XML 141 R121.htm IDEA: XBRL DOCUMENT v3.3.1.900
ENVIRONMENTAL (Details 1)
$ in Millions
12 Months Ended
Dec. 31, 2015
USD ($)
Dec. 31, 2014
USD ($)
Dec. 31, 2013
USD ($)
Accrued liabilities for unasserted claims $ 1.8    
Maximum period for required site OM and M expense accrual (in years) 30    
Accrual for environmental loss contingencies [Roll Forward]      
Beginning balance $ 138.3 $ 144.6  
Charges to income 15.7 9.6 $ 11.5
Remedial and investigatory spending (14.1) (14.9)  
Currency translation adjustments (1.8) (1.0)  
Ending balance 138.1 138.3 $ 144.6
Reserves for environmental expenditures-noncurrent 119.1 $ 119.3  
Future environmental expenditures expected to be utilized over the next 5 years 81.1    
Future environmental expenditures expected to be utilized over the next 6 to 10 years 16.7    
Future environmental expenditures expected to be utilized beyond 10 years $ 40.3    
Number of sites included in the total estimated environmental liability 69    
Number of USEPA NPL sites 14    
Number of sites which constituted the largest portion of the environmental liability 9    
Percentage of environmental liability that the larger sites made up (in hundredths) 79.00%    
Number of sites which constituted the smallest portion of the environmental liability 60    
Percentage of environmental liability any one of the smallest sites made up, maximum (in hundredths) 3.00%    
Number of larger sites in which part of the site is subject to a remedial investigation and another part is in the long-term OM and M stage 4    
Number of larger sites remedial design being developed 1    
Number of larger sites subject to remedial investigation and remedial design being developed 1    
Number of larger sites in which a remedial investigation is being performed 1    
Number of larger sites which are in long-term OM and M 2    
Percentage of environmental liability any one of the largest sites made up., maximum (in hundredths) 23.00%    
Possible additional contingent environmental liabilities $ 60.0    
Minimum      
Expected annual environmental-related cash outlay for site investigation and remediation 15.0    
Maximum      
Expected annual environmental-related cash outlay for site investigation and remediation $ 25.0