Public Utilities, General Disclosures [Line Items]    
Net Investment $ 68,708.2 $ 66,001.3
Regulatory Assets, Noncurrent 4,157.7 4,142.3
Regulatory Assets, Current 1,324.8 647.8
AEP Texas Inc. [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 11,055.3 10,635.4
Regulatory Assets, Noncurrent 269.4 275.2
AEP Transmission Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 12,449.2 11,935.7
Regulatory Assets, Noncurrent 4.6 8.5
Appalachian Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 11,988.3 11,804.3
Regulatory Assets, Noncurrent 771.8 757.6
Regulatory Assets, Current 513.4 201.3
Indiana Michigan Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 7,349.4 7,310.9
Regulatory Assets, Noncurrent 428.8 410.9
Regulatory Assets, Current 22.3 6.4
Ohio Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 8,214.8 7,963.0
Regulatory Assets, Noncurrent 290.3 293.0
Public Service Co Of Oklahoma [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 5,455.0 4,802.8
Regulatory Assets, Noncurrent 1,043.8 1,037.4
Regulatory Assets, Current 314.5 194.6
Public Service Co Of Oklahoma [Member] | Northeastern Plant, Unit 3 | Generating Units Probable of Abandonment [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 151.3  
Accelerated Depreciation Regulatory Asset 136.9  
Cost of Removal Regulatory Liability [1] $ 20.2  
Expected Retirement Date [2] 2026  
Depreciation [3] $ 14.9  
Southwestern Electric Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 8,105.1 7,400.1
Regulatory Assets, Noncurrent 987.2 1,005.3
Net Under-Recovered Fuel Costs 187.0  
Regulatory Assets, Current 286.3 143.9
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations    
Public Utilities, General Disclosures [Line Items]    
Share of Net Investment in Dolet Hills Power Station 113.0  
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations | Arkansas    
Public Utilities, General Disclosures [Line Items]    
Recovery of 2021 Dolet Hills Fuel Costs 20.0  
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations | Louisiana Jurisdiction [Member]    
Public Utilities, General Disclosures [Line Items]    
Recovery of 2021 Dolet Hills Fuel Costs 20.0  
Approved Deferral of Dolet Hills Fuel Costs 30.0  
Southwestern Electric Power Co [Member] | Pirkey Power Plant and Related Fuel Operations    
Public Utilities, General Disclosures [Line Items]    
Share of Net Investment in Pirkey Power Plant 204.0  
Pirkey Power Plant and Sabine Unbilled Fixed Costs 79.0  
Southwestern Electric Power Co [Member] | Pirkey Generating Station (Unit No. 1) | Generating Units Probable of Abandonment [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 75.1  
Accelerated Depreciation Regulatory Asset 129.3  
Cost of Removal Regulatory Liability $ 39.5  
Expected Retirement Date [4] 2023  
Depreciation [3] $ 13.2  
Southwestern Electric Power Co [Member] | Welsh Plant Unit 1 and 3 | Generating Units Probable of Abandonment [Member]    
Public Utilities, General Disclosures [Line Items]    
Net Investment 449.4  
Accelerated Depreciation Regulatory Asset 65.9  
Cost of Removal Regulatory Liability [5] $ 58.8  
Expected Retirement Date [6] 2028  
Depreciation [3] $ 38.4  
Southwestern Electric Power Co [Member] | Welsh Plant Unit 2    
Public Utilities, General Disclosures [Line Items]    
Impairment Charge Welsh Plant, Unit 2 7.0  
Southwestern Electric Power Co [Member] | Dolet Hills Power Station | Arkansas    
Public Utilities, General Disclosures [Line Items]    
Other Asset Impairment Charges 2.0  
Southwestern Electric Power Co [Member] | Dolet Hills Power Station | Texas    
Public Utilities, General Disclosures [Line Items]    
Other Asset Impairment Charges 12.0  
Regulatory Assets Pending Final Regulatory Approval [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 879.6 1,048.6
Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 51.7 41.2
Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 146.3 105.1
Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 1.7 3.7
Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 25.1 3.8
Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 20.5 14.2
Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 631.7 880.6
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Plant Retirement Costs - Unrecovered Plant [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 35.2 35.2
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Dolet Hills Power Station Accelerated Depreciation [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 52.8 72.3
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 14.7 9.2
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | February 2021 Severe Storm Fuel Costs    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent [7] 133.7 430.2
Regulatory Assets, Current 37.0 63.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Pirkey Power Plant Accelerated Depreciation    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 129.3 87.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Welsh Unit 1 and 3 Accelerated Depreciation    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 65.9 45.9
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Dolet Hills Power Station Fuel Costs - Louisiana    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 31.5 30.9
