BUSINESS UPDATE May 3, 2017 1


LOGO

Forward-Looking Statements
Statements contained in this slide presentation regarding PG&E Corporation’s three-year financial outlook, including without limitation 2017 guidance, 2017 items impacting comparability, 2017 equity issuance, 2017-2019 capital expenditures and rate base growth, dividend policy, general earnings sensitivities and statements regarding electric vehicle-related growth opportunities, planned investments, potential tax reform, and other statements and assumptions that are not purely historical constitute forward-looking statements that reflect management’s current expectations and are based on management’s judgments, opinions, and assumptions. These statements are necessarily subject to various risks and uncertainties, the realization or resolution of which may be outside management’s control. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Factors that could cause actual results to differ materially include, but are not limited to:
the timing and outcomes of the 2017 GRC, the TO rate case, the cost of capital proceeding, and other ratemaking and regulatory proceedings;
the timing and outcome of the Butte fire litigation, and whether the Utility’s insurance is sufficient to cover the Utility’s liability resulting there from or whether insurance is otherwise available; the effect, if any, the SED’s $8.3 million citations issued in connection with the Butte fire may have on such litigation; and whether additional investigations and proceedings in connection with the Butte fire will be opened and any additional fines or penalties imposed on the Utility;
the outcome of the probation and the monitorship, the timing and outcomes of the debarment proceeding, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and other investigations that have been or may be commenced, and the ultimate amount of fines, penalties, and remedial and other costs that the Utility may incur as a result;
the timing and outcomes of (i) the CPUC’s decision in connection with its investigation of the Utility’s compliance with its ex parte communication rules and the settlement agreement entered into by the Utility and certain parties, and (ii) the U.S. Attorney’s Office in San Francisco and the California Attorney General’s office investigations in connection with communications between the Utility’s personnel and CPUC officials;
the outcomes of current and future self-reports, investigations or other enforcement proceedings that could be commenced or notices of violation that could be issued relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations;
the Utility’s ability to control its costs within the authorized levels of spending and the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs;
the impact of the increasing cost of natural gas regulations;
changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;
the impact that reductions in customer demand for electricity and natural gas have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, changing customer demand for natural gas and electric services, and an increasing number of customers departing for community choice aggregators;
whether, as a result of Westinghouse Electric Company LLC’s Chapter 11 proceeding, the Utility will experience issues with nuclear fuel supply, nuclear fuel inventory, and related services and products that Westinghouse supplies, and whether such proceeding will affect the Utility’s contracts with Westinghouse;
whether the Utility can continue to obtain insurance and whether insurance coverage is adequate for future losses or claims, especially following a major event that causes widespread third-party losses;
the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms, and the amount and timing of additional common stock and debt issuances by PG&E Corporation;
changes in estimated environmental remediation costs, including costs associated with the Utility’s natural gas compressor sites;
the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation, including as a result of the recent changes in the federal government;
the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application; and
the other factors disclosed in PG&E Corporation and the Utility’s joint annual report on Form 10-K for the year ended December 31, 2016, their joint quarterly report on Form 10-Q for the quarter ended March 31, 2017, and other reports that are filed with the Securities and Exchange Commission (SEC). Information regarding 2017 guidance was issued as of May 2, 2017. The statements in this presentation are made as of their date and PG&E Corporation undertakes no obligation to update information contained herein. This presentation was attached to PG&E Corporation’s Current Report on Form 8-K that was furnished to the SEC on May 3, 2017 and is also available on PG&E Corporation’s website at www.pgecorp.com.
2


LOGO

Well-positioned to Deliver Strong Returns A Strengthened Company Significant safety, reliability and operational improvements Improved customer satisfaction Key Advantages One of the greenest utilities in the country Constructive regulatory and policy environment Multiple infrastructure investment drivers Robust Growth Profile State policies support strong cap ex and ratebase growth Resumed dividend growth Healthy 3-year growth profile ~6.5-7% ratebase growth Above average dividend growth See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 3

 


LOGO

Agenda A strengthened company Key advantages Robust growth profile 4

 


LOGO

PG&E System At a Glance 2016 Revenue Sources Pass-through ~45% General Rate Case ~45% Gas Transmission & Storage ~3% Electric Transmission ~7% California Public Utilities Commission Federal Energy Regulatory Commission Key Highlights Employees ~24,000 Californians served ~16M Net income (2016) ~$1.4B Ratebase (2016) ~$32.4B Miles of electric lines ~130,000 Miles of natural gas pipelines ~50,000 MW utility-owned generation ~7,700 GWh electricity generated and procured ~68,500 Carbon-free and renewable energy delivered ~70% 5


LOGO

Safety Forms the Foundation of Operational and Financial Success Strong Operational and Financial Results Leadership Significant utility leadership experience on the Board and executive team Transparency Developed industry-leading public safety dashboard Incentives 50% of short-term variable compensation tied to safety performance Culture Embraced a continuous improvement mindset and speak-up culture Demonstrated commitment to safety and compliance at all levels 6


LOGO

Improved Safety and Reliability Gas Metrics ~40% Reduction in Emergency Response Time(1) >99% Reduction in Leak 40% Reduction in Dig-ins(3) Backlog(2) 12,200 >99% 3.5 ~40% 2.1 52 2010 2016 2010 2016 Major Progress from 2010-2016: Achieved international certifications in gas safety excellence programs Replaced 645+ miles of transmission and distribution pipeline Hydrotested 835+ miles of transmission pipeline Made 750+ miles transmission pipeline capable of in-line inspection Installed 268 automated valves (1) Emergency response time recorded in minutes; (2) Open Grade 2 and 2+ leaks; (3) Third party damages per 1,000 Underground Service Alert (USA) tickets. 7


LOGO

Improved Safety and Reliability Electric Metrics 911 Emergency Response(1) ~50% 98% 65% 2010 2016 System Average Interruption Customer Experiencing Duration Index(2) Multiple Interruptions(3) 157.2 ~30% 3.31% ~40% 109.0 2.10% 2010 2016 2010 2016 Major Progress from 2010-2016: Delivered 6 Years of record-setting electric reliability ~$14 billion investment in transmission and distribution asset enhancements Completed deployment of ~10 million SmartMeters Upgraded ~80% of our targeted circuits (1) Percentage of time PG&E personnel are on-site within 60 minutes of receiving a 911 electric-related call; (2) Average outage duration experienced by all customers served measured in minutes; (3) Percentage of customers experiencing 5 or more sustained interruptions over the past rolling 12 months (includes both planned & unplanned outages). 8


LOGO

Customer Satisfaction has Improved Each Year Since 2012 800 J.D. Power Survey Results, 2011-2017 Gas Business 2nd Quartile Electric Business 1st Quartile 750 700 Gas Residential 4th Quartile Electric Residential 2nd Quartile 650 600 2011 2012 2013 2014 2015 2016 2017 Unwavering commitment to customer satisfaction 9


LOGO

Projected Strong Growth Ratebase ($ in B) Dividend ~6.5-7% ~60% Payout CAGR Ratio ~$39B + ~8% ~$34.4B $1.96 $1.82 2017 2019 2015 2016 2019 Ratebase Range See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 10

 


LOGO

Agenda A strengthened company Key advantages Robust growth profile 11


LOGO

Key Strengths 1 One of the greenest utilities in the country 2 Constructive regulatory framework 3 California clean energy policies 4 Multiple infrastructure investment drivers 12

 


LOGO

K E Y S T R E N G T H # 1 : O N E O F T H E G R E E N E S T U T I L I T I E S I N T H E C O U N T R Y Focused on Sustainability Nearly 2x More Carbon Free and Renewable Energy Than The U.S. Average in 2016 Shaping California Model for Energy Efficiency 69% 36% PG&E U.S. Avg RPS GHG Free *Source: US Energy Information Administration PG&E Customers Lead the Nation in Clean Technology Adoption ~300,000 solar customers Ranked #1 with ~25% of all U.S. rooftop solar More than 100,000 electric vehicles Ranked #1 with ~20% of all U.S. vehicles ~800 GWh/yr of efficiency savings Ranked #2 among U.S. utilities 13


