XML 77 R29.htm IDEA: XBRL DOCUMENT v3.8.0.1
Commitments and Contingencies (Notes)
12 Months Ended
Dec. 31, 2017
Contractual Obligation [Line Items]  
Commitments and Contingencies
Commitments and Contingencies

Commitments

The Company has the following firm commitments that are not reflected on the Consolidated Balance Sheet. Minimum payments as of December 31, 2017 are as follows (in millions):
 
 
 
 
 
 
 
 
 
 
 
 
2023 and
 
 
 
 
2018
 
2019
 
2020
 
2021
 
2022
 
Thereafter
 
Total
Contract type:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Fuel, capacity and transmission contract commitments
 
$
2,098

 
$
1,637

 
$
1,435

 
$
1,210

 
$
1,055

 
$
10,044

 
$
17,479

Construction commitments
 
1,120

 
57

 
5

 

 

 

 
1,182

Operating leases and easements
 
180

 
157

 
141

 
121

 
111

 
1,297

 
2,007

Maintenance, service and other contracts
 
246

 
249

 
238

 
231

 
253

 
1,055

 
2,272

 
 
$
3,644

 
$
2,100

 
$
1,819

 
$
1,562

 
$
1,419

 
$
12,396

 
$
22,940



Fuel, Capacity and Transmission Contract Commitments

The Utilities have fuel supply and related transportation and lime contracts for their coal- and natural gas-fueled generating facilities. The Utilities expect to supplement these contracts with additional contracts and spot market purchases to fulfill their future fossil fuel needs. The Utilities acquire a portion of their electricity through long-term purchases and exchange agreements. The Utilities have several power purchase agreements with renewable generating facilities that are not included in the table above as the payments are based on the amount of energy generated and there are no minimum payments. The Utilities also have contracts for the right to transmit electricity over other entities' transmission lines to facilitate delivery to their customers.

MidAmerican Energy has long-term rail transportation contracts with BNSF Railway Company ("BNSF"), an affiliate company, and Union Pacific Railroad Company for the transportation of coal to all of the MidAmerican Energy-operated coal-fueled generating facilities. For the years ended December 31, 2017, 2016 and 2015, $109 million, $137 million and $185 million, respectively, were incurred for coal transportation services, the majority of which was related to the BNSF agreement.

Construction Commitments

The Company's firm construction commitments reflected in the table above include the following major construction projects:
MidAmerican Energy's construction of wind-powered generating facilities and the last of the four Multi-Value Projects approved by the Midcontinent Independent System Operator, Inc. for high voltage transmission lines in Iowa and Illinois in 2018.
ALP's investments in directly assigned transmission projects from the AESO.
PacifiCorp's costs associated with certain generating plant, transmission and distribution projects.

Operating Leases and Easements

The Company has non-cancelable operating leases primarily for office equipment, office space, certain operating facilities, land and rail cars. These leases generally require the Company to pay for insurance, taxes and maintenance applicable to the leased property. Certain leases contain renewal options for varying periods and escalation clauses for adjusting rent to reflect changes in price indices. The Company also has non-cancelable easements for land on which certain of its assets, primarily wind-powered generating facilities, are located. Rent expense on non-cancelable operating leases and easements totaled $156 million for both 2017 and 2016 and $146 million for 2015.

Maintenance, Service and Other Contracts

The Company has entered into service agreements related to its nonregulated solar and wind-powered projects with third parties to operate and maintain the projects under fixed-fee operating and maintenance agreements. Additionally, the Company has various non-cancelable maintenance, service and other contracts primarily related to turbine and equipment maintenance and various other service agreements.

Legal Matters

The Company is party to a variety of legal actions arising out of the normal course of business. Plaintiffs occasionally seek punitive or exemplary damages. The Company does not believe that such normal and routine litigation will have a material impact on its consolidated financial results.

Environmental Laws and Regulations

The Company is subject to federal, state, local and foreign laws and regulations regarding air and water quality, renewable portfolio standards, emissions performance standards, climate change, coal combustion byproduct disposal, hazardous and solid waste disposal, protected species and other environmental matters that have the potential to impact the Company's current and future operations. The Company believes it is in material compliance with all applicable laws and regulations.

