Regulatory Matters
9 Months Ended
Sep. 30, 2012
Regulated Operations [Abstract]  
REGULATORY MATTERS
REGULATORY MATTERS

STATE REGULATION

Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in Ohio by the PUCO, in New Jersey by the NJBPU, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE in Virginia are subject to certain regulations of the VSCC. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility.

MARYLAND

PE provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third party monitor. The settlements with respect to residential SOS for PE customers expire on December 31, 2012, but by statute service will continue in the same manner unless changed by order of the MDPSC. The settlement provisions relating to non-residential service have expired but, by MDPSC order, the terms of service remain in place unless PE requests or the MDPSC orders a change. PE recovers its costs plus a return for providing SOS.

The Maryland legislature in 2008 adopted a statute codifying the EmPOWER Maryland goals to reduce electric consumption by 10% and reduce electricity demand by 15%, in each case by 2015. Expenditures were estimated to be approximately $101 million for the PE programs for the period of 2009 to 2015 and would be recovered over that six-year period. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date such recovery has not been sought or obtained by PE. Meanwhile, after extensive meetings with the MDPSC Staff and other stakeholders, on August 31, 2011, PE filed a new comprehensive plan that includes additional and improved programs for the period 2012-2014. The plan is expected to cost approximately $66 million over the three-year period. On December 22, 2011, the MDPSC issued an order approving PE's plan with various modifications and follow-up assignments.

Pursuant to a bill passed by the Maryland legislature, the MDPSC proposed rules, based on the product of a working group of utilities, regulators and other interested stakeholders, that create specific requirements related to a utility's obligation to address service interruptions, downed wire response, customer communication, vegetation management, equipment inspection, and annual reporting. The bill requires that the MDPSC consider cost-effectiveness, and provides that the MDPSC may adopt different standards for different utilities based on such factors as system design and existing infrastructure, geography, and customer density. Beginning in July 2013, the MDPSC is required to assess each utility's compliance with the new rules, and may assess penalties of up to $25,000 per day, per violation. Further comments were filed regarding the proposed rules on March 26, 2012, and at a hearing on April 17, 2012, the MDPSC approved re-publication of the rules as final.

Following a "derecho" storm through the region on June 29, 2012, the MDPSC convened a new proceeding to consider matters relating to the electric utilities' performance in responding to the storm. Hearings on the matter were conducted on September 13 and 14, 2012. Concurrently, Maryland's governor convened a special panel to examine possible ways to improve the resilience of the electric distribution system. On October 3, 2012, that panel issued a report calling for various measures including: acceleration and expansion of some of the requirements contained in the reliability standards that the MDPSC approved on April 17, 2012, and which had become final on May 28, 2012; for selective increased investment in system hardening; for creation of separate recovery mechanisms for the costs of those changes and investments; and penalties or bonuses on returns earned by the utilities based on their reliability performance. The panel's report has been referred to the MDPSC for action.


NEW JERSEY

JCP&L currently provides BGS for retail customers that do not choose a third party EGS and for customers of third party EGSs that fail to provide the contracted service. The supply for BGS, which is comprised of two components, is provided through contracts procured through separate, annually held descending clock auctions, the results of which are approved by the NJBPU. One BGS component and auction, reflecting hourly real time energy prices, is available for larger commercial and industrial customers. The other BGS component and auction, providing a fixed price service, is intended for smaller commercial and residential customers. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates. The most recent BGS auction results, for supply that commenced on June 1, 2012, were approved by the NJBPU on February 9, 2012.

On September 8, 2011, the Division of Rate Counsel filed a Petition with the NJBPU asserting that it has reason to believe that JCP&L is earning an unreasonable return on its New Jersey jurisdictional rate base. The Division of Rate Counsel requested that the NJBPU order JCP&L to file a base rate case petition so that the NJBPU may determine whether JCP&L's current rates for electric service are just and reasonable. In its written Order issued July 31, 2012, the NJBPU found that a base rate proceeding "will assure that JCP&L's rates are just and reasonable and that the Company is investing sufficiently to assure the provision of safe, adequate and proper utility service to its customers" and ordered JCP&L to file a base rate case using a historical 2011 test year. Due to Hurricane Sandy, JCP&L requested an extension and will file a base rate case using a historic 2011 test year by December 1, 2012.

Pursuant to a formal Notice issued by the NJBPU on September 14, 2011, public hearings were held to solicit comments regarding the state of preparedness and responsiveness of the EDCs prior to, during, and after Hurricane Irene, with additional hearings held in October 2011. Additionally, the NJBPU accepted written comments through October 31, 2011 related to this inquiry. On December 14, 2011, the NJBPU Staff filed a report of its preliminary findings and recommendations with respect to the electric utility companies' planning and response to Hurricane Irene and the October 2011 snowstorm. The NJBPU selected a consultant to further review and evaluate the New Jersey EDCs' preparation and restoration efforts with respect to Hurricane Irene and the October 2011 snowstorm, and the consultant's report was submitted to and subsequently accepted by the NJBPU on September 12, 2012. The NJBPU solicited written comments on the report from stakeholders to be submitted by September 20, 2012, and JCP&L submitted written comments on that date. The NJBPU has not specified the action that will be taken as a result of information obtained through this process.

OHIO

The Ohio Companies operate under an ESP, which expires on May 31, 2014. The material terms of the ESP include:
Generation supplied through a CBP commencing June 1, 2011;
A load cap of no less than 80%, so that no single supplier is awarded more than 80% of the tranches, which also applies to tranches assigned post-auction;
A 6% generation discount to certain low income customers provided by the Ohio Companies through a bilateral wholesale contract with FES (FES is one of the wholesale suppliers to the Ohio Companies);
No increase in base distribution rates through May 31, 2014; and
A new distribution rider, Rider DCR, to recover a return of, and on, capital investments in the delivery system.

The Ohio Companies also agreed not to recover from retail customers certain costs related to transmission cost allocations by PJM as a result of ATSI's integration into PJM for the longer of the five-year period from June 1, 2011 through May 31, 2016 or when the amount of costs avoided by customers for certain types of products totals $360 million dependent on the outcome of certain PJM proceedings, agreed to establish a $12 million fund to assist low income customers over the term of the ESP and agreed to additional matters related to energy efficiency and alternative energy requirements.

On April 13, 2012, the Ohio Companies filed an application with the PUCO to essentially extend the terms of their current ESP for two years. The ESP 3 Application was approved by the PUCO on July 18, 2012. Several parties timely filed applications for rehearing, which the PUCO granted on September 12, 2012, solely for the purpose of giving the PUCO additional time to consider the issues raised in the applications for rehearing.

As approved, the ESP 3 plan continues certain provisions from the current ESP including:
Continuing the current base distribution rate freeze through May 31, 2016;
Continuing to provide economic development and assistance to low-income customers for the two-year extension period at levels established in the existing ESP;
Providing Percentage of Income Payment Plan customers with a 6 percent generation rate discount;
Continuing to provide power to shopping and to non-shopping customers as part of the market-based price set through an auction process; and
Continuing Rider DCR that allows continued investment in the distribution system for the benefit of customers.

As approved, the ESP 3 plan will provide additional provisions, including:
Securing generation supply for a longer period of time by conducting an auction for a three-year period rather than a one-year period, in October 2012 and January 2013, to mitigate any potential price spikes for FirstEnergy Ohio utility customers who do not switch to a competitive generation supplier; and
Extending the recovery period for costs associated with purchasing RECs mandated by SB 221 through the end of the new ESP 3 period. This is expected to initially reduce the monthly renewable energy charge for all FirstEnergy Ohio non-shopping utility customers by spreading out the costs over the entire ESP period.

Under the provisions of SB221, the Ohio Companies are required to implement energy efficiency programs that will achieve a total annual energy savings equivalent of approximately 1,211 GWHs in 2012 (an increase of 416,000 MWHs over 2011 levels), 1,726 GWHs in 2013, 2,306 GWHs in 2014 and 2,903 GWHs for each year thereafter through 2025. Utilities were also required to reduce peak demand in 2009 by 1%, with an additional 0.75% reduction each year thereafter through 2018.

In December 2009, the Ohio Companies filed their three-year portfolio plan, as required by SB221, seeking approval for the programs they intended to implement to meet the energy efficiency and peak demand reduction requirements for the 2010-2012 period. In March 2011, the PUCO issued an Opinion and Order generally approving the Ohio Companies' 2010-2012 portfolio plan which provides for recovery of all costs associated with the programs, including lost revenues. The Ohio Companies have implemented those programs included in the plan. Failure to comply with the benchmarks or to obtain such an amendment may subject the Ohio Companies to an assessment of a penalty by the PUCO.

The Ohio Companies had filed applications for rehearing regarding portions of the PUCO's decision related to the Ohio Companies' three-year portfolio plan, which was later denied by the PUCO and the subsequent appeal was dismissed by the Supreme Court of Ohio. In accordance with PUCO Rules and a PUCO directive, the Ohio Companies filed their next three-year portfolio plan for the period January 1, 2013 through December 31, 2015 on July 31, 2012. Estimated costs for the three Ohio Companies' plans total approximately $250 million over the three-year period. Hearings were held the week of October 22, 2012.

Additionally, under SB221, electric utilities and electric service companies are required to serve part of their load in 2011 from renewable energy resources equivalent to 1.00% of the average of the KWH they served in 2008-2010; in 2012 from renewable energy resources equivalent to 1.50% of the average of the KWH they served in 2009-2011; and in 2013 from renewable energy resources equivalent to 2.00% of the average of the KWH they served in 2010-2012. In August and October 2009, the Ohio Companies conducted RFPs to secure RECs. The RECs acquired through these two RFPs were used to help meet the renewable energy requirements established under SB221 for 2009, 2010 and 2011. In August 2011, the Ohio Companies conducted two RFP processes to obtain RECs to meet the statutory benchmarks for 2011 and beyond. On September 20, 2011 the PUCO opened a new docket to review the Ohio Companies' alternative energy recovery rider. The PUCO selected auditors to perform a financial and management audit, and final audit reports were filed with the PUCO on August 15, 2012. While generally supportive of the Ohio Companies' approach to procurement of RECs, the management/performance auditor recommended the PUCO examine, for possible disallowance, certain costs associated with the procurement of In-State All Renewable obligations that the auditor characterized as excessive. The PUCO has set this matter for hearing on February 19, 2013. In March 2012, the Ohio Companies conducted an RFP process to obtain SRECs to help meet the statutory benchmarks for 2012 and beyond. With the successful completion of this RFP, the Ohio Companies have achieved their in-state solar compliance requirements for 2012. The Ohio companies are in the midst of a short-term RFP process to obtain all state SRECs and both in-state and all state non-solar RECs to help meet the statutory benchmarks for 2012.

PENNSYLVANIA

The Pennsylvania Companies currently operate under DSPs that expire May 31, 2013, and provide for the competitive procurement of generation supply for customers that do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service. The default service supply is currently provided by wholesale suppliers through a mix of long-term and short-term contracts procured through descending clock auctions, competitive requests for proposals and spot market purchases. On November 17, 2011, the Pennsylvania Companies filed a Joint Petition for Approval of their DSP that will provide the method by which they will procure the supply for their default service obligations for the period of June 1, 2013 through May 31, 2015. The ALJ issued a Recommended Decision on June 15, 2012, that supported adoption of the Pennsylvania Companies' proposed wholesale procurement plans, denial of their proposed Market Adjustment Charge, and various modifications to the proposed competitive enhancements. The PPUC entered an opinion and order on August 16, 2012, which primarily resolved those issues related to procurement and rate design, but required the submission of revised proposals regarding the retail market enhancement programs. The Pennsylvania Companies made a compliance filing on September 6, 2012, seeking finalization of their procurement and rate design plans, and the PPUC issued a Secretarial Letter on November 8, 2012 approving the compliance filing. The PPUC entered an order on September 27, 2012, disposing of the Petitions for Reconsideration or Clarification filed by the Pennsylvania Companies and other parties. The Pennsylvania Companies were granted an extension to file revised proposals on the retail market enhancements by November 14, 2012.

The PPUC entered an Order on March 3, 2010 that denied the recovery of marginal transmission losses through the TSC rider for the period of June 1, 2007 through March 31, 2008, and directed ME and PN to submit a new tariff or tariff supplement reflecting the removal of marginal transmission losses from the TSC. Pursuant to a plan approved by the PPUC, ME and PN began to refund those amounts to customers in January 2011, and the refunds are continuing over a 29-month period until the full amounts previously recovered for marginal transmission losses are refunded. In April 2010, ME and PN filed a Petition for Review with the Commonwealth Court of Pennsylvania appealing the PPUC's March 3, 2010 Order. On June 14, 2011, the Commonwealth Court issued an opinion and order affirming the PPUC's Order to the extent that it holds that line loss costs are not transmission costs and, therefore, the approximately $254 million in marginal transmission losses and associated carrying charges for the period prior to January 1, 2011, are not recoverable under ME's and PN's TSC riders. ME and PN filed a Petition for Allowance of Appeal with the Pennsylvania Supreme Court, which was denied on February 28, 2012, and ME and PN also filed a complaint seeking relief in the U.S. District Court for the Eastern District of Pennsylvania, which was subsequently amended. The PPUC filed a Motion to Dismiss the amended complaint on September 15, 2011, to which ME and PN responded. On September 26, 2012, United States District Court Judge Gardner entered an order dismissing the PPUC's motion to dismiss without prejudice. On June 27, 2012, ME and PN filed a Petition for Writ of Certiorari with the Supreme Court of the United States. On October 9, 2012, the Supreme Court denied that petition. Accordingly, ME and PN intend to pursue their claims in the proceedings that are pending in the U.S. District Court (E.D. PA).

In each of May 2008, 2009 and 2010, the PPUC approved ME's and PN's annual updates to their TSC rider for the annual periods between June 1, 2008 to December 31, 2010, including marginal transmission losses as approved by the PPUC, although the recovery of marginal transmission losses will be subject to the outcome of the proceeding related to the 2008 TSC filing as described above. The PPUC's approval in May 2010 authorized an increase to the TSC for ME's customers to provide for full recovery by December 31, 2010. Although the ultimate outcome of this matter cannot be determined at this time, ME and PN believe that they should ultimately prevail through the judicial process and therefore expect to fully recover the approximately $254 million in marginal transmission losses for the period prior to January 1, 2011.

Pennsylvania adopted Act 129 in 2008 to address issues such as: energy efficiency and peak load reduction; generation procurement; time-of-use rates; smart meters; and alternative energy. Among other things, Act 129 required utilities to file with the PPUC an energy efficiency and peak load reduction plan (EE&C Plan) by July 1, 2009, setting forth the utilities' plans to reduce energy consumption by a minimum of 1% and 3% by May 31, 2011 and May 31, 2013, respectively, and to reduce peak demand by a minimum of 4.5% by May 31, 2013. Act 129 provides for potentially significant financial penalties to be assessed upon utilities that fail to achieve the required reductions in consumption and peak demand. The Pennsylvania Companies submitted a final report on November 15, 2011, in which they reported on their compliance with statutory May 31, 2011, energy efficiency benchmarks. ME, PN and Penn achieved the 2011 benchmarks; however WP has been unable to provide final results because several customers are still accumulating necessary documentation for projects that may qualify for inclusion in the final results. Preliminary numbers indicate that WP did not achieve its 2011 benchmark and it is not known at this time whether WP will be subject to a fine for failure to achieve the benchmark. WP could be subject to a statutory penalty of up to $20 million and is unable to predict the outcome of this matter.

Pursuant to Act 129, the PPUC was charged with reviewing the cost effectiveness of energy efficiency and peak demand reduction programs. The PPUC found the energy efficiency programs to be cost effective and in an Order entered on August 3, 2012, the PPUC directed all of the electric utilities in Pennsylvania to submit by November 1, 2012, a phase II EE&C Plan that would be in effect for the period June 1, 2013 through May 31, 2016. A hearing on the level of the Pennsylvania Companies' respective Phase II energy efficiency targets as established by the PPUC was held on October 19, 2012. The PPUC has deferred ruling on the need to create peak demand reduction targets until it receives more information from the EE&C statewide evaluator.

In addition, Act 129 required utilities to file a SMIP with the PPUC. In light of the significant expenditures that would be associated with its smart meter deployment plans and related infrastructure upgrades, as well as its evaluation of recent PPUC decisions approving less-rapid deployment proposals by other utilities, WP re-evaluated its Act 129 compliance strategy, including both its plans with respect to its previously approved smart meter deployment plan and certain smart meter dependent aspects of the EE&C Plan. WP proposed to decelerate its previously contemplated smart meter deployment schedule and to target the installation of approximately 25,000 smart meters in support of its EE&C Plan, based on customer requests, by mid-2012. WP also proposed to take advantage of the 30-month grace period authorized by the PPUC to continue WP's efforts to re-evaluate full-scale smart meter deployment plans. WP would be permitted to recover certain previously incurred and anticipated smart-meter related expenditures through a levelized customer surcharge, with certain expenditures amortized over a ten-year period. A joint settlement with all parties based on these terms, with one party retaining the ability to challenge the recovery of amounts spent on WP's original SMIP, was approved by the PPUC on June 30, 2011. Additionally, WP would be permitted to seek recovery of certain other costs as part of its revised SMIP that it currently intends to file by the end of 2012, or in a future base distribution rate case. The deadline for the Pennsylvania Companies to file their smart meter deployment plan is December 31, 2012.

In the PPUC Order approving the FirstEnergy and AE merger, the PPUC announced that a separate statewide investigation into Pennsylvania's retail electricity market will be conducted with the goal of making recommendations for improvements to ensure that a properly functioning and workable competitive retail electricity market exists in the state. On April 29, 2011, the PPUC entered an Order initiating the investigation and requesting comments from interested parties on eleven directed questions concerning retail markets in Pennsylvania to investigate both intermediate and long term plans that could be adopted to further foster the competitive markets, and to explore the future of default service in Pennsylvania following the expiration of the upcoming DSPs on May 31, 2015. Following the issuance of a Tentative Order and comments filed by numerous parties, the PPUC entered a final order on December 16, 2011, providing recommendations for components to be included in upcoming DSPs, including: the duration of the programs and the length of associated energy contracts; a customer referral program; a retail opt-in auction; time-of-use rate options provided through contracts with EGSs; and periodic rate adjustments. Following the issuance of a Tentative Order and comments filed by various parties, the PPUC entered a final order on March 2, 2012 outlining an intermediate work plan. Several suggested models for long-range default service have been presented and were the topic of a March 2012 en banc hearing. On September 27, 2012, the PPUC issued a Secretarial Letter and an "RMI End State Proposal" discussion document. PPUC staff hosted a conference call on October 17, 2012, and a Tentative Order was entered by the PPUC on November 8, 2012, seeking comments, that are due within 30 days, regarding the end state of default service and related issues.

The PPUC issued a Proposed Rulemaking Order on August 25, 2011, which proposed a number of substantial modifications to the current Code of Conduct regulations that were promulgated to provide competitive safeguards to the competitive retail electric market in Pennsylvania. The proposed changes include, but are not limited to: an EGS may not have the same or substantially similar name as the EDC or its corporate parent; EDCs and EGSs would not be permitted to share office space and would need to occupy different buildings; EDCs and affiliated EGSs could not share employees or services, except certain corporate support, emergency, or tariff services (the definition of "corporate support services" excludes items such as information systems, electronic data interchange, strategic management and planning, regulatory services, legal services, or commodities that have been included in regulated rates at less than market value); and an EGS must enter into a trademark agreement with the EDC before using its trademark or service mark. The Proposed Rulemaking Order was published on February 11, 2012, and comments were filed by ME, PN, Penn, WP and FES on March 27, 2012. If implemented these rules could require a significant change in the ways FES, ME, PN, Penn and WP do business in Pennsylvania, and could possibly have an adverse impact on their results of operations and financial condition. Pennsylvania's Independent Regulatory Review Commission subsequently issued comments on April 26, 2012, on the proposed rulemaking, which called for the PPUC to further justify the need for the proposed revisions by citing a lack of evidence demonstrating a need for them. The House Consumer Affairs Committee of the Pennsylvania General Assembly also sent a letter to the Independent Regulatory Review Commission on July 12, 2012, noting its opposition to the proposed regulations as modified.

WEST VIRGINIA

In April 2010, MP and PE filed with the WVPSC a Joint Stipulation and Agreement of Settlement reached with the other parties in a proceeding for an annual increase in retail rates that provided for:

$40 million annualized base rate increases effective June 29, 2010;
Deferral of February 2010 storm restoration expenses over a maximum five-year period;
Additional $20 million annualized base rate increase effective in January 2011;
Decrease of $20 million in ENEC rates effective January 2011, providing for deferral of related costs for later recovery in 2012; and
Moratorium on filing for further increases in base rates before December 1, 2011, except under specified circumstances.

The WVPSC approved the Joint Petition and Agreement of Settlement in June 2010.

In February 2011, MP and PE filed a petition with the WVPSC seeking an order declaring that MP owns all alternative and RECs associated with the energy and capacity that MP is required to purchase pursuant to electric energy purchase agreements between MP and three NUG facilities in West Virginia. The City of New Martinsville and Morgantown Energy Associates, each the owner of one of the contracted resources, have participated in the case in opposition to the petition. The WVPSC issued an order on November 22, 2011, granting ownership of all RECs produced by the facilities to MP, and holding that an electric utility that purchases electric energy and capacity under an electric power purchase agreement with a Qualifying Facility formed under PURPA owns the RECs associated with that purchase. The West Virginia Supreme Court issued an Order on June 11, 2012, upholding the WVPSC's decision. The City of New Martinsville and Morgantown Energy Associates filed complaints at FERC alleging the WVPSC order violated PURPA and requested that FERC initiate an enforcement action. On April 24, 2012, the FERC ruled that the FERC-jurisdictional contracts are intended to pay only for electric energy and capacity (and not for RECs), and that state law controlled on the issues of determining which entity owns RECs and how they are transferred between entities. The FERC declined to act on the complaints and instead noted that the City of New Martinsville and Morgantown Energy Associates could file complaints in the U.S. District Court. FERC also noted there may be language in the WVPSC order that is inconsistent with PURPA. MP filed for rehearing of the FERC's order taking the position that the WVPSC order is consistent with PURPA, which was denied by FERC on September 20, 2012. The City of New Martinsville filed a complaint in the U.S. District Court on June 4, 2012, alleging that the WVPSC order violates PURPA.

On March 9, 2012, to assist the WVPSC with inquiries from public officials and the public, MP provided information to the WVPSC in the form of a closed entry filing in the ENEC case related to the plant deactivations. The WVPSC issued a final order on July 13, 2012, finding that FirstEnergy's decision to deactivate the Albright, Rivesville and Willow Island plants was reasonable and concluded that the plants could be deactivated by September 1, 2012.

The WVPSC has proceedings for each West Virginia electric utility to establish reliability targets for distribution performance. The parties entered into a settlement in September 2012 resolving all issues and establishing performance targets with more stringent targets beginning in 2014. The settlement is under review by the WVPSC.

The WVPSC opened a general investigation into the June 29, 2012, derecho windstorm with data requests for all utilities. A public meeting for presentations on utility responses and restoration efforts was held on October 22, 2012.

The West Virginia ENEC fuel case was filed by MP and PE at the WVPSC in August 2012 with a projected over-recovery of approximately $66 million under current rates for the next year, January 1, 2013 through December 31, 2013. MP and PE proposed no change in overall rates on January 1, 2013; however, MP and PE proposed establishing a separate regulatory liability for the difference between the recommended 2013 ENEC rates and the current ENEC rates. This estimated $66 million liability would be used to offset the rate relief MP and PE will seek in a filing later this year to become effective with the completion of a proposed generation resource transaction, which MP and PE will propose to complete by mid-2013. Discovery in the ENEC proceeding is underway and a hearing is expected in December 2012.

MP and PE filed their Resource Plan with the WVPSC in August 2012 detailing both supply and demand forecasts and noting a substantial capacity deficiency. MP and PE plan to file a Petition for Approval of a Generation Resource Transaction with the WVPSC in November 2012 that involves a net ownership transfer of 1,476 MW of coal-fired generation capacity to MP. The proposed transfer would involve MP's acquisition of the remaining ownership of the Harrison Power Station from AE Supply and the sale of MP's minority interest in the Pleasants Power Station to AE Supply. The proposed transfer would implement what we believe to be a cost-effective plan to assist MP in meeting its energy and capacity obligations with its own generation resources, eliminating the need to make additional electricity and capacity purchases from the spot market which is expected to result in greater rate stability for MP's customers. The plan is expected to remedy MP's capacity and energy shortfalls, which are projected to increase due to an increase in annual load growth of approximately 1.4%.

RELIABILITY MATTERS

Federally-enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements on the Utilities, FES, AE Supply, FGCO, FENOC, ATSI and TrAIL. NERC is the ERO designated by FERC to establish and enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to eight regional entities, including RFC. All of FirstEnergy's facilities are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and enforced by RFC.

FirstEnergy believes that it is in compliance with all currently-effective and enforceable reliability standards. Nevertheless, in the course of operating its extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the reliability standards. If and when such items are found, FirstEnergy develops information about the item and develops a remedial response to the specific circumstances, including in appropriate cases “self-reporting” an item to RFC. Moreover, it is clear that the NERC, RFC and FERC will continue to refine existing reliability standards as well as to develop and adopt new reliability standards. The financial impact of complying with future new or amended standards cannot be determined at this time; however, 2005 amendments to the FPA provide that all prudent costs incurred to comply with the future reliability standards be recovered in rates. Any future inability on FirstEnergy's part to comply with the reliability standards for its bulk power system could result in the imposition of financial penalties that could have a material adverse effect on its financial condition, results of operations and cash flows.

On December 9, 2008, a transformer at JCP&L's Oceanview substation failed, resulting in an outage on certain bulk electric system (transmission voltage) lines out of the Oceanview and Atlantic substations resulting in customers losing power for up to eleven hours. On March 31, 2009, NERC initiated a Compliance Violation Investigation in order to determine JCP&L's contribution to the electrical event and to review any potential violation of NERC Reliability Standards associated with the event. NERC has submitted first and second Requests for Information regarding this and another related matter. JCP&L is complying with these requests. On March 22, 2012, NERC concluded the investigation of the matter and forwarded it to NCEA for further review. NCEA is currently evaluating the findings of the investigation. JCP&L expects the matter to be resolved for an immaterial amount.

During September 2012, RFC performed a routine compliance audit of certain parts of FirstEnergy's bulk-power systems and generally found the audited systems and processes to be in full compliance with all the audited reliability standards.

FERC MATTERS

PJM Transmission Rate

PJM and its stakeholders have been debating the proper method to allocate costs for new transmission facilities. While FirstEnergy and other parties advocated for a traditional "beneficiary pays" approach, others advocate for “socializing” the costs on a load-ratio share basis - each customer in the zone would pay based on its total usage of energy within PJM. This debate is framed by regulatory and court decisions. In 2007, the U.S. Court of Appeals for the Seventh Circuit found that FERC had not supported a prior FERC decision to allocate costs for new 500 kV and higher voltage facilities on a load ratio share basis and, based on that finding, remanded the rate design issue to FERC. In an order dated January 21, 2010, FERC set this matter for a “paper hearing” and requested parties to submit written comments. FERC identified nine separate issues for comment and directed PJM to file the first round of comments. PJM filed certain studies with FERC on April 13, 2010, which demonstrated that allocation of the cost of high voltage transmission facilities on a beneficiary pays basis results in certain LSEs in PJM bearing the majority of the costs. Subsequently, numerous parties filed responsive comments or studies on May 28, 2010 and reply comments on June 28, 2010. FirstEnergy and a number of other utilities, industrial customers and state utility commissions supported the use of the beneficiary pays approach for cost allocation for high voltage transmission facilities. Other utilities and state utility commissions supported continued socialization of these costs on a load ratio share basis. On March 30, 2012, FERC issued an order on remand reaffirming its prior decision that costs for new transmission facilities that are rated at 500 kV or higher are to be collected from all transmission zones throughout the PJM footprint by means of a postage-stamp rate based on the amount of load served in a transmission zone and concluding that such methodology is just and reasonable and not unduly discriminatory or preferential. On April 30, 2012, FirstEnergy requested rehearing of FERC's March 30, 2012 order. FirstEnergy's request for rehearing remains pending before FERC.

Order No. 1000, issued by FERC on July 21, 2011, required the submission of a compliance filing by PJM or the PJM transmission owners demonstrating that the cost allocation methodology for new transmission projects directed by the PJM Board of Managers satisfied the principles set forth in the order. To demonstrate compliance with the regional cost allocation principles of the order, the PJM transmission owners, including FirstEnergy, submitted a filing to FERC on October 11, 2012, proposing a hybrid method of 50% beneficiary pays (or usage based) and 50% postage stamp (or socialization) to be effective for RTEP projects approved by the PJM Board on and after the effective date of the compliance filing. The filing is pending before FERC. Filings to demonstrate compliance with the interregional cost allocation principles of the order must be submitted to FERC by April 2013.

RTO Realignment

On June 1, 2011, ATSI and the ATSI zone transferred from MISO to PJM. The move was performed as planned with no known operational or reliability issues for ATSI or for the wholesale transmission customers in the ATSI zone. While most of the matters involved with the move have been resolved, the question of ATSI's responsibility for certain costs for the “Michigan Thumb” transmission project continues to be disputed; the details of which dispute are discussed below in the "MISO Multi-Value Project Rule Proposal." In addition, FERC denied certain exit fees of ATSI's transmission rate until such time as ATSI submits a cost/benefit analysis that demonstrates net benefits to customers from the move. ATSI has asked for rehearing of FERC's orders that address the Michigan Thumb transmission project, and the exit fee issue. Finally, FERC ruled that the costs for certain "legacy RTEP" transmission projects in PJM could be charged to loads in the ATSI zone. ATSI sought rehearing of the question of whether the ATSI zone should pay these legacy RTEP charges and, on September 20, 2012, FERC denied ATSI's request for rehearing. ATSI is considering whether to appeal FERC's ruling on the "legacy RTEP" issue. FirstEnergy has also appealed the issue of legacy RTEP to the Seventh Circuit Court of Appeals. Although there can be no assurance, success in the appeal could terminate the ATSI zone's responsibility for legacy RTEP charges.

ATSI's filings and requests for rehearing on certain of these matters, as well as the pleadings submitted by parties that oppose ATSI's position are currently pending before FERC. Finally, on August 22, 2012, FERC approved a negotiated agreement that requires ATSI to pay a one-time charge of $1.8 million for long term firm transmission rights that, according to the MISO, were payable upon ATSI's exit.

The outcome of those proceedings that address the remaining open issues related to ATSI's move into PJM and their impact, if any, on FirstEnergy cannot be predicted at this time.

MISO Multi-Value Project Rule Proposal

In July 2010, MISO and certain MISO transmission owners (not including ATSI or FirstEnergy) jointly filed with FERC a proposed cost allocation methodology for certain new transmission projects. The new transmission projects - described as MVPs - are a class of transmission projects that are approved via MISO's MTEP process. Under MISO's proposal, the costs of “Michigan Thumb” MVP projects that were approved by MISO's Board prior to the June 1, 2011 effective date of FirstEnergy's integration into PJM would continue to be allocated to and charged to ATSI. MISO estimated that approximately $16 million in annual revenue requirements associated with the Michigan Thumb Project would be allocated to the ATSI zone upon completion of project construction.

FirstEnergy has filed pleadings in opposition to the MISO's efforts to “socialize” the costs of the Michigan Thumb Project onto ATSI or onto ATSI's customers that assert legal, factual and policy arguments. To date, FERC has responded in a series of orders that may require ATSI to absorb the charges for the Michigan Thumb Project pending the outcome of further regulatory proceedings and appeals. These further proceedings can be divided into two classes: litigation related to the MISO's generic MVP cost allocation proposal; and litigation related to the MISO's "Schedule 39" tariff that purports to charge the MVP costs against ATSI.

On October 31, 2011, FirstEnergy filed a Petition of Review of certain of the FERC's orders that address the generic MVP tariffs with the U.S. Court of Appeals for the D.C. Circuit. Other parties also filed appeals of those orders and, in November 2011, the cases were consolidated for briefing and disposition in the U.S. Court of Appeals for the Seventh Circuit with briefs due from the parties through 2012 and oral argument to be scheduled in 2013.

In February 2012, FERC accepted the MISO's proposed Schedule 39 tariff, subject to hearings and potential refund of MVP charges to ATSI. MISO's Schedule 39 tariff is the vehicle through which the MISO plans to charge the Michigan Thumb Project costs to ATSI. FERC set for hearing the question of whether it is just and reasonable for ATSI to pay the Michigan Thumb Project costs and, if so, the amount of and methodology for calculating ATSI's Michigan Thumb Project cost responsibility. The hearings will start in April 2013.

FirstEnergy cannot predict the outcome of these proceedings or estimate the possible loss or range of loss.




PJM Underfunding FTR Complaint

On December 28, 2011, FES and AE Supply filed a complaint with FERC against PJM challenging the ongoing underfunding of FTR contracts, which exist to hedge against transmission congestion in the day-ahead markets. The underfunding is a result of PJM's practice of using the funds that are intended to pay the holders of FTR contracts to pay instead for congestion costs that occur in the real time markets. Underfunding of the FTR contracts resulted in losses of approximately $35 million ($0.5 million - FES; $34.5 million - AE Supply) in the 2010-2011 Delivery Year. Losses for the 2011-2012 Delivery Year are estimated to be approximately $11.5 million ($11.4 million - FES; $0.1 million - AE Supply). On January 13, 2012, PJM filed comments describing changes to the PJM tariff that, if adopted, should remedy the underfunding issue. On March 2, 2012, FERC dismissed the complaint without prejudice, pending PJM's publication for stakeholder review and discussion, a report on the causes of the FTR underfunding and potential improvements, including modeling, which could be made to minimize the revenue inadequacy. On March 30, 2012, FES and AE Supply requested rehearing and reconsideration of the March 2, 2012 order. On July 19, 2012, FERC issued its Order on Rehearing and again dismissed FirstEnergy's complaint without prejudice. FERC noted PJM's ongoing stakeholder process and directed that if the issues were not addressed in that process FirstEnergy could file its complaint again.

FTR Allocation Complaint

On March 26, 2012, FES and AE Supply filed a complaint with FERC against PJM challenging PJM's FTR allocation rules. PJM allocates FTRs to LSEs in an annual allocation process, up to each LSE's peak load, based on the expected transmission capability for the upcoming planning year. If a transmission facility is scheduled to be out of service for a significant part of the year, it can result in LSEs' FTR allocations being reduced in the annual allocation. When these transmission facilities return to service during the year, PJM will create monthly FTRs to reflect the increased transmission capability during that month. However, instead of allocating these new monthly FTRs to the LSEs that were unable to obtain their full allocation of FTRs in the annual allocation process, PJM's rules instead require PJM to auction off these new monthly FTRs in the market. The complaint seeks a change to the PJM rules such that the new FTRs created each month by transmission lines returning to service would first be allocated to those LSEs that were denied a full allocation of their FTR entitlement in the annual allocation process before they are auctioned off in the market. On April 16, 2012, PJM filed its answer to the complaint. Exelon Corporation filed a protest, and several other parties filed comments. On July 11, 2012, FERC issued its Order Granting Complaint and Requiring a Compliance Filing. In the order, FERC agreed with FirstEnergy's description of the issues and with FirstEnergy's proposed changes to PJM's rules, and FERC directed PJM to submit a compliance filing within 60 days to implement the changes in the rules. On September 10, 2012, PJM submitted the compliance filing. On October 17, 2012, FERC accepted the PJM compliance filing, resolving this matter.

California Claims Matters

In October 2006, several California governmental and utility parties presented AE Supply with a settlement proposal to resolve alleged overcharges for power sales by AE Supply to the California Energy Resource Scheduling division of the CDWR during 2001. The settlement proposal claims that CDWR is owed approximately $190 million for these alleged overcharges. This proposal was made in the context of mediation efforts by FERC and the United States Court of Appeals for the Ninth Circuit in pending proceedings to resolve all outstanding refund and other claims, including claims of alleged price manipulation in the California energy markets during 2000 and 2001. The Ninth Circuit had previously remanded one of those proceedings to FERC. In March 2010, the FERC ALJ assigned to the case entered an opinion that granted the motions to dismiss filed by AE Supply and other sellers and dismissed the claims of the California Parties. On May 4, 2011, FERC affirmed the judge's ruling. On June 3, 2011, the California parties requested rehearing of the May 4, 2011 order. By Order issued June 13, 2012, FERC denied the request for rehearing. On June 20, 2012, the California Parties appealed the FERC's decision back to the Ninth Circuit Court of Appeals. On July 19, 2012, the Ninth Circuit Court of Appeals issued an order declining to consolidate the appeal with other pending appeals regarding California refund claims, suspending briefing, and directing interested parties to intervene by August 31, 2012. AE Supply filed an intervention on August 28, 2012. On September 6, 2012, the Ninth Circuit issued an order granting AE Supply's intervention and continuing the suspension of the briefing schedule ordered on July 19, 2012. The timing of further action by the Ninth Circuit is unknown.

In June 2009, the California Attorney General, on behalf of certain California parties, filed a second complaint with FERC against various sellers, including AE Supply, again seeking refunds for transactions in the California energy markets during 2000 and 2001. The above-noted transactions with CDWR are the basis for including AE Supply in this additional complaint. AE Supply filed a motion to dismiss this second complaint, which was granted by FERC on May 24, 2011. On June 23, 2011, the California Attorney General requested rehearing of the May 24, 2011 order. By Order issued June 13, 2012, that request for rehearing also was denied. On June 20, 2012, the California Attorney General appealed the FERC's decision to the Ninth Circuit Court of Appeals. In addition, on July 13, 2012, the California Attorney General requested rehearing of the June 13, 2012 order. On July 19, 2012, the Ninth Circuit consolidated the June 20, 2012 appeal with other pending appeals related to California refund claims, referred the case to the Circuit Mediator, and stayed the proceedings pending further order. On August 7, 2012, FERC rejected the California Attorney General's July 13, 2012 request for rehearing. On August 16, 2012, the California Attorney General appealed the August 7, 2012 order to the Ninth Circuit. On August 29, 2012, the Ninth Circuit consolidated the August 16, 2012 appeal with the aforementioned cases and continued the stay pending further order. FirstEnergy cannot predict the outcome of either of the above matters or estimate the possible loss or range of loss.

PATH Transmission Project

The PATH project was proposed to be comprised of a 765 kV transmission line from West Virginia through Virginia and into Maryland, modifications to an existing substation in Putnam County, West Virginia, and the construction of new substations in Hardy County, West Virginia and Frederick County, Maryland. PJM initially authorized construction of the PATH project in June 2007. On August 24, 2012, the PJM Board of Managers officially canceled the project, which it had originally suspended in February 2011. All applications for authorization to construct the project filed with state commissions have been withdrawn. As a result, approximately $62 million and $59 million in costs incurred by PATH-Allegheny and PATH-WV, respectively, were reclassified from net property, plant and equipment to a regulatory asset for future recovery. On September 28, 2012, these companies requested authorization from FERC to recover these costs associated with the project with a proposed return on equity of 10.9% (10.4% base plus 0.5% RTO Membership) from PJM customers over the next 5 years. Several parties have protested the request and a FERC decision is pending.

On September 20, 2012, FERC set for hearing formal challenges to the PATH formula rate annual updates submitted in June 2010 and June 2011. These challenges seek a disallowance of approximately $6.6 million in costs for the project. Settlement judge procedures are pending. FirstEnergy cannot predict the outcome of either of the above matters or estimate the possible loss or range of loss.

Yards Creek

The Yards Creek Pumped Storage Project is a 400 MW hydroelectric project located in Warren County, New Jersey. JCP&L owns an undivided 50% interest in the project, and operates the project. PSEG Fossil, LLC, a subsidiary of Public Service Enterprise Group, owns the remaining interest in the plant. The project was constructed in the early 1960s, and became operational in 1965. FERC issued a license for authorization to operate the project. The existing license expires on February 28, 2013.

In February 2011, JCP&L and PSEG filed a joint application with FERC to renew the license for an additional forty years. The companies are pursuing relicensure through FERC's ILP. Under the ILP, FERC will assess the license applications, issue draft and final Environmental Assessments/Environmental Impact Studies (as required by NEPA), and provide opportunities for intervention and protests by affected third parties. FERC may hold hearings during the five-year ILP licensure process. FirstEnergy expects FERC to issue the new license before February 28, 2013. To the extent however that the license proceedings extend beyond the February 28, 2013 expiration date for the current license, the current license will be extended yearly as necessary to permit FERC to issue the new license.

Seneca

The Seneca Pumped Storage Project is a 451 MW hydroelectric project located in Warren County, Pennsylvania owned and operated by FGCO. FGCO holds the current FERC license that authorizes ownership and operation of the project. The current FERC license will expire on November 30, 2015. FERC's regulations call for a five-year relicensing process. On November 24, 2010, and acting pursuant to applicable FERC regulations and rules, FGCO initiated the relicensing process by filing its notice of intent to relicense and related documents in the license docket.

On November 30, 2010, the Seneca Nation filed its notice of intent to relicense and related documents necessary for the Seneca Nation to submit a competing application. Section 15 of the FPA contemplates that third parties may file a "competing application" to assume ownership and operation of a hydroelectric facility upon (i) relicensure and (ii) payment of net book value of the plant to the original owner/operator. Nonetheless, FGCO believes it is entitled to a statutory “incumbent preference” under Section 15.

The Seneca Nation and certain other intervenors have asked FERC to redefine the “project boundary” of the hydroelectric plant to include the dam and reservoir facilities operated by the U.S. Army Corps of Engineers. On May 16, 2011, FirstEnergy filed a Petition for Declaratory Order with FERC seeking an order to exclude the dam and reservoir facilities from the project. The Seneca Nation, the New York State Department of Environmental Conservation, and the U.S. Department of Interior each submitted responses to FirstEnergy's petition, including motions to dismiss FirstEnergy's petition. The “project boundary” issue is pending before FERC.

On September 12, 2011, FirstEnergy and the Seneca Nation each filed “Revised Study Plan” documents. These documents describe the parties' respective proposals for the scope of the environmental studies that should be performed as part of the relicensing process. On October 11, 2011, FERC Staff issued a letter order that addressed the Revised Study Plans. In the order, FERC Staff approved FirstEnergy's Revised Study Plan, subject to a finding that the Project is located on “aboriginal lands” of the Seneca Nation. Based on this finding, FERC Staff directed FirstEnergy to consult with the Seneca Nation and other parties about the data set, methodology and modeling of the hydrological impacts of project operations. In March of 2012, FirstEnergy hosted a meeting as part of the consultation process. In that meeting, FirstEnergy reviewed its proposed methodology for conducting the hydrological impacts study and answered questions from third parties about the methodology. On April 11, 2012, the Seneca Nation and other parties filed comments on the proposed hydrologic impacts study, the study processes, including the discrete hydrological impacts study, which study will extend through approximately November 2013.

FirstEnergy cannot predict the outcome of this matter or estimate the possible loss or range of loss.

MISO Capacity Portability

On June 11, 2012, the FERC issued a Notice of Request for Comments regarding whether existing rules on transfer capability act as barriers to the delivery of capacity between MISO and PJM. FERC is responding to suggestions from MISO Stakeholders that PJM's rules regarding the criteria and qualifications for external generation capacity resources be changed to ease participation by resources that are located in MISO in PJM's RPM capacity auctions. FirstEnergy submitted comments on August 10, 2012, and reply comments on August 27, 2012. Changes to the criteria and qualifications for participation in the PJM RPM capacity auctions could have a significant impact on the outcome of those auctions, including the prices at which those auctions would clear.