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Mobile Generation Lease Payments    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 4.1 0.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | COVID-19 - Virginia    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 6.9 6.8
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 0.1 0.1
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Dolet Hills Power Station Accelerated Depreciation [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 52.8 72.3
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Plant Retirement Costs - Unrecovered Plant, Louisiana    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 35.2 35.2
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 3.5 2.4
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | February 2021 Severe Storm Fuel Costs    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent [8] 133.7 430.2
Regulatory Assets, Current 37.0 63.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Pirkey Power Plant Accelerated Depreciation    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 129.3 87.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Welsh Unit 1 and 3 Accelerated Depreciation    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 65.9 45.9
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Dolet Hills Power Station Fuel Costs - Louisiana    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 31.5 30.9
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Dolet Hills Power Station    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 53.0  
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | COVID-19    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 11.5 11.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Plant Retirement Costs - Asset Retirement Obligation Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 25.9 25.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Storm Related Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 322.3 256.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 42.8 41.8
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Renewable Energy Portfolio Standards Costs    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 14.0 2.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | COVID-19    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 3.7 2.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Storm Related Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 26.5 22.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 8.1 7.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Texas Retail Electric Provider Bad Debt Expense    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 4.1 4.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Vegetation Management Programs    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 5.2 5.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Plant Retirement Costs - Asset Retirement Obligation Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 25.9 25.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Storm Related Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 97.4 68.8
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 2.1 1.5
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Renewable Energy Portfolio Standards Costs    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 14.0 2.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | COVID-19    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 0.1 1.7
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 1.5 1.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member] | Storm Related Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 25.1 3.8
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Storm Related Costs [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 20.4 13.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 0.1 0.3
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Asset Retirement Obligation - Louisiana [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 11.0 10.3
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent 17.5 18.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Storm Related Costs - Louisiana    
Public Utilities, General Disclosures [Line Items]    
Regulatory Assets, Noncurrent $ 151.3 $ 148.0
[1] Includes Northeastern Plant, Unit 4, which was retired in 2016. Removal of Northeastern Plant, Unit 4, will be performed with Northeastern Plant, Unit 3, after retirement.
[2] Northeastern Plant, Unit 3 is currently being recovered through 2040.
[3] Represents the amount of annual depreciation that has been collected from customers over the prior 12-month period.
[4] Pirkey Power Plant is currently being recovered through 2025 in the Louisiana jurisdiction and through 2045 in the Arkansas and Texas jurisdictions
[5] Includes Welsh Plant, Unit 2, which was retired in 2016. Removal of Welsh Plant, Unit 2, will be performed with Welsh Plant, Units 1 and 3, after retirement.
[6] Unit 1 is being recovered through 2027 in the Louisiana jurisdiction and through 2037 in the Arkansas and Texas jurisdictions. Unit 3 is being recovered through 2032 in the Louisiana jurisdiction and through 2042 in the Arkansas and Texas jurisdictions.
[7] Includes $37 million and $63 million of unrecovered winter storm fuel costs recorded as a current regulatory asset as of June 30, 2022 and December 31, 2021, respectively.