COMMITMENTS AND CONTINGENCIES
6 Months Ended
Jun. 30, 2012
Commitments and Contingencies Disclosure [Text Block]
9.
COMMITMENTS AND CONTINGENCIES

Nuclear Insurance

Under Price-Anderson, SCE&G (for itself and on behalf of Santee-Cooper, a one-third owner of Summer Station Unit 1) maintains agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at the Company's nuclear power plant. Price-Anderson provides funds up to $12.6 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $375 million by ANI with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. Each reactor licensee is currently liable for up to $117.5 million per reactor owned for each nuclear incident occurring at any reactor in the United States, provided that not more than $17.5 million of the liability per reactor would be assessed per year.  SCE&G’s maximum assessment, based on its two-thirds ownership of Summer Station Unit 1, would be $78.3 million per incident, but not more than $11.7 million per year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years.

SCE&G currently maintains policies (for itself and on behalf of Santee Cooper) with NEIL.  The policies provide coverage to the nuclear facility for property damage and outage costs up to $2.75 billion. In addition, a builder's risk insurance policy has been purchased from NEIL for the construction of the New Units. This policy provides the owners of the New Units up to $500 million in limits of accidental property damage occurring during construction. All of the NEIL policies permit retrospective assessments under certain conditions to cover insurer’s losses.  Based on the current annual premium, SCE&G’s portion of the retrospective premium assessment would not exceed $37.3 million.
 
To the extent that insurable claims for property damage, decontamination, repair and replacement and other costs and expenses arising from a nuclear incident at Summer Station Unit 1 exceed the policy limits of insurance, or to the extent such insurance becomes unavailable in the future, and to the extent that SCE&G's rates would not recover the cost of any purchased replacement power, SCE&G will retain the risk of loss as a self-insurer.  SCE&G has no reason to anticipate a serious nuclear incident.  However, if such an incident were to occur, it likely would have a material impact on the Company’s results of operations, cash flows and financial position.

Environmental
 
SCE&G

On April 13, 2012, the EPA issued a proposed rule to establish a new source performance standard for GHG emissions from fossil fuel-fired electric generating units. If enacted, the proposed rule will limit emissions of carbon dioxide from new fossil fuel-fired electric utility generating units.  EPA's proposed rule covers only GHGs from new sources.  The Company is evaluating the proposed rule, but cannot predict when the rule will become final, if at all, or what conditions it may impose on the Company, if any.  The Company expects that any costs incurred to comply with GHG emission requirements will be recoverable through rates 

In 2005, the EPA issued the CAIR, which required the District of Columbia and 28 states, including South Carolina, to reduce nitrogen oxide and sulfur dioxide emissions in order to attain mandated state levels.  CAIR set emission limits to be met in two phases beginning in 2009 and 2015, respectively, for nitrogen oxide and beginning in 2010 and 2015, respectively, for sulfur dioxide.  SCE&G and GENCO determined that additional air quality controls would be needed to meet the CAIR requirements.  On July 6, 2011 the EPA issued the CSAPR.  This rule replaces CAIR and the Clean Air Transport Rule proposed in July 2010 and is aimed at addressing power plant emissions that may contribute to air pollution in other states.  The rule requires states in the eastern United States to reduce power plant emissions, specifically sulfur dioxide and nitrogen oxide.  On December 30, 2011, the United States Court of Appeals for the District of Columbia issued an order staying CSAPR and reinstating CAIR pending resolution of an appeal of CSAPR. Air quality control installations that SCE&G and GENCO have already completed should assist the Company in complying with CSAPR and the reinstated CAIR.  The Company will continue to pursue strategies to comply with all applicable environmental regulations.  Any costs incurred to comply with CAIR, CSAPR, or other rules issued by the EPA in the future are expected to be recoverable through rates.
 
In 2005, the EPA issued the CAMR which established a mercury emissions cap and trade program for coal-fired power plants. Numerous parties challenged the rule and, on February 8, 2008, the United States Circuit Court for the District of Columbia vacated the rule for electric utility steam generating units.  In March 2011, the EPA proposed new standards for mercury and other specified air pollutants. The rule containing the proposed new standards, which became effective on April 16, 2012, provides up to four years for facilities to meet the standards. The rule is currently being evaluated by the Company. Any costs incurred to comply with this rule or other rules issued by the EPA in the future are expected to be recoverable through rates.

