Environmental Matters