LOGO

K E Y S T R E N G T H # 2 : C O N S T R U C T I V E R E G U L A T O R Y F R A M E W O R K California’s Regulatory Mechanisms Revenues decoupled from sales Balancing accounts reduce cost volatility Forward-looking test year rate cases Risk-informed rate making Separate cost of capital proceeding PG&E’s industry-leading risk management aligns with CPUC safety focus 14


LOGO

K E Y S T R E N G T H # 3 : C A L I F O R N I A C L E A N E N E R G Y P O L I C I E S California’s Climate Goals California Greenhouse Gas Reduction Goals and Historic Emissions* Million metric tons CO2 e 600 AB 32 requires Historic Emissions California to return to 500 1990 levels by 2020 Industrial 400 SB 32 requires at Electricity least 40% below 1990 300 Generation levels by 2030 200 Transportation 100 Res. & Comm. 0 Ag. & Forestry 2000 2005 2010 2015 2020 2025 2030 California is Targeting: 50% renewables by 2030 2X energy efficiency in existing buildings by 2030 1.5M electric vehicles by 2025 PG&E is a critical partner in achieving California’s clean energy goals *Source: California Air Resources Board 15

 


LOGO

K E Y S T R E N G T H # 3 : C A L I F O R N I A C L E A N E N E R G Y P O L I C I E S Electric Vehicles Present Growth Opportunities Projected EV Landscape 600K EVs on PG&E’s grid in 2025 if California meets zero-emission vehicles goal 4:1 Ideal ratio of EVs to public and workplace chargers to enable access 50% The average EV consumes about half the electricity of a typical home each year EV Options Continue to Grow Number of Electric Vehicle Models 33 16 5 2011 2013 2016 EV Infrastructure Investments $109M in spend over 3 years Largest utility deployment in US supporting light-duty vehicles Up to $211M over 5 years Pending request to support medium and heavy-duty electrification and public charging Continued EV adoption creates sustainable growth opportunities See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 16


LOGO

K E Y S T R E N G T H # 4 : M U L T I P L E I N F R A S T R U C T U R E I N V E S T M E N T D R I V E R S California Policies Drive Infrastructure Investment Safety and Reliability Enabling California’s Clean Energy Economy Gas investments (e.g., pipeline replacement, in-line inspection capability) Electric investments (e.g., substation upgrades, cable upgrades) Generation asset upgrades Grid modernization Renewable integration projects Energy efficiency programs Energy storage options Electric vehicle infrastructure State infrastructure modernization (e.g., rail and water projects) Sustained Investments 17

 


LOGO

Agenda A strengthened company Key advantages Robust growth profile 18


LOGO

Focus Areas for Growth 1 Enhance safety and reliability 2 Enable California’s clean energy economy 3 Ensure customer affordability PG&E’s operating plan provides a strong foundation for future success 19


LOGO

G R O W T H F O C U S # 1 : E N H A N C E S A F E T Y A N D R E L I A B I L I T Y Continue to Upgrade Our System % of Gas Transmission System Piggable Annual Projected Miles of Gas Distribution Main Replacement % Penetration of Automated Switches in Urban Areas % of Urban Substations Upgraded ~65% ~170 ~45% ~85% 126 33% 54% 26% 15% 27 5% 7% 2010 2016 2026 2010 2016 2019 2010 2016 2019 2010 2016 2019 Investments to systematically modernize infrastructure See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 20


LOGO

G R O W T H F O C U S # 2 : E N A B L E C A L I F O R N I A ’ S C L E A N E N E R G Y E C O N O M Y Grid Modernization Will Require Significant Investment Grid Control and Monitoring Increased remote control and sensor technology reduce outages and enable self-healing grid Distributed Energy Resources Bi-directional energy flows and voltage fluctuations require integration investments Grid Data Analytics Advanced analytics enhance decision making, improve operations and reduce cost Grid Storage Enables renewable integration Electric Vehicles Requires expanded infrastructure for light, medium, and heavy-duty EVs Increased Renewables Requires transmission integration Energy Efficiency and Demand Response Help manage customer costs Over $1 billion in planned grid modernization investments through 2020 See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 21


LOGO

G R O W T H F O C U S # 3 : E N S U R E C U S T O M E R A F F O R D A B I L I T Y PG&E Bills Lower Than the National Average PG&E Average Residential Bills Are PG&E’s Electric Bundled Rates Have 30% Below National Average Grown In Line With Inflation $200 20.0¢ USA $150 ~30% 16.0¢ 12.0¢ $100 8.0¢ $50 4.0¢ $0 0.0¢ 2015 1991 1996 2001 2006 2011 2016 Actual Electric Bundled Rate PG&E Service Territory CPI Continued focus on keeping customer bills affordable 22

 


LOGO

G R O W T H F O C U S # 3 : E N S U R E C U S T O M E R A F F O R D A B I L I T Y Strategies to Manage Declining Load Flexible Electric Portfolio ~40% of procured MWhs under no contractual obligations in 2021 Utility-Owned Generation Procured ~45% ~55% Constructive Regulatory Mechanisms Revenues decoupled from sales Cost allocation mechanisms for departing customers Modernizing Rate Structures CPUC Distributed Energy Resources Action Plan Fixed/ Residential Time of Use Net Energy Demand Rate Design Rates Metering Charges Focus on Continuous Improvement Process Standardization Procurement Efficiencies Sustainable Efficiencies Leveraging Technology 23

 


LOGO

G O I N G F O R W A R D Well-Positioned for Industry Changes Industry Changes Decarbonized Economy Customer Choice PG&E Strategies Integrate renewables and distributed energy resources Enable electric vehicle adoption Expand energy storage options Enhance energy efficiency programs Flexible procurement portfolio Constructive regulatory mechanisms Modernize rate structures Sustainable efficiencies 24

 


LOGO

Three-year Financial Outlook 1 Cap ex growth 2 Ratebase growth 3 Dividend growth and policy 25


LOGO

Robust Cap Ex Supports Strong Returns Capital Expenditures ($ in B) 2017-2019 ~$6B ~$6B ~$6B 2017 2018 2019 General Rate Case Gas Transmission & Storage Electric Transmission Owner Range See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 26


LOGO

Ratebase Supports Strong Returns Weighted Average Ratebase ($ in B) 2017-2019 ~6.5-7% CAGR ~$39B ~$37B ~$34.4B 2017 2018 2019 General Rate Case Gas Transmission & Storage Electric Transmission Owner Range Base Case Assumptions: 2017 General Rate Case settlement through 2019 2015 Gas Transmission & Storage rate case Phase 2 decision through 2018; flat in 2019 ~$400M for 2011-2014 spend subject to audit added in 2018 Transmission Owner rate case: High end: TO18 filing held flat through 2019 Low end: TO17 settlement held flat through 2019 Electric Vehicle Infrastructure decision in December 2016 Potential Future Updates: 2019 Gas Transmission & Storage rate case 2018 and 2019 Transmission Owner rate cases Future competitive transmission opportunities State infrastructure modernization (e.g., rail and water projects) Future storage opportunities Future transportation electrification (e.g., January 2017 medium and heavy duty vehicle filing) New gas storage regulations See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 27

 


LOGO

Dividend Policy Supports Strong Total Shareholder Return + ~8% ~60% Payout Ratio $1.96 $1.82 2015 2016 2019 Targeting 55-65% payout ratio over time See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 28

 