  The enactment of these environmental regulations, along with other factors, has resulted in the inclusion in SCE&G's most recently filed IRP of its plans to retire a total of six coal-fired units by 2018, subject to future developments in environmental regulations, among other things.

SCE&G maintains an environmental assessment program to identify and evaluate its current and former operations sites that could require environmental clean-up.  As site assessments are initiated, estimates are made of the amount of expenditures, if any, deemed necessary to investigate and remediate each site.  These estimates are refined as additional information becomes available; therefore, actual expenditures could differ significantly from the original estimates.  Amounts estimated and accrued to date for site assessments and clean-up relate solely to regulated operations.  SCE&G defers site assessment and cleanup costs and expects to recover them through rates. 
 
SCE&G is responsible for four decommissioned MGP sites in South Carolina which contain residues of by-product chemicals.  These sites are in various stages of investigation, remediation and monitoring under work plans approved by DHEC and the EPA.  SCE&G anticipates that major remediation activities at these sites will continue until 2015 and will cost an additional $7.9 million, which is accrued in Other within Deferred Credits and Other Liabilities on the consolidated balance sheet.  SCE&G expects to recover any cost arising from the remediation of MGP sites through rates and insurance settlements.  At June 30, 2012, deferred amounts, net of amounts previously recovered through rates and insurance settlements, totaled $24.3 million and are included in regulatory assets.
 
PSNC Energy
 
PSNC Energy is responsible for environmental clean-up at five sites in North Carolina on which MGP residuals are present or suspected.  PSNC Energy’s actual remediation costs for these sites will depend on a number of factors, such as actual site conditions, third-party claims and recoveries from other PRPs.  PSNC Energy has recorded a liability and associated regulatory asset of approximately $3.1 million, the estimated remaining liability at June 30, 2012. PSNC Energy expects to recover through rates any cost, net of insurance recovery, allocable to PSNC Energy arising from the remediation of these sites.

Nuclear Generation
 
SCE&G and Santee Cooper are parties to construction and operating agreements in which they agreed to be joint owners, and share operating costs and generation output, of two 1,117MW nuclear generation units to be constructed at the site of Summer Station, with SCE&G responsible for 55% of the cost and receiving 55% of the output, and Santee Cooper responsible for and receiving the remaining 45% .  Under these agreements, SCE&G has the primary responsibility for oversight of the construction of the New Units and will be responsible for the operation of the New Units as they come online. 

SCE&G, on behalf of itself and as agent for Santee Cooper, has entered into the EPC Contract with the Consortium for the design, procurement and construction of the New Units.  SCE&G's share of the estimated cash outlays (future value, excluding AFC) totals approximately $6 billion for plant costs and related transmission infrastructure costs, which costs are projected based on historical one-year and five-year escalation rates as required by the SCPSC.

On March 30, 2012, the NRC approved and issued COLs for the New Units.  On April 19, 2012, SCE&G, on behalf of itself and as agent for Santee Cooper, issued a Full Notice to Proceed to the Consortium for construction of the New Units, allowing for the commencement of safety related aspects of the project.  The first New Unit is scheduled for substantial completion in March 2017, and the second New Unit is scheduled for substantial completion in May 2018.

The parties to the EPC Contract have established both informal and formal dispute resolution procedures in order to resolve issues that arise during the course of constructing a project of this magnitude.  During the course of activities under the EPC Contract, issues have materialized that impact project budget and schedule. Claims specifically relating to COL delays, design modifications of the shield building and certain pre-fabricated modules for the New Units and unanticipated rock conditions at the site resulted in assertions of contractual entitlement to recover additional costs to be incurred. On July 11, 2012, SCE&G and the Consortium finalized an agreement which set SCE&G's portion of the costs for these specific claims at approximately $138 million (in 2007 dollars).  SCE&G anticipates that these additional costs, as well as other costs that may be identified from time to time, will be recoverable through rates.

