XML 46 R20.htm IDEA: XBRL DOCUMENT v3.20.2
OTHER CONTINGENCIES AND COMMITMENTS
9 Months Ended
Sep. 30, 2020
Commitments and Contingencies Disclosure [Abstract]  
OTHER CONTINGENCIES AND COMMITMENTS WILDFIRE-RELATED CONTINGENCIESPG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to wildfires. A provision for a loss contingency is recorded when it is both probable that a liability has been incurred and the amount of the liability can be reasonably estimated. PG&E Corporation and the Utility evaluate which potential liabilities are probable and the related range of reasonably estimated losses and record a charge that reflects their best estimate or the lower end of the range, if there is no better estimate. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of losses is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly, and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, advice of legal counsel, and other information and events pertaining to a particular matter. PG&E Corporation’s and the Utility’s provision for loss and expense excludes anticipated legal costs, which are expensed as incurred. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows may be materially affected by the outcome of the following matters.
2015 Butte Fire

In September 2015, a wildfire (the “2015 Butte fire”) ignited and spread in Amador and Calaveras Counties in Northern California. Cal Fire concluded that the 2015 Butte fire was caused when a gray pine tree contacted the Utility’s electric line, which ignited portions of the tree, and determined that the failure by the Utility and/or its vegetation management contractors, ACRT Inc. and Trees, Inc., to identify certain potential hazards during its vegetation management program ultimately led to the failure of the tree.

During the quarter ended September 30, 2020, the remaining 2015 Butte fire claims were satisfied and discharged in accordance with the Plan. See “Pre-Petition Wildfire-Related Claims and Discharge Upon Plan Effective Date” and “District Attorneys’ Office Investigations” below for more information on the 2015 Butte fire.

2018 Camp Fire and 2017 Northern California Wildfires Background

According to Cal Fire, on November 8, 2018 at approximately 6:33 a.m., a wildfire began near the city of Paradise, Butte County, California (the “2018 Camp fire”), which is located in the Utility’s service territory. Cal Fire’s Camp Fire Incident Information Website as of November 15, 2019 (the “Cal Fire website”) indicated that the 2018 Camp fire consumed 153,336 acres. On the Cal Fire website, Cal Fire reported 85 fatalities and the destruction of 18,804 structures resulting from the 2018 Camp fire.

Beginning on October 8, 2017, multiple wildfires spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Lake, Nevada, and Yuba Counties, as well as in the area surrounding Yuba City (the “2017 Northern California wildfires”). According to the Cal Fire California Statewide Fire Summary dated October 30, 2017, at the peak of the 2017 Northern California wildfires, there were 21 major fires that, in total, burned over 245,000 acres and destroyed an estimated 8,900 structures. The 2017 Northern California wildfires resulted in 44 fatalities.

PG&E Corporation and the Utility were subject to numerous claims in connection with the 2018 Camp fire and 2017 Northern California wildfires. These included claims by various groups of wildfire victims, including individual plaintiffs, holders of insurance subrogation claims, and various federal, state and local entities. During the quarter ended September 30, 2020, these claims have been satisfied and discharged in accordance with the Plan, as described below.

Pre-petition Wildfire-Related Claims and Discharge Upon Plan Effective Date

Pre-petition wildfire-related claims on the Condensed Consolidated Financial Statements include amounts associated with the 2018 Camp fire, the 2017 Northern California wildfires, and the 2015 Butte fire.

On July 1, 2020, pursuant to the Plan, PG&E Corporation and the Utility funded the Fire Victim Trust with $5.4 billion in cash (with an additional $1.35 billion to be funded on a deferred basis), 477.0 million shares of common stock of PG&E Corporation (representing 22.19% of the outstanding common stock of PG&E Corporation as of the Effective Date (subject to potential adjustments)), plus the assignment of certain rights and causes of action. Additionally, as a result of the Equity Units Underwriters exercising their option to purchase 1.45 million additional Equity Units, on August 3, 2020, PG&E Corporation made an equity contribution of 748,415 shares to the Utility which delivered such additional shares of common stock to the Fire Victim Trust pursuant to an anti-dilution provision in the assignment agreement with the Fire Victim Trust. In accordance with the Plan and the Confirmation Order, as a result of such funding, all Fire Victim Claims have been fully and finally satisfied, released and discharged and channeled to the Fire Victim Trust with no recourse to PG&E Corporation or the Utility. Accordingly, $12.15 billion of the $13.5 billion liability as of June 30, 2020 was extinguished in the third quarter of 2020, and the remaining $1.35 billion will be paid out under the terms of the Tax Benefits Payment Agreement, as described in Note 2 under the heading “Significant Bankruptcy Court Actions.”

On July 1, 2020, PG&E Corporation and the Utility funded the Subrogation Wildfire Trust for the benefit of holders of Subrogation Claims in the amount of $11.0 billion in cash and paid approximately $43 million in respect of professional fees of such claimants, for a total of approximately $52 million for subrogation wildfire claimants’ professional fees. Such amount was initially funded into escrow and later paid to the Subrogation Wildfire Trust. In accordance with the Plan and the Confirmation Order, as a result of such funding, all Subrogation Claims have been satisfied, released and discharged and channeled to the Subrogation Wildfire Trust with no recourse to PG&E Corporation or the Utility. Accordingly, the $11.0 billion liability accrual for Subrogation Claims and $47.5 million liability for professional fees was extinguished in the third quarter of 2020.
On July 1, 2020, PG&E Corporation and the Utility paid $1.0 billion in cash to the Settling Public Entities and established a segregated fund in the amount of $10 million to be used to reimburse the Settling Public Entities for any and all legal fees and costs associated with the defense or resolution of any third party claims against the Settling Public Entities. In accordance with the Plan and the Confirmation Order, as a result of such payments, the $1.0 billion liability for the Public Entity Wildfire Claims has been satisfied, released and discharged in the third quarter of 2020.

Plan Support Agreements with Public Entities

On June 18, 2019, PG&E Corporation and the Utility entered into PSAs with certain local public entities (collectively, the “Supporting Public Entities”) providing for an aggregate of $1.0 billion to be paid by PG&E Corporation and the Utility to such public entities pursuant to the Plan in order to fully and finally settle and discharge such public entities’ claims against PG&E Corporation and the Utility relating to the 2018 Camp fire, 2017 Northern California wildfires and 2015 Butte fire (collectively, “Public Entity Wildfire Claims”).

The PSAs also provide that, following the Effective Date, PG&E Corporation and the Utility would create and promptly fund $10 million to a segregated fund to be used by the Supporting Public Entities collectively in connection with the defense or resolution of claims against the Supporting Public Entities by third parties relating to the wildfires noted above (“Third Party Claims”).

These elements were incorporated into the Plan which was approved by the Bankruptcy Court in the Confirmation Order. As described in Note 2 under the heading “Significant Bankruptcy Court Actions,” the actions required by each PSA were taken on or around the Effective Date.

Restructuring Support Agreement with Holders of Subrogation Claims

On September 22, 2019, PG&E Corporation and the Utility entered into the Subrogation RSA. The Subrogation RSA provides for an aggregate amount of $11.0 billion to be paid by PG&E Corporation and the Utility pursuant to the Plan in order to fully and finally settle the Subrogation Claims, upon the terms and conditions set forth in the Subrogation RSA. Under the Subrogation RSA, PG&E Corporation and the Utility have also agreed to reimburse the holders of Subrogation Claims for professional fees of up to $55 million, upon the terms and conditions set forth in the Subrogation RSA.

As described above under the heading “Pre-petition Wildfire-Related Claims and Discharge Upon Plan Effective Date,” the payments described in the Subrogation RSA were made on the Effective Date.

Restructuring Support Agreement with the TCC

On December 6, 2019, PG&E Corporation and the Utility entered into the TCC RSA. The TCC RSA provides for, among other things, a combination of cash and common stock of the reorganized PG&E Corporation to be provided by PG&E Corporation and the Utility pursuant to the Plan (together with certain additional rights, the “Aggregate Fire Victim Consideration”) in order to settle and discharge the Fire Victim Claims, upon the terms and conditions set forth in the TCC RSA and the Plan. The Aggregate Fire Victim Consideration that will fund the Fire Victim Trust pursuant to the Plan for the benefit of holders of the Fire Victim Claims will consist of (a) $5.4 billion in cash that was contributed on the Effective Date of the Plan, (b) $1.35 billion in cash consisting of (i) $650 million to be paid in cash on or before January 15, 2021 and (ii) the remaining balance of $1.35 billion to be paid in cash on or before January 15, 2022, in each case pursuant to the terms of a tax benefit payment agreement to be entered into between the Fire Victim Trust and the reorganized Utility, and (c) an amount of common stock of the reorganized PG&E Corporation valued at 14.9 times Normalized Estimated Net Income (as defined in the TCC RSA), except that the Fire Victim Trust’s share ownership of the reorganized PG&E Corporation would not be less than 20.9% based on the number of fully diluted shares of the reorganized PG&E Corporation outstanding as of the Effective Date of the Plan, assuming the Utility’s allowed ROE as of the date of the TCC RSA. Under certain circumstances, including certain change of control transactions and in connection with the monetization of certain tax benefits related to the payment of wildfire-related claims, the payments described in clause (b) will be accelerated and payable upon an earlier date. The Aggregate Fire Victim Consideration also includes (1) the assignment by PG&E Corporation and the Utility to the Fire Victim Trust of certain rights and causes of action related to the 2015 Butte fire, the 2017 Northern California wildfires and the 2018 Camp fire (together, the “Fires”) that PG&E Corporation and the Utility may have against certain third parties and (2) the assignment of rights under the 2015 insurance policies to resolve any claims related to the Fires in those policy years, other than the rights of PG&E Corporation and the Utility to be reimbursed under the 2015 insurance policies for claims submitted to and paid by PG&E Corporation and the Utility prior to the Petition Date to resolve any claims related to the Fires in those policy years. On June 11, 2020, PG&E Corporation and the Utility and the TCC agreed that the percentage ownership of the Fire Victim Trust will be 22.19% of the outstanding shares of the PG&E Corporation on the Effective Date, subject to potential adjustments.
Pursuant to further discussions with claimants relating to the Ghost Ship fire, certain provisions of the TCC RSA were superseded by the terms of the Plan, and accordingly the above description of the TCC RSA has been revised to reflect the fact that claims arising out of the Ghost Ship fire will be resolved separately from the TCC RSA.

