Commitments and Contingencies
12 Months Ended
Dec. 31, 2021
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Note 7: Commitments and Contingencie
s

Regulatory Matters
Overview
—Unitil’s distribution utilities deliver electricity and/or natural gas to customers in the Company’s service territories at rates established under traditional cost of service regulation. Under this regulatory structure, Unitil Energy, Fitchburg, and Northern Utilities are provided the opportunity to recover the cost of providing distribution service to their customers based on a representative test year, in addition to earning a return on their capital investment in utility assets. Fitchburg’s electric and gas divisions also operate under revenue decoupling mechanisms.
Most of Unitil’s customers are entitled to purchase their electric or natural gas supplies from third-party suppliers. For Northern Utilities, only business customers are entitled to purchase their natural gas supplies from third-party suppliers at this time. Most small and medium-sized customers, however, continue to purchase such supplies through Unitil Energy, Fitchburg and Northern Utilities as the providers of basic or default service energy supply. Unitil Energy, Fitchburg and Northern Utilities purchase electricity or natural gas for basic or default service from unaffiliated wholesale suppliers and recover the actual costs of these supplies, without profit or markup, through reconciling, pass-through rate mechanisms that are periodically adjusted. The MDPU, the NHPUC and the MPUC each have continued to approve these reconciling rate mechanisms which allow Fitchburg, Unitil Energy and Northern Utilities to recover their actual wholesale energy costs for electric power and natural gas.
In connection with the implementation of retail choice, Unitil Power and Fitchburg divested their long-term power supply contracts through the sale of the entitlements to the electricity sold under those contracts.

Unitil Energy and Fitchburg recover in their rates all the costs associated with the divestiture of their power supply portfolios and have secured regulatory approval from the NHPUC and MDPU, respectively, for the recovery of power supply-related stranded costs and other restructuring-related regulatory assets. As of December 31, 2021, Fitchburg and Unitil Energy have fully recovered their power supply-related stranded costs. The obligations for prior periods related to these divestitures are recorded in Energy Supply Obligations on the Company’s Consolidated Balance Sheets with a corresponding regulatory asset recorded in Accrued Revenue. Unitil’s distribution companies have a continuing obligation to submit filings in Massachusetts and New Hampshire demonstrating their compliance with regulatory mandates and provide for timely recovery of costs in accordance with their approved restructuring plans.
Ta
x Cuts and Jobs Act of 2017
On December 22, 2017, the Tax Cuts and Jobs Act of 2017 (TCJA) was signed into law. Among other things, the TCJA substantially reduced the corporate income tax rate to 21
%, effective January 1, 2018. Each state public utility commission, with jurisdiction over the areas that are served by Unitil’s electric and gas subsidiary companies, issued orders directing how the tax law changes were to be reflected in rates. Unitil has complied with these orders and has made the required changes to its rates as directed by the commissions. The FERC issued a Notice of Proposed Rulemaking that would allow it to determine which pipelines under the Natural Gas Act may be collecting unjust and unreasonable rates in light of the corporate tax reduction. This matter was resolved for Granite State in its May 2, 2018 uncontested rate settlement filing, which accounted for the effect of the TCJA.
On November 21
, 2019, the FERC issued Order No. 864, a final rule on Public Utility Transmission Rate Changes to Address Accumulated Deferred Income Taxes. The new rule requires public utilities with formula transmission rates to revise their formula rates to include a transparent methodology to address the TCJA and future tax law changes on customer rates by accounting for “excess” or “deficient” Accumulated Deferred Income Taxes (ADIT). The FERC also required transmission providers with stated rates to account for TCJA’s effect on ADIT in their next rate case. The Company is complying with the new rule and there is no material effect on its financial position, operating results, or cash flows.
Rate Case Activity
Northern Utilities—Base Rates—Maine
—On March 26, 2020, the MPUC approved an increase to base revenue of $3.6 million, a 3.6% increase over the Company’s test year operating revenues, effective April 1, 2020. The order approved a Return on Equity of 9.48%, and a hypothetical capital structure of 50% equity and 50%
debt. As part of the order and increase in base revenue, the MPUC provided for recovery of some, but not all, of the Company’s implementation costs associated with its customer information system pending the completion of an investigation, including a third-party audit. On March 9, 2021, the MPUC opened a new docket to investigate the amount of customer information system costs that will be allowed in rates. On January 27, 2022, the Company and the Maine Office of the Public Advocate filed a stipulation in this docket. The stipulation includes no finding of imprudence or asset disallowance. The terms of the stipulation provide for recovery of the revenue requirement related to the Company’s customer information system in base rates starting November 1, 2022, which coincides with the timing of the Company’s winter cost of gas rate change. The stipulation is subject to approval by the MPUC.
Northern Utilities—Targeted Infrastructure Replacement Adjustment (TIRA)—Maine
—The settlement in Northern Utilities’ Maine division’s 2013 rate case authorized the Company to implement a TIRA rate mechanism to adjust base distribution rates annually to recover the revenue requirements associated with targeted investments in gas distribution system infrastructure replacement and upgrade projects, including the Company’s Cast Iron Replacement Program (CIRP). In its Final Order issued on February 28, 2018 for Northern Utilities’ 2017 base rate case, the MPUC approved an extension of the TIRA mechanism for an additional eight-year period, which will allow for annual rate adjustments through the end of the CIRP program. The Company’s most recent request under the TIRA mechanism, to increase annual base rates by $1.1 million for 2020 eligible facilities, was approved by the MPUC effective May 1, 2021.
Northern Utilities—Base Rates—New Hampshire
—On August 2, 2021, Northern Utilities filed a base rate case with the NHPUC, requesting a permanent increase in total annual revenues of $7.8 million,
which represents an increase of 8.1% over total annual revenue at present rates. The multi-year rate filing includes a revenue decoupling mechanism and an Arrearage Management Program for financial hardship customers. Northern Utilities also requested implementation of temporary rates for service rendered on and after October 1, 2021. On September 30, 2021, the NHPUC approved a settlement providing for a temporary rate increase of $2.6 million, effective October 1, 2021. As provided by statute, once a final order on permanent rates is issued, the permanent rate level is reconciled back to the effective date of the temporary
rates
.