LOGO

I N S U M M A R Y Solid Growth Strategy Positions PG&E for Success A Strengthened Company Significant safety, reliability and operational improvements Improved customer satisfaction Key Advantages One of the greenest utilities in the country Constructive regulatory and policy environment Multiple infrastructure investment drivers Robust Growth Profile State policies support strong cap ex and ratebase growth Resumed dividend growth Healthy 3-year growth profile ~6.5-7% ratebase growth Above average dividend growth See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 29

 


LOGO

Appendices 30


LOGO

Table of Contents Appendix 1: Q1 2017 Earnings Results and 2017 Guidance Slides 32 – 37 Appendix 2: Q1 2017 Supplemental Earnings Materials Slides 38 – 48 Appendix 3: Supplemental Material on Tax Reform Slide 49 Appendix 4: Leadership Bios Slides 50 – 56 Appendix 5: Overview of Key Regulatory Cases Slides 57 – 65 Appendix 6: Breakdown of 2016 Total Revenue Requirement Slide 66 Appendix 7: Description of Gas System Certifications Slide 67 Appendix 8: Credit Metrics and Ratings Slide 68 31


LOGO

A P P E N D I X 1 – Q 1 2 0 1 7 E A R N I N G S R E S U L T S A N D 2 0 1 7 G U I D A N C E Q1 2017 Earnings Results Earnings EPS (millions) Earnings on a GAAP basis $ 576 $ 1.13 Items Impacting Comparability Pipeline related expenses 16 0.03 Legal and regulatory related expenses 2 0.00 Fines and penalties 36 0.07 Butte fire related costs, net of insurance 2 0.00 GT&S revenue timing impact(88)(0.17) Earnings from Operations $ 544 $ 1.06 Items Impacting Comparability (millions, pre-tax) Pipeline related expenses $ 28 Legal and regulatory related expenses 4 Fines and penalties 60 Butte fire related costs, net of insurance 3 GT&S revenue timing impact(150) Total $(55) Earnings from Operations is not calculated in accordance with GAAP and excludes items impacting comparability. See Appendix 2, Exhibit A for a reconciliation of non-GAAP financial measures and Exhibit G for the use of non-GAAP financial measures. 32


LOGO

A P P E N D I X 1 – Q 1 2 0 1 7 E A R N I N G S R E S U L T S A N D 2 0 1 7 G U I D A N C E Q1 2017: Quarter over Quarter Comparison Earnings per Share from Operations $1.20 $ 0.05 $ 0.03 $0.06($ 0.03) $1.00 $ 0.15($0.02) $0.80 $0.60 $1.06 $0.40 $0.82 $0.20 $0.00 Q1 2016 EPS from Timing of 2015 Tax Benefit on Growth in Rate Miscellaneous Timing of 2017 Increase in Q1 2017 EPS from Operations GT&S Revenue Stock Base Earnings GRC Decision Shares Operations Impact Compensation Outstanding Earnings from Operations is not calculated in accordance with GAAP and excludes items impacting comparability. See Appendix 2, Exhibit A for a reconciliation of non-GAAP financial measures and Exhibit G for the use of non-GAAP financial measures. 33


LOGO

A P P E N D I X 1 – Q 1 2 0 1 7 E A R N I N G S R E S U L T S A N D 2 0 1 7 G U I D A N C E
2017 Earnings Per Share Guidance as of May 2, 2017
Low High
Estimated EPS on a GAAP Basis $ 3.57 $ 3.82 Estimated Items Impacting Comparability Pipeline related expenses 0.14 0.09 Legal and regulatory related expenses ~ 0.01 ~ 0.01 Fines and penalties ~ 0.07 ~ 0.07 Butte fire related costs, net of insurance 0.00 0.00 GT&S revenue timing impact (0.17) (0.17) Net benefit from derivative settlement ~ (0.07) ~ (0.07) Estimated EPS on an Earnings from Operations Basis $ 3.55 $ 3.75
Changes from prior quarter noted in blue
See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. See Appendix 2, Exhibit E for PG&E Corporation’s 2017 Earnings per Share Guidance and Exhibit G for the Use of Non-GAAP Financial Measures.
34


LOGO

A P P E N D I X 1 – Q 1 2 0 1 7 E A R N I N G S R E S U L T S A N D 2 0 1 7 G U I D A N C E
2017 Assumptions as of May 2, 2017
Capital Expenditures
($ millions)
2017 General Rate Case 3,900 Gas Transmission and Storage 1,000 Transmission Owner 18 1,100 Total Cap Ex ~$6 billion
Authorized Ratebase (weighted average)
($ billions)
2017 General Rate Case 24.6 Gas Transmission and Storage 3.0 Transmission Owner 6.8 Total Ratebase ~$34.4 billion
Authorized Cost of Capital*
Return on Equity: 10.4%
Equity Ratio: 52%
*CPUC authorized
Other Factors Affecting
Earnings from Operations
+/- GRC settlement approved without material change
- GT&S amounts not requested
+ Incentive revenues and other benefits
CWIP earnings: offset by below-the-line costs
See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions.
35


LOGO

A P P E N D I X 1 – Q 1 2 0 1 7 E A R N I N G S R E S U L T S A N D 2 0 1 7 G U I D A N C E
2017 Items Impacting Comparability as of May 2, 2017
($ millions, pre-tax) 2017 Pipeline related expenses (1) 80 - 125 Legal and regulatory related expenses ~ 10 Fines and penalties (2) ~ 60 Butte fire related costs, net of insurance 3 GT&S revenue timing impact (150) Net benefit from derivative settlement ~ (65) 2017 Items Impacting Comparability Total ~ $(62) - (17)
Fines and Penalties ($ in millions, pre-tax) (2)
Charge for disallowed expense 32 GT&S ex parte penalty 15 Ex parte OII settlement ~ 13 Total ~ $60
(1) Total cost of rights-of-way program expected to range from $425 million to $475 million
(2) Fines and penalties range excludes any additional potential future fines or penalties beyond those outlined above
See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. See Appendix 2, Exhibit E for PG&E Corporation’s 2017 Earnings per Share Guidance and Exhibit G for Use of Non-GAAP Financial Measures.
36


LOGO

A P P E N D I X 1 – Q 1 2 0 1 7 E A R N I N G S R E S U L T S A N D 2 0 1 7 G U I D A N C E
2017 Equity Issuance as of May 2, 2017
~$800M $400 - 600M 2016 2017
- San Bruno Penalty
- GT&S Capital Disallowance
+ Capital Expenditures
March 31, 2017 shares outstanding: ~511 million
See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions.
37


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Table of Contents—2017 Supplemental Earnings Materials Exhibit A: Reconciliation of PG&E Corporation’s Consolidated Income Available Slides 39-40 for Common Shareholders in Accordance with GAAP to Earnings from Operations Exhibit B: Key Drivers of PG&E Corporation’s Earnings per Common Share Slide 41 from Operations Exhibit C: Operational Performance Metrics Slides 42-43 Exhibit D: Sales and Sources Summary Slide 44 Exhibit E: PG&E Corporation’s 2017 Earnings Per Share Guidance Slides 45-46 Exhibit F: 2017 General Earnings Sensitivities Slide 47 Exhibit G: Use of Non-GAAP Financial Measures Slide 48 38