As described above under the heading “Pre-petition Wildfire-Related Claims and Discharge Upon Plan Effective Date,” the funding to be made pursuant to the TCC RSA and the Plan were made on the Effective Date.

2019 Kincade Fire

According to Cal Fire, on October 23, 2019 at approximately 9:27 p.m., a wildfire began northeast of Geyserville in Sonoma County, California (the “2019 Kincade fire”), located in the service territory of the Utility. The Cal Fire Kincade Fire Incident Update dated November 20, 2019, 11:02 a.m. Pacific Time (the “incident update”) indicated that the 2019 Kincade fire had consumed 77,758 acres. In the incident update, Cal Fire reported no fatalities and four first responder injuries. The incident update also indicates the following: structures destroyed, 374 (consisting of 174 residential structures, 11 commercial structures and 189 other structures); and structures damaged, 60 (consisting of 35 residential structures, one commercial structure and 24 other structures). In connection with the 2019 Kincade fire, state and local officials issued numerous mandatory evacuation orders and evacuation warnings at various times for certain areas of the region. Based on County of Sonoma information, PG&E Corporation and the Utility understand that the geographic zones subject to either a mandatory evacuation order or an evacuation warning between October 23, 2019 and November 4, 2019 included approximately 200,000 persons.

On October 23, 2019, by 3:00 p.m. Pacific Time, the Utility had conducted a PSPS event and turned off the power to approximately 27,837 customers in Sonoma County, including Geyserville and the surrounding area. As part of the PSPS, the Utility’s distribution lines in these areas were deenergized. Following the Utility’s established and CPUC-approved PSPS protocols and procedures, transmission lines in these areas remained energized.

The Utility has submitted electric incident reports to the CPUC indicating that:

at approximately 9:19 p.m. Pacific Time on October 23, 2019, the Utility became aware of a transmission level outage on the Geysers #9 Lakeville 230 kV line when the line relayed and did not reclose;

various generating facilities on the Geysers #9 Lakeville 230kV line detected the disturbance and separated at approximately the same time;

at approximately 9:21 p.m. Pacific Time, the PG&E Grid Control Center received a report that a fire had started in an area near transmission tower 001/006;

at approximately 7:30 a.m. Pacific Time on October 24, 2019, a responding Utility troubleman patrolling the Geysers #9 Lakeville 230 kV line observed that Cal Fire had taped off the area around the base of transmission tower 001/006 in the area of the 2019 Kincade fire; and

on site Cal Fire personnel brought to the troubleman’s attention what appeared to be a broken jumper on the same tower.

On July 16, 2020, Cal Fire issued a press release addressing the cause of the 2019 Kincade fire. Cal Fire has determined that “the Kincade Fire was caused by electrical transmission lines owned and operated by Pacific Gas and Electric (PG&E) located northeast of Geyserville. Tinder dry vegetation and strong winds combined with low humidity and warm temperatures contributed to extreme rates of fire spread.”

Cal Fire also indicated that its investigative report has been forwarded to the Sonoma County District Attorney’s Office, which is investigating the matter. On September 25, 2020, the Utility entered into a tolling agreement with the Sonoma County District Attorney’s Office in which the Utility agreed to waive any applicable statute of limitations for violations related to the Kincade fire that would otherwise have expired on or about October 23, 2020, for a period of six months, until April 23, 2021.

PG&E Corporation and the Utility are also conducting their own investigation into the cause of the 2019 Kincade fire. This investigation is preliminary, and PG&E Corporation and the Utility do not have access to all of the evidence in the possession of Cal Fire or other third parties.
Potential liabilities related to the Kincade fire depend on various factors, including but not limited to the cause of the fire, contributing causes of the fire (including alternative potential origins, weather- and climate-related issues), the number, size and type of structures damaged or destroyed, the contents of such structures and other personal property damage, the number and types of trees damaged or destroyed, attorneys’ fees for claimants, the nature and extent of any personal injuries, the amount of fire suppression and clean-up costs, other damages the Utility may be responsible for if found negligent, and the amount of any penalties, fines, or restitution that may be imposed by governmental entities.

If the Utility’s facilities, such as its electric distribution and transmission lines, are judicially determined to be the substantial cause of the Kincade fire, and the doctrine of inverse condemnation applies, the Utility could be liable for property damage, business interruption, interest and attorneys’ fees without having been found negligent. California courts have imposed liability under the doctrine of inverse condemnation in legal actions brought by property holders against utilities on the grounds that losses borne by the person whose property was damaged through a public use undertaking should be spread across the community that benefited from such undertaking, and based on the assumption that utilities have the ability to recover these costs from their customers. Further, California courts have determined that the doctrine of inverse condemnation is applicable regardless of whether the CPUC ultimately allows recovery by the utility for any such costs. The CPUC may decide not to authorize cost recovery even if a court decision were to determine that the Utility is liable as a result of the application of the doctrine of inverse condemnation. (See “Loss Recoveries – Regulatory Recovery” below for further information regarding potential cost recovery related to the wildfires.)

In light of the current state of the law concerning inverse condemnation and the information currently available to PG&E Corporation and the Utility, including the information contained in the electric incident reports, Cal Fire’s determination of the cause, and other information gathered as part of PG&E Corporation’s and the Utility’s investigation, PG&E Corporation and the Utility believe it is probable that they will incur a loss in connection with the 2019 Kincade fire. PG&E Corporation and the Utility recorded a charge in the amount of $600 million for the six months ended June 30, 2020 (before available insurance). Based on additional facts and circumstances available to the Utility as of the date of this filing, PG&E Corporation and the Utility recorded an additional charge for potential losses in connection with the 2019 Kincade fire in the amount of $25 million for the three months ended September 30, 2020.

The aggregate liability of $625 million for claims in connection with the 2019 Kincade fire (before available insurance) corresponds to the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable range of losses and is subject to change based on additional information. The $625 million estimate does not include, among other things, (i) any amounts for potential penalties or fines that may be imposed by governmental entities on PG&E Corporation or the Utility, (ii) any punitive damages, (iii) any amounts in respect of compensation claims by Federal or state agencies other than state fire suppression costs, (iv) evacuation costs or (v) any other amounts that are not reasonably estimable.

The $600 million estimate of the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable range of losses from the end of the prior quarter was based primarily on publicly available information and the Utility had not received significant data regarding actual claimed losses from potential claimants. Since that time, the Utility has received certain information from potential claimants, including certain information received from holders of certain insurance subrogation claims, leading to an increase in such estimate of the lower end. The Utility believes it will continue to receive additional information from potential claimants as litigation or resolution efforts progress. Any such additional information may potentially allow PG&E Corporation and the Utility to refine such estimate and may result in additional changes to the accrual depending on the information provided.

PG&E Corporation and the Utility currently believe that it is reasonably possible that the amount of loss could be greater than $625 million (before available insurance) but are unable to reasonably estimate the additional loss and the upper end of the range because, as described above, there are a number of unknown facts and legal considerations that may impact the amount of any potential liability, including the total scope and nature of claims that may be asserted against PG&E Corporation and the Utility. If the liability for the 2019 Kincade fire were to exceed $1.0 billion, it is possible the Utility would be eligible to make a claim to the Wildfire Fund under AB 1054 for such excess amount, subject to the 40% limitation on claims arising before emergence from bankruptcy. PG&E Corporation and the Utility intend to continue to review the available information and other information as it becomes available, including evidence in Cal Fire’s possession, evidence from or held by other parties, claims that have not yet been submitted, and additional information about the nature and extent of potential damages.

The process for estimating losses associated with potential claims related to the 2019 Kincade fire requires management to exercise significant judgment based on a number of assumptions and subjective factors, including the factors identified above and estimates based on currently available information and prior experience with wildfires. As more information becomes available, management estimates and assumptions regarding the potential financial impact of the 2019 Kincade fire may change.
The Utility has liability insurance from various insurers, which provides coverage for third-party liability attributable to the Kincade fire in an aggregate amount of $430 million. The Utility records insurance recoveries when it is deemed probable that recovery will occur, and the Utility can reasonably estimate the amount or its range. As of September 30, 2020, the Utility has recorded an insurance receivable for the full amount of the $430 million. While the Utility plans to seek recovery of all insured losses, it is unable to predict the ultimate amount and timing of such insurance recoveries.

PG&E Corporation and the Utility have received and are responding to data requests from the SED relating to the Kincade fire. The Sonoma County District Attorney’s Office is currently investigating the fire and various other entities may also be investigating the fire. It is uncertain when the investigations will be complete.

As of October 28, 2020, PG&E Corporation and the Utility are aware of 16 complaints on behalf of approximately 377 plaintiffs related to the 2019 Kincade fire and expects that they may receive further such complaints. The complaints were filed in the California Superior Court for the County of Sonoma and include claims based on multiple theories of liability, including inverse condemnation, negligence, violations of the Public Utilities Code, violations of the Health & Safety Code, premises liability, trespass, public nuisance and private nuisance. The plaintiffs in each action principally assert that PG&E Corporation’s and the Utility’s alleged failure to properly maintain, inspect and de-energize their transmission lines was the cause of the 2019 Kincade fire. The plaintiffs seek damages that include property damage, economic loss, punitive damages, exemplary damages, attorneys’ fees and other damages.

In addition to claims for property damage, business interruption, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, punitive damages and other damages under other theories of liability, including if the Utility were found to have been negligent.