Unitil Energy—Base Rates—
On April 2, 2021, Unitil Energy filed a base rate case with the NHPUC, requesting a permanent increase in total annual revenues of $12.0 million, which represents an increase of 4.4% above present rates. Unitil Energy also requested implementation of temporary rates for service rendered on and after June 1, 2021, and until a final order on permanent rates is issued. The filing includes (1) a proposed multi-year rate plan, (2) a revenue decoupling mechanism, (3) a Grid Modernization plan that includes a group of foundational grid modernization projects, (4) a suite of proposed time of use (TOU) rates including rates for electric vehicles (EV), (5) an EV infrastructure development program which includes rebates for residential customers for the installation of smart charging equipment and a public “make-ready” program for general service customers under which the Company will install the infrastructure required to connect an EV charger, (6) a Marketing, Communications, and Education Plan to engage with customers about the TOU rates and EV program offerings, (7) resiliency programs to further the Company’s commitment to reliability, (8) an Arrearage Management Program for financial hardship customers, and (9) other rate design and tariff changes. On April 24, 2020, the Governor of New Hampshire issued an executive order that extended the NHPUC’s authority to suspend rate schedules by six months, from 12 to 18 months, to conduct its investigation of a utility company’s request to increase rates. On April 6, 2021, the NHPUC determined that the extension applies to this proceeding, but stated it will endeavor to set final rates as expeditiously as possible. On May 27, 2021, the NHPUC approved a settlement agreement providing for a temporary rate increase of $4.5 million in annual electric distribution revenues, effective June 1, 2021. As provided by statute, once a final order on permanent rates is issued, the permanent rate level is reconciled back to the effective date of the temporary rates.
 