On May 15, 2012, SCE&G filed a petition with the SCPSC seeking an order approving an updated capital cost and construction schedule for the New Units.  This petition replaced the February 29, 2012 petition, which was withdrawn.  The updated capital cost schedule in this petition reflects an increase of $283 million (SCE&G's portion in 2007 dollars) in the cost approved in the May 2011 order.  This petition includes additional identifiable capital costs of approximately $6 million (SCE&G's portion in 2007 dollars) related to new federal healthcare laws, information security measures, and certain minor design modifications; approximately $8 million (SCE&G's portion in 2007 dollars) related to transmission infrastructure; and approximately $132 million (SCE&G's portion in 2007 dollars) related to additional labor for the oversight of the New Units during construction and for preparing to operate the New Units, and facilities and information technology systems required to support the New Units and their personnel.  In addition, this petition includes revised substantial completion dates for the New Units based on the March 30, 2012 issuance of the COL and the amounts agreed upon by SCE&G and the Consortium in July 2012 to resolve claims for costs related to COL delays, design modifications of the shield building and certain pre-fabricated modules for the New Units and unanticipated rock conditions at the site.  A public hearing on this petition is set to begin on September 11, 2012.

               When the NRC issued the COLs for the New Units, it imposed two conditions on the COLs, with the first requiring inspection and testing of certain components of the New Units' passive cooling system, and the second requiring the development of strategies to respond to extreme natural events resulting in the loss of power at the New Units.  In addition, the NRC directed the Office of New Reactors to issue to SCE&G an order requiring enhanced, reliable spent fuel pool instrumentation, as well as a request for information related to emergency plant staffing.  These conditions and requirements are responsive to the NRC's Near-Term Task Force report titled “Recommendations for Enhancing Reactor Safety in the 21st Century.”  This report was prepared in the wake of the March 2011 tsunami resulting from a massive earthquake, which severely damaged several nuclear generating units and their back-up cooling systems in Japan.  SCE&G is evaluating the


impact these conditions and requirements impose on the construction and operation of the New Units.  SCE&G cannot predict what additional regulatory or other outcomes may be implemented in the United States, or how such initiatives would impact SCE&G's existing Summer Station or the construction or operation of the New Units.

As previously reported, SCE&G has been advised by Santee Cooper that it is reviewing certain aspects of its capital improvement program and long-term power supply plan, including the level of its participation in the New Units.  Santee Cooper has entered into letters of intent with several parties that may result in one or more of them executing a power purchase agreement or acquiring a portion of Santee Cooper's ownership interest in the New Units.  SCE&G is unable to predict whether any change in Santee Cooper's ownership interest or the addition of new joint owners will increase project costs or delay the commercial operation dates of the New Units.  Any such project cost increase or delay could be material.
SCE&G
 
Commitments and Contingencies Disclosure [Text Block]
COMMITMENTS AND CONTINGENCIES

 Nuclear Insurance

Under Price-Anderson, SCE&G (for itself and on behalf of Santee-Cooper, a one-third owner of Summer Station Unit 1) maintains agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at the Company's nuclear power plant. Price-Anderson provides funds up to $12.6 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $375 million by ANI with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. Each reactor licensee is currently liable for up to $117.5 million per reactor owned for each nuclear incident occurring at any reactor in the United States, provided that not more than $17.5 million of the liability per reactor would be assessed per year.  SCE&G’s maximum assessment, based on its two-thirds ownership of Summer Station Unit 1, would be $78.3 million per incident, but not more than $11.7 million per year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years.
 
SCE&G currently maintains policies (for itself and on behalf of Santee Cooper) with NEIL.  The policies provide coverage to the nuclear facility for property damage and outage costs up to $2.75 billion. In addition, a builder's risk insurance policy has been purchased from NEIL for the construction of the New Units. This policy provides the owners of the New Units up to $500 million in limits of accidental property damage occurring during construction. All of the NEIL policies permit retrospective assessments under certain conditions to cover insurer’s losses.  Based on the current annual premium, SCE&G’s portion of the retrospective premium assessment would not exceed $37.3 million.
 
To the extent that insurable claims for property damage, decontamination, repair and replacement and other costs and expenses arising from a nuclear incident at Summer Station Unit 1 exceed the policy limits of insurance, or to the extent such insurance becomes unavailable in the future, and to the extent that SCE&G's rates would not recover the cost of any purchased replacement power, SCE&G will retain the risk of loss as a self-insurer.  SCE&G has no reason to anticipate a serious nuclear incident.  However, if such an incident were to occur, it likely would have a material impact on the Company’s results of operations, cash flows and financial position.