2020 Zogg Fire

According to Cal Fire, on September 27, 2020, a wildfire began in the area of Zogg Mine Road and Jenny Bird Lane, north of Igo in Shasta County, California (the “2020 Zogg fire”), located in the service territory of the Utility. The Cal Fire Zogg fire Incident Update dated October 16, 2020, 3:08 p.m. Pacific Time (the “incident update”), indicated that the 2020 Zogg fire had consumed 56,338 acres. The incident update reported four fatalities and one injury. The incident update also indicated that 27 structures were damaged and 204 structures were destroyed.

On October 9, 2020, the Utility submitted an electric incident report to the CPUC indicating that:

wildfire camera and satellite data on September 27, 2020 show smoke, heat or signs of fire in the area of Zogg Mine Road and Jenny Bird Lane between approximately 2:43 p.m. and 2:46 p.m. Pacific Time;

according to Utility records, on September 27, 2020, a SmartMeter and a line recloser serving the area of Zogg Mine Road and Jenny Bird Lane reported alarms and other activity between approximately 2:40 p.m. and 3:06 p.m. Pacific Time when the line recloser de-energized a portion of the Girvan 1101 12 kV circuit, a distribution line that serves that area;

the data currently available to the Utility do not establish the causes of the activity on the Girvan 1101 circuit or the locations of these causes;

on October 9, 2020, Cal Fire informed the Utility that they had taken possession of Utility equipment as part of Cal Fire’s ongoing investigation into the cause of the 2020 Zogg fire and allowed the Utility access to the area; and

Cal Fire has not issued a determination as to the cause.

The cause of the 2020 Zogg fire remains under investigation by Cal Fire, and PG&E Corporation and the Utility are cooperating with its investigation. The Shasta County District Attorney’s Office is investigating the fire, and various other entities, which may include other law enforcement agencies, may also be investigating the fire. It is uncertain when any such investigations will be complete. PG&E Corporation and the Utility are also conducting their own investigation into the cause of the 2020 Zogg fire. This investigation is preliminary, and PG&E Corporation and the Utility do not have access to all of the evidence in the possession of Cal Fire or other third parties.
Based on the facts and circumstances available to PG&E Corporation and the Utility as of the date of this filing, including the information contained in the electric incident report and other information gathered as part of PG&E Corporation’s and the Utility’s investigation, PG&E Corporation and the Utility believe it is reasonably possible that they will incur a loss in connection with the 2020 Zogg fire. However, due to the limited amount of time that has elapsed since the start of the 2020 Zogg fire, the preliminary stages of the investigations, and the uncertainty as to the extent and magnitude of potential losses, PG&E Corporation and the Utility cannot reasonably estimate the amount or range of such possible loss at this time.

While the cause of the 2020 Zogg fire remains under investigation and there are a number of unknown facts surrounding the cause of the 2020 Zogg fire, the Utility could be subject to significant liability in connection with this fire. If such liability were to exceed insurance coverage, it could have a material impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

As of October 28, 2020, PG&E Corporation and the Utility are aware of one complaint on behalf of approximately six plaintiffs that may be related to the 2020 Zogg fire and expect that they may receive further such complaints. The one complaint filed thus far has, as of October 28, 2020, not yet been served on PG&E Corporation or the Utility, and PG&E Corporation and the Utility have not yet had the opportunity to review it.

In addition to claims for property damage, business interruption, interest and attorneys’ fees, the Utility could be liable for fire suppression costs, evacuation costs, medical expenses, personal injury damages, punitive damages and other damages under other theories of liability, including if the Utility were found to have been negligent.

Loss Recoveries

PG&E Corporation and the Utility have insurance coverage for liabilities, including wildfire. Additionally, there are several mechanisms that allow for recovery of costs from customers. Potential for recovery is described below. Failure to obtain a substantial or full recovery of costs related to wildfires or any conclusion that such recovery is no longer probable could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. In addition, the inability to recover costs in a timely manner could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Insurance

Insurance Coverage

PG&E Corporation and the Utility have liability insurance coverage for wildfire events in an amount of $430 million (subject to an initial self-insured retention of $10 million per occurrence) for the period from August 1, 2019 through July 31, 2020, and approximately $1 billion in liability insurance coverage for non-wildfire events (subject to an initial self-insured retention of $10 million per occurrence), comprised of $520 million for the period from August 1, 2019 through July 31, 2020 and $480 million for the period from September 3, 2019 through September 2, 2020. PG&E Corporation’s and the Utility’s cost of obtaining this wildfire and non-wildfire insurance coverage in place for the period of August 1, 2019 through September 2, 2020 is approximately $212 million.

In July 2020, and through additional purchases in August 2020, the Utility renewed its liability insurance coverage for wildfire events in the amount of $867.5 million (subject to an initial self-insured retention of $60 million), comprised of $825 million for the period of August 1, 2020 to July 31, 2021 and $42.5 million in reinsurance for the period of July 1, 2020 through June 30, 2021. In addition, the Utility renewed its liability insurance coverage for non-wildfire events in the amount of $700 million (subject to an initial self-insured retention of $10 million) for the period from August 1, 2020 through July 31, 2021. PG&E Corporation’s and the Utility’s cost of obtaining this wildfire and non-wildfire coverage is approximately $859 million.

Various coverage limitations applicable to different insurance layers could result in material uninsured costs in the future depending on the amount and type of damages resulting from covered events.

The Utility’s 2020 GRC settlement agreement, currently pending before the Commission, includes a new two-way balancing account that, if approved, would allow the Utility to recover in rates its actual insurance premium costs for up to $1.4 billion in coverage. The Utility is unable to predict the timing and outcome of the 2020 GRC proceeding.

The Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any calendar year that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054. (See “Wildfire Fund under AB 1054” below.)
Insurance Receivable

PG&E Corporation and the Utility record a receivable for insurance recoveries when it is deemed probable that recovery of a recorded loss will occur. Through September 30, 2020, PG&E Corporation and the Utility recorded $1.38 billion for probable insurance recoveries in connection with the 2018 Camp fire, $843 million for probable insurance recoveries in connection with the 2017 Northern California wildfires, and $430 million for probable insurance recoveries in connection with the 2019 Kincade fire. These amounts reflect an assumption that the cause of each fire is deemed to be a separate occurrence under the insurance policies. PG&E Corporation and the Utility intend to seek full recovery for all insured losses.

If PG&E Corporation and the Utility are unable to recover the full amount of their insurance, PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows could be materially affected.

The balances for insurance receivables with respect to wildfires are included in Other accounts receivable in PG&E Corporation’s and the Utility’s Condensed Consolidated Balance Sheets:
Insurance Receivable (in millions)2019 Kincade fire2018 Camp fire2017 Northern California wildfires2015 Butte fireTotal
Balance at December 31, 2019
$ $1,380 $807 $50 $2,237 
Accrued insurance recoveries430 — — — 430 
Reimbursements— (1,380)(707)— (2,087)
Balance at September 30, 2020
$430 $ $100 $50 $580 

In October 2020, the Utility received another $75 million and $50 million in insurance reimbursements related to the 2017 Northern California wildfires and the 2015 Butte fire, respectively.

Regulatory Recovery

On June 21, 2018, the CPUC issued a decision granting the Utility’s request to establish a WEMA to track specific incremental wildfire liability costs effective as of July 26, 2017. The decision does not grant the Utility rate recovery of any wildfire-related costs. Any such rate recovery would require CPUC authorization in a separate proceeding. The Utility may be unable to fully recover costs in excess of insurance, if at all. Rate recovery is uncertain; therefore, the Utility has not recorded a regulatory asset related to any wildfire claims costs. Even if such recovery is possible, it could take a number of years to resolve and a number of years to collect.

In addition, SB 901, signed into law on September 21, 2018, requires the CPUC to establish a CHT, directing the CPUC to limit certain disallowances in the aggregate, so that they do not exceed the maximum amount that the Utility can pay without harming ratepayers or materially impacting its ability to provide adequate and safe service. SB 901 also authorizes the CPUC to issue a financing order that permits recovery, through the issuance of recovery bonds (also referred to as “securitization”), of wildfire-related costs found to be just and reasonable by the CPUC and, only for the 2017 Northern California wildfires, any amounts in excess of the CHT.

On January 10, 2019, the CPUC adopted an OIR, which establishes a process to develop criteria and a methodology to inform determinations of the CHT in future applications under Section 451.2(a) of the Public Utilities Code for recovery of costs related to the 2017 Northern California wildfires.

On July 8, 2019, the CPUC issued a decision in the CHT proceeding. The decision adopts a methodology to determine the CHT based on (1) the maximum additional debt that a utility can take on and maintain a minimum investment grade credit rating; (2) excess cash available to the utility; (3) a potential regulatory adjustment of 20% of the CHT or 5% of the total disallowed wildfire liabilities; and (4) an adjustment to preserve for ratepayers any tax benefits associated with the CHT. The decision also requires a utility to include proposed ratepayer protection measures to mitigate harm to ratepayers as part of an application under Section 451.2(b).
Pursuant to SB 901 and the CPUC’s methodology adopted in the CHT OIR, on April 30, 2020, the Utility filed an application with the CPUC seeking authorization for a post-emergence transaction to securitize $7.5 billion of 2017 wildfire claims costs that is designed to not impact amounts billed to customers, with the proceeds used to pay or reimburse the Utility for the payment of wildfire claims costs associated with the 2017 Northern California wildfires. As a result of the proposed transaction, the Utility would retire $6.0 billion of Utility debt and accelerate a $700 million payment due to the Fire Victim Trust.

Failure to obtain a substantial or full recovery of costs related to wildfires could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows.