Hydroelectric Relicensing

PacifiCorp's Klamath hydroelectric system is currently operating under annual licenses with the FERC. In February 2010, PacifiCorp, the United States Department of the Interior, the United States Department of Commerce, the state of California, the state of Oregon and various other governmental and non-governmental settlement parties signed the Klamath Hydroelectric Settlement Agreement ("KHSA").

Congress failed to pass legislation needed to implement the original KHSA. On April 6, 2016, PacifiCorp, the states of California and Oregon, and the United States Departments of the Interior and Commerce and other stakeholders executed an amendment to the KHSA. Consistent with the terms of the amended KHSA, on September 23, 2016, PacifiCorp and the Klamath River Renewal Corporation ("KRRC"), a private, independent nonprofit 501(c)(3) organization formed by signatories of the amended KSHA, jointly filed an application with the FERC to transfer the license for the four mainstem Klamath River hydroelectric generating facilities from PacifiCorp to the KRRC. Also on September 23, 2016, the KRRC filed an application with the FERC to surrender the license and decommission the facilities. The KRRC's license surrender application included a request for the FERC to refrain from acting on the surrender application until after the transfer of the license to the KRRC is effective.

Under the amended KHSA, PacifiCorp and its customers are protected from uncapped dam removal costs and liabilities. The KRRC must indemnify PacifiCorp from liabilities associated with dam removal. The amended KHSA also limits PacifiCorp's contribution to facilities removal costs to no more than $200 million, of which up to $184 million would be collected from PacifiCorp's Oregon customers with the remainder to be collected from PacifiCorp's California customers. California voters approved a water bond measure in November 2014 from which the state of California's contribution towards facilities removal costs are being drawn. In accordance with this bond measure, additional funding of up to $250 million for facilities removal costs was included in the California state budget in 2016, with the funding effective for at least five years. If facilities removal costs exceed the combined funding that will be available from PacifiCorp's Oregon and California customers and the state of California, sufficient funds would need to be provided by the KRRC or an entity other than PacifiCorp for removal to proceed.

If certain conditions in the amended KHSA are not satisfied and the license does not transfer to the KRRC, PacifiCorp will resume relicensing with the FERC.

As of December 31, 2017, PacifiCorp's assets included $55 million of costs associated with the Klamath hydroelectric system's mainstem dams and the associated relicensing and settlement costs, which are being depreciated and amortized in accordance with state regulatory approvals through either December 31, 2019, or December 31, 2022, depending upon the state jurisdiction.

Hydroelectric Commitments

Certain of PacifiCorp's hydroelectric licenses contain requirements for PacifiCorp to make certain capital and operating expenditures related to its hydroelectric facilities. PacifiCorp estimates it is obligated to make capital expenditures of approximately $239 million over the next 10 years related to these licenses.

Guarantees

The Company has entered into guarantees as part of the normal course of business and the sale of certain assets. These guarantees are not expected to have a material impact on the Company's consolidated financial results.
PacifiCorp [Member]  
Contractual Obligation [Line Items]  
Commitments and Contingencies
Commitments and Contingencies

Legal Matters

PacifiCorp is party to a variety of legal actions arising out of the normal course of business. Plaintiffs occasionally seek punitive or exemplary damages. PacifiCorp does not believe that such normal and routine litigation will have a material impact on its consolidated financial results.
    
Environmental Laws and Regulations

PacifiCorp is subject to federal, state and local laws and regulations regarding air and water quality, renewable portfolio standards, emissions performance standards, climate change, coal combustion byproduct disposal, hazardous and solid waste disposal, protected species and other environmental matters that have the potential to impact PacifiCorp's current and future operations. PacifiCorp believes it is in material compliance with all applicable laws and regulations.

Hydroelectric Relicensing

PacifiCorp's Klamath hydroelectric system is currently operating under annual licenses with the FERC. In February 2010, PacifiCorp, the United States Department of the Interior, the United States Department of Commerce, the state of California, the state of Oregon and various other governmental and non-governmental settlement parties signed the Klamath Hydroelectric Settlement Agreement ("KHSA"). Among other things, the KHSA provided that the United States Department of the Interior would conduct scientific and engineering studies to assess whether removal of the Klamath hydroelectric system's mainstem dams was in the public interest and would advance restoration of the Klamath Basin's salmonid fisheries. If it was determined that dam removal should proceed, dam removal would begin no earlier than 2020.