The Company and all parties to the case filed a motion on January 25, 2022 advising the NHPUC that, as a result of settlement negotiations, they have reached a comprehensive settlement agreement in principle on final rates. On January 26, 2022, the NHPUC suspended certain elements of the procedural schedule to allow the parties an opportunity to finalize and file the agreement. Once the settlement agreement has been finalized and filed, it is subject to approval by the NHPUC.
Fitchburg—Base Rates—Electric
—Fitchburg’s base rates are decoupled in order to mitigate economic, weather, and energy efficiency effects to the Company’s revenues and subject to an annual revenue decoupling adjustment mechanism, which includes a cap on the amount that rates may be increased in any year. In addition, Fitchburg has an annual capital cost recovery mechanism to recover the revenue requirement associated with certain capital additions. On November 1, 2018, Fitchburg filed its cumulative revenue requirement of $0.9 million associated with the Company’s 2015-2017 capital expenditures. On December 22, 2020, final approval of the filing was issued. On October 29, 2019, Fitchburg filed its cumulative revenue requirement of $1.1
 
million associated with the Company’s 2015-2018 capital expenditures. On December 22, 2020, final approval of the filing was issued. On November 2, 2020, Fitchburg filed its cumulative revenue requirement of $
1.4
 million associated with its 2019 capital expenditures. The Department allowed the associated rate increase to become effective on January 1, 2021, subject to further investigation and reconciliation. On June 15, 2021, final approval of the filing was issued. On November 2, 2021, Fitchburg filed its cumulative revenue requirement of $
1.6
 million associated with its 2019 and 2020 capital expenditures. The Department allowed the associated rate increase to become effective on January 1, 2022, subject to further investigation and reconciliation.
On April 17, 2020, the MDPU approved a settlement agreement entered into by the Company and the Massachusetts Office of the Attorney General providing for a distribution increase of $1.1 million, effective November 1, 2020. The Company’s subsequent Compliance Filing reflected an adjusted distribution increase of $0.9 million, a decrease of $0.2 million from the original settlement amount. On May 21, 2020, the MDPU approved the Company’s Compliance Filing. The agreement provides for a Return on Equity of 9.7% and a capital structure reflecting 52.45% equity and 47.55% long-term debt. Under the agreement, the Company will not increase or redesign base distribution rates to become effective prior to November 1, 
 
 
2023, though the Company may seek cost recovery for certain exogenous events that meet a revenue threshold of $0.1 million. The agreement also provides for the implementation of a major storm reserve fund, whereby the Company may recover the costs of restoration for qualifying storm events. In addition, the agreement provides for the extension of the annual capital cost recovery mechanism, modified to allow the recovery of property tax on the cumulative net capital expenditures.​​​​​​​
Fitchburg—Base Rates—Gas
Pursuant to its revenue decoupling adjustment clause tariff, as approved in its last base rate case, the Company is allowed to modify, on a semi-annual basis, its base distribution rates to an established revenue per customer target in order to mitigate economic, weather and energy efficiency affect to the Company’s revenues. The MDPU consistently has found the Company’s filings are in accord with its approved tariffs, applicable law and precedent, and that they result in just and reasonable rates.
On February 28, 2020, the MDPU approved a settlement agreement between the Company and the Massachusetts Office of the Attorney General. The agreement provides for an annual distribution revenue increase of $4.6 million to be phased in over two years: (1) an increase of $3.7 million, which became effective on March 1, 2020; and (2) an increase of $0.9 million, which became effective on March 1, 2021. Under the agreement, the Company will not increase or redesign base distribution rates to become effective prior to March 1, 2023, though the Company may seek cost recovery for certain exogenous events that meet a revenue effect threshold of $40,000. The agreement provides for a Return on Equity of 9.7% and a capital structure reflecting 52.45% equity and 47.55% long-term debt.
Fitchburg—Gas System Enhancement Program
Pursuant to statute and MDPU order, Fitchburg has an approved Gas System Enhancement Plan tariff through which it may recover certain gas infrastructure replacement and safety related investment costs, subject to an annual cap. Under the plan, the Company is required to make two annual filings with the MDPU: a forward-looking filing for the subsequent construction year, to be filed on or before October 31; and a filing, submitted on or before May 1, of final project documentation for projects completed during the prior year, demonstrating substantial compliance with its plan in effect for that year and showing that project costs were reasonably and prudently incurred. Fitchburg’s forward-looking filing submitted on October 30, 2020 requested recovery of approximately
$2.2 million, and received final approval on April 29, 2021, effective May 1, 2021. The Company’s most recent forward-looking filing, filed on October 29, 2021, requested recovery of approximately $3.3 million. The Company considers these to be routine regulatory proceedings, and there are no material issues outstanding.
Granite State—Base Rates
—On November 30, 2020, the FERC approved Granite State’s filing of an uncontested rate settlement which provides for an increase in annual revenues of approximately $1.3 million, effective November 1, 2020. The Settlement Agreement permits the filing of limited Section 4 rate adjustments for capital cost projects eligible for cost recovery in 2021, 2022, and 2023, and sets forth an overall cap of approximately $14.6 million on the capital cost recoverable under such filings during the term of the Settlement. Under the Settlement Agreement, Granite may not file a new general rate case earlier than April 30, 2024 with rates to be effective no earlier than November 1, 2024 based on a test year ending no earlier than December 31, 2023.
On August 24, 2021, the FERC accepted Granite State’s first limited Section 4 rate adjustment pursuant to the Settlement Agreement, for an annual revenue increase of $0.1 million, effective September 1, 2021.
Other Matters
Fitchburg—Grid Modernization
—On July 1, 2021, Fitchburg submitted its Grid Modernization Plan (GMP) to the MDPU. The GMP includes a five year strategic plan, including a plan for the full deployment of advanced metering functionality, and a four-year short-term investment plan
,
which focuses on foundational investments to facilitate the interconnection and integration of distributed energy resources, optimizing system performance through command and control and self-healing measures, and optimizing system demand by facilitating consumer price-responsiveness. The GMP is subject to review and approval by the MDPU and remains pending.
Fitchburg—Grid Modernization Cost Recovery Factor
On April 15, 2021, Fitchburg filed its Grid Modernization Factor (GMF) rate adjustment and reconciliation filing pursuant to the Company’s proposed GMF Tariff, for recovery of the costs incurred as a result of implementing the Company’s 2018-2021 GMP, previously approved by the MDPU on February 7, 2019. The proposed GMF was approved on May 27, 2021, effective June 1, 2021, subject to further investigation and reconciliation.