Wildfire-Related Derivative Litigation

Two purported derivative lawsuits alleging claims for breach of fiduciary duties and unjust enrichment were filed in the San Francisco County Superior Court on November 16, 2017 and November 20, 2017, respectively, naming as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation and the Utility. PG&E Corporation and the Utility are named as nominal defendants. These lawsuits were consolidated by the court on February 14, 2018 and are denominated In Re California North Bay Fire Derivative Litigation. On April 13, 2018, the plaintiffs filed a consolidated complaint. After the parties reached an agreement regarding a stay of the derivative proceeding pending resolution of the tort actions described above and any regulatory proceeding relating to the 2017 Northern California wildfires, on April 24, 2018, the court entered a stipulation and order to stay. The stay was subject to certain conditions regarding the plaintiffs’ access to discovery in other actions. On January 28, 2019, the plaintiffs filed a request to lift the stay for the purposes of amending their complaint to add allegations regarding the 2018 Camp fire. Prior to resolution of the plaintiffs’ request to lift the stay, this matter was automatically stayed by PG&E Corporation’s and the Utility’s commencement of bankruptcy proceedings, as discussed below.

On August 3, 2018, a third purported derivative lawsuit, entitled Oklahoma Firefighters Pension and Retirement System v. Chew, et al., was filed in the U.S. District Court for the Northern District of California, naming as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation and the Utility. PG&E Corporation is named as a nominal defendant. The lawsuit alleges claims for breach of fiduciary duties and unjust enrichment as well as a claim under Section 14(a) of the federal Securities Exchange Act of 1934 alleging that PG&E Corporation’s and the Utility’s 2017 proxy statement contained misrepresentations regarding the companies’ risk management and safety programs. On October 15, 2018, PG&E Corporation filed a motion to stay the litigation. Prior to the scheduled hearing on this motion, this matter was automatically stayed by PG&E Corporation’s and the Utility’s commencement of bankruptcy proceedings, as discussed below. A case management conference is currently set for November 19, 2020.

On October 23, 2018, a fourth purported derivative lawsuit, entitled City of Warren Police and Fire Retirement System v. Chew, et al., was filed in San Francisco County Superior Court, alleging claims for breach of fiduciary duty, corporate waste and unjust enrichment. It names as defendants certain current and former members of the Board of Directors and certain current and former officers of PG&E Corporation, and names PG&E Corporation as a nominal defendant. The plaintiff filed a request with the court seeking the voluntary dismissal of this matter without prejudice on January 18, 2019.

On November 21, 2018, a fifth purported derivative lawsuit, entitled Williams v. Earley, Jr., et al., was filed in federal court in San Francisco, alleging claims identical to those alleged in the Oklahoma Firefighters Pension and Retirement System v. Chew, et al. lawsuit listed above against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. This lawsuit includes allegations related to the 2017 Northern California wildfires and the 2018 Camp fire. This action was stayed by stipulation of the parties and order of the court on December 21, 2018, subject to resolution of the pending securities class action. A case management conference is currently set for November 19, 2020.

On December 24, 2018, a sixth purported derivative lawsuit, entitled Bowlinger v. Chew, et al., was filed in San Francisco Superior Court, alleging claims for breach of fiduciary duty, abuse of control, corporate waste, and unjust enrichment in connection with the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. On February 5, 2019, the plaintiff in Bowlinger filed a response to the notice asserting that the automatic stay did not apply to his claims. PG&E Corporation and the Utility accordingly filed a Motion to Enforce the Automatic Stay with the Bankruptcy Court as to the Bowlinger action, which was granted. A case management conference is currently set for November 6, 2020.
On January 25, 2019, a seventh purported derivative lawsuit, entitled Hagberg v. Chew, et al., was filed in San Francisco Superior Court, alleging claims for breach of fiduciary duty, abuse of control, corporate waste, and unjust enrichment in connection with the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation and the Utility as nominal defendants. A case management conference is currently set for January 6, 2021.

On January 28, 2019, an eighth purported derivative lawsuit, entitled Blackburn v. Meserve, et al., was filed in federal court alleging claims for breach of fiduciary duty, unjust enrichment, and waste of corporate assets in connection with the 2017 Northern California wildfires and the 2018 Camp fire against certain current and former officers and directors, and naming PG&E Corporation as a nominal defendant. A case management conference is currently set for November 19, 2020.

Due to the commencement of the Chapter 11 Cases, PG&E Corporation and the Utility filed notices in each of these proceedings on February 1, 2019, reflecting that the proceedings were automatically stayed through the Effective Date pursuant to section 362(a) of the Bankruptcy Code. PG&E Corporation’s and the Utility’s rights with respect to the derivative claims asserted against former officers and directors of PG&E Corporation and the Utility were assigned to the Fire Victim Trust under the TCC RSA. The assignment became effective as of the Effective Date.

The above purported derivative lawsuits were brought against the named defendants on behalf of PG&E Corporation and/or the Utility. As a result of the assignment of these derivative claims to the Fire Victim Trust, any recovery based on the derivative claims would be paid to the Fire Victim Trust. Any such recovery is limited to the extent of any director and officer insurance policy proceeds paid by any insurance carrier to reimburse PG&E Corporation and/or the Utility for amounts paid pursuant to their indemnification obligations in connection with such causes of action.

Securities Class Action Litigation

Wildfire-Related Class Action

In June 2018, two purported securities class actions were filed in the United States District Court for the Northern District of California, naming PG&E Corporation and certain of its current and former officers as defendants, entitled David C. Weston v. PG&E Corporation, et al. and Jon Paul Moretti v. PG&E Corporation, et al., respectively.  The complaints alleged material misrepresentations and omissions related to, among other things, vegetation management and transmission line safety in various PG&E Corporation public disclosures. The complaints asserted claims under Section 10(b) and Section 20(a) of the federal Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder, and sought unspecified monetary relief, interest, attorneys’ fees and other costs. Both complaints identified a proposed class period of April 29, 2015 to June 8, 2018. On September 10, 2018, the court consolidated both cases and the litigation is now denominated In re PG&E Corporation Securities Litigation. The court also appointed the Public Employees Retirement Association of New Mexico (“PERA”) as lead plaintiff. The plaintiff filed a consolidated amended complaint on November 9, 2018. After the plaintiff requested leave to amend its complaint to add allegations regarding the 2018 Camp fire, the plaintiff filed a second amended consolidated complaint on December 14, 2018.

Due to the commencement of the Chapter 11 Cases, PG&E Corporation and the Utility filed a notice on February 1, 2019, reflecting that the proceedings were automatically stayed as to PG&E Corporation and the Utility pursuant to section 362(a) of the Bankruptcy Code. On February 15, 2019, PG&E Corporation and the Utility filed a complaint in Bankruptcy Court against the plaintiff seeking preliminary and permanent injunctive relief to extend the stay to the claims alleged against the individual officer defendants.

On February 22, 2019, a third purported securities class action was filed in the United States District Court for the Northern District of California, entitled York County on behalf of the York County Retirement Fund, et al. v. Rambo, et al. (the “York County Action”). The complaint names as defendants certain current and former officers and directors, as well as the underwriters of four public offerings of notes from 2016 to 2018. Neither PG&E Corporation nor the Utility is named as a defendant. The complaint alleges material misrepresentations and omissions in connection with the note offerings related to, among other things, PG&E Corporation’s and the Utility’s vegetation management and wildfire safety measures. The complaint asserts claims under Section 11 and Section 15 of the Securities Act, and seeks unspecified monetary relief, attorneys’ fees and other costs, and injunctive relief. On May 7, 2019, the York County Action was consolidated with In re PG&E Corporation Securities Litigation.
On May 28, 2019, the plaintiffs in the consolidated securities actions filed a third amended consolidated class action complaint, which includes the claims asserted in the previously filed actions and names as defendants PG&E Corporation, the Utility, certain current and former officers and directors, and the underwriters. On August 28, 2019, the Bankruptcy Court denied PG&E Corporation’s and the Utility’s request to extend the stay to the claims against the officer, director, and underwriter defendants. On October 4, 2019, the officer, director, and underwriter defendants filed motions to dismiss the third amended complaint, which motions are currently under submission with the District Court.

Satisfaction of HoldCo Rescission or Damage Claims and Subordinated Debt Claims

Claims against PG&E Corporation and the Utility relating to the three purported securities class actions (described above) that have been consolidated and denominated In re PG&E Corporation Securities Litigation, U.S. District Court for the Northern District of California, Case No. 18-035509, will be resolved pursuant to the Plan. As described above, these claims consist of pre-petition claims under the Federal securities laws related to, among other things, allegedly misleading statements or omissions with respect to vegetation management and wildfire safety disclosures, and are classified into two categories under the Plan, each of which is subject to subordination under the Bankruptcy Code. The first category of claims consists of pre-petition claims arising from or related to the common stock of PG&E Corporation (such claims, with certain other similar claims against PG&E Corporation, the “HoldCo Rescission or Damage Claims”). The second category of pre-petition claims consists of claims arising from debt securities issued by PG&E Corporation and the Utility (such claims, with certain other similar claims against PG&E Corporation and the Utility, the “Subordinated Debt Claims,” and together with the HoldCo Rescission or Damage Claims, the “Subordinated Claims”).

While PG&E Corporation and the Utility believe they have defenses to the Subordinated Claims, as well as insurance coverage that may be available in respect of the Subordinated Claims, these defenses may not prevail and any such insurance coverage may not be adequate to cover the full amount of the allowed claims. In that case, PG&E Corporation and the Utility will be required, pursuant to the Plan, to satisfy such claims as follows:

each holder of an allowed HoldCo Rescission or Damage Claim will receive a number of shares of common stock of PG&E Corporation equal to such holder’s HoldCo Rescission or Damage Claim Share (as such term is defined in the Plan); and

each holder of an allowed Subordinated Debt Claim will receive payment in full in cash.

PG&E Corporation and the Utility have been engaged in settlement efforts with respect to the Subordinated Claims. If the Subordinated Claims are not settled (with any such resolution being subject to the approval of the Bankruptcy Court), PG&E Corporation and the Utility expect that the Subordinated Claims will be resolved by the Bankruptcy Court in the claims reconciliation process and treated as described above under the Plan. Under the Plan, after the Effective Date, PG&E Corporation and the Utility have the authority to compromise, settle, object to, or otherwise resolve proofs of claim, and the Bankruptcy Court retains jurisdiction to hear disputes arising in connection with disputed claims. With respect to the Subordinated Claims, the claims reconciliation process may include litigation of the merits of such claims, including the filing of motions, fact discovery, and expert discovery. The total number and amount of allowed Subordinated Claims, if any, was not determined at the Effective Date. To the extent any such claims are allowed, the total amount of such claims could be material, and therefore could result in (a) the issuance of a material number of shares of common stock of PG&E Corporation with respect to allowed HoldCo Rescission or Damage Claims, and/or (b) the payment of a material amount of cash with respect to allowed Subordinated Debt Claims. There can be no assurance that such claims will not have a material adverse impact on PG&E Corporation’s and the Utility’s business, financial condition, results of operations, and cash flows.