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Exhibit A: Reconciliation of PG&E Corporation’s Consolidated Income Available for Common Shareholders in Accordance with Generally Accepted Accounting Principles (“GAAP”) to Earnings from Operations Page 1 of 2 First Quarter, 2017 vs. 2016 Three Months Ended March 31, (in millions, except per share amounts) Earnings per Common Earnings Share (Diluted) 2017 2016 2017 2016 PG&E Corporation’s Earnings on a GAAP basis $ 576 $ 107 $ 1.13 $ 0.22 Items Impacting Comparability: (1) Pipeline related expenses (2) 16 13 0.03 0.03 Legal and regulatory related expenses (3) 2 10 0.00 0.02 Fines and penalties (4) 36 51 0.07 0.10 Butte fire related costs, net of insurance (5) 2 226 0.00 0.45 GT&S revenue timing impact (6)(88) -(0.17)—PG&E Corporation’s Earnings from Operations (7) $ 544 $ 407 $ 1.06 $ 0.82 All amounts presented in the table above are tax adjusted at PG&E Corporation’s statutory tax rate of 40.75 percent except for fines, which are not tax deductible. See Footnote 4 below. (1) “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods. See Exhibit G: Use of Non-GAAP Financial Measures. (2) The Utility incurred costs of $28 million (before the tax impact of $12 million) during the three months ended March 31, 2017, for pipeline related expenses incurred in connection with the multi-year effort to identify and remove encroachments from transmission pipeline rights-of-way. (3) The Utility incurred costs of $4 million (before the tax impact of $2 million) during the three months ended March 31, 2017, for legal and regulatory related expenses incurred in connection with various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications. (4) The Utility incurred costs of $60 million (before the tax impact of $24 million) during the three months ended March 31, 2017, for fines and penalties. This includes costs of $32 million (before the tax impact of $13 million) during the three months ended March 31, 2017, associated with safety-related cost disallowances imposed by the California Public Utilities Commission (“CPUC”) in its April 9, 2015 decision (“San Bruno Penalty Decision”) in the gas transmission pipeline investigations. The Utility also recorded $15 million (before the tax impact of $6 million) during the three months ended March 31, 2017, for disallowances imposed by the CPUC in its final phase two decision of the 2015 Gas Transmission and Storage (“GT&S”) rate case for prohibited ex parte communications. In addition, the Utility accrued financial remedies of $12 million (before the tax impact of $5 million) and $1 million (which is not tax deductible) during the three months ended March 31, 2017, in connection with the settlement filed with the CPUC on March 28, 2017, related to the Order Instituting an Investigation into Compliance with Ex Parte Communication Rules. 39


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Exhibit A: Reconciliation of PG&E Corporation’s Consolidated Income Available for Common Shareholders in Accordance with Generally Accepted Accounting Page 2 of Principles 2 (“GAAP”) to Earnings from Operations Three Months Ended (in millions, pre-tax) March 31, 2017 Charge for disallowed expense $ 32 GT&S ex parte penalty 15 Ex Parte OII Settlement 13 Fines and penalties $ 60 Future fines or penalties may be imposed in connection with other enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications. (5) The Utility recorded costs of $3 million (before the tax impact of $1 million) during the three months ended March 31, 2017, associated with the Butte fire, net of insurance. This includes charges of $ 10 million (before the tax impact of $4 million) during the three months ended March 31, 2017, for legal costs associated with the Butte fire, partially offset by $7 million (before the tax impact of $3 million) recorded during the three months ended March 31, 2017, for expected insurance recovery. (in millions, pre-tax) March 31, 2017 Legal costs $ 10 Insurance(7) Butte fire related costs, net of insurance $ 3 (6) As a result of the CPUC’s final phase two decision in the 2015 GT&S rate case, during the three months ended March 31, 2017, the Utility recorded revenues of $150 million (before the tax impact of $62 million) in excess of the 2017 authorized revenue requirement, which includes the final component of under-collected revenues retroactive to January 1, 2015. (7) “Earnings from operations” is a non-GAAP financial measure. See Exhibit G: Use of Non-GAAP Financial Measures. 40


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Exhibit B: Key Drivers of PG&E Corporation’s Earnings per Common Share (“EPS”) from Operations First Quarter, 2017 vs. 2016 ($/Share, Diluted) First Quarter 2016 EPS from Operations (1) $ 0.82 Timing of 2015 GT&S revenue impact (2) 0.15 Tax benefit on stock compensation (3) 0.06 Growth in rate base earnings 0.03 Miscellaneous 0.05 Timing of 2017 GRC decision (4) (0.03) Increase in shares outstanding (0.02) First Quarter 2017 EPS from Operations (1) $ 1.06 (1) See Exhibit A for a reconciliation of EPS on a GAAP basis to EPS from Operations. All amounts presented in the table above are tax adjusted at PG&E Corporation’s statutory tax rate of 40.75 percent. (2) Represents the impact in 2016 of the delay in the Utility’s 2015 GT&S rate case. The CPUC issued its final phase two decision on December 1, 2016, delaying recognition of the full 2016 revenue increase until the fourth quarter of 2016. (3) Represents the incremental tax benefit related to share-based compensation awards that vested during the three months ended March 31, 2017. Pursuant to ASU 2016-09, which PG&E Corporation and the Utility adopted in 2016, excess tax benefits associated with vested awards are reflected in net income. (4) Represents the increase in GRC-related capital costs (depreciation and interest) but does not include an offsetting revenue increase, which is pending a final decision in the Utility’s 2017 GRC proceeding. 41


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Exhibit C: Operational Performance Metrics Meets YTD First Quarter 2017 Q1 Actual EOY Target Target (1) Safety (includes both public and employee safety metrics) Nuclear Operations Safety Unit 1 Performance Indicator 100.0 90.5 P Unit 2 Performance Indicator 90.0 87.6 P Electric Operations Safety Electric Overhead Conductor Index 1.0 1.0 P 911 Emergency Response 95.7% 97.5%—Gas Operations Safety Gas In-Line Inspection and Upgrade Index 0.8 1.0—Gas Dig-ins Reduction 1.45 1.92 P Gas Emergency Response 19.9 21.0 P Employee Safety SIF Corrective Action Index 1.0 1.0 P Serious Preventable Motor Vehicle Incident Rate 0.058 0.239 P Timely Reporting of Injuries 65.0% 71.3%—Customer Customer Satisfaction Score 75.5 76.4—System Average Interruption Duration Index (SAIDI) 28.9 107.0—Financial Earnings from Operations $544 See note (1) See note (1) See following page for definitions of the operational performance metrics. The operational performance goals set under the PG&E Corporation 2017 Short Term Incentive Plan (“STIP”) are based on the same operational metrics and targets. (1) The 2017 target for earnings from operations is not publicly reported but is consistent with the guidance range provided for 2017 EPS from operations of $3.55 to $3.75. 42


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Definitions of 2017 Operational Performance Metrics from Exhibit C Safety Public and employee safety are measured in four areas: (1) Nuclear Operations Safety, (2) Electric Operations Safety, (3) Gas Operations Safety, and (4) Employee Safety. 1. The safety of the Utility’s nuclear power operations, Unit 1 and Unit 2, is an index comprised of 11 performance indicators for nuclear power generation that are regularly benchmarked against other nuclear power generators. 2. The safety of the Utility’s electric operations is represented by (a) work that supports the safe reliable operations of the overhead electric system, and (b) the percentage of time that Utility personnel are on site within 60 minutes after receiving a 911 call of a potential Utility electric hazard. 3. The safety of the Utility’s natural gas operations is represented by (a) the ability to complete planned in-line inspections and pipeline retrofit projects, measured by two equally weighted components of In-Line Inspections and In-Line Upgrades; (b) the number of third party “dig-ins” (i.e., damage resulting in repair or replacement of underground facility) to Utility gas assets per 1,000 Underground Service Alert tickets; and (c) the timeliness (measured in minutes) of on-site response to gas emergency service calls. 4. The safety of the Utility’s employees is represented by (a) measuring the timely and quality completion of planned action in response to Serious Injuries and Fatalities (SIF), (b) the number of serious preventable motor vehicle incidents that the driver could have reasonably avoided, per one million miles driven, and (c) the percentage of work-related injuries reported to the 24/7 Nurse Report Line within one day of the incident. Customer Customer satisfaction and service reliability are measured by: 1. The overall satisfaction (measured as a score of zero to 100) of customers with the products and services offered by the Utility, as measured through a quarterly survey performed by an independent third-party research firm. 2. The total time (measured in minutes) the average customer is without electric power during a given time period. Financial Earnings from Operations (shown in millions of dollars) measures PG&E Corporation’s earnings power from ongoing core operations. They allow investors to compare the underlying financial performance of the business from one period to another, exclusive of items that management believes do not reflect the normal course of operations (items impacting comparability). Earnings from Operations are not calculated in accordance with GAAP. For a reconciliation of Consolidated Income Available for Common Shareholders as reported in accordance with GAAP to Earnings from Operations, see Exhibit A. 43