Environmental
 
On April 13, 2012, the EPA issued a proposed rule to establish a new source performance standard for GHG emissions from fossil fuel-fired electric generating units. If enacted, the proposed rule will limit emissions of carbon dioxide from new fossil fuel-fired electric utility generating units.  EPA's proposed rule covers only GHGs from new sources.  Consolidated SCE&G is evaluating the proposed rule, but cannot predict when the rule will become final, if at all, or what conditions it may impose on Consolidated SCE&G, if any.  Consolidated SCE&G expects that any costs incurred to comply with GHG emission requirements will be recoverable through rates.
 
In 2005, the EPA issued the CAIR, which required the District of Columbia and 28 states, including South Carolina, to reduce nitrogen oxide and sulfur dioxide emissions in order to attain mandated state levels.  CAIR set emission limits to be met in two phases beginning in 2009 and 2015, respectively, for nitrogen oxide and beginning in 2010 and 2015, respectively, for sulfur dioxide.  SCE&G and GENCO determined that additional air quality controls would be needed to meet the CAIR requirements.  On July 6, 2011 the EPA issued the CSAPR.  This rule replaces CAIR and the Clean Air Transport Rule proposed in July 2010 and is aimed at addressing power plant emissions that may contribute to air pollution in other states.  The rule requires states in the eastern United States to reduce power plant emissions, specifically sulfur dioxide and nitrogen oxide.  On December 30, 2011, the United States Court of Appeals for the District of Columbia issued an order staying CSAPR and reinstating CAIR pending resolution of an appeal of CSAPR. Air quality control installations that SCE&G and GENCO have already completed should assist Consolidated SCE&G in complying with CSAPR and the reinstated CAIR.  Consolidated SCE&G will continue to pursue strategies to comply with all applicable environmental regulations.  Any costs incurred to comply with CAIR, CSAPR, or other rules issued by the EPA in the future are expected to be recoverable through rates.

In 2005, the EPA issued the CAMR which established a mercury emissions cap and trade program for coal-fired power plants. Numerous parties challenged the rule and, on February 8, 2008, the United States Circuit Court for the District of Columbia vacated the rule for electric utility steam generating units.  In March 2011, the EPA proposed new standards for mercury and other specified air pollutants. The rule containing the proposed new standards, which became effective on April 16, 2012, provides up to four years for facilities to meet the standards. The rule is currently being evaluated by Consolidated SCE&G. Any costs incurred to comply with this rule or other rules issued by the EPA in the future are expected to be recoverable through rates.

The enactment of these environmental regulations, along with other factors, has resulted in the inclusion in SCE&G's most recently filed IRP of its plans to retire a total of six coal-fired units by 2018, subject to future developments in environmental regulations, among other things.
 
SCE&G maintains an environmental assessment program to identify and evaluate its current and former operations sites that could require environmental clean-up.  As site assessments are initiated, estimates are made of the amount of expenditures, if any, deemed necessary to investigate and remediate each site.  These estimates are refined as additional information becomes available; therefore, actual expenditures could differ significantly from the original estimates.  Amounts estimated and accrued to date for site assessments and clean-up relate solely to regulated operations.  SCE&G defers site assessment and cleanup costs and expects to recover them through rates. 
 
SCE&G is responsible for four decommissioned MGP sites in South Carolina which contain residues of by-product chemicals.  These sites are in various stages of investigation, remediation and monitoring under work plans approved by DHEC and the EPA.  SCE&G anticipates that major remediation activities at these sites will continue until 2015 and will cost an additional $7.9 million, which is accrued in Other within Deferred Credits and Other Liabilities on the consolidated balance sheet.  SCE&G expects to recover any cost arising from the remediation of MGP sites through rates and insurance settlements.  At June 30, 2012, deferred amounts, net of amounts previously recovered through rates and insurance settlements, totaled $24.3 million and are included in regulatory assets.

Nuclear Generation
 
SCE&G and Santee Cooper are parties to construction and operating agreements in which they agreed to be joint owners, and share operating costs and generation output, of two 1,117-MW nuclear generation units to be constructed at the site of Summer Station, with SCE&G responsible for 55% of the cost and receiving 55% of the output, and Santee Cooper responsible for and receiving the remaining 45%.  Under these agreements, SCE&G has the primary responsibility for oversight of the construction of the New Units and will be responsible for the operation of the New Units as they come online. 

