XML 34 R21.htm IDEA: XBRL DOCUMENT v3.22.0.1
Debt, Net
12 Months Ended
Dec. 31, 2021
Debt, Net  
Debt, Net

11. Debt, Net

Debt consists of the following:

December 31, 2021

December 31, 2020

    

    

Unamortized

    

    

Unamortized

    

Discount and

 

Discount and

Debt Issuance

Debt Issuance

Principal

Costs

Net

Principal

Costs

Net

PPN JV Loan, due November 2025, bearing interest at 4.1%

$

43,582

$

248

$

43,334

$

44,568

$

314

$

44,254

Watersound Origins Crossings JV Loan, due May 2024, bearing interest at 5.0%

37,897

248

37,649

27,179

351

26,828

PPC JV Loan, insured by HUD, due June 2060, bearing interest at 3.1% as of December 31, 2021

35,670

1,056

34,614

36,084

1,079

35,005

Watercrest JV Loan, due June 2047, bearing interest at LIBOR plus 2.2% and swapped to a fixed rate of 4.4%

20,053

327

19,726

18,066

284

17,782

PPC II JV Loan, due October 2024, bearing interest at LIBOR plus 2.1% (effective rate of 2.2% at December 31, 2021)

17,374

147

17,227

15,921

198

15,723

Airport Hotel Loan, due March 2025, bearing interest at LIBOR plus 2.0%, with a floor rate of 3.0% (effective rate of 3.0% at December 31, 2021)

14,642

128

14,514

3,548

168

3,380

Pier Park Resort Hotel JV Loan, due April 2027, bearing interest at LIBOR plus 2.2% (effective rate of 2.3% at December 31, 2021)

14,650

964

13,686

Breakfast Point Hotel Loan, due November 2042, bearing interest at LIBOR plus 2.8%, with a floor rate of 3.8% (effective rate of 3.8% at December 31, 2021)

11,843

191

11,652

The Lodge 30A JV Loan, due January 2028, bearing interest at 3.8%

7,474

179

7,295

Beckrich Building III Loan, due August 2029, bearing interest at LIBOR plus 1.7% (effective rate of 1.8% at December 31, 2021)

5,188

52

5,136

5,421

59

5,362

Community Development District debt, secured by certain real estate or other collateral, due May 2022 through May 2039, bearing interest at 3.6% to 6.0%

 

4,909

 

 

4,909

6,294

 

 

6,294

Self-Storage Facility Loan, due November 2025, bearing interest at LIBOR plus 2.4%, with a floor rate of 2.9% (effective rate of 2.9% at December 31, 2021)

4,666

70

4,596

Watersound Camp Creek Loan, due December 2047, bearing interest at LIBOR plus 2.1%, with a floor rate of 2.6% (effective rate of 2.6% at December 31, 2021)

3,437

382

3,055

Beach Homes Loan, due May 2029, bearing interest at LIBOR plus 1.7% (effective rate of 1.8% at December 31, 2021)

 

1,492

 

15

 

1,477

1,545

17

1,528

Pier Park Outparcel Loan, due March 2027, bearing interest at LIBOR plus 1.7% (effective rate of 1.8% at December 31, 2021)

1,370

10

1,360

1,458

12

1,446

North Bay Landing Apartments Loan, due September 2024, bearing interest at LIBOR plus 2.5%, with a floor rate of 3.2% (effective rate of 3.2% at December 31, 2021)

1,342

254

1,088

WaterColor Crossings Loan, due February 2029, bearing interest at LIBOR plus 1.7% (effective rate of 1.8% at December 31, 2021)

1,265

18

1,247

1,334

21

1,313

Watersound Town Center Grocery Loan, due August 2031, bearing interest at LIBOR plus 2.0%, with a floor rate of 2.2% (effective rate of 2.2% at December 31, 2021)

620

151

469

Total debt

$

227,474

$

4,440

$

223,034

$

161,418

$

2,503

$

158,915

In October 2015, the Pier Park North JV entered into a $48.2 million loan, secured by a first lien on, and security interest in, a majority of the Pier Park North JV’s property. The PPN JV Loan provides for principal and interest payments with a final balloon payment at maturity in November 2025. In connection with the PPN JV Loan, the Company entered into a limited guarantee in favor of the lender, based on its percentage ownership of the JV. In addition, the guarantee can become full recourse in the case of any fraud or intentional misrepresentation by the Pier Park North JV; any voluntary transfer or encumbrance of the property in violation of the due-on-sale clause in the security instrument; upon commencement of voluntary bankruptcy or insolvency proceedings and upon breach of covenants in the security instrument.