Fitchburg—Investigation into the role of gas LDCs to achieve Commonwealth 2050 climate goals—
The MDPU has opened an investigation to examine the role of Massachusetts gas local distribution companies (LDCs) in helping the Commonwealth achieve its 2050 climate goal of
net-zero
greenhouse gas (GHG) emissions. In its Order opening the inquiry, the MDPU stated it is required to consider new policies and structures as the Commonwealth reduces reliance on fossil fuels, including natural gas, which may require LDCs to make significant changes to their planning processes and business models. The LDCs, including Fitchburg, have engaged an independent consultant to conduct a study and prepare a report (Report), including a detailed study of each LDC, that analyzes the feasibility of all identified pathways to help the Commonwealth achieve its
net-zero
GHG goal. The study is to include an examination of the potential pathways identified in the 2050 Decarbonization Roadmap developed by the MA Executive Office of Energy and Environmental Affairs, in consultation with the Massachusetts Department of Environmental Protection and the Massachusetts Department of Energy Resources. On or before March 1, 2022, each LDC is required to submit a proposal to the MDPU that includes the LDCs’ recommendations and plans for helping the Commonwealth achieve its 2050 climate goals, supported by the Report. Prior to filing the Report and the LDCs’ proposals, the LDCs are directed to engage in a stakeholder process to solicit feedback and advice on both the Report and the proposals. Fitchburg is actively involved in the LDCs’ joint effort to respond to the MDPU’s directives.
Financial Effects of COVID-19 Pandemic
The NHPUC and the MDPU have opened proceedings to consider the revenue and cost effects on the regulated electric and gas utilities within their respective jurisdictions of the requirement to continue the availability of gas, electric and water service to customers during the COVID-19 pandemic. Among the effects under investigation are the revenue effects associated with service disconnection moratoriums, the waiver of fees and expanded customer payments arrangements; the increased cost of customer accounts that cannot be collected, including the cost of bad debt reserves and increased working capital costs; and increased operating and maintenance costs incurred for employees to work safely and protect the public. Fitchburg, Unitil Energy and Northern Utilities are active participants in these proceedings, and are in full compliance with all regulatory orders governing service shut-off moratoriums and other customer service protection measures. These matters remain pending. On December 31, 2020, in docket DPU 20-58, the MDPU issued an order which, among other provisions, allows the utility companies to defer for future recovery bad debt expense in excess of a baseline. On July 7, 2021, the NHPUC issued an order which declined to authorize New Hampshire’s rate-regulated utilities’ establishment of a regulatory asset for incremental bad debt or waived late payment fees related to the COVID-19 pandemic. The NHPUC stated that these costs will be addressed in each utility’s next rate case. On September 7, 2021, the NHPUC clarified its July 7 Order, determining that it has not foreclosed rate-regulated utilities from utilizing accounting mechanisms to defer costs in order to seek recovery in a future rate proceeding, and that Unitil Energy’s and Northern Utilities’ respective pending rate cases are the appropriate venue to address incremental bad debt and/or waived late payment fees resulting from the COVID-19 public health emergency orders and directives.
Northern Utilities / Granite State—Firm Capacity Contract
Northern Utilities relies on the transportation of gas supply over its affiliate Granite State pipeline to serve its customers in the Maine and New Hampshire service territories. Granite State facilitates critical upstream interconnections with interstate pipelines and third party suppliers essential to Northern Utilities’ service to its customers. Northern Utilities reserves firm capacity through a contract with Granite State, which is renewed annually. Pursuant to statutory requirements in Maine and orders of the MPUC, Northern Utilities submits an annual informational report requesting approval of a one-year extension of its 12-month contract for firm pipeline capacity reservation, with an evergreen provision and three-month termination notification requirement. On March 30, 2021, Northern Utilities submitted an annual informational report requesting approval on a one-year extension for the period of November 1, 2021 through October 31, 2022. The MPUC approved the request on June 29, 2021.