Congress failed to pass legislation needed to implement the original KHSA. Hence, in February 2016, the principal parties to the KHSA (PacifiCorp, the states of California and Oregon and the United States Departments of the Interior and Commerce) executed an agreement in principle committing to explore potential amendment of the KHSA to facilitate removal of the Klamath dams through a FERC process without the need for federal legislation. On April 6, 2016, PacifiCorp, the states of California and Oregon, and the United States Departments of the Interior and Commerce and other stakeholders executed an amendment to the KHSA. Consistent with the terms of the amended KHSA, on September 23, 2016, PacifiCorp and the Klamath River Renewal Corporation ("KRRC"), a private, independent nonprofit 501(c)(3) organization formed by signatories of the amended KSHA, jointly filed an application with the FERC to transfer the license for the four mainstem Klamath River hydroelectric generating facilities from PacifiCorp to the KRRC. Also on September 23, 2016, the KRRC filed an application with the FERC to surrender the license and decommission the facilities. The KRRC's license surrender application included a request for the FERC to refrain from acting on the surrender application until after the transfer of the license to the KRRC is effective.

Under the amended KHSA, PacifiCorp and its customers continue to be protected from uncapped dam removal costs and liabilities. The KRRC must indemnify PacifiCorp from liabilities associated with dam removal. The amended KHSA also limits PacifiCorp's contribution to facilities removal costs to no more than $200 million, of which up to $184 million would be collected from PacifiCorp's Oregon customers with the remainder to be collected from PacifiCorp's California customers. California voters approved a water bond measure in November 2014 from which the state of California's contribution towards facilities removal costs will be drawn. In accordance with this bond measure, additional funding of up to $250 million for facilities removal costs was included in the California state budget in 2016, with the funding effective for at least five years. If facilities removal costs exceed the combined funding that will be available from PacifiCorp's Oregon and California customers and the state of California, sufficient funds would need to be provided by the KRRC or an entity other than PacifiCorp in order for removal to proceed.

If certain conditions in the amended KHSA are not satisfied and the license does not transfer to the KRRC, PacifiCorp will resume relicensing with the FERC.

As of December 31, 2017, PacifiCorp's assets included $55 million of costs associated with the Klamath hydroelectric system's mainstem dams and the associated relicensing and settlement costs, which are being depreciated and amortized in accordance with state regulatory approvals through either December 31, 2019, or December 31, 2022, depending upon the state jurisdiction.

Hydroelectric Commitments

Certain of PacifiCorp's hydroelectric licenses contain requirements for PacifiCorp to make certain capital and operating expenditures related to its hydroelectric facilities. PacifiCorp estimates it is obligated to make capital expenditures of approximately $239 million over the next 10 years related to these licenses.

Commitments

PacifiCorp has the following firm commitments that are not reflected on the Consolidated Balance Sheet. Minimum payments as of December 31, 2017 are as follows (in millions):

 
2018
 
2019
 
2020
 
2021
 
2022
 
2023 and Thereafter
 
Total
Contract type:
 
 
 
 
 
 
 
 
 
 
 
 
 
Purchased electricity contracts -
 
 
 
 
 
 
 
 
 
 
 
 
 
commercially operable
$
276

 
$
165

 
$
161

 
$
150

 
$
145

 
$
1,574

 
$
2,471

Purchased electricity contracts -
 
 
 
 
 
 
 
 
 
 
 
 
 
non-commercially operable
9

 
18

 
26

 
26

 
27

 
451

 
557

Fuel contracts
695

 
619

 
591

 
453

 
337

 
1,268

 
3,963

Construction commitments
85

 
29

 
3

 

 

 

 
117

Transmission
112

 
96

 
66

 
49

 
39

 
428

 
790

Operating leases and easements
7

 
7

 
7

 
7

 
6

 
97

 
131

Maintenance, service and
 
 
 
 
 
 
 
 
 
 
 