Further, if shares are issued in respect of allowed HoldCo Rescission or Damage Claims, it may be determined that under the Plan, the Fire Victim Trust should receive additional shares of common stock of PG&E Corporation (assuming, for this purpose, that shares issued in respect of the HoldCo Rescission or Damage Claims were issued on the Effective Date).

The named plaintiffs in the consolidated securities actions filed proofs of claim with the Bankruptcy Court on or before the bar date that reflect their securities litigation claims against PG&E Corporation and the Utility. On December 9, 2019, the lead plaintiff in the consolidated securities actions filed a motion seeking approval from the Bankruptcy Court to treat its proof of claim as a class proof of claim. On February 27, 2020, the Bankruptcy Court issued an order denying the motion, but extending the bar date for putative class members to file proofs of claim until April 16, 2020. On March 6, 2020, the lead plaintiff filed a notice of appeal regarding the denial of its motion. On May 15, 2020, the lead plaintiff filed the opening brief for its appeal. On June 15, 2020, PG&E filed its brief in response. On June 29, 2020, the lead plaintiff filed its reply. No hearing date has been set.
On July 2, 2020, PERA filed a notice of appeal of the Confirmation Order to the District Court, solely to the extent of seeking review of that part of the Confirmation Order approving the Insurance Deduction (as defined in the Plan) with respect to the formula for the determination of the HoldCo Rescission or Damage Claims Share. On September 3, 2020, PERA filed its principal brief in support of the appeal. On October 5, 2020, PG&E Corporation and the Utility filed their response brief. PERA filed its reply brief on October 19, 2020.

On September 1, 2020, PG&E Corporation and the Utility filed a motion (the “Securities Claims Procedures Motion”) with the Bankruptcy Court to approve procedures to allow for the resolution of the outstanding and unresolved Subordinated Claims, which motion, among other things, requests approval of certain information request procedures, standard and abbreviate mediation processes, and procedures with respect to the potential filing of omnibus claim objections with respect to the Subordinated Claims. PERA and a number of other parties have filed objections to the Securities Claims Procedures Motion.

On September 28, 2020, PERA filed a second motion requesting the Bankruptcy Court exercise its discretion pursuant to Bankruptcy Rule 7023 to allow PERA to file a class proof of claim on behalf of the holders of Subordinated Claims (the “Renewed 7023 Motion”). The Bankruptcy Court set a briefing schedule that, among other things, (i) adjourned the hearing on the Securities Claims Procedures Motion to November 17, 2020, and (ii) established a briefing scheduled with respect to the Renewed 7023 Motion with a hearing on the motion also scheduled for November 17, 2020. PG&E Corporation’s and the Utility’s deadline to object to the Renewed 7023 Motion is October 29, 2020.

De-energization Class Action

On October 25, 2019, a purported securities class action was filed in the United States District Court for the Northern District of California, entitled Vataj v. Johnson et al. The complaint named as defendants a current director and certain current and former officers of PG&E Corporation. Neither PG&E Corporation nor the Utility was named as a defendant. The complaint alleged materially false and misleading statements regarding PG&E Corporation’s wildfire prevention and safety protocols and policies, including regarding the Utility’s public safety power shutoffs, that allegedly resulted in losses and damages to holders of PG&E Corporation’s securities. The complaint asserted claims under Section 10(b) and Section 20(a) of the federal Securities Exchange Act of 1934 and Rule 10b-5 promulgated thereunder, and sought unspecified monetary relief, attorneys’ fees and other costs. On February 3, 2020, the District Court granted a stipulation appointing Iron Workers Local 580 Joint Funds, Ironworkers Locals 40,361 & 417 Union Security Funds and Robert Allustiarti co-lead plaintiffs and approving the selection of the plaintiffs’ counsel, and further ordered the parties to submit a proposed schedule by February 13, 2020. On February 20, 2020, the District Court issued a scheduling order that required the amended complaint to be filed by April 17, 2020.

On April 17, 2020, the plaintiffs filed an amended complaint asserting the same claims. The amended complaint added PG&E Corporation and a former officer of PG&E Corporation as defendants, and no longer asserts claims against the other two officers of PG&E Corporation previously named in the action.

On May 15, 2020 the officer defendants filed their motion to dismiss in Vataj. On June 19, 2020, the lead plaintiff filed its opposition to the motion to dismiss. On July 10, 2020 the officer defendants filed their reply. The motion is currently under submission with the District Court. As of October 28, 2020, PG&E Corporation had not yet been served with this complaint.

PG&E Corporation and the Utility currently believe it is probable that they will incur a loss in connection with this proceeding and accordingly recorded a charge during the three months ended September 30, 2020. PG&E Corporation and the Utility determined that the amount of the charge recorded in connection with such loss is not material and corresponds to the lower end of the range of PG&E Corporation’s and the Utility’s reasonably estimable range of losses. This amount is subject to change based on additional information.

PG&E Corporation and the Utility are unable to reasonably estimate the upper end of the range given the early stages of the consolidated securities actions and the de-energization class action, including but not limited to, the fact that the defendants’ motions to dismiss have not yet been decided and no discovery has occurred.
Indemnification Obligations

To the extent permitted by law, PG&E Corporation and the Utility have obligations to indemnify directors and officers for certain events or occurrences while a director or officer is or was serving in such capacity, which indemnification obligations extend to the claims asserted against the directors and officers in the securities class action. PG&E Corporation and the Utility maintain directors’ and officers’ insurance coverage to reduce their exposure to such indemnification obligations. PG&E Corporation and the Utility have provided notice to their insurance carriers of the claims asserted in the wildfire-related securities class actions and derivative litigation, and are in communication with the carriers regarding the applicability of the directors and officers insurance policies to those matters. PG&E Corporation and the Utility additionally have potential indemnification obligations to the underwriters for the Utility’s note offerings, pursuant to the underwriting agreements associated with those offerings. PG&E Corporation’s and the Utility’s indemnification obligations to the officers, directors and underwriters may be limited or affected by the Chapter 11 Cases.

District Attorneys’ Offices Investigations

Following the 2018 Camp fire, the Butte County District Attorney’s Office and the California Attorney General’s Office opened a criminal investigation of the 2018 Camp fire. PG&E Corporation and the Utility were informed by the Butte County District Attorney’s Office and the California Attorney General’s Office that a grand jury had been empaneled in Butte County.

On March 17, 2020, the Utility entered into the Plea Agreement and Settlement (the “Plea Agreement”) with the People of the State of California, by and through the Butte County District Attorney’s office (the “People” and the “Butte DA,” respectively) to resolve the criminal prosecution of the Utility in connection with the 2018 Camp fire. Subject to the terms and conditions of the Plea Agreement, the Utility agreed to plead guilty to 84 counts of involuntary manslaughter in violation of Penal Code section 192(b) and one count of unlawfully causing a fire in violation of Penal Code section 452, and to admit special allegations pursuant to Penal Code sections 452.1(a)(2), 452.1(a)(3) and 452.1(a)(4).

Per the Plea Agreement, the Utility was sentenced to pay the maximum total fine and penalty of approximately $3.5 million. The Utility also agreed to pay $500,000 to the Butte County District Attorney Environmental and Consumer Protection Fund to reimburse costs spent on the investigation of the 2018 Camp fire.

Simultaneous with entry into the Plea Agreement, the Utility has committed to spend up to $15 million over five years to provide water to Butte County residents impacted by damage to the Utility’s Miocene Canal caused by the 2018 Camp fire. In addition, the Utility has consented to the Butte DA consulting, sharing information with and receiving information from the Monitor overseeing the Utility’s probation related to the San Bruno explosion through the expiration of the Utility’s term of probation and in no event until later than January 31, 2022. This consent is subject to the approval of the federal court overseeing the Utility’s probation and the Monitor.

On June 16, 2020 through June 18, 2020, the Butte County Superior Court held proceedings at which the Utility pled guilty and was sentenced according to the terms of the Plea Agreement. On July 21, 2020, the Utility paid the $3.5 million fine and penalty to the Butte County Superior Court and $500,000 to the Butte County District Attorney Environmental and Consumer Protection Fund.

Cal Fire announced that it had determined that “the Kincade Fire was caused by electrical transmission lines owned and operated by Pacific Gas and Electric (PG&E) located northeast of Geyserville. Tinder dry vegetation and strong winds combined with low humidity and warm temperatures contributed to extreme rates of fire spread.” Cal Fire also indicated that its investigative report has been forwarded to the Sonoma County District Attorney’s Office, which is currently conducting an investigation of the fire. For more information see “2019 Kincade Fire” above.

The Shasta County District Attorney’s Office is investigating the 2020 Zogg fire. See “2020 Zogg Fire” above for further information.

Additional investigations and other actions may arise out of the 2019 Kincade fire or the 2020 Zogg fire. The timing and outcome for resolution of any such investigations are uncertain.
SEC Investigation

On March 20, 2019, PG&E Corporation learned that the SEC’s San Francisco Regional Office was conducting an investigation related to PG&E Corporation’s and the Utility’s public disclosures and accounting for losses associated with the 2018 Camp fire, the 2017 Northern California wildfires and the 2015 Butte fire. PG&E Corporation and the Utility are unable to predict the timing and outcome of the investigation.