Reconciliation Filings
Fitchburg, Unitil Energy and Northern Utilities each have a number of regulatory reconciling accounts that require annual or semi-annual filings with the MDPU, NHPUC and MPUC, respectively, to reconcile costs and revenues, and to seek approval of any rate changes. These filings include: annual electric reconciliation filings by Fitchburg and Unitil Energy for a number of items, including default service, stranded cost changes and transmission charges; costs associated with energy efficiency programs in New Hampshire and Massachusetts, as directed by the NHPUC and MDPU; recovery of the ongoing costs of storm repairs incurred by Unitil Energy; and the actual wholesale energy costs for electric power and gas incurred by each of the three companies. Fitchburg, Unitil Energy and Northern Utilities have been, and remain in full compliance with all directives and orders regarding these filings. The Company considers these to be routine regulatory proceedings, and there are no material issues outstanding.
Fitchburg—Massachusetts Request for Proposals (RFPs)—
Pursuant to a comprehensive energy law enacted in 2016, “An Act to Promote Energy Diversity,” (the Act) under Section 83C, the Massachusetts electric distribution companies (EDCs), including Fitchburg, are required to jointly solicit proposals for long-term contracts for at least 400 megawatts (MW) of offshore wind energy generation by June 30, 2017, as part of a total of 1,600 MW of offshore wind the EDCs are directed to procure by June 30, 2027. Under Section 83D of the Act, the EDCs are required to jointly seek proposals for cost-effective clean energy (hydroelectric, solar and land-based wind) long-term contracts via one or more staggered solicitations for a total of 9,450,000 megawatt-hours (MWh) by December 31, 2022. Unitil’s
 
pro rata share of these contracts is approximately one percent.
The EDCs issued the RFP for Section 83D Long-Term Contracts for Qualified Clean Energy Projects in March 2017, and after selection of final projects and negotiation, final contracts for 9,554,940
 