 
 
other contracts
36

 
34

 
22

 
25

 
14

 
80

 
211

Total commitments
$
1,220

 
$
968

 
$
876

 
$
710

 
$
568

 
$
3,898

 
$
8,240


    
Purchased Electricity Contracts - Commercially Operable

As part of its energy resource portfolio, PacifiCorp acquires a portion of its electricity through long-term purchases and exchange agreements. PacifiCorp has several power purchase agreements with wind-powered generating facilities that are not included in the table above as the payments are based on the amount of energy generated and there are no minimum payments. Included in the purchased electricity payments are any power purchase agreements that meet the definition of a lease. Rent expense related to those power purchase agreements that meet the definition of a lease totaled $14 million for 2017 and 2016 and $13 million for 2015.

Included in the minimum fixed annual payments for purchased electricity above are commitments to purchase electricity from several hydroelectric systems under long-term arrangements with public utility districts. These purchases are made on a "cost-of-service" basis for a stated percentage of system output and for a like percentage of system operating expenses and debt service. These costs are included in energy costs on the Consolidated Statements of Operations. PacifiCorp is required to pay its portion of operating costs and its portion of the debt service, whether or not any electricity is produced. These arrangements accounted for less than 5% of PacifiCorp's 2017, 2016 and 2015 energy sources.

Purchased Electricity Contracts - Non-commercially Operable

PacifiCorp has several contracts for purchases of electricity from facilities that have not yet achieved commercial operation. To the extent any of these facilities do not achieve commercial operation, PacifiCorp has no obligation to the counterparty.

Fuel Contracts

PacifiCorp has "take or pay" coal and natural gas contracts that require minimum payments.

Construction Commitments

PacifiCorp's construction commitments included in the table above relate to firm commitments and include costs associated with certain generating plant, transmission, and distribution projects.

Transmission

PacifiCorp has contracts for the right to transmit electricity over other entities' transmission lines to facilitate delivery to PacifiCorp's customers.

    
Operating Leases and Easements

PacifiCorp has non-cancelable operating leases primarily for certain operating facilities, office space, land and equipment that expire at various dates through the year ending December 31, 2096. These leases generally require PacifiCorp to pay for insurance, taxes and maintenance applicable to the leased property. Certain leases contain renewal options for varying periods and escalation clauses for adjusting rent to reflect changes in price indices. PacifiCorp also has non-cancelable easements for land on which certain of its assets, primarily wind-powered generating facilities, are located. Rent expense totaled $15 million for the years ended December 31, 2017, 2016 and 2015.

Guarantees

PacifiCorp has entered into guarantees as part of the normal course of business and the sale of certain assets. These guarantees are not expected to have a material impact on PacifiCorp's consolidated financial results.
MidAmerican Energy Company [Member]  
Contractual Obligation [Line Items]  
Commitments and Contingencies
Commitments and Contingencies    

Commitments

MidAmerican Energy had the following firm commitments that are not reflected on the Balance Sheet. Minimum payments as of December 31, 2017, are as follows (in millions):
 
 
 
 
 
 
 
 
 
 
 
 
2023 and
 
 
 
 
2018
 
2019
 
2020
 
2021
 
2022
 
Thereafter
 
Total
Contract type:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coal and natural gas for generation
 
$
112

 
$
56

 
$
12

 
$
9

 
$
8

 
$

 
$
197

Electric capacity and transmission
 
34

 
31

 
31

 
27

 
16

 
43

 
182

Natural gas contracts for gas operations
 
122

 
75

 
73

 
57

 
42

 
42

 
411

Construction commitments
 
790

 
28

 
2

 

 

 

 
820

Easements and operating leases
 
22

 
21

 
21

 
21

 
21

 
713

 
819

Maintenance and services contracts
 
96

 
102

 
119

 
114

 
154

 
233

 
818

 
 
$
1,176

 
$
313

 
$
258

 
$
228

 
$
241

 
$
1,031

 
$
3,247



Coal, Natural Gas, Electric Capacity and Transmission Commitments

MidAmerican Energy has coal supply and related transportation and lime contracts for its coal-fueled generating facilities. MidAmerican Energy expects to supplement the coal contracts with additional contracts and spot market purchases to fulfill its future coal supply needs. Additionally, MidAmerican Energy has a natural gas transportation contract for a natural gas-fueled generating facility. The contracts have minimum payment commitments ranging through 2022.