In May 2019, the Watersound Origins Crossings JV entered into a $37.9 million loan to finance the construction of apartments located near the entrance to the Watersound Origins residential community. The Watersound Origins Crossings JV Loan provides for interest only payments for the first thirty-two months and principal and interest payments thereafter with a final balloon payment at maturity in May 2024. The Watersound Origins Crossings JV Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property. In connection with the Watersound Origins Crossings JV Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Watersound Origins Crossings JV Loan. The Company is the sole guarantor and receives a monthly fee related to the guarantee from its JV partner based on the JV partner’s ownership percentage.

In May 2018, the Pier Park Crossings JV entered into a $36.6 million loan, insured by HUD, to finance the construction of apartments in Panama City Beach, Florida. The PPC JV Loan provides for monthly principal and interest payments through maturity in June 2060. In August 2021, the Pier Park Crossings JV entered into a modification of the PPC JV Loan, that reduced the interest rate from 4.0% to 3.1% and revised the prepayment provisions. Prior to the modification, a prepayment premium was due to the lender of 1% - 9% of any prepaid principal through June 30, 2030. The modification revised the prepayment provision to include that the PPC JV Loan may not be prepaid prior to September 1, 2022 and from September 1, 2022 through August 31, 2031 a premium is due to the lender of 2% - 10% of any prepaid principal. The PPC JV Loan is secured by the Pier Park Crossings JV’s real property and the assignment of rents and leases. As of December 31 2021, the Company incurred less than $0.1 million of additional loan costs due to the PPC JV Loan modification.

In June 2019, the Watercrest JV entered into a $22.5 million loan to finance the construction of a senior living facility in Santa Rosa Beach, Florida. The Watercrest JV Loan provides for interest only payments for the first thirty-six months and principal and interest payments thereafter through maturity in June 2047. The Watercrest JV Loan is secured by the real property, assignment of rents, leases and deposits and the security interest in the rents and personal property. In connection with the Watercrest JV Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Watercrest JV Loan. The Company is the sole guarantor and receives a quarterly fee related to the guarantee from its JV partner based on the JV partner’s ownership percentage. The Watercrest JV entered into an interest rate swap to hedge cash flows tied to changes in the underlying floating interest rate tied to LIBOR. The interest rate swap was effective June 1, 2021 and matures on June 1, 2024 and fixed the variable rate on the notional amount of related debt of $20.0 million to a rate of 4.4%. See Note 6. Financial Instruments and Fair Value Measurements for additional information.

In October 2019, the Pier Park Crossings II JV entered into a $17.5 million loan to finance the construction of apartments in Panama City Beach, Florida. The PPC II JV Loan provides for monthly principal and interest payments with a final balloon payment at maturity in October 2024. The PPC II JV Loan is secured by the real property, assignment of rents and leases and the security interest in the rents, leases and personal property. In connection with the

PPC II JV Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the PPC II JV Loan. As guarantor, the Company’s liability under the PPC II JV Loan was reduced to 50% of the principal amount upon satisfaction of final advance conditions in April 2021 and will be reduced to 25% of the principal amount upon reaching and maintaining a certain debt service coverage ratio. The Company is the sole guarantor and receives a monthly fee related to the guarantee from its JV partner based on the JV partner’s ownership percentage. In January 2022, the Company began the process to refinance the PPC II JV Loan with a loan commitment to be insured by HUD.

In March 2020, a wholly-owned subsidiary of the Company entered into a $15.3 million loan to finance the construction of the Hilton Garden Inn Panama City Airport. The Airport Hotel Loan provides for interest only payments for the first thirty-six months and principal and interest payments thereafter with a final balloon payment at maturity in March 2025. The Airport Hotel Loan is secured by the real property, assignment of leases, rents and profits and the security interest in the rents and personal property. In connection with the Airport Hotel Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Airport Hotel Loan.

In April 2020, the Pier Park Resort Hotel JV entered into a loan with an initial amount of $52.5 million up to a maximum of $60.0 million through additional earn-out requests. The Pier Park Resort Hotel JV Loan was entered into to finance the construction of an Embassy Suites by Hilton hotel in the Pier Park area of Panama City Beach, Florida. The Pier Park Resort Hotel JV Loan provides for interest only payments for the first thirty-six months and principal and interest payments thereafter with a final balloon payment at maturity in April 2027. The Pier Park Resort Hotel JV Loan is secured by the real property, assignment of rents and leases and the security interest in the rents, leases and personal property. In connection with the Pier Park Resort Hotel JV Loan, as guarantor, the Company and the Company’s JV partner entered into a guarantee based on each partner’s ownership interest in favor of the lender, to guarantee the payment and performance of the borrower. As guarantor, the Company’s liability under the Pier Park Resort Hotel JV Loan will be released upon reaching and maintaining certain debt service coverage for twelve months. In addition, the guarantee can become full recourse in the case of the failure of guarantor to abide by or perform any of the covenants or warranties to be performed on the part of such guarantor. The Pier Park Resort Hotel JV entered into an interest rate swap to hedge cash flows tied to changes in the underlying floating interest rate tied to LIBOR. The interest rate swap is effective December 10, 2022 and matures on April 12, 2027 and fixed the variable rate on the notional amount of related debt of $42.0 million to a rate of 3.2%. See Note 6. Financial Instruments and Fair Value Measurements for additional information.