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Exhibit D: Pacific Gas and Electric Company Sales and Sources Summary First Quarter, 2017 vs. 2016 Three Months Ended March 31, 2017 2016 Sales from Electric Energy Deliveries (in millions kWh) 19,538 19,540 Total Electric Customers at March 31 5,374,780 5,333,298 Total Gas Sales (in Bcf) 227 226 Total Gas Customers at March 31 4,464,473 4,433,903 Sources of Electric Energy (in millions kWh) Total Utility Generation 8,597 8,617 Total Purchased Power 7,291 8,539 Total Electric Energy Delivered (1) 19,538 19,540 Diablo Canyon Performance Overall Capacity Factor (including refuelings) 98% 100% Refueling Outage Period None None Refueling Outage Duration during the Period (days) None None (1) Includes other sources of electric energy totaling 3,650 million kWh and 2,384 million kWh for the three months ended March 31, 2017 and 2016, respectively. Please see the 2016 Annual Report on Form 10-K for additional information about operating statistics. 44


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S
Exhibit E: PG&E Corporation’s 2017 Earnings per Share Guidance as of May 2, 2017
Page 1 of 2 2017 EPS Guidance Low High Estimated EPS on a GAAP Basis $ 3.57 $ 3.82 Estimated Items Impacting Comparability: (1) Pipeline related expenses (2) 0.14 0.09 Legal and regulatory related expenses (3) ~ 0.01 ~ 0.01 Fines and penalties (4) ~ 0.07 ~ 0.07 Butte fire related costs, net of insurance (5) 0.00 0.00 GT&S revenue timing impact (6) (0.17) (0.17) Net benefit from derivative settlement (7) ~ (0.07) ~ (0.07) Estimated EPS on an Earnings from Operations Basis (8) $ 3.55 $ 3.75
All amounts presented in the table above are tax adjusted at PG&E Corporation’s statutory tax rate of 40.75 percent except for fines, which are not tax deductible.
(1) “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods. See Exhibit G: Use of Non-GAAP Financial Measures.
(2) “Pipeline related expenses” includes costs incurred to identify and remove encroachments from transmission pipeline rights-of-way. The pre-tax range of estimated costs is shown below. The offsetting tax impacts for the low and high EPS guidance range are $51 million and $33 million, respectively.
2017 Low EPS High EPS (in millions, pre-tax) guidance guidance Pipeline related expenses $ 125 $ 80
(3) “Legal and regulatory related expenses” includes costs incurred in connection with various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications. The pre-tax range of estimated costs is shown below. The offsetting tax impact for the low and high EPS guidance range is $4 million.
2017 Low EPS High EPS (in millions, pre-tax) guidance guidance Legal and regulatory related expenses ~$ 10 ~$ 10
(4) “Fines and penalties” includes fines and penalties resulting from various enforcement, regulatory, and litigation activities regarding natural gas matters and regulatory communications. Guidance is consistent with the 2017 components of the $1.6 billion San Bruno Penalty Decision in the gas transmission pipeline investigations, the disallowances imposed by the CPUC in its final phase two decision in the 2015 GT&S rate case for prohibited ex parte communications, and the settlement filed with the CPUC related to the Order Instituting an Investigation into Compliance with Ex Parte Communication Rules. Guidance does not include amounts for other potential future fines and penalties. The pre-tax range of estimated costs is shown below. The offsetting tax impact for the low and high EPS guidance range is $24 million.
2017 Low EPS High EPS (in millions, pre-tax) guidance guidance Charge for disallowed expense $ 32 $ 32 GT&S ex parte disallowance 15 15 Ex Parte OII Settlement ~ 13 ~ 13 Fines and penalties ~$ 60 ~$ 60
45


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S
Exhibit E: PG&E Corporation’s 2017 Earnings per Share Guidance as of May 2, 2017
Page 2 of 2
(5) “Butte fire related costs, net of insurance” includes recorded legal costs of $3 million during the three months ended March 31, 2017, associated with the Butte fire, net of insurance. The Utility currently is unable to estimate the low and high end of the range of Butte fire related third-party claims and legal costs for 2017. The offsetting tax impact for the low and high EPS guidance range is $1 million.
2017 Low EPS High EPS (in millions, pre-tax) guidance guidance Butte fire related costs, net of insurance $ 3 $ 3
(6) “GT&S revenue timing impact” refers to the revenues recorded in excess of the 2017 authorized revenue requirements as a result of the CPUC’s final phase two decision issued on December 1, 2016 in the 2015 GT&S rate case. Accounting rules allow the Utility to recognize revenues in a given year only if they will be collected from customers within 24 months of the end of that year. Because the phase one decision directs the Utility to collect the difference between the adopted “interim” revenue requirements and the amounts previously collected in rates, retroactive to January 1, 2015, over a 36-month period, the Utility was not able to complete recording the full true-up of under-collected revenues until the first quarter of 2017. The pre-tax range of the recorded revenues is shown below. The offsetting tax impact for the low and high EPS guidance range is $62 million.
2017 Low EPS High EPS (in millions, pre-tax) guidance guidance GT&S revenue timing impact $ (150) $ (150)
(7) “Net benefit from derivative settlement” refers to the settlement to resolve the consolidated shareholder derivative lawsuits and certain additional claims in the San Bruno Fire Derivative Cases filed on March 15, 2017. This amount includes insurance recoveries net of plaintiff costs. PG&E Corporation expects the final approval hearing will be held during the third quarter of 2017. The offsetting tax impact for the low and high EPS guidance range is $26 million.
2017 Low EPS High EPS (in millions, pre-tax) guidance guidance Net benefit from derivative settlement ~$ (65) ~$ (65)
(8) “Earnings from operations” is a non-GAAP financial measure. See Exhibit G: Use of Non-GAAP Financial Measures.
Actual financial results for 2017 may differ materially from the guidance provided. For a discussion of the factors that may affect future results, see the Forward-Looking Statements.
46


LOGO

APPENDIX 2 – Q1 2017 SUPPLEMENTAL EARNINGS MATERIALS Exhibit F: 2017 General Earnings Sensitivities as of May 2, 2017 PG&E Corporation and Pacific Gas and Electric Company
Variable Description of Change Estimated 2017 Earnings Impact Rate base +/- $100 million change in allowed rate base +/- $5 million Return on equity (ROE) +/- 0.1% change in allowed ROE +/- $18 million Share count +/- 1% change in average shares +/- $0.04 per share Revenues +/- $9 million change in at-risk revenue (pre-tax), including Electric Transmission and Gas Transmission and Storage +/- $0.01 per share These general earnings sensitivities on factors that may affect 2017 earnings are forward-looking statements that are based on various assumptions. Actual results may differ materially. For a discussion of the factors that may affect future results, see the Forward-Looking Statements.
47


