
Weighted Average Remaining Life20202019
Income taxes refundable through future rates(1)
Various$473 $560 
Other postretirement benefit costs(2)
Various115 133 
Provision for future cost of removal and AROs(3)
Various89 113 
OtherVarious32 35 
Total regulatory liabilities$709 $841 
Reflected as:
Current liabilities$40 $41 
Noncurrent liabilities669 800 
Total regulatory liabilities$709 $841 

(1)Amounts primarily represent income tax liabilities related to the federal tax rate change from 35% to 21% that are probable to be passed on to customers, offset by income tax benefits related to certain property-related basis differences and other various differences that were previously passed on to customers and will be included in regulated rates when the temporary differences reverse.

(2)Reflects a regulatory liability for the collection of postretirement benefit costs allowed in rates in excess of expense incurred.

(3)Rates charged to customers by Eastern Energy Gas' regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.


Regulatory Matters

Eastern Gas Transmission and Storage, Inc.

In July 2017, the FERC audit staff communicated to Eastern Gas Transmission and Storage, Inc. ("EGTS") that it had substantially completed an audit of EGTS' compliance with the accounting and reporting requirements of the FERC's Uniform System of Accounts and provided a description of matters and preliminary recommendations. In November 2017, the FERC audit staff issued its audit report. In December 2017, EGTS provided its response to the audit report. EGTS requested FERC review of the contested findings and submitted its plan for compliance with the uncontested portions of the report. EGTS reached resolution of certain matters with the FERC in the fourth quarter of 2018. EGTS recognized a charge of $129 million ($94 million after-tax) recorded primarily within operations and maintenance expense in the Consolidated Statement of Operations for the year ended December 31, 2018 for a disallowance of plant, originally established beginning in 2012, for the resolution of one matter with the FERC. In December 2020, the FERC issued a final ruling on the remaining matter, which resulted in a $43 million ($31 million after-tax) charge for disallowance of capitalized AFUDC, recorded within operations and maintenance expense in the Consolidated Statement of Operations. As a condition of the December 2020 ruling, EGTS will file its proposed accounting entries and supporting documentation with the FERC by the second quarter of 2021; however, EGTS does not expect a material change from the charge recognized.
In December 2014, EGTS entered into a precedent agreement with Atlantic Coast Pipeline, LLC ("Atlantic Coast Pipeline") for the project previously intended for EGTS to provide approximately 1,500,000 decatherms ("Dth") of firm transportation service to various customers in connection with the Atlantic Coast Pipeline project ("Supply Header Project"). As a result of the cancellation of the Atlantic Coast Pipeline project, in the second quarter of 2020 Eastern Energy Gas recorded a charge of $482 million ($359 million after-tax) in operations and maintenance expense in its Consolidated Statement of Operations associated with the probable abandonment of a significant portion of the project as well as the establishment of a $75 million ARO. In the third quarter of 2020, Eastern Energy Gas recorded an additional charge of $10 million ($7 million after-tax) associated with the probable abandonment of a significant portion of the project and a $29 million ($20 million after-tax) benefit from a revision to the previously established ARO, both of which were recorded in operations and maintenance expense in Eastern Energy Gas' Consolidated Statement of Operations. As EGTS evaluates its future use, approximately $40 million remains within property, plant and equipment for a potential modified project.

In December 2019, EGTS filed an application to request FERC authorization to construct, operate and maintain the Tri-West project to provide 120,000 Dths per day of firm transportation service from Pennsylvania to Ohio for delivery to Tennessee Gas Pipeline Company, L.L.C. The application was automatically approved after a 60-day waiting period from the date of filing and the project commenced commercial operations in August 2020 at a cost of $17 million.

In January 2018, EGTS filed an application to request FERC authorization to construct and operate certain facilities located in Ohio and Pennsylvania for the Sweden Valley project. In June 2019, EGTS withdrew its application for the project due to certain regulatory delays. As a result of the project abandonment, during the second quarter of 2019, EGTS recorded a charge of $13 million ($10 million after-tax), included in operations and maintenance expenses in the Consolidated Statement of Operations.

Cove Point

In June 2015, Cove Point executed two binding precedent agreements for the approximately $150 million project to provide 150,000 Dths per day of transportation service to help meet demand for natural gas for Washington Gas Light Company ("Eastern Market Access Project"). In January 2018, Cove Point received FERC authorization to construct and operate the project facilities. In October 2018, Cove Point announced it was evaluating alternatives to a proposed Charles County, Maryland compressor station that was initially part of this project and in December 2018, after working with project customers for alternative solutions, decided not to pursue further construction at this location resulting in a revised project estimate of approximately $45 million and a write-off of $37 million ($28 million after-tax). In May 2019, Cove Point filed an application for an amendment to vacate its FERC authorization for the Charles County, Maryland compressor station and revised its project scope. In August 2019, Cove Point received FERC authorization and the Eastern Market Access Project commenced commercial operations in September 2019.

In January 2020, pursuant to the terms of a previous settlement, Cove Point filed a general rate case for its FERC-jurisdictional services, with proposed rates to be effective March 1, 2020. Cove Point proposed an annual cost-of-service of approximately $182 million. In February 2020, FERC approved suspending the changes in rates for five months following the proposed effective date, until August 1, 2020, subject to refund. In November 2020, Cove Point reached an agreement in principle with the active participants in the general rate case proceeding. Under the terms of the agreement in principle, Cove Point's rates effective August 1, 2020 result in an increase to annual revenues of approximately $4 million and a decrease in annual depreciation expense of approximately $1 million, compared to the rates in effect prior to August 1, 2020. The interim settlement rates were implemented November 1, 2020, and Cove Point's provision for rate refunds for August 2020 through October 2020 totaled $7 million. The agreement in principle was reflected in a stipulation and agreement filed with the FERC in January 2021, which is subject to final approval by the FERC.