In November 2020, a wholly-owned subsidiary of the Company entered into a $16.8 million loan to finance the construction of a Homewood Suites by Hilton hotel in the Breakfast Point area of Panama City Beach, Florida. The Breakfast Point Hotel Loan provides for interest only payments for the first twenty-four months and principal and interest payments thereafter through maturity in November 2042. The Breakfast Point Hotel Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property. In connection with the Breakfast Point Hotel Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Breakfast Point Hotel Loan.

In January 2021, The Lodge 30A JV entered into a $15.0 million loan to finance the construction of a boutique hotel in Seagrove Beach, Florida. The Lodge 30A JV Hotel Loan provides for interest only payments for the first twenty-four months and principal and interest payments thereafter with a final balloon payment at maturity in January 2028. The Lodge 30A JV Hotel Loan is secured by the real property, assignment of leases and rents and the security interest in the rents and personal property. In connection with the Lodge 30A JV Hotel Loan, the Company, wholly-owned subsidiaries of the Company and the Company’s JV partner entered into a joint and several payment and performance guarantee in favor of the lender. Upon reaching a certain debt service coverage ratio for a minimum of twenty-four months, the Company’s liability as guarantor will be reduced to 75% for a twelve-month period. The debt service coverage ratio will be tested annually thereafter and the Company’s liability will be reduced to 50% in year four and 25% in year five. The Company receives a monthly fee related to the guarantee from its JV partner based on the JV partner’s ownership percentage.

In August 2019, a wholly-owned subsidiary of the Company entered into a $5.5 million loan to finance the construction of an office building in Panama City Beach, Florida. The Beckrich Building III Loan provides for monthly principal and interest payments with a final balloon payment at maturity in August 2029. The Beckrich Building III Loan is secured by the real property, assignment of leases, rents and profits and the security interest in the rents and personal property. In connection with the Beckrich Building III Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Beckrich Building III Loan.

CDD bonds financed the construction of infrastructure improvements at some of the Company’s projects. The principal and interest payments on the bonds are paid by assessments on the properties benefited by the improvements financed by the bonds. The Company has recorded a liability for CDD debt that is associated with platted property, which is the point at which it becomes fixed and determinable. Additionally, the Company has recorded a liability for the portion of the CDD debt that is associated with unplatted property if it is probable and reasonably estimable that the Company will ultimately be responsible for repayment. The Company’s total CDD debt assigned to property it owns was $14.1 million and $15.8 million as of December 31, 2021 and 2020, respectively. The Company pays interest on this total outstanding CDD debt.

In November 2020, a wholly-owned subsidiary of the Company entered into a $5.8 million loan to finance the construction of a self-storage facility in Santa Rosa Beach, Florida. The Self-Storage Facility Loan provides for interest only payments for the first forty-eight months and principal and interest payments thereafter with a final balloon payment at maturity in November 2025. The Self-Storage Facility Loan is secured by the real property, assignment of leases and rents and the security interest in the rents and personal property. In connection with the Self-Storage Facility Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Self-Storage Facility Loan. The Company’s liability as guarantor under the Self-Storage Facility Loan shall not exceed $2.9 million, plus any additional fees, upon reaching and maintaining certain debt service coverage.

In June 2021, a wholly-owned subsidiary of the Company entered into a $28.0 million loan to finance the construction of Watersound Camp Creek, which includes an inn and amenity center near the Watersound Camp Creek residential community. The Watersound Camp Creek Loan provides for interest only payments for the first eighteen months and principal and interest payments thereafter through maturity in December 2047. The Watersound Camp Creek Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property. In connection with the Watersound Camp Creek Loan, the Company executed a guarantee in favor of the lender to guarantee completion of the project and the payment of the borrower under the Watersound Camp Creek Loan. As guarantor, the Company’s liability under the Watersound Camp Creek Loan will be reduced to 50% of the principal amount upon the project reaching and maintaining a trailing six months operations with a certain debt service coverage ratio and reduced to 25% of the principal amount upon reaching and maintaining a trailing twelve months operations of a certain debt service coverage ratio. In addition, the guarantee can become full recourse in the case of the failure of guarantor to abide by or perform any of the covenants, warranties or other certain obligations to be performed on the part of such guarantor.

In May 2018, a wholly-owned subsidiary of the Company entered into a $1.7 million loan to finance the construction of two beach homes located in Panama City Beach, Florida (the “Beach Homes Loan”). The Beach Homes Loan provides for monthly principal and interest payments with a final balloon payment at maturity in May 2029. The Beach Homes Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property. In connection with the Beach Homes Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the Beach Homes Loan.