LOGO

A P P E N D I X 2 – Q 1 2 0 1 7 S U P P L E M E N T A L E A R N I N G S M A T E R I A L S Exhibit G: Use of Non-GAAP Financial Measures PG&E Corporation and Pacific Gas and Electric Company: Use of Non-GAAP Financial Measures PG&E Corporation discloses historical financial results and provides guidance based on “earnings from operations” in order to provide a measure that allows investors to compare the underlying financial performance of the business from one period to another, exclusive of items impacting comparability. “Earnings from operations” is a non-GAAP financial measure and is calculated as income available for common shareholders less items impacting comparability. “Items impacting comparability” represent items that management does not consider part of the normal course of operations and affect comparability of financial results between periods, including certain pipeline related expenses, certain legal and regulatory related expenses, fines and penalties, Butte fire related costs, impacts of the 2015 GT&S rate case, and insurance recoveries for natural gas matters. PG&E Corporation uses earnings from operations to understand and compare operating results across reporting periods for various purposes including internal budgeting and forecasting, short- and long-term operating planning, and employee incentive compensation. PG&E Corporation believes that earnings from operations provide additional insight into the underlying trends of the business allowing for a better comparison against historical results and expectations for future performance. Earnings from operations are not a substitute or alternative for GAAP measures such as consolidated income available for common shareholders and may not be comparable to similarly titled measures used by other companies. 48


LOGO

A P P E N D I X 3 – S U P P L E M E N T A L M A T E R I A L O N T A X R E F O R M Tax Reform Helps Affordability and Creates Potential for Future Investments 1. Lower Corporate Tax Rate 2. Loss of Interest Expense Deduction 3. Full Expensing of Capital Expenditures Utility Holding Company Excess deferred taxes flow back to customers Lower net cost of service revenues going forward Reduction in deferred tax asset – shareholder impact Higher costs borne by customers Limited impact due to low outstanding debt balances Minimal near-term impact given net operating loss Reduced ratebase growth in the future Net Deferred Tax Liability (Asset) (millions, pre-tax) Holding Utility as of December 31, 2016 Company Property-related and other $ 12,110 $ (50) Operating loss carryforward (1,600) (250) Net deferred tax liability (asset) $ 10,510 $ (300) See the Forward Looking Statements for factors that could cause actual results to differ materially from the guidance presented and underlying assumptions. 49


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S Geisha J. Williams Geisha J. Williams Chief Executive Officer (CEO) and President PG&E Corporation Geisha J. Williams was elected CEO and President of PG&E Corporation, effective March 1, 2017. Williams has more than three decades of experience in the utility industry. Williams and her team are responsible for the end-to-end delivery of safe, reliable, affordable and clean electricity and gas to 16 million people in northern and central California. Her focus on renewables integration, grid modernization and smart grid technologies has resulted in PG&E customers benefitting from the best electric reliability in company history while also receiving energy that is nearly 70 percent greenhouse gas free. Williams previously was the Utility’s President, Electric (August 2015 – February 2017) and Executive Vice President, Electric Operations (June 2011 to August 2015). In her role as President, Williams led all aspects of the Utility’s electric business, including power generation, nuclear operations, transmission, distribution, and substation operations, asset management and strategy, energy procurement and customer care. Before joining PG&E, Williams worked at Florida Power and Light (FPL) for 24 years. She served in a number of roles during her tenure there including Vice President of Power Systems, Electric Distribution. In this role, she was responsible for all aspects of the electric distribution infrastructure serving FPL’s 4.4 million customers, including asset management and planning, engineering, construction, maintenance and restoration. During her time at FPL, she considers the company’s restoration and recovery efforts in response to seven hurricanes that made landfall in a 15-month period as one of her proudest accomplishments. Williams is a director at the Edison Electric Institute, the Institute of Nuclear Power Operations, and the Association of Edison Illuminating Companies. She also serves as the board chair for the Center for Energy Workforce Development and is an active participant in Executive Women in Energy. Her involvement with the community includes serving as a trustee of the California Academy of Sciences and a member of the University of Miami President’s Council. She is a five-time recipient of the Bay Area Most Influential Women in Business Award, and in 2014 she was honored with Leadership California’s Trailblazer Award. Williams holds a bachelor’s degree in engineering from the University of Miami and a master’s degree in business administration from Nova Southeastern University. She lives in the Bay Area with her family. 50


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S Nick Stavropoulos Nick Stavropoulos President & Chief Operating Officer Pacific Gas and Electric Company Nick Stavropoulos serves as President and Chief Operating Officer of Pacific Gas and Electric Company and has more than 35 years of experience in the U.S. and international energy industry. He oversees a diverse workforce of more than 23,000 employees across electric, gas, generation and nuclear operations as well as corporate support functions. He also serves on the utility’s board of directors. Today, he and his team are responsible for the end-to-end delivery of safe, reliable, affordable and clean electric and gas service to 16 million people across PG&E’s 70,000 square mile service area in northern and central California. PG&E’s energy portfolio is one of the cleanest in the nation with more than 60 percent of its portfolio coming from carbon-free energy sources. Stavropoulos is a passionate advocate for workplace safety and safety culture. Under his leadership, PG&E’s gas business has earned or qualified for international certifications including ISO 55000; PAS 55001; API RP 1173; and RC 14001. PG&E is the only North American utility to currently hold these third party certifications. Prior to joining PG&E, Stavropoulos served as Executive Vice President and Chief Operating Officer for National Grid, an electricity and natural gas delivery company serving nearly seven million customers in the Northeast United States. As COO, he was responsible for all aspects of its U.S. gas distribution business. Throughout his career, he held a number of senior leadership positions with successive levels of responsibility, including Chief Financial Officer, at Keyspan’s predecessor companies – Colonial Gas Company and Boston Gas. Stavropoulos is an internationally sought after speaker on the topics of leadership and safety culture. In recent years, he has delivered keynote speeches at the International Atomic Energy Agency; National Safety Council’s Campbell Institute; Institute of Engineering and Technology/The Institute of Asset Management Conference; International Safety Culture Symposium; and Global Safety Culture Conference. Stavropoulos is a member of the Board of Directors for the American Gas Association, Gas Technology Institute as well as a member of the Advisory Board for Underwriters Laboratory’s Integrated Health and Safety Institute. He holds a bachelor’s degree in accounting from Bentley College and a master’s degree in business administration from Babson College. He sits on the board of his alma mater Bentley University and has served on multiple public and not-for-profit boards including chairing audit committees. A native New Englander, he lives in San Francisco and is an avid Soul Cycler. 51


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S Anthony F. Earley, Jr. Anthony F. Earley, Jr. Executive Chair PG&E Corporation Anthony F. Earley, Jr., is Executive Chair of the Board of PG&E Corporation. Earley joined PG&E in September 2011 as Chairman, Chief Executive Officer, and President after 17 years at DTE Energy, where he served as Executive Chairman, Chairman, and Chief Executive Officer. Since joining PG&E, Earley has spearheaded major initiatives related to safety culture, operational excellence, long-term integrated planning, and workforce development. Under Earley’s leadership, PG&E has experienced the highest reliability in its over 150-year history. PG&E also continues to grow its environmentally friendly generation portfolio, with more than 50 percent of its assets having no carbon emissions. As former chairman of the Edison Electric Institute (EEI), the trade association of investor utilities, Earley was directly involved in the development of national policies on energy, the environment, and climate change issues. In 2014, Earley received EEI’s Distinguished Leadership Award for his decades of contributions to the electric power industry. He also served as chair of the Nuclear Energy Institute. Earley earned a Bachelor of Science degree in physics, a Master of Science degree in engineering, and a law degree at the University of Notre Dame, where he serves on the advisory council of the College of Engineering. After graduating from Notre Dame, Earley went on to serve as an officer in the United States Navy nuclear submarine program, where he was qualified as a chief engineer officer. He joined DTE Energy as president and chief operating officer in March 1994. Prior to joining DTE Energy, Earley served in various capacities at Long Island Lighting Company, including president and chief operating officer. He was also a partner at the Hunton & Williams law firm. Earley serves on the executive committees of the Edison Electric Institute and the Nuclear Energy Institute and is a board member of the Electric Power Research Institute. He is also on the board at Ford Motor Company. His commitment to the community includes memberships on the boards of United Way Bay Area, The Exploratorium, a science, arts, and human perception museum based in San Francisco, and the Bay Area Council. Earley was named 2015 Philanthropic CEO of the Year by the American Red Cross of the Bay Area. His community service was also recognized by readers of The Detroit News, and in 2003 he was selected as one of the several Michiganians of the Year. 52