MWh of Qualified Clean Energy and associated Environmental Attributes from Hydro-Quebec Energy Services (U.S.), Inc. for hydroelectric generation were filed in July 2018 for approval by the MDPU. On June 25, 2019, the MDPU approved the power purchase agreements, including the EDCs’ proposal to sell the energy procured under the contract into the ISO-NE wholesale market and to credit or charge the difference between the contract costs and the ISO-NE market costs to customers. The MDPU also determined that the EDCs’ request for remuneration equal
to 2.75
% of the contract payments is reasonable and in the public interest and approved the EDCs’ proposal to amend their respective tariffs to include the recovery of costs associated with the contracts. The Massachusetts Supreme Judicial Court upheld the MDPU’s approval in an opinion dated September 3, 2020. The Company believes the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
The EDCs issued the RFP pursuant to Section 83C for Long-Term Contracts for Offshore Wind Energy Generation in June 2017. The EDCs selected an 800 MW project submitted by Vineyard Wind in May 2018, contracts were signed in July 2018 and on July 23, 2018, the EDCs, including Fitchburg, filed two long-term contracts, each for 400 MW of offshore wind energy generation with the MDPU for approval. On April 12, 2019, the MDPU approved the offshore wind energy generation power purchase agreements, including the EDCs’ proposal to sell the energy procured under the contract into the
ISO-NE
wholesale market and to credit or charge the difference between the contract costs and the
ISO-NE
market costs to customers. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% of the contract payments is reasonable and in the public interest and approved the EDCs’ proposal to amend their respective tariffs to include the recovery of costs associated with the contracts. The Company believes the power purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
The EDCs issued a second RFP pursuant to Section 83C for Long-Term Contracts for Offshore Wind Energy Generation on May 23, 2019. This solicitation sought to procure the obligation remaining under 83C at the time, an additional 800 MW of offshore wind energy generation. The EDCs selected an 800 MW project submitted by Mayflower Wind Energy LLC and contracts were executed on January 10, 2020. A filing with the MDPU for approval of two long-term contracts, each for 400 MW of offshore wind energy generation, was made on February 10, 2020. On November 5, 2020, the MDPU approved the Offshore Wind Energy Generation power purchase agreements. The MDPU also determined that the EDCs’ request for remuneration equal to 2.75% is reasonable and in the public interest. The Company believes the power 
purchase obligations under these long-term contracts will have a material effect on the contractual obligations of Fitchburg, once certain conditions and contingencies are met.
In accordance with the requirement of Chapter 227 of the Acts of 2018, An Act to Advance Clean Energy, signed August 9, 2018, Massachusetts Department of Energy Resources (MDOER) prepared a report on the necessity, benefits and costs of requiring the EDCs to competitively conduct offshore wind
 
generation RFPs for up to an additional
1,600
MW. The MDOER filed its report with the Legislature in May,
2019
, recommending that, “the EDCs should proceed with additional offshore wind solicitations for up to
1,600
MW of offshore wind in
2022
and
2024
and only enter into contracts if found to be cost-effective.” On March 
10
,
2021
, Fitchburg, along with the other  EDCs, filed a petition with the MDPU for approval of a proposed timetable and method of solicitation and execution of long-term contracts for up to an additional
1,600
MW of off shore wind generation. On May 
5
,
2021
, the DPU approved the proposed timetable and method for the solicitation, and the RFP was issued on May 
7
,
2021
. On December 
17
,
2021
, the EDCs selected a
1,600