Clean-up and Repair Costs

The Utility incurred costs of $62 million for clean-up and repair of the Utility’s facilities (including $18 million in capital expenditures) through September 30, 2020, in connection with the 2019 Kincade fire. The Utility is authorized to track and seek recovery of clean-up and repair costs through CEMA. (CEMA requests are subject to CPUC approval.) The Utility capitalizes and records as regulatory assets costs that are probable of recovery. At September 30, 2020, the CEMA regulatory asset balance related to the 2019 Kincade fire was zero. Additionally, the capital expenditures for clean-up and repair are included in property, plant and equipment at September 30, 2020.

Failure to obtain a substantial or full recovery of costs that are deemed probable of recovery could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.

Wildfire Fund under AB 1054

On July 12, 2019, the California governor signed into law AB 1054, a bill which provides for the establishment of a statewide fund that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment, subject to the terms and conditions of AB 1054. Eligible claims are claims for third party damages resulting from any such wildfires, limited to the portion of such claims that exceeds the greater of (i) $1.0 billion in the aggregate in any calendar year and (ii) the amount of insurance coverage required to be in place for the electric utility company pursuant to Section 3293 of the Public Utilities Code, added by AB 1054.

Electric utility companies that draw from the Wildfire Fund will only be required to repay amounts that are determined by the CPUC in an application for cost recovery not to be just and reasonable, subject to a rolling three-year disallowance cap equal to 20% of the electric utility company’s transmission and distribution equity rate base. For the Utility, this disallowance cap is expected to be approximately $2.4 billion for the three-year period starting in 2019, subject to adjustment based on changes in the Utility’s total transmission and distribution equity rate base. The disallowance cap is inapplicable in certain circumstances, including if the Wildfire Fund administrator determines that the electric utility company’s actions or inactions that resulted in the applicable wildfire constituted “conscious or willful disregard for the rights and safety of others,” or the electric utility company fails to maintain a valid safety certification. Costs that the CPUC determines to be just and reasonable will not need to be repaid to the Wildfire Fund, resulting in a draw-down of the Wildfire Fund.

On August 23, 2019, the CPUC approved the Utility’s Initial Safety Certification, which under AB 1054 entitles the Utility to certain benefits, including eligibility for a cap on wildfire fund reimbursement and for a reformed prudent manager standard. The Utility satisfied the required elements for its Initial Safety Certificate, as follows: (i) the electrical corporation has an approved wildfire mitigation plan, (ii) the electrical corporation is in good standing, which can be satisfied by the electrical corporation having agreed to implement the findings of its most recent safety culture assessment, if applicable, (iii) the electrical corporation has established a safety committee of its board of directors composed of members with relevant safety experience, and (iv) the electrical corporation has established board-of-director-level reporting to the CPUC on safety issues. The Initial Safety Certification is valid for 12 months. Before the expiration of any current safety certification, the Utility must request a new safety certification for the following 12 months, which shall be issued within 90 days if the Utility has provided documentation that it has satisfied the requirements for the safety certification pursuant to Section 8389(e) of the Public Utilities Code, added by AB 1054. The existing safety certification remains valid until a timely request for a new safety certification is acted upon. On July 29, 2020, the Utility submitted its application for a new safety certification.
The Wildfire Fund and disallowance cap will be terminated when the amounts therein are exhausted. The Wildfire Fund is expected to be capitalized with (i) $10.5 billion of proceeds of bonds supported by a 15-year extension of the Department of Water Resources charge to ratepayers, (ii) $7.5 billion in initial contributions from California’s three investor-owned electric utility companies and (iii) $300 million in annual contributions paid by California’s three investor-owned electric utility companies for at least a 10 year period. The contributions from the investor-owned electric utility companies will be effectively borne by their respective shareholders, as they will not be permitted to recover these costs from ratepayers. The costs of the initial and annual contributions are allocated among the three investor-owned electric utility companies pursuant to a “Wildfire Fund allocation metric” set forth in AB 1054 based on land area in the applicable utility’s service territory classified as high fire threat districts and adjusted to account for risk mitigation efforts. The Utility’s Wildfire Fund allocation metric is 64.2% (representing an initial contribution of approximately $4.8 billion and annual contributions of approximately $193 million). The Wildfire Fund will only be available for payment of eligible claims so long as there are sufficient funds remaining in the Wildfire Fund. Such funds could be depleted more quickly than expected, including as a result of claims made by California’s other participating electric utility companies.

AB 1054 also provides that the first $5.0 billion expended in the aggregate by California’s three investor-owned electric utility companies on fire risk mitigation capital expenditures included in their respective approved WMPs will be excluded from their respective equity rate bases. The $5.0 billion of capital expenditures will be allocated among the investor-owned electric utility companies in accordance with their Wildfire Fund allocation metrics (described above). The Utility’s allocation is $3.21 billion. AB 1054 contemplates that such capital expenditures may be securitized through a customer charge.

On July 23, 2019, the Utility notified the CPUC of its intent to participate in the Wildfire Fund. On August 7, 2019, PG&E Corporation and the Utility submitted a motion with the Bankruptcy Court for the entry of an order authorizing PG&E Corporation and the Utility to participate in the Wildfire Fund and to make any initial and annual contributions to the Wildfire Fund upon emergence from Chapter 11. On August 26, 2019, the Bankruptcy Court entered an order granting such authorizations. In order to participate in the Wildfire Fund, the Utility also was required to meet the eligibility and other requirements set forth in AB 1054, and to pay its share of the initial contribution to the Wildfire Fund upon emergence from Chapter 11.

On the Effective Date, having satisfied the conditions for the Utility’s participation in the Wildfire Fund, PG&E Corporation and the Utility contributed, in accordance with AB 1054, an initial contribution of approximately $4.8 billion and first annual contribution of approximately $193 million to the Wildfire Fund to secure participation of the Utility therein. SDG&E and Edison made their initial contributions to the Wildfire Fund in September 2019.

As of the Effective Date, the Wildfire Fund is available to the Utility to pay for eligible claims arising on or after the effective date of AB 1054, July 12, 2019, subject to a limit of 40% of the amount of allowed claims arising between the effective date of AB 1054 and the Effective Date of the Plan.

For additional information on the Wildfire Fund, see Note 3 above.
OTHER CONTINGENCIES AND COMMITMENTS
PG&E Corporation and the Utility have significant contingencies arising from their operations, including contingencies related to enforcement and litigation matters and environmental remediation.  A provision for a loss contingency is recorded when it is both probable that a loss has been incurred and the amount of the loss can be reasonably estimated. PG&E Corporation and the Utility evaluate the range of reasonably estimated losses and record a provision based on the lower end of the range, unless an amount within the range is a better estimate than any other amount. The assessment of whether a loss is probable or reasonably possible, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Loss contingencies are reviewed quarterly and estimates are adjusted to reflect the impact of all known information, such as negotiations, discovery, settlements and payments, rulings, penalties related to regulatory compliance, advice of legal counsel, and other information and events pertaining to a particular matter. PG&E Corporation’s and the Utility’s policy is to exclude anticipated legal costs from the provision for loss and expense these costs as incurred.

The Utility also has substantial financial commitments in connection with agreements entered into to support its operating activities.  See “Purchase Commitments” below.

PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity and cash flows may be materially affected by the outcome of the following matters.
Enforcement Matters

U.S. District Court Matters and Probation

In connection with the Utility’s probation proceeding, the United States District Court for the Northern District of California has the ability to impose additional probation conditions on the Utility. Additional conditions, if implemented, could be wide-ranging and would impact the Utility’s operations, number of employees, costs and financial performance. Depending on the terms of these additional requirements, costs in connections with such requirements could have a material effect on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
CPUC and FERC Matters
Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire

On June 27, 2019, the CPUC issued the Wildfires OII to determine whether the Utility “violated any provision(s) of the California Public Utilities Code (PU Code), Commission General Orders (GO) or decisions, or other applicable rules or requirements pertaining to the maintenance and operation of its electric facilities that were involved in igniting fires in its service territory in 2017.” On December 5, 2019, the assigned commissioner issued a second amended scoping memo and ruling that amended the scope of issues to be considered in this proceeding to include the 2018 Camp fire.

As previously disclosed, on December 17, 2019, the Utility, the SED of the CPUC, the CPUC’s Office of the Safety Advocate, and CUE jointly submitted to the CPUC a proposed settlement agreement in connection with this proceeding and jointly moved for its approval.

Pursuant to the settlement agreement, the Utility agreed to (i) not seek rate recovery of wildfire-related expenses and capital expenditures in future applications in the amount of $1.625 billion, as specified below, and (ii) incur costs of $50 million in shareholder-funded system enhancement initiatives as described further in the settlement agreement. The settlement agreement stipulates that no violations have been identified in the Tubbs fire. As a result of this finding, the settlement agreement does not prevent the Utility from seeking recovery of costs associated with the Tubbs fire through rates. The amounts set forth in the table below include actual recorded costs and forecasted cost estimates as of the date of the settlement agreement for expenses and capital expenditures which the Utility has incurred or planned to incur to comply with its legal obligations to provide safe and reliable service. While actual costs incurred for certain cost categories are different than what was assumed in the settlement agreement, the Utility has recorded $1.621 billion of the disallowed costs through September 30, 2020 and plans to incur the remaining $4 million in the fourth quarter of 2020.

(in millions)
Description(1)
ExpenseCapitalTotal
Distribution Safety Inspections and Repairs Expense (FRMMA/WMPMA)(2)
$236 $— $236 
Transmission Safety Inspections and Repairs Expense (TO)(3)
433 — 433 
Vegetation Management Support Costs (FHPMA)36 — 36 
2017 Northern California Wildfires CEMA Expense and Capital (CEMA)82 66 148 
2018 Camp Fire CEMA Expense (CEMA)435 — 435 
2018 Camp Fire CEMA Capital for Restoration (CEMA)— 253 253 
2018 Camp Fire CEMA Capital for Temporary Facilities (CEMA)(4)
— 84 84 
Total$1,222 $403 $1,625 
(1) Unless indicated otherwise, all amounts included in the table reflect actual recorded costs for 2019.
(2) Includes $29 million forecasted for 2020.
(3) Transmission amounts are under the FERC’s regulatory authority.
(4) Includes $59 million forecasted for 2020.