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S Jason P. Wells Jason P. Wells Senior Vice President and Chief Financial Officer PG&E Corporation Jason P. Wells is Senior Vice President and Chief Financial Officer for PG&E Corporation. Wells oversees the financial activities of the $50 billion company including accounting, treasury, tax, risk, business and financial planning, and investor relations. Wells began his career at PricewaterhouseCoopers, LLC, where he was most recently a senior manager. In 2007, Wells joined PG&E as the Director of technical accounting and was promoted to Senior Director and Assistant Controller of corporate accounting in 2008. In 2011, Wells became Vice President, Finance. He assumed his current position on January 2016. He earned his bachelor’s and master’s degrees in accounting from the University of Florida. Wells is a Certified Public Accountant in the state of Florida. He currently serves as the Treasurer and on the board of Habitat for Humanity Greater San Francisco. 53


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S Patrick M. Hogan Patrick M. Hogan Senior Vice President of Electric Operations Pacific Gas and Electric Company Patrick M. Hogan is Senior Vice President of Electric Operations at Pacific Gas and Electric Company. Hogan oversees PG&E’s electric transmission and distribution system, which delivers safe and reliable energy to more than 16 million people throughout Northern and Central California. In addition to his electric responsibilities, Hogan has enterprise-wide responsibility for PG&E’s Transportation Services organization, managing over 14,000 vehicles and pieces of equipment. Prior to his promotion to Senior Vice President of Electric Operations in 2016, Hogan served as Vice President of Electric Strategy & Asset Management where he oversaw the company’s electric transmission and distribution assets. Hogan also led the development and deployment of technology into PG&E’s electric system. Before joining PG&E in 2013, Hogan held leadership and officer roles in transmission, distribution, operations, engineering and asset management at British Columbia Hydro, National Grid, and KeySpan. Originally from New York, Hogan holds a bachelor’s and master’s degree in electrical engineering from Manhattan College and a master’s degree in business administration from Hofstra University. His community involvement includes serving on the board of the San Francisco Ballet, and he currently resides in San Francisco. 54


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S Jesus Soto Jr. Jesus Soto Jr. Senior Vice President, Gas Operations Pacific Gas and Electric Company Jesus Soto Jr. is the Senior Vice President of Gas Operations for Pacific Gas and Electric Company. He is responsible for overseeing and executing the day-to-day operations of the second largest natural gas system in the United States. PG&E’s natural gas system provides safe, reliable, affordable and clean gas service to 16 million people in northern and central California. Soto is passionate about public and employee safety and PG&E’s Gas Operations earned ISO 55000 and PAS 55001 international certifications for the company’s enhancements in gas asset management. PG&E is the only North American utility to currently hold these third party certifications. Through his leadership, PG&E was the first utility to deploy a state-of-the-art leak detection technology that is 1,000 times more sensitive than conventional leak detection tools. Soto’s commitment to safety has led to a significant reduction in the time it takes PG&E to respond to gas odor calls. Most recently, Soto served as Vice President of Operations Services for El Paso Corporation’s Pipeline Group in Houston, TX. He led the technical services and support functions for pipeline operations and oversaw measurement, compression, reservoir and pipeline systems and Department of Transportation compliance. He was also responsible for risk and integrity management, public awareness and emergency response. Prior to that, Soto was vice president of engineering and construction, leading the engineering and construction programs for ANR Pipeline, El Paso Natural Gas, Colorado Interstate Gas, Southern Natural Gas and Tennessee Gas Pipeline for onshore and offshore facilities. Soto holds a Bachelor of Science in civil engineering from the University of Texas at El Paso, a master’s degree in civil engineering from Texas A&M University, and a Master of Business Administration degree from the University of Phoenix. 55

 


LOGO

A P P E N D I X 4 – L E A D E R S H I P B I O S David S. Thomason David S. Thomason Vice President and Controller PG&E Corporation Vice President, Chief Financial Officer and Controller Pacific Gas and Electric Company David S. Thomason is Vice President and Controller of PG&E Corporation, as well as Vice President, Chief Financial Officer and Controller of Pacific Gas and Electric Company. Thomason joined PG&E in 2001 as a senior accounting analyst after starting his career with Arthur Andersen in Portland. During his 16 years at PG&E, he has held a multitude of roles, growing as a leader and gaining additional responsibilities with each new position. Functional areas he has overseen include external financial reporting, revenue forecasting, planning and analysis, corporate accounting and more. Thomason received a Master’s degree in Business Administration from University of California, Berkeley, and a Bachelor’s degree in Accounting from University of Oregon, Eugene. He holds registrations as a Certified Public Accountant in the states of California and Oregon. 56


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S Separate Rate Cases Maintain Focus on Specific Assets General Rate Gas Transmission Transmission Case and Storage Case Owner Case Regulatory Jurisdiction CPUC CPUC FERC Time Period of 2017-2019 2015-2017 2017 Current Rate Case Revenue Requirement $8.0B (1) $1.3B $1.7B (2) ROE (2017) 10.4% 10.4% 10.9% (3) Final decision Implementation of January 2018 Key Next Steps anticipated in GT&S decisions Hearings Q2 2017 (1) All-party settlement agreement (2) Requested amount (3) FERC TO cases have typically been settled black box without an explicit ROE; FERC ROE is inclusive of 50 basis points adder. PG&E’s objective is to earn the CPUC authorized 10.4% ROE across the enterprise 57

 


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S 2017 CPUC General Rate Case September 1, 2015 – Filed CPUC application requesting 2017 - 2019 revenues August 3, 2016 – Filed all-party settlement agreement February 27, 2017 – ALJ issued proposed decision (PD) adopting the settlement agreement with modifications April 4, 2017 – Assigned Commissioner Picker issued an alternative proposed decision (APD) Increase Proposed in Difference (Decrease) from PD Settlement Agreement and Increase Proposed in PD to the Settlement & Alternate Year APD ($ millions) PD ($ millions) ($ millions) 2017 $ 88 $ 86 ($ 2) 2018 $ 444 $ 444 $ 0 2019 $ 361 $ 361 $ 0 The PD would approve the settlement with modifications, including: - A broader tax memorandum account to track any differences between forecasted income tax expense and actual income tax expense - A $24 million increase in capital expenditures to fund Rule 20A undergrounding work - A requirement that PG&E submit a stand-alone application to recover customer outreach and other costs incurred as a result of rate reform implementation The PD also would deny the third attrition year and the proposed new balancing account for gas leak management requirements, arguing that both should be considered in other proceedings The APD maintains each of the above changes with the exception of the increased funding for Rule 20A work which it restored to the settlement amount Assigned Commissioner: Picker Administrative Law Judge: Roscow 58


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S 2015 CPUC Gas Transmission and Storage Rate Case December 1, 2016 – CPUC voted out a final Phase 2 decision consistent with proposed decision Revenue Utility Requested Phase 2 Decision Difference Requirement Revenue Revenue Requirement(Decrease)* ($ millions) Requirement 2015 $ 1,263 $ 815($ 448) 2016 $ 1,346 $ 1,061($ 285) 2017 $ 1,488 $ 1,125($ 363) 2018 $ N/A $ 1,230 $ N/A Assigned Commissioner: Peterman Administrative Law Judge: Dudney *Difference compares Utility Requested Revenue Requirement to Phase 2 Decision Revenue Requirement 59