MW portfolio of offshore wind generation that includes a
1,200
MW project submitted by Vineyard Wind and a
400
MW project submitted by Mayflower Wind. Contract negotiations are expected to be completed by the end of
March 2022
and submitted for approval to the MDPU by the end
of
April 2022
.
Section 83C of Chapter 169 of the Acts of 2008 was recently amended by the Acts of 2021 to increase the aggregate amount of offshore wind capacity to be procured to 5,600 MW not later than June 30, 2027.
 After considering 
the two approved offshore wind contracts of 800 MW each and the most recent selection of 1,600 MW
there is 
another 2,400 MW of offshore wind capacity to be procured in the future.
FERC Transmission Formula Rate Proceedings
Pursuant to Section 206 of the Federal Power Act, there are several pending proceedings before the FERC concerning the justness and reasonableness of the Return on Equity (ROE) component of the ISO-New England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates. On April 14, 2017, the U.S. Court of Appeals for the D.C. Circuit (the Court) issued an opinion vacating a decision of the FERC with respect to the ROE, and remanded it for further proceedings. The FERC had found that the Transmission Owners existing ROE was unlawful, and set a new ROE. The Court found that the FERC had failed to articulate a satisfactory explanation for its orders. At this time, the ROE set in the vacated order will remain in place until further FERC action is taken. Separately, on March 15, 2018, the Transmission Owners filed a petition for review with the Court of certain orders of the FERC setting for hearing other complaints challenging the allowed Return on Equity component of the formula rates. On November 21, 2019 the FERC issued an order in EL14-12, Midcontinent Independent System Operator ROE, in which FERC outlined a new methodology for calculating the ROE. In response to the FERC order in EL 14-12, the New England Transmission Owners (NETOs) filed a motion to reopen the record, which has been granted. This matter remains pending. The Company does not believe these proceedings will have a material adverse effect on its financial condition or results of operations.
The FERC Section 206 proceeding concerning the justness and reasonableness of ISO-New England, Inc. Participating Transmission Owners’ Regional Network Service and Local Network Service formula rates and to develop formula rate protocols for these rates has been resolved. On August 17, 2018 a joint settlement agreement among a number of the parties was filed with the FERC. FERC rejected the settlement agreement on May 22, 2019 and remanded the proceeding to the Chief Administrative Law Judge to resume hearing procedures. On May 24, 2019 the judge appointed a Dispute Resolution Facilitator to aid parties in settlement negotiations. The procedural schedule was suspended September 24, 2019 in order to allow participants to focus on settlement negotiations. On October 24, 2019, the NETOs filed an unopposed motion to suspend the procedural schedule and waiver of answer period indicating that the NETOs, Municipal Pool Transmission Facility Owners and the Commission Trial Staff have reached agreement in principle on the terms of a settlement to resolve all open issues in the proceeding. On June 15, 2020 a settlement was filed. The FERC approved the settlement agreement on December 28, 2020. Pursuant to the terms of the settlement agreement, the negotiated formula rates took effect on January 1, 2022. Fitchburg and Unitil Energy are Participating Transmission Owners, although Unitil Energy does not own transmission plant. To the extent these proceedings result in any changes to the rates being charged, a retroactive reconciliation may be required. The Company does not believe these proceedings will have a material adverse effect on its financial condition or results of operations.
Contractual Obligations
The following table lists the Company’s known specified gas and electric supply contractual obligations as of December 31, 2021.
 