MidAmerican Energy has various natural gas supply and transportation contracts for its regulated and nonregulated gas operations that have minimum payment commitments ranging through 2037.

MidAmerican Energy has contracts to purchase electric capacity that have minimum payment commitments ranging through 2028. MidAmerican Energy also has contracts for the right to transmit electricity over other entities' transmission lines with minimum payment commitments ranging through 2022.

Construction Commitments

MidAmerican Energy's firm construction commitments reflected in the table above consist primarily of contracts for the construction of wind-powered generating facilities in 2018, the settlement of asset retirement obligations for ash pond closures and the construction in 2018 of the last of four Multi-Value Projects approved by the Midcontinent Independent System Operator, Inc. for high voltage transmission lines in Iowa and Illinois.

Easements and Operating Leases

MidAmerican Energy has non-cancelable easements with minimum payment commitments ranging through 2061 for land in Iowa on which certain of its assets, primarily wind-powered generating facilities, are located. MidAmerican Energy also has non-cancelable operating leases with minimum payment commitments ranging through 2020 primarily for office and other building space, rail cars and computer equipment. These leases generally require MidAmerican Energy to pay for insurance, taxes and maintenance applicable to the leased property. Certain leases contain renewal options for varying periods and escalation clauses for adjusting rent to reflect changes in price indices. Rent expense on non-cancelable operating leases totaled $3 million, $4 million and $4 million for 2017, 2016 and 2015, respectively.

Maintenance and Services Contracts

MidAmerican Energy has non-cancelable maintenance and services contracts related to various generating facilities with minimum payment commitments ranging through 2027.

Environmental Laws and Regulations

MidAmerican Energy is subject to federal, state and local laws and regulations regarding air and water quality, emissions performance standards, climate change, coal combustion byproduct disposal, hazardous and solid waste disposal, protected species and other environmental matters that have the potential to impact its current and future operations. MidAmerican Energy believes it is in material compliance with all applicable laws and regulations.

Transmission Rates

MidAmerican Energy's wholesale transmission rates are set annually using FERC-approved formula rates subject to true-up for actual cost of service. Prior to September 2016, the rates in effect were based on a 12.38% return on equity ("ROE"). In November 2013 and February 2015, a coalition of intervenors filed successive complaints with the FERC requesting that the 12.38% ROE no longer be found just and reasonable and sought to reduce the base ROE to 9.15% and 8.67%, respectively. MidAmerican Energy is authorized by the FERC to include a 0.50% adder beyond the base ROE effective January 2015. In September 2016, the FERC issued an order for the first complaint, which reduces the base ROE to 10.32% and requires refunds, plus interest, for the period from November 2013 through February 2015. It is uncertain when the FERC will rule on the second complaint, covering the period from February 2015 through May 2016. MidAmerican Energy believes it is probable that the FERC will order a base ROE lower than 12.38% in the second complaint and, as of December 31, 2017, has accrued a $9 million liability for refunds of amounts collected under the higher ROE from November 2013 through May 2016.

Legal Matters

MidAmerican Energy is party to a variety of legal actions arising out of the normal course of business. Plaintiffs occasionally seek punitive or exemplary damages. MidAmerican Energy does not believe that such normal and routine litigation will have a material impact on its financial results.
MidAmerican Funding, LLC and Subsidiaries [Domain]  
Contractual Obligation [Line Items]  
Commitments and Contingencies
Commitments and Contingencies

Refer to Note 15 of MidAmerican Energy's Notes to Financial Statements.

Legal Matters

MidAmerican Funding is party to a variety of legal actions arising out of the normal course of business. Plaintiffs occasionally seek punitive or exemplary damages. MidAmerican Funding does not believe that such normal and routine litigation will have a material impact on its consolidated financial results.
Nevada Power Company [Member]  
Contractual Obligation [Line Items]  
Commitments and Contingencies
Commitments and Contingencies

Environmental Laws and Regulations

Nevada Power is subject to federal, state and local laws and regulations regarding air and water quality, renewable portfolio standards, emissions performance standards, climate change, coal combustion byproduct disposal, hazardous and solid waste disposal, protected species and other environmental matters that have the potential to impact Nevada Power's current and future operations. Nevada Power believes it is in material compliance with all applicable laws and regulations.