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S FERC Transmission Owner Rate Case TO18 (2017 Revenues) July 29, 2016 – Filed TO18 with FERC requesting $1.7 billion revenue requirement, a $400 million increase over approved TO17 ROE (inclusive of 50 basis points adder) 10.90% Cap ex ~$1.3B WAVG Ratebase ~$6.7B March 16, 2017 – Parties notified settlement judge of impasse January 2018 – Hearings scheduled, with initial decision expected on or before June 1, 2018 TO19 (2018 Revenues) TO19 case expected to be filed in mid to late summer 2017 60


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S Distributed Resources Distributed Energy Resources (DER) Action Plan In December 2016, the CPUC adopted a DER Action Plan which is intended to be a roadmap to coordinate the development of DER policy across proceedings in three areas: Rates and tariffs Distribution grid infrastructure, planning, interconnection and procurement Wholesale DER market integration and interconnection Distribution Resources Plan (DRP) DRP proceeding is about integrating cost effective DERs into the utility’s investment decisions; the DRP proceeding is evaluating criteria for grid framework for how to incorporate DER solutions into our distribution adoption forecasting processes Integrated Distributed Energy Resources (IDER) The IDER proceeding is examining how to create sourcing options that encourage DER deployment to areas and times of most value to the grid, and is considering DER valuation and cost-effectiveness in addition to piloting a utility incentive mechanism 61


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S CPUC Cost of Capital Structure and Cost Capital 2017 2018-19 Structure Cost Cost (1)(2) Common Equity 52% 10.40% 10.25% Preferred Stock 1% 5.60% TBD (3) Long-Term Debt 47% 5.52% TBD (3) Weighted Average Cost of Capital 8.06% TBD Trigger Mechanism Moody’s Baa Utility Index 7% 6% 5% 4% PG&E Benchmark rate at 5.00% 3% 10/1/11 10/1/12 10/1/13 10/1/14 10/1/15 10/1/16 On February 7, 2017, PG&E, the other California IOUs, TURN, and ORA jointly filed a petition to modify our 2018 and 2019 cost of capital and extend the deadline for filing our next application; the petition is pending Under the terms of our agreement, the trigger mechanism would be suspended through 2018 Should the extension be approved, the next cost of capital application is expected to be filed in April 2019 (1) The 2018-2019 cost of common equity is pending approval at the CPUC (2) 2019 is subject to trigger mechanism (3) The long-term debt and preferred stock cost will be reset later in the year to reflect actual embedded costs as of the end of August 2017 and forecasted interest rates for the new long-term debt scheduled to be issued for the remainder of 2017 and all of 2018 62

 


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S Electric Vehicle Infrastructure Light Duty Electric Vehicle Infrastructure December 15, 2016 – CPUC voted out a final decision authorizing $130M of spend ($109M capital, $21M expense) Medium to Heavy-Duty Transportation Electrification January 20, 2017 – Filed CPUC application requesting approval of up to $253M in costs ($211M capital, $42M expense) for 3 programs to support transportation electrification for medium to heavy-duty vehicles and public fast charging Capital Investment ($ millions) (1) Year 1 Year 2 Year 3 Year 4 Year 5 Total Electric Vehicle Infrastructure $32 $32 $40 $47 $60 $211 (1) Annual proposed breakdown results may vary 63

 


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S Energy Storage Energy Storage RFO CPUC Storage Rulemaking (R.10-12-007) established 1,325 MW target for all IOUs (580 MW target for PG&E) by 2024 with up to 50% utility ownership of transmission and distribution projects; first projects expected to come on line in May 2017 CPUC’s Decision establishes biennial procurement targets, including 4 solicitations December 1, 2016 – Second solicitation was issued, targeting 120 MWs: Transmission 65 MW Distribution 40 MW Customer 15 MW The total procurement target has been expanded up to 150 MW in order to cover the 2016 target (120 MW) and shortfall from the 2014 ES RFO AB 2868 AB 2868 authorizes up to 500 MW of additional distribution and customer connected energy storage, allocated equally across the three IOUs; utility ownership is permitted On April 27, 2017 the CPUC approved a final decision which would require the IOUs to propose programs and investments for up to 167 additional MW of distributed energy storage resources in their 2018 energy storage procurement plan applications The decision also requires the IOUs to propose reasonable mechanisms for cost allocation and cost recovery as part of their plans 64

 


LOGO

A P P E N D I X 5 – O V E R V I E W O F K E Y R E G U L A T O R Y C A S E S Residential Rate/NEM Decisions Residential Rate Design OIR Decision The CPUC reviewed residential rate structure and issued a decision in July 2015 which: Transition from 4 to 2 tiers by 2019, with 1:1.25 ratio; Currently at 2 tiers, with 1:1.38 ratio “High Usage Surcharge” added in 2017 for consumption at or above 400% of baseline No fixed charges in near-term, but adopts a $10 minimum bill for non-CARE customers Requires the IOUs to file TOU rate proposals by January 2018, with pilots in 2016 NEM 2.0 The CPUC largely left NEM 1.0 rates in place, although its decision requires NEM 2.0 customers to take service under one of PG&E’s current TOU rates and to pay non-bypassable charges and small interconnection fees In December 2016, PG&E passed its NEM cap The CPUC has stated it will review NEM in 2019 Time of Use Rates In the DER Action Plan, the CPUC affirmed its intention to implement default TOU rates for all residential customers in 2019 Currently, PG&E has an opt-in TOU rate schedules available to customers; the peak for one is 4pm—9pm, and the other is 3pm—8pm transitioning to 4pm—9pm in 2020 PG&E will file our default TOU rate proposal, with a number of TOU options, with the CPUC by January 1, 2018; the peak period for default rates in 2019 is expected to be from 4-9 pm 65


LOGO

A P P E N D I X 6 Breakdown of 2016 Total Revenue Requirement Revenue Requirement Component General Rate case (Distribution and Generation) Gas Transmission and Storage Electric Transmission Purchased Gas Costs Energy Resource Recovery Account Public Purpose Programs and Other 2016 Revenue Requirement 56% Base Includes costs to own and operate our assets Earning the authorized rate of return depends on ability to manage costs within rate case outcomes 31% Procurement Pass Through 13% Public Purpose Programs Pass Through 2016 Revenue Requirement ($ in M) ~$9,900 M ~$5,500 M ~$2,250 M ~$17,650 M 66

 


LOGO

A P P E N D I X 7 Description of Gas System Safety Recognition ISO 55001 ISO (International Organization for Standardization) 55001 enables the development of an effective asset management system so that an organization can achieve its objectives consistently and sustainably over time. ISO consists of members from the national standards bodies of 162 countries and has published more than 19,500 international standards. PAS 55 PAS (Publicly Available Specification) 55 is a rigorous specification for optimized management of physical assets with widespread recognition among utilities, transport, mining, process and manufacturing industries worldwide. PAS 55 was developed by the Institute for Asset Management and published by the British Standards Institution. RC 14001 RC (Responsible Care) 14001 is the chemical industry standard issued through the American Chemistry Council (ACC) for process and product safety; community communications; security and safety, health, environmental (SHE) practices. A third party audit reviewed end-to-end safety processes at the company, ultimately approving PG&E as the first utility to secure the certification. API 1173 API RP (American Petroleum Institute Recommended Practice) 1173 outlines specific best practices for safe and effective pipeline operations underpinned by a healthy safety culture. PG&E joined other gas pipeline organizations, along with the National Transportation Safety Board and the Pipeline and Hazardous Materials Safety Administration to help co-author the standard. 67

 


LOGO

A P P E N D I X 8 Credit Metrics and Ratings Fitch Moody’s S&P Pacific Gas and Electric Company Senior Unsecured Debt A A3 BBB+ Short-term Debt F2 P-2 A-2 Outlook Stable Positive Positive PG&E Corporation Senior Unsecured Debt A- Baa1 BBB Short-term Debt F2 P-2 A-2 Outlook Stable Positive Positive 68