           
Payments Due by Period
 
Gas and Electric Supply
Contractual Obligations (millions) as of December 31, 2021
  
Total
    
2022
    
2023
    
2024
    
2025
    
2026
    
2027 &
Beyond
 
Gas Supply Contracts
   $ 523.9      $ 58.5      $ 50.6      $ 38.8      $ 37.3      $ 36.9      $ 301.8  
Electric Supply Contracts
     14.2        1.2        1.2        1.2        1.3        1.3        8.0  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
Total
   $ 538.1      $ 59.7      $ 51.8      $ 40.0      $ 38.6      $ 38.2      $ 309.8  
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
    
 
 
 
The Company and its subsidiaries have material energy supply commitments (see Note
6
 (Energy Supply)). Cash outlays for the purchase of electricity and natural gas to serve customers are subject to reconciling recovery through periodic changes in rates, with carrying charges on deferred balances. From year to year, there are likely to be timing differences associated with the cash recovery of such costs, creating under- or over-recovery situations at any point in time. Rate recovery mechanisms are typically designed to collect the
 
under-recovered cash or refund the over-collected cash over subsequent periods of less than a year.
Legal Proceedings
The Company is involved in legal and administrative proceedings and claims of various types, including those which arise in the ordinary course of business. The Company believes, based upon information furnished by counsel and others, that the ultimate resolution of these claims will not have a material effect on its financial position, operating results or cash flows.
Environmental Matters
The Company’s past and present operations include activities that are generally subject to extensive and complex federal and state environmental laws and regulations. The Company is in material compliance with applicable environmental and safety laws and regulations and, as of December 31, 2021, has not identified any material losses reasonably likely to be incurred in excess of recorded amounts. However, the Company cannot assure that significant costs and liabilities will not be incurred in the future. It is possible that other developments, such as increasingly stringent federal, state or local environmental laws and regulations could result in increased environmental compliance costs. Based on its current assessment of its environmental responsibilities, existing legal requirements and regulatory policies, the Company does not believe that these environmental costs will have a material adverse effect on the Company’s consolidated financial position or results of operations.
Northern Utilities Manufactured Gas Plant Sites
—Northern Utilities has an extensive program to identify, investigate and remediate former manufactured gas plant (MGP) sites, which were operated from the
mid-1800s
through the
mid-1900s.
In New Hampshire, MGP sites were identified in Dover, Exeter, Portsmouth, Rochester and Somersworth. In Maine, Northern Utilities has documented the presence of MGP sites in Lewiston and Portland, and a former MGP disposal site in Scarborough.
Northern Utilities has worked with the Maine Department of Environmental Protection and New Hampshire Department of Environmental Services (NH DES) to address environmental concerns with these sites. Northern Utilities or others have completed remediation activities at all sites; however, on site monitoring continues at several sites which may result in future remedial actions as directed by the applicable regulatory agency.
In July 2019, the NH DES requested that Northern Utilities review modeled expectations for groundwater contaminants against observed data at the Rochester site. In June 2020, the NH DES
coupled the submittal of the review to a proposed extension of the gas distribution system by Northern Utilities. Northern Utilities submitted the review in January 2022. In anticipation of the NH DES approval of the work plan, the Company has accrued $0.8 million for estimated costs to complete the remediation at the Rochester site, which is included in Environmental Obligations.
The NHPUC and MPUC have approved regulatory mechanisms for the recovery of MGP environmental costs. For Northern Utilities’ New Hampshire division, the NHPUC has approved the recovery of MGP environmental costs over succeeding seven-year periods. For Northern Utilities’ Maine division, the MPUC has authorized the recovery of environmental remediation costs over succeeding five-year periods.
The Environmental Obligations table shows the amounts accrued for Northern Utilities related to estimated future cleanup costs associated with Northern Utilities’ environmental remediation obligations for former MGP sites. Corresponding Regulatory Assets were recorded to reflect that the future recovery of these environmental remediation costs is expected based on regulatory precedent and established practices.
Fitchburg’s Manufactured Gas Plant Site
—Fitchburg has worked with the Massachusetts Department of Environmental Protection (Mass DEP) to address environmental concerns with the former MGP site at Sawyer Passway, and has substantially completed remediation activities, though on site monitoring continues. In April 2020, Fitchburg received notification from the Massachusetts Department of Transportation (Mass DOT) that a portion of the site may be incorporated into the proposed Twin City Rail Trail with an anticipated completion in 2023. Depending upon the final agreement between Fitchburg and Mass DOT, additional minor costs are expected prior to completion.
In August 2021, the Mass DEP issued a Notice of Non-compliance to FGE following a November 2020 audit of the September 2015 Response Action Outcome on the MGP site. Mass DEP directed Fitchburg to further define the extent of MGP site contaminants in the sediment and riverbank of an abutting watercourse. FGE began the investigation in November 2021 with an anticipated completion by June 2022. The Company does not believe this investigation will have a material adverse effect on its financial condition, results of operations or cash flows.
Fitchburg recovers the environmental response costs incurred at this former MGP site in gas rates pursuant to the terms of a cost recovery agreement approved by the MDPU. Pursuant to this agreement, Fitchburg is authorized to amortize and recover environmental response costs from gas customers over succeeding seven-year periods.
Unitil Energy—Kensington Distribution Operations Center
—Unitil Energy conducted a Phase I and II environmental site assessment (ESA) in the second quarter of 2021. The ESA results identified soil and groundwater contaminants in excess of state regulatory standards. In September 2021, the NH DES directed Unitil Energy to conduct a supplemental site investigation (SSI) and identify whether there is a need to conduct further investigation or remedial actions. Unitil Energy began the SSI in December 2021 with an anticipated completion June 2022.
The following table sets forth a summary of changes in the Company’s liability for Environmental Obligations for the years-ended December 31, 2021 and 2020.
Environmental Obligations ($ millions)

    
December 31,
 
    
2021
    
2020
 
Total Balance at Beginning of Period
  
$
2.1
 
  
$
2.7
 
Additions
  
 
0.9
 
     0.2  
Less: Payments / Reductions
  
 
0.3
 
     0.8  
    
 
 
    
 
 
 
Total Balance at End of Period
  
 
2.7
 
  
 
2.1
 
    
 
 
    
 
 
 
Less: Current Portion
  
 
0.5
 
     0.3  
    
 
 
    
 
 
 
Noncurrent Balance at End of Period
  
$
2.2
 
  
$
1.8