In March 2017, a wholly-owned subsidiary of the Company entered into a $1.6 million loan to finance the construction of a commercial leasing property located in Panama City Beach, Florida (the “Pier Park Outparcel Loan”). The Pier Park Outparcel Loan provides for monthly principal and interest payments with a final balloon payment at maturity in March 2027. The Pier Park Outparcel Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property.

In March 2021, a wholly-owned subsidiary of the Company entered into a $26.8 million loan to finance the construction of apartments in Panama City, Florida. The North Bay Landing Apartments Loan provides for interest only payments and a principal balloon payment at maturity in September 2024. The North Bay Landing Apartments Loan includes an option for an extension of the maturity date by eighteen months, subject to certain conditions, that would provide for principal and interest payments commencing on the original maturity date with a final balloon payment at the extended maturity date. The North Bay Landing Apartments Loan is secured by the real property, assignment of rents and leases and the security interest in the rents, leases and personal property. In connection with the North Bay Landing Apartments Loan, the Company executed a guarantee in favor of the lender to guarantee completion of the project and the payment and performance of the borrower under the North Bay Landing Apartments Loan. As guarantor, the Company’s liability under the North Bay Landing Apartments Loan will be reduced to 50% of the principal amount upon satisfaction of final advance conditions and reduced to 25% of the principal amount upon reaching and maintaining a certain debt service coverage ratio. In addition, the guarantee can become full recourse in the case of any fraud or intentional misrepresentation or failure to abide by other certain obligations on the part of such guarantor.

In February 2018, a wholly-owned subsidiary of the Company entered into a $1.9 million loan to finance the construction of a commercial leasing property located in Santa Rosa Beach, Florida (the “WaterColor Crossings Loan”). The WaterColor Crossings Loan provides for monthly principal and interest payments with a final balloon payment at maturity in February 2029. The WaterColor Crossings Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property. In connection with the WaterColor Crossings Loan, the Company executed a guarantee in favor of the lender to guarantee the payment and performance of the borrower under the WaterColor Crossings Loan.

In August 2021, a wholly-owned subsidiary of the Company entered into a $12.0 million loan to finance the construction of a building in the Watersound Town Center near the Watersound Origins residential community. The Watersound Town Center Grocery Loan provides for interest only payments for the first twenty-four months and principal and interest payments thereafter with a final balloon payment at maturity in August 2031. The Watersound Town Center Grocery Loan is secured by the real property, assignment of rents and the security interest in the rents and personal property. In connection with the Watersound Town Center Grocery Loan, the Company executed a guarantee in favor of the lender to guarantee completion of the project and the payment and performance of the borrower under the Watersound Town Center Grocery Loan. As guarantor, the Company’s liability under the Watersound Town Center Grocery Loan will be reduced to 50% of the principal amount upon satisfaction of final advance conditions, issuance of the certificate of occupancy for the project and receipt of the initial base rent payment and reduced to 25% of the principal amount upon reaching a certain debt service coverage ratio and the project maintaining 93% occupancy for ninety consecutive days.

In October 2021, a wholly-owned subsidiary of the Company entered into a $21.2 million loan to finance the construction of a hotel in Panama City, Florida. The Hotel Indigo Loan provides for interest only payments for the first twenty-four months and principal and interest payments thereafter with a final balloon payment at maturity in October 2028. The Hotel Indigo Loan includes an option for an extension of the maturity date by sixty months, subject to certain conditions, that would provide for continued principal and interest payments with a final balloon payment at the extended maturity date. The Hotel Indigo Loan is secured by the leasehold property, assignment of rents, leases, deposits, permits, plans, fees, agreements, approvals and contracts and the security interest in the personal property and rents. In connection with the Hotel Indigo Loan, the Company executed a guarantee in favor of the lender to guarantee completion of the project and the payment and performance of the borrower under the Hotel Indigo Loan. As of December 31, 2021, there was no principal balance and the Company had incurred $0.3 million of loan costs related to the Hotel Indigo Loan.

The Company’s financing agreements are subject to various customary debt covenants and as both of December 31, 2021 and 2020, the Company was in compliance with the financial debt covenants.

As of December 31, 2021, assets that were pledged as collateral related to the Company’s debt agreements, including unfunded commitments, had an approximate carrying amount of $352.8 million. These assets are included within investment in real estate, net and property and equipment, net on the consolidated balance sheets.

The aggregate maturities of debt subsequent to December 31, 2021 are:

    

December 31,

2021

2022

$

3,627

2023

 

5,660

2024

 

60,330

2025

 

62,655

2026

 

3,809

Thereafter

 

91,393

$

227,474