PG&E Corporation and the Utility record a charge when it is both probable that costs incurred or projected to be incurred for recently completed plant will not be recoverable through rates charged to customers and the amount of disallowance can be reasonably estimated.

The Utility expects that the system enhancement spending pursuant to the settlement agreement will occur through 2025.
On April 20, 2020, the assigned commissioner issued a Decision Different adopting, with changes, the proposed modifications set forth in the request for review. The Decision Different (i) increases the amount of disallowed wildfire expenditures by $198 million (as set forth in the POD); (ii) increases the amount of shareholder funding for System Enhancement Initiatives by $64 million (as set forth in the POD); (iii) imposes a $200 million fine but permanently suspends payment of the fine; and (iii) limits the tax savings that must be returned to ratepayers to those savings generated by disallowed operating expenditures. The Decision Different also denies all pending appeals of the POD and denies, in part, the Utility’s motion requesting other relief. On April 30, 2020, the Utility submitted its comments on the Decision Different to the CPUC, accepting the modifications. The CPUC approved the Decision Different on May 7, 2020.

The settlement agreement, as modified by the Decision Different, became effective upon: (i) approval by the CPUC in the Decision Different, (ii) following such approval by the CPUC, the June 20, 2020 approval of the Bankruptcy Court, and (iii) the July 1, 2020 effectiveness of the Plan.

As it relates to the additional $198 million in disallowed costs as adopted in the Decision Different, the Utility has recorded charges of $80 million as of September 30, 2020 and intend to record the remaining charges of $118 million in fourth quarter of 2020 and 2021.

On June 8, 2020, two parties filed separate Applications for Rehearing, the purpose of which was to challenge the CPUC’s approval of the settlement agreement, as modified. On June 23, 2020, the Utility and CUE filed a joint response opposing the Applications for Rehearing. The Utility is unable to predict the timing and outcome of the CPUC’s rulings on the Applications for Rehearing.
Transmission Owner Rate Case Revenue Subject to Refund

The FERC determines the amount of authorized revenue requirements, including the rate of return on electric transmission assets, that the Utility may collect in rates in the TO rate case. The FERC typically authorizes the Utility to charge new rates based on the requested revenue requirement, subject to refund, before the FERC has issued a final decision. The Utility bills and records revenue based on the amounts requested in its rate case filing and records a reserve for its estimate of the amounts that are probable of refund. Rates subject to refund went into effect on March 1, 2017, and March 1, 2018, for TO18 and TO19, respectively. Rates subject to refund for TO20 went into effect on May 1, 2019.

On October 1, 2018, the ALJ issued an initial decision in the TO18 rate case and the Utility filed initial briefs on October 31, 2018, in response to the ALJ’s recommendations. On October 15, 2020, FERC issued an order that affirmed in part and reversed in part the initial decision. The order reopens the record for the limited purpose of allowing the participants to this proceeding an opportunity to present written evidence concerning FERC’s revised ROE methodology adopted in FERC Opinion No. 569-A, issued on May 21, 2020, that refined the methodology it established in Opinion No. 569 for setting the ROE that electric utilities are authorized to earn on electric transmission investments. In addition, the order approves depreciation rates that yield an estimated composite depreciation rate of 2.94% compared to the Utility’s request of 3.25%. Further, the decision reduces forecasted capital, operations and maintenance, and cost of debt expense to actual costs incurred for the rate case period. Finally, the order upheld the initial decision’s rejection of the Utility’s direct assignment of common plant to FERC and required the allocation of all common plant between CPUC and FERC jurisdiction be based on operating and maintenance labor ratios. Application of the operating and maintenance labor rates would result in an allocation of 6.15% of common plant to FERC in comparison to 8.84% under the Utility’s direct assignment method.

On September 21, 2018, the Utility filed an all-party settlement with the FERC, which was approved by FERC on December 20, 2018, in connection with TO19. As part of the settlement, the TO19 revenue requirement will be set at 98.85% of the revenue requirement for TO18 that will be determined upon issuance of a final unappealable decision in TO18.
On November 30, 2018, the FERC issued an order accepting the Utility’s October 2018 filing of its TO20 formula rate case, subject to hearings and refund, and established May 1, 2019, as the Effective Date for rate changes.  The FERC also ordered that the hearings will be held in abeyance pending settlement discussions among the parties.  On March 31, 2020, the Utility filed a partial settlement of TO20 resolving certain issues related to the formula rate but leaving several issues including return on equity, capital structure, and depreciation rates for further settlement discussions or hearing. FERC approved the Partial Settlement on August 17, 2020. On October 15, 2020, the Utility filed a settlement with FERC resolving all of the remaining issues in the Formula Rate Proceedings, including the Utility’s ROE, capital structure, depreciation rates, as well as certain other aspects of the Utility’s formula rate. The term of the settlement continues until December 31, 2023 and the Utility will be required to file a replacement rate filing to be effective on January 1, 2024. The settlement also required the Utility to concurrently file a motion for interim rates requesting that the settlement rates go into effect on January 1, 2021, while approval of the settlement is pending at FERC. The settlement also provides that the Utility will make supplemental filings in two FERC dockets addressing the calculation of the AFUDC, effective May 1, 2019, to reflect the terms of the settlement. The two AFUDC dockets have not been consolidated with the Formula Rate Proceedings but include capital structure issues addressed by the settlement.

The Utility is unable to predict the timing or outcome of FERC’s decisions in the TO18 and TO19 proceedings.
Other Matters

PG&E Corporation and the Utility are subject to various claims and lawsuits that separately are not considered material.  Accruals for contingencies related to such matters (excluding amounts related to the contingencies discussed above under “Enforcement and Litigation Matters”) totaled $167 million and $116 million at September 30, 2020 and December 31, 2019, respectively. These amounts were included in LSTC at December 31, 2019 and were included in Other current liabilities at September 30, 2020. PG&E Corporation and the Utility do not believe it is reasonably possible that the resolution of these matters will have a material impact on their financial condition, results of operations, or cash flows.
PSPS Class Action

On December 19, 2019, a complaint was filed in the United States Bankruptcy Court for the Northern District of California naming PG&E Corporation and the Utility. The plaintiff seeks certification of a class consisting of all California residents and business owners who had their power shut off by the Utility during the October 9, October 23, October 26, October 28, or November 20, 2019 power outages and any subsequent voluntary outages occurring during the course of litigation. The plaintiff alleges that the necessity for the October and November 2019 power shutoff events was caused by the Utility’s negligence in failing to properly maintain its electrical lines and surrounding vegetation. The complaint seeks up to $2.5 billion in special and general damages, punitive and exemplary damages and injunctive relief to require the Utility to properly maintain and inspect its power grid. PG&E Corporation and the Utility believe the allegations are without merit and intend to defend this lawsuit vigorously.

On January 21, 2020, PG&E Corporation and the Utility filed a motion to dismiss the complaint or in the alternative strike the class action allegations. The motion to dismiss and strike was heard by the Bankruptcy Court on March 10, 2020, and on April 3, 2020, the Bankruptcy Court entered an order dismissing the action without leave to amend, finding that the action was preempted under the California Public Utilities Code.

On March 30, 2020, the Bankruptcy Court issued an opinion granting the Utility's motion to dismiss this class action. The court held that plaintiff’s class action claims are preempted as a matter of law by section 1759 of the California Public Utilities Code and thus plaintiffs could not pursue civil damages. The court stated that “any claim for damages caused by PSPS events approved by the CPUC, even if based on pre-existing events that may or may not have contributed to the necessity of the PSPS events, would interfere with the CPUC’s policy-making decisions.”

On April 6, 2020, plaintiff filed a notice of appeal of the Bankruptcy Court decision dismissing the complaint. Plaintiff has elected to have the appeal heard by the District Court, rather than the Bankruptcy Appellate Panel. Plaintiff filed a designation of the record and statement of the issues on April 20, 2020, and the Utility had until May 4, 2020, 14 days thereafter, to file a designation of any additional items.

On June 8, 2020, plaintiff filed its opening brief. The Utility filed its opposition brief on July 6, 2020. Plaintiff’s reply brief was filed on August 4, 2020 with a request for oral argument. The court has not yet ruled on plaintiff’s request for oral argument.

The Utility is unable to determine the timing and outcome of this proceeding.
GT&S Capital Expenditures 2011-2014

On June 23, 2016, the CPUC approved a final phase one decision in the Utility’s 2015 GT&S rate case.  The phase one decision excluded from rate base $696 million of capital spending in 2011 through 2014 in excess of the amount adopted in the prior GT&S rate case. The decision permanently disallowed $120 million of that amount and ordered that the remaining $576 million be subject to a review of reasonableness to be conducted, or overseen, by the CPUC staff. The review was completed on June 1, 2020 and did not result in any additional disallowances. The report certified $512 million for future recovery. The difference between the certified amount and the $576 million previously disallowed is primarily a result of differences between capital expenditures forecasted in the 2015 GT&S rate case and recorded capital expenditures.

On July 31, 2020, the Utility filed an application seeking recovery of revenue requirements on the $512 million of capital expenditures retroactive to January 1, 2015. On October 16, 2020, the assigned commissioner issued a scoping memo establishing the scope and schedule for the proceeding. The scoping memo requires the Utility to provide supplemental testimony on January 20, 2021 addressing the reasonableness of the capital expenditures. The scoping memo calls for the issuance of a proposed decision in the fourth quarter of 2021.

