COMMITMENTS AND CONTINGENCIES
6 Months Ended
Jun. 30, 2011
COMMITMENTS AND CONTINGENCIES  
COMMITMENTS AND CONTINGENCIES

9.             COMMITMENTS AND CONTINGENCIES

 

Nuclear Insurance

 

The Price-Anderson Indemnification Act deals with public liability for a nuclear incident and establishes the liability limit for third-party claims associated with any nuclear incident at $12.6 billion.  Each reactor licensee is currently liable for up to $117.5 million per reactor owned for each nuclear incident occurring at any reactor in the United States, provided that not more than $17.5 million of the liability per reactor would be assessed per year.  SCE&G’s maximum assessment, based on its two-thirds ownership of Summer Station, would be $78.3 million per incident, but not more than $11.7 million per year.

 

SCE&G currently maintains policies (for itself and on behalf of Santee Cooper, a one-third owner of Summer Station) with Nuclear Electric Insurance Limited.  The policies, covering the nuclear facility for property damage, excess property damage and outage costs, permit retrospective assessments under certain conditions to cover insurer’s losses.  Based on the current annual premium, SCE&G’s portion of the retrospective premium assessment would not exceed $14.2 million.

 

To the extent that insurable claims for property damage, decontamination, repair and replacement and other costs and expenses arising from a nuclear incident at Summer Station exceed the policy limits of insurance, or to the extent such insurance becomes unavailable in the future, and to the extent that SCE&G rates would not recover the cost of any purchased replacement power, SCE&G will retain the risk of loss as a self-insurer.  SCE&G has no reason to anticipate a serious nuclear incident.  However, if such an incident were to occur, it likely would have a material adverse impact on the Company’s results of operations, cash flows and financial position.

 

Environmental

 

SCE&G

 

In 2005, the EPA issued the CAIR, which required the District of Columbia and 28 states, including South Carolina, to reduce nitrogen oxide and sulfur dioxide emissions in order to attain mandated state levels.  CAIR set emission limits to be met in two phases beginning in 2009 and 2015, respectively, for nitrogen oxide and beginning in 2010 and 2015, respectively, for sulfur dioxide.  SCE&G and GENCO determined that additional air quality controls would be needed to meet the CAIR requirements.  SCE&G has completed the installation of SCR technology at Cope Station for nitrogen oxide reduction, and GENCO has completed installation of a wet limestone scrubber at Williams Station for sulfur dioxide reduction.   SCE&G also installed a wet limestone scrubber at Wateree Station.  On July 6, 2011 the EPA issued the Cross-State Air Pollution Rule.  This rule replaces CAIR and the Clean Air Transport Rule proposed in July 2010 and is aimed at addressing power plant emissions that may contribute to air pollution in other states.  The rule requires states in the eastern United States to reduce power plant emissions, specifically sulfur dioxide and nitrogen oxide.  The air quality control installations that SCE&G and GENCO have completed should assist the Company in complying with the Cross-State Air Pollution Rule.  The Company will continue to pursue strategies to comply with all applicable environmental regulations.  Any costs incurred to comply with this rule or other rules issued by the EPA in the future are expected to be recoverable through rates.

 

In 2005, the EPA issued the CAMR which established a mercury emissions cap and trade program for coal-fired power plants. Numerous parties challenged the rule and, on February 8, 2008, the United States Circuit Court for the District of Columbia vacated the rule for electric utility steam generating units.  In March 2011, the EPA proposed new standards for mercury and other specified air pollutants.  The proposed rule provides up to four years for facilities to meet the standards once promulgated.  The EPA is expected to finalize the rule in November 2011.  The proposed rule is currently being evaluated by the Company. Any costs incurred to comply with this rule or other rules issued by the EPA in the future are expected to be recoverable through rates.

 

SCE&G maintains an environmental assessment program to identify and evaluate its current and former operations sites that could require environmental clean-up.  As site assessments are initiated, estimates are made of the amount of expenditures, if any, deemed necessary to investigate and remediate each site.  These estimates are refined as additional information becomes available; therefore, actual expenditures could differ significantly from the original estimates.  Amounts estimated and accrued to date for site assessments and clean-up relate solely to regulated operations.  SCE&G defers site assessment and cleanup costs and expects to recover them through rates.

 

SCE&G is responsible for four decommissioned MGP sites in South Carolina which contain residues of by-product chemicals.  These sites are in various stages of investigation, remediation and monitoring under work plans approved by DHEC.  SCE&G anticipates that major remediation activities at these sites will continue until 2012 and will cost an additional $8.7 million.  In addition, the National Park Service of the Department of the Interior made a demand to SCE&G for payment of $9.1 million for certain costs and damages relating to the MGP site in Charleston, South Carolina.  In May 2011, the parties agreed to settle for $3.75 million (which amount SCE&G had previously accrued) and are awaiting judicial approval of the settlement.  SCE&G expects to recover any cost arising from the remediation of MGP sites through rates.  At June 30, 2011, deferred amounts, net of amounts previously recovered through rates and insurance settlements, totaled $25.6 million and are included in regulatory assets.

 

PSNC Energy

 

PSNC Energy is responsible for environmental clean-up at five sites in North Carolina on which MGP residuals are present or suspected.  PSNC Energy’s actual remediation costs for these sites will depend on a number of factors, such as actual site conditions, third-party claims and recoveries from other PRPs.  PSNC Energy has recorded a liability and associated regulatory asset of $3.2 million, which reflects its estimated remaining liability at June 30, 2011. PSNC Energy expects to recover through rates any costs allocable to PSNC Energy arising from the remediation of these sites.

 

Nuclear Generation

 

SCE&G, on behalf of itself and as agent for Santee Cooper has entered into a contractual agreement for the design and construction of two 1,117-MW nuclear generation units at the site of Summer Station.  The contract provides that SCE&G and Santee Cooper will be joint owners and share operating costs and generation output of the New Units, with SCE&G responsible for 55 percent of the cost and receiving 55 percent of the output, and Santee Cooper responsible for and receiving the remaining 45 percent.  Assuming timely receipt of federal approvals and construction proceeding as scheduled, the first unit is expected to be completed and in service in 2016, and the second in 2019.  SCE&G will be the operator of the New Units.  SCE&G’s share of the estimated cash outlays (future value, excluding AFC) totals $5.5 billion for plant costs and related transmission infrastructure costs, which costs are projected based on historical one-year and five-year escalation rates as required by the SCPSC.

 

SCE&G’s latest Integrated Resource Plan filed with the SCPSC in February 2011 continues to support SCE&G’s need for 55 percent of the output of the two units.  As previously reported, SCE&G has been advised by Santee Cooper that it is reviewing certain aspects of its capital improvement program and long-term power supply plan, including the level of its participation in the New Units.  Santee Cooper has indicated that it will seek to reduce its 45 percent ownership in the New Units.  Santee Cooper has disclosed that, in March 2011, it entered into a non-binding letter of intent with OUC that may result in the execution of a power purchase agreement with an option for OUC to acquire a portion of Santee Cooper’s ownership interest in the New Units.  Similarly, Santee Cooper announced in July 2011 that it has entered into separate letters of intent with Duke and FMPA that may result in either or both of them acquiring a portion of Santee Cooper’s ownership interest in the New Units.   SCE&G is unable to predict whether any change in Santee Cooper’s ownership interest or the addition of new joint owners will increase project costs or delay the commercial operation dates of the New Units.  Any such project cost increase or delay could be material.