SCE&G, on behalf of itself and as agent for Santee Cooper, has entered into the EPC Contract with the Consortium for the design, procurement and construction of the New Units.  SCE&G's share of the estimated cash outlays (future value, excluding AFC) totals approximately $6 billion for plant costs and related transmission infrastructure costs, which costs are projected based on historical one-year and five-year escalation rates as required by the SCPSC.

On March 30, 2012, the NRC approved and issued COLs for the New Units.  On April 19, 2012, SCE&G, on behalf of itself and as agent for Santee Cooper, issued a Full Notice to Proceed to the Consortium for construction of the New Units, allowing for the commencement of safety related aspects of the project.  The first New Unit is scheduled for substantial completion in March 2017, and the second New Unit is scheduled for substantial completion in May 2018.

The parties to the EPC Contract have established both informal and formal dispute resolution procedures in order to resolve issues that arise during the course of constructing a project of this magnitude.  During the course of activities under the EPC Contract, issues have materialized that impact project budget and schedule. Claims specifically relating to COL delays, design modifications of the shield building and certain pre-fabricated modules for the New Units and unanticipated rock conditions at the site resulted in assertions of contractual entitlement to recover additional costs to be incurred. On July 11, 2012, SCE&G and the Consortium finalized an agreement which set SCE&G's portion of the costs for these specific claims at approximately $138 million (in 2007 dollars).  SCE&G anticipates that these additional costs, as well as other costs that may be identified from time to time, will be recoverable through rates.

On May 15, 2012, SCE&G filed a petition with the SCPSC seeking an order approving an updated capital cost and construction schedule for the New Units.  This petition replaced the February 29, 2012 petition, which was withdrawn. The updated capital cost schedule in this petition reflects an increase of $283 million (SCE&G's portion in 2007 dollars) in the cost approved in the May 2011 order.  This petition includes additional identifiable capital costs of approximately $6 million (SCE&G's portion in 2007 dollars) related to new federal healthcare laws, information security measures, and certain minor design modifications; approximately $8 million (SCE&G's portion in 2007 dollars) related to transmission infrastructure; and approximately $132 million (SCE&G's portion in 2007 dollars) related to additional labor for the oversight of the New Units during construction and for preparing to operate the New Units, and facilities and information technology systems required to support the New Units and their personnel.  In addition, this petition includes revised substantial completion dates for the New Units based on the March 30, 2012 issuance of the COL and the amounts agreed upon by SCE&G and the Consortium in July 2012 to resolve claims for costs related to COL delays, design modifications of the shield building and certain pre-fabricated modules for the New Units and unanticipated rock conditions at the site.  A public hearing on this petition is set to begin on September 11, 2012.

When the NRC issued the COLs for the New Units, it imposed two conditions on the COLs, with the first requiring inspection and testing of certain components of the New Units' passive cooling system, and the second requiring the development of strategies to respond to extreme natural events resulting in the loss of power at the New Units.  In addition, the NRC directed the Office of New Reactors to issue to SCE&G an order requiring enhanced, reliable spent fuel pool instrumentation, as well as a request for information related to emergency plant staffing.  These conditions and requirements are responsive to the NRC's Near-Term Task Force report titled “Recommendations for Enhancing Reactor Safety in the 21st Century.”  This report was prepared in the wake of the March 2011 tsunami resulting from a massive earthquake, which severely damaged several nuclear generating units and their back-up cooling systems in Japan.  SCE&G is evaluating the impact these conditions and requirements impose on the construction and operation of the New Units.  SCE&G cannot predict what additional regulatory or other outcomes may be implemented in the United States, or how such initiatives would impact SCE&G's existing Summer Station or the construction or operation of the New Units.

As previously reported, SCE&G has been advised by Santee Cooper that it is reviewing certain aspects of its capital improvement program and long-term power supply plan, including the level of its participation in the New Units.  Santee Cooper has entered into letters of intent with several parties that may result in one or more of them executing a power purchase agreement or acquiring a portion of Santee Cooper's ownership interest in the New Units.  SCE&G is unable to predict whether any change in Santee Cooper's ownership interest or the addition of new joint owners will increase project costs or delay the commercial operation dates of the New Units.  Any such project cost increase or delay could be material.