Senate Bill 123

In June 2013, the Nevada State Legislature passed Senate Bill No. 123 ("SB 123"), which included the retirement of coal plants and replacing the capacity with renewable facilities and other generating facilities. In May 2014, Nevada Power filed its ERCR Plan in compliance with SB 123. In July 2015, Nevada Power filed an amendment to its ERCR Plan with the PUCN which was approved in September 2015. In June 2015, the Nevada State Legislature passed Assembly Bill No. 498, which modified the capacity replacement components of SB 123.

Consistent with the ERCR Plan, Nevada Power acquired a 272-MW natural gas co-generating facility in 2014, acquired a 210-MW natural gas peaking facility in 2014, constructed a 15-MW solar photovoltaic facility in 2015, contracted two renewable power purchase agreements with 100-MW solar photovoltaic generating facilities in 2015, contracted a renewable power purchase agreement with 100-MW solar photovoltaic generating facility in 2016 and acquired the remaining 130 MW, 25%, of the Silverhawk natural gas-fueled generating facility in April 2017, of which 54 MW were approved as part of the ERCR Plan. Nevada Power has the option to acquire 35 MW of nameplate renewable energy capacity in the future under the ERCR Plan, subject to PUCN approval. Nevada Power retired Reid Gardner Units 1, 2, and 3, 300 MW of coal-fueled generation, in 2014 and Reid Gardner Unit 4, 257 MW of coal-fueled generation, in March 2017. These transactions are related to Nevada Power's compliance with SB 123, resulting in the retirement of 812 MW of coal-fueled generation by 2019.

Legal Matters

Nevada Power is party to a variety of legal actions arising out of the normal course of business. Plaintiffs occasionally seek punitive or exemplary damages. Nevada Power does not believe that such normal and routine litigation will have a material impact on its consolidated financial results. Nevada Power is also involved in other kinds of legal actions, some of which assert or may assert claims or seek to impose fines, penalties and other costs in substantial amounts and are described below.

Commitments

Nevada Power has the following firm commitments that are not reflected on the Consolidated Balance Sheet. Minimum payments as of December 31, 2017 are as follows (in millions):
 
2018
 
2019
 
2020
 
2021
 
2022
 
2023 and Thereafter
 
Total
Contract type:
 
 
 
 
 
 
 
 
 
 
 
 
 
Fuel, capacity and transmission contract commitments
$
591

 
$
450

 
$
377

 
$
378

 
$
380

 
$
5,208

 
$
7,384

Fuel and capacity contract commitments (not commercially operable)

 
15

 
22

 
24

 
25

 
421

 
507

Operating leases and easements
7

 
7

 
8

 
8

 
7

 
54

 
91

Maintenance, service and other contracts
46

 
44

 
43

 
39

 
37

 
40

 
249

Total commitments
$
644

 
$
516

 
$
450

 
$
449

 
$
449

 
$
5,723

 
$
8,231



Fuel and Capacity Contract Commitments

Purchased Power

Nevada Power has several contracts for long-term purchase of electric energy which have been approved by the PUCN. The expiration of these contracts range from 2018 to 2067. Purchased power includes contracts which meet the definition of a lease. Nevada Power's operations and maintenance expense for purchase power contracts which met the lease criteria for 2017, 2016 and 2015 were $310 million, $302 million and $264 million, respectively, and are recorded as cost of fuel, energy and capacity on the Consolidated Statements of Operations.

Coal and Natural Gas

Nevada Power has a contract for the transportation of coal that extends through 2018. Additionally, gas transportation contracts expire from 2022 to 2032 and the gas supply contract expires from 2018 to 2019.

Fuel and Capacity Contract Commitments - Not Commercially Operable

Nevada Power has several contracts for long-term purchase of electric energy in which the facility remains under development. Amounts represent the estimated payments under renewable energy power purchase contracts, which have been approved by the PUCN and are contingent upon the developers obtaining commercial operation and their ability to deliver power.