The Utility is unable to determine the timing and outcome of this upcoming proceeding.
Environmental Remediation Contingencies

The Utility’s environmental remediation liability is primarily included in non-current liabilities on the Condensed Consolidated Balance Sheets and is comprised of the following:
 Balance at
(in millions)September 30, 2020December 31, 2019
Topock natural gas compressor station$323 $362 
Hinkley natural gas compressor station133 138 
Former manufactured gas plant sites owned by the Utility or third parties (1)
670 568 
Utility-owned generation facilities (other than fossil fuel-fired),
  other facilities, and third-party disposal sites (2)
99 101 
Fossil fuel-fired generation facilities and sites (3)
100 106 
Total environmental remediation liability$1,325 $1,275 
(1) Primarily driven by the following sites: San Francisco Beach Street, Vallejo, and San Francisco East Harbor.
(2) Primarily driven by Geothermal landfill and Shell Pond site.
(3) Primarily driven by the San Francisco Potrero Power Plant.

The Utility’s gas compressor stations, former manufactured gas plant sites, power plant sites, gas gathering sites, and sites used by the Utility for the storage, recycling, and disposal of potentially hazardous substances are subject to requirements issued by the Environmental Protection Agency under the Federal Resource Conservation and Recovery Act in addition to other state hazardous waste laws.  The Utility has a comprehensive program in place designed to comply with federal, state, and local laws and regulations related to hazardous materials, waste, remediation activities, and other environmental requirements.  The Utility assesses and monitors the environmental requirements on an ongoing basis and implements changes to its program as deemed appropriate. The Utility’s remediation activities are overseen by the DTSC, several California regional water quality control boards, and various other federal, state, and local agencies.

The Utility’s environmental remediation liability at September 30, 2020, reflects its best estimate of probable future costs for remediation based on the current assessment data and regulatory obligations. Future costs will depend on many factors, including the extent of work necessary to implement final remediation plans, the Utility’s time frame for remediation, and unanticipated claims filed against the Utility.  The Utility may incur actual costs in the future that are materially different than this estimate and such costs could have a material impact on results of operations, financial condition, and cash flows during the period in which they are recorded. At September 30, 2020, the Utility expected to recover $1,003 million of its environmental remediation liability for certain sites through various ratemaking mechanisms authorized by the CPUC. 

For more information, see remediation site descriptions below and see Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K.
Natural Gas Compressor Station Sites

The Utility is legally responsible for remediating groundwater contamination caused by hexavalent chromium used in the past at the Utility’s natural gas compressor stations. The Utility is also required to take measures to abate the effects of the contamination on the environment.

Topock Site

The Utility’s remediation and abatement efforts at the Topock site are subject to the regulatory authority of the California DTSC and the U.S. Department of the Interior. On April 24, 2018, the DTSC authorized the Utility to build an in-situ groundwater treatment system to convert hexavalent chromium into a non-toxic and non-soluble form of chromium. Construction activities began in October 2018 and will continue for several years. The Utility’s undiscounted future costs associated with the Topock site may increase by as much as $221 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Topock site are expected to be recovered primarily through the HSM, where 90% of the costs are recovered in rates.

Hinkley Site

The Utility has been implementing remediation measures at the Hinkley site to reduce the mass of the chromium plume in groundwater and to monitor and control movement of the plume. The Utility’s remediation and abatement efforts at the Hinkley site are subject to the regulatory authority of the California Regional Water Quality Control Board, Lahontan Region. In November 2015, the California Regional Water Quality Control Board, Lahontan Region adopted a clean-up and abatement order directing the Utility to contain and remediate the underground plume of hexavalent chromium and the potential environmental impacts. The final order states that the Utility must continue and improve its remediation efforts, define the boundaries of the chromium plume, and take other action. Additionally, the final order sets plume capture requirements, requires a monitoring and reporting program, and includes deadlines for the Utility to meet interim cleanup targets. The United States Geological Survey team is currently conducting a background study on the site to better define the chromium plume boundaries. A draft background report was received in January 2020 and is expected to be finalized in 2021. The Utility’s undiscounted future costs associated with the Hinkley site may increase by as much as $137 million if the extent of contamination or necessary remediation is greater than anticipated. The costs associated with environmental remediation at the Hinkley site will not be recovered through rates.
Former Manufactured Gas Plants

Former MGPs used coal and oil to produce gas for use by the Utility’s customers before natural gas became available. The by-products and residues of this process were often disposed of at the MGPs themselves. The Utility has a program to manage the residues left behind as a result of the manufacturing process; many of the sites in the program have been addressed. The Utility’s undiscounted future costs associated with MGP sites may increase by as much as $492 million if the extent of contamination or necessary remediation at currently identified MGP sites is greater than anticipated. The costs associated with environmental remediation at the MGP sites are recovered through the HSM, where 90% of the costs are recovered in rates.
Utility-Owned Generation Facilities and Third-Party Disposal Sites

Utility-owned generation facilities and third-party disposal sites often involve long-term remediation. The Utility’s undiscounted future costs associated with Utility-owned generation facilities and third-party disposal sites may increase by as much as $64 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the Utility-owned generation facilities and third-party disposal sites are recovered through the HSM, where 90% of the costs are recovered in rates.
Fossil Fuel-Fired Generation Sites

In 1998, the Utility divested its generation power plant business as part of generation deregulation. Although the Utility sold its fossil-fueled power plants, the Utility retained the environmental remediation liability associated with each site. The Utility’s undiscounted future costs associated with fossil fuel-fired generation sites may increase by as much as $40 million if the extent of contamination or necessary remediation is greater than anticipated. The environmental remediation costs associated with the fossil fuel-fired sites will not be recovered through rates.
Nuclear Insurance

The Utility maintains multiple insurance policies through NEIL and European Mutual Association for Nuclear Insurance, covering nuclear or non-nuclear events at the Utility’s two nuclear generating units at Diablo Canyon and the retired Humboldt Bay Unit 3.  If NEIL losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment.  If NEIL were to exercise this assessment, the maximum aggregate annual retrospective premium obligation for the Utility would be approximately $43 million.  If European Mutual Association for Nuclear Insurance losses in any policy year exceed accumulated funds, the Utility could be subject to a retrospective assessment of approximately $4 million.  For more information about the Utility’s nuclear insurance coverage, see Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K. 
Tax Matters

PG&E Corporation’s and the Utility’s unrecognized tax benefits may change significantly within the next 12 months due to the resolution of audits.  As of September 30, 2020, it is reasonably possible that unrecognized tax benefits will decrease by approximately $30 million within the next 12 months.

As of the date of this report, PG&E Corporation did not believe that it had undergone an ownership change, and consequently, its net operating loss carryforwards and other tax attributes are not limited by Section 382 of the Internal Revenue Code.

In March 2020, Congress passed, and the President signed into law the Coronavirus Aid, Relief and Economic Security (“CARES”) Act. Under the CARES Act, PG&E Corporation and the Utility expect to be able to defer the payment of 2020 payroll taxes for the remainder of the year to 2021 and 2022.

During June 2020, the State of California enacted AB 85, which increases taxes on corporations over a three-year period beginning in 2020 by suspension of the net operating loss deduction and a limit of $5 million per year on business tax credits. PG&E Corporation and the Utility do not anticipate any material impacts to PG&E Corporation’s Condensed Consolidated Financial Statements due to this legislation.

See “Ownership Restrictions in PG&E Corporation’s Amended Articles” in Note 6 for information on the possible election to treat the Fire Victim Trust as a “grantor trust” for federal income tax purposes.
Purchase Commitments

In the ordinary course of business, the Utility enters into various agreements to purchase power and electric capacity; natural gas supply, transportation, and storage; nuclear fuel supply and services; and various other commitments. At December 31, 2019, the Utility had undiscounted future expected obligations of approximately $38 billion. (See Note 15 of the Notes to the Consolidated Financial Statements in Item 8 of the 2019 Form 10-K.)

Oakland Headquarters Lease

On June 5, 2020, the Utility entered into an Agreement to Enter Into Lease and Purchase Option (the “Agreement”) with TMG Bay Area Investments II, LLC (“TMG”). The Agreement provides that, contingent on (i) entry of an order by the Bankruptcy Court authorizing the Utility to enter into the Agreement and the Lease Agreement (as defined below), subject to certain conditions, and (ii) acquisition of the Building (as defined below) by BA2 300 Lakeside LLC (“Landlord”), a wholly owned subsidiary of TMG, the Utility and Landlord will enter into an office lease agreement (the “Lease Agreement”) for approximately 910,000 rentable square feet of space within the building located at 300 Lakeside Drive, Oakland, California 94612 (the “Building”) to serve as the Utility’s principal administrative headquarters (the “Lease”). On June 9, 2020, PG&E Corporation and the Utility filed a motion with the Bankruptcy Court authorizing them to enter into the Agreement and grant related relief. The Bankruptcy Court entered an order approving the motion on June 24, 2020.

The term of the Lease will begin on or about January 1, 2022. The Lease term will expire 34 years and 11 months after the commencement date, unless earlier terminated in accordance with the terms of the Lease. In addition to base rent, the Utility will be responsible for certain costs and charges specified in the Lease, including insurance costs, maintenance costs and taxes.

The Lease will require the Landlord to pursue approvals to subdivide the real estate it owns surrounding the Building to create a separate legal parcel that contains the Building (the “Property”) that can be sold to the Utility. The Lease will grant to the Utility an option to purchase the Property, following such subdivision, at a price of $892 million, subject to certain adjustments (the “Purchase Price”). The Purchase Price would not be paid until 2023.
Pursuant to the terms of the Agreement, concurrent with the Landlord’s acquisition of the building, on October 23, 2020, the Utility and the Landlord entered into the Lease, and the Utility issued to Landlord (i) an option payment letter of credit in the amount of $75 million on or before the Lease Date (as defined in the Agreement and the Lease Agreement), and (ii) and a lease security letter of credit in the amount of $75 million.

In connection with entry into the Agreement, the Utility intends to sell its current office space generally located at 77 Beale Street, 215 Market Street, 245 Market Street and 50 Main Street, San Francisco, California 94105, and associated properties owned by the Utility (“SFGO”). Any sale of the SFGO would be subject to approval by the CPUC. On September 30, 2020, the Utility filed an application with the CPUC seeking authorization to sell the SFGO.

At September 30, 2020, the Agreement had no impact on PG&E Corporation’s and the Utility’s Condensed Consolidated Financial Statements.