XML 52 R22.htm IDEA: XBRL DOCUMENT v2.4.0.8
Environmental Matters
12 Months Ended
Dec. 31, 2013
Environmental Matters [Abstract]  
Environmental Matters [Text Block]
15. ENVIRONMENTAL MATTERS

We own, or previously owned, properties that may require environmental remediation or action. We estimate the range of loss for environmental liabilities based on current remediation technology, enacted laws and regulations, industry experience gained at similar sites and an assessment of the probable level of involvement and financial condition of other potentially responsible parties. Due to the numerous uncertainties surrounding the course of environmental remediation and the preliminary nature of several site investigations, in some cases, we may not be able to reasonably estimate the high end of the range of possible loss. In those cases, we have disclosed the nature of the possible loss and the fact that the high end of the range cannot be reasonably estimated. Unless there is an estimate within a range of possible losses that is more likely than other cost estimates within that range, we record the liability at the low end of this range. It is likely that changes in these estimates and ranges will occur throughout the remediation process for each of these sites due to our continued evaluation and clarification concerning our responsibility, the complexity of environmental laws and regulations and the determination by regulators of remediation alternatives. 

In the 2012 Oregon general rate case, the new SRRM mechanism was approved to recover the Company's deferred environmental costs. The Commission ordered a separate docket to determine the prudence of deferred costs, the allocation of insurance proceeds, and an earnings test that would be applied to past and future deferred costs. In July 2013, all parties filed a settlement agreement with the OPUC to address how to apply the new mechanism. In November, the Commission rejected the settlement and ordered further proceedings. We have established a schedule with parties for 2014 and are working toward resolution of this matter.

In Washington, cost recovery and carrying charges on amounts deferred for costs associated with services provided to Washington customers will be determined in a future proceeding. We annually review all regulatory assets for recoverability and more often if circumstances warrant. If we should determine that all or a portion of these regulatory assets no longer meet the criteria for continued application of regulatory accounting, then we would be required to write off the net unrecoverable balances against earnings in the period such determination is made.

In December 2010, NW Natural commenced litigation against certain of its historical liability insurers in Multnomah County Circuit Court, State of Oregon (see Part I, Item 3 "Legal Proceedings"). In the complaint, NW Natural sought damages in excess of $50 million in losses it incurred through the date of the complaint, as well as declaratory relief for additional losses it expects to incur in the future. As of February 6, 2014, we had settled with all defendant insurance companies in this litigation. As a result of this settlement, the Company expects to receive additional payments aggregating approximately $102 million in 2014 related to the settlements. Such payments are to be made in the first and second quarters of 2014. Through December 31, 2013, we have received approximately $48 million. See Note 17 for additional information.

Environmental Sites
The following table summarizes information regarding liabilities related to environmental sites, which are recorded in other current liabilities and other noncurrent liabilities on the balance sheet at December 31:
 
 
Current Liabilities
 
Non-Current Liabilities
In thousands
 
2013
 
2012
 
2013
 
2012
Portland Harbor site:
 
 
 
 
 
 
 
 
Gasco/Siltronic Sediments
 
$
1,278

 
$
2,207

 
$
37,954

 
$
36,087

Other Portland Harbor
 
1,766

 
1,767

 
3,478

 
3,160

Gasco Upland site
 
11,010

 
18,722

 
39,508

 
5,028

Siltronic Upland site
 
763

 
637

 
406

 
379

Central Service Center site
 
85

 
140

 
248

 
396

Front Street site
 
1,274

 
993

 
122

 

Oregon Steel Mills
 

 

 
179

 
185

Total
 
$
16,176

 
$
24,466

 
$
81,895

 
$
45,235



The following table presents information regarding the total amount of cash paid for environmental sites and the total regulatory asset deferred as of December 31:
In thousands
 
2013
 
2012
Cash paid(1)
 
$
98,817

 
$
71,124

Total regulatory asset deferral(2)
 
148,389

 
121,144



(1) Includes $20.1 million reclassified to utility plant in 2013 associated with the water treatment station of which a portion was paid in 2012.
(2) Includes cash paid, remaining liability, and interest, net of insurance reimbursement and amounts reclassified to utility plant for the water treatment station.

PORTLAND HARBOR SITE. The Portland Harbor is an EPA listed Superfund site that is approximately 11 miles long on the Willamette River and is adjacent to NW Natural's Gasco upland and Siltronic upland sites. We have been notified that we are a potentially responsible party to the Superfund site and we have joined with other potentially responsible parties (the Lower Willamette Group or LWG) to develop a Portland Harbor Remedial Investigation/Feasibility Study (RI/FS). The LWG submitted a draft Feasibility Study (FS) to the Environmental Protection Agency (EPA) in March 2012 that provides a range of remedial costs for the entire Portland Harbor Superfund Site, which includes the Gasco/Siltronic Sediment site, discussed below. The range of costs estimated for various remedial alternatives for the entire Portland Harbor, as provided in the draft FS, is $169 million to $1.8 billion. NW Natural's potential liability is a portion of the costs of the remedy the EPA will select for the entire Portland Harbor Superfund site. The cost of that remedy is expected to be allocated among more than 100 potentially responsible parties. NW Natural is participating in a non-binding allocation process in an effort to settle this potential liability. We manage our liability related to the Superfund site as two distinct remediation projects, the Gasco/Siltronic Sediment and Other Portland Harbor projects.