Operating Leases and Easements

Nevada Power has non-cancelable operating leases primarily for office equipment, office space, certain operating facilities, vehicles and land. These leases generally require Nevada Power to pay for insurance, taxes and maintenance applicable to the leased property. Certain leases contain renewal options for varying periods and escalation clauses for adjusting rent to reflect changes in price indices. Nevada Power also has non-cancelable easements for land. Operations and maintenance expense on non-cancelable operating leases and easements totaled $9 million, $13 million and $11 million for the years ended December 31, 2017, 2016 and 2015, respectively.

Maintenance, Service and Other Contracts

Nevada Power has long-term service agreements for the performance of maintenance on generation units. Obligation amounts are based on estimated usage. The estimated expiration of these service agreements range from 2019 to 2026.
Sierra Pacific Power Company [Member]  
Contractual Obligation [Line Items]  
Commitments and Contingencies
Commitments and Contingencies

Environmental Laws and Regulations

Sierra Pacific is subject to federal, state and local laws and regulations regarding air and water quality, renewable portfolio standards, emissions performance standards, climate change, coal combustion byproduct disposal, hazardous and solid waste disposal, protected species and other environmental matters that have the potential to impact Sierra Pacific's current and future operations. Sierra Pacific believes it is in material compliance with all applicable laws and regulations.

Legal Matters

Sierra Pacific is party to a variety of legal actions arising out of the normal course of business. Plaintiffs occasionally seek punitive or exemplary damages. Sierra Pacific does not believe that such normal and routine litigation will have a material impact on its consolidated financial results.

Commitments

Sierra Pacific has the following firm commitments that are not reflected on the Consolidated Balance Sheet. Minimum payments as of December 31, 2017 are as follows (in millions):
 
 
 
 
 
 
 
 
 
 
 
2023 and
 
 
 
2018
 
2019
 
2020
 
2021
 
2022
 
Thereafter
 
Total
Contract type:
 
 
 
 
 
 
 
 
 
 
 
 
 
Fuel, capacity and transmission contract commitments
$
200

 
$
155

 
$
114

 
$
74

 
$
71

 
$
515

 
$
1,129

Fuel and capacity contract commitments (not commercially operable)

 
7

 
17

 
22

 
22

 
590

 
658

Operating leases and easements
4

 
4

 
4

 
3

 
2

 
54

 
71

Maintenance, service and other contracts
6

 
6

 
6

 
7

 
5

 
12

 
42

Total commitments
$
210

 
$
172

 
$
141

 
$
106

 
$
100

 
$
1,171

 
$
1,900



Fuel and Capacity Contract Commitments

Purchased Power

Sierra Pacific has several contracts for long-term purchase of electric energy which have been approved by the PUCN. The expiration of these contracts range from 2018 to 2045. Purchased power includes contracts which meet the definition of a lease. Sierra Pacific's operating and maintenance expense for purchase power contracts which met the lease criteria for 2017, 2016 and 2015 were $74 million, $69 million and $65 million, respectively, and are recorded as cost of fuel, energy and capacity on the Consolidated Statements of Operations.

Coal and Natural Gas
    
Sierra Pacific has a long-term contract for the transport of coal that expires in 2018. Additionally, gas transportation contracts expire from 2019 to 2046 and the gas supply contracts expire from 2018 to 2019.

Operating Leases and Easements

Sierra Pacific has non-cancelable operating leases primarily for office equipment, office space, certain operating facilities, vehicles and land. These leases generally require Sierra Pacific to pay for insurance, taxes and maintenance applicable to the leased property. Certain leases contain renewal options for varying periods and escalation clauses for adjusting rent to reflect changes in price indices. Sierra Pacific also has non-cancelable easements for land. Operating and maintenance expense on non-cancelable operating leases and easements totaled $4 million, $6 million and $7 million for the year-ended December 31, 2017, 2016 and 2015, respectively.

Maintenance, Service and Other Contracts

Sierra Pacific has long-term service agreements for the performance of maintenance on generation units. Obligation amounts are based on estimated usage. The estimated expiration of these service agreements range from 2019 to 2039.