XML 143 R128.htm IDEA: XBRL DOCUMENT v3.6.0.2
ENVIRONMENTAL (Details 1)
$ in Millions
12 Months Ended
Dec. 31, 2016
USD ($)
Dec. 31, 2015
USD ($)
Dec. 31, 2014
USD ($)
Accrued liabilities for unasserted claims $ 2.0    
Maximum period for required site OM and M expense accrual (in years) 30    
Accrual for environmental loss contingencies [Roll Forward]      
Beginning balance $ 138.1 $ 138.3  
Charges to income 9.2 15.7 $ 9.6
Remedial and investigatory spending (10.3) (14.1)  
Currency translation adjustments 0.3 (1.8)  
Ending balance 137.3 138.1 $ 138.3
Reserves for environmental expenditures-noncurrent 120.3 $ 119.1  
Future environmental expenditures expected to be utilized over the next 5 years 77.8    
Future environmental expenditures expected to be utilized over the next 6 to 10 years 16.1    
Future environmental expenditures expected to be utilized beyond 10 years $ 43.4    
Number of sites included in the total estimated environmental liability 64    
Number of USEPA NPL sites 16    
Number of sites which constituted the largest portion of the environmental liability 9    
Percentage of environmental liability that the larger sites made up (in hundredths) 79.00%    
Number of sites which constituted the smallest portion of the environmental liability 55    
Percentage of environmental liability any one of the smallest sites made up, maximum (in hundredths) 3.00%    
Number of larger sites in which part of the site is subject to a remedial investigation and another part is in the long-term OM and M stage 4    
Number of larger sites remedial design being developed 1    
Number of larger sites subject to remedial investigation and remedial design being developed 1    
Number of larger sites in which a remedial investigation is being performed 1    
Number of larger sites which are in long-term OM and M 2    
Percentage of environmental liability any one of the largest sites made up., maximum (in hundredths) 23.00%    
Possible additional contingent environmental liabilities $ 60.0    
Minimum      
Expected annual environmental-related cash outlay for site investigation and remediation 15.0    
Maximum      
Expected annual environmental-related cash outlay for site investigation and remediation $ 25.0