Gasco/Siltronic Sediments. In 2009, NW Natural and Siltronic Corporation entered into a separate Administrative Order on Consent with the EPA to evaluate and design specific remedies for sediments adjacent to the Gasco upland and Siltronic upland sites. NW Natural submitted a draft Engineering Evaluation/Cost Analysis (EE/CA) to the EPA in May 2012 to provide the estimated cost of potential remedial alternatives for this site. At this time, the estimated costs for the various sediment remedy alternatives in the draft EE/CA range from $39.2 million to $350 million. We have recorded a liability of $39.2 million for the sediment clean-up, which reflects the low end of the EE/CA range, as well as costs for the additional studies and design work needed before the clean-up can occur, and for regulatory oversight throughout the clean-up. At this time, we believe sediments at this site represent the largest portion of our liability related to the Portland Harbor site, discussed above. 

Other Portland Harbor. NW Natural incurs costs related to its membership in the LWG which is performing the RI/FS for the EPA. NW Natural also incurs costs related to natural resource damages from these sites. The Company and other parties have signed a cooperative agreement with the Portland Harbor Natural Resource Trustee council to participate in a phased natural resource damage assessment to estimate liabilities to support an early restoration-based settlement of natural resource damage claims. Natural resource damage claims may arise only after a remedy for clean-up has been settled. We have accrued a liability for these claims which is at the low end of the range of the potential liability and the high end of the range cannot be reasonably estimated. This liability is not included in the range of costs provided in the draft FS for the Portland Harbor.

Gasco upland site. NW Natural owns a former gas manufacturing plant that was closed in 1958 (Gasco site) and is adjacent to the Portland Harbor site described above. The Gasco site has been under investigation by us for environmental contamination under the ODEQ Voluntary Clean-Up Program. It is not included in the range of remedial costs for the Portland Harbor site. We manage the Gasco site in two parts, the uplands portion and the groundwater source control action.

In May 2007, we completed a revised Remedial Investigation Report for the uplands portion and submitted it to ODEQ for review. We have recognized a liability for the remediation of the uplands portion of the site which is at the low end of the range of potential liability and the high end of the range cannot be reasonably estimated at this time.

In September 2013, we completed construction and placed into service a groundwater source control system, including a water treatment station, at the Gasco site. We are working with ODEQ on monitoring the effectiveness of the system and at this time it is unclear what, if any, additional actions ODEQ may require subsequent to the initial testing of the system or as part of the final remedy for the uplands portion of the Gasco site. We have estimated the cost associated with the ongoing operation of the system and have recognized a liability which is at the low end of the range of potential cost. We cannot estimate the high end of the range due to the uncertainty associated with the duration of running the water treatment station, which will be highly dependent upon the remedy determined for both the upland portion as well as the final remedy for our Gasco sediment exposure.
On October 28, 2013, the OPUC approved placing $19.0 million of capital costs associated with constructing a water treatment station at our Gasco environmental site into rates beginning November 1, 2013. These amounts are subject to refund, with interest, in the event the Commission determines, through a separate docket, that any of these costs were incurred imprudently. On February 13, 2014, NW Natural filed an all-party stipulation in the proceeding with the OPUC, which if approved would deem Gasco construction costs prudent and would also approve applying $2.5 million of insurance proceeds plus interest to reduce the Gasco costs included in rates beginning November 1, 2014.

Other sites. In addition to those sites above, we have environmental exposures at four other sites: Siltronic, Central Service Center, Front Street, and Oregon Steel Mills. Due to the uncertainty of the design of remediation, regulation, timing of the liabilities, and in the case of the Oregon Steel Mills site, pending litigation, liabilities for each of these sites has been recognized at their respective low end of the range of potential liability; the high end of the range could not be reasonably estimated as of December 31, 2013.

Siltronic upland site. Siltronic is the location of a manufactured gas plant formerly owned by NW Natural. We are currently conducting an investigation of manufactured gas plant wastes on the uplands at this site for the ODEQ. 
 
Central Service Center site. We are currently performing an environmental investigation of the property under the ODEQ's Independent Cleanup Pathway. This site is on ODEQ's list of sites with confirmed releases of hazardous substances, and cleanup is necessary. 
 
Front Street site. The Front Street site was the former location of a gas manufacturing plant we operated. Studies for source control investigation have been presented to ODEQ and a final sampling plan required by ODEQ is currently being developed. 

Oregon Steel Mills site. See “Legal Proceedings,” below.
 
Legal Proceedings
NW Natural is subject to claims and litigation arising in the ordinary course of business. Although the final outcome of any of these legal proceedings cannot be predicted with certainty, including the matter described below, NW Natural does not expect that the ultimate disposition of any of these matters will have a material effect on our financial condition, results of operations or cash flows. See also Part I, Item 3, “Legal Proceedings.”
 
OREGON STEEL MILLS SITE. In 2004, NW Natural was served with a third-party complaint by the Port of Portland (the Port) in a Multnomah County Circuit Court case, Oregon Steel Mills, Inc. v. The Port of Portland. The Port alleges that in the 1940s and 1950s petroleum wastes generated by our predecessor, Portland Gas & Coke Company, and 10 other third-party defendants, were disposed of in a waste oil disposal facility operated by the United States or Shaver Transportation Company on property then owned by the Port and now owned by Oregon Steel Mills. The complaint seeks contribution for unspecified past remedial action costs incurred by the Port regarding the former waste oil disposal facility as well as a declaratory judgment allocating liability for future remedial action costs. No date has been set for trial. Although the final outcome of this proceeding cannot be predicted with certainty, we do not expect that the ultimate disposition of this matter will have a material effect on our financial condition, results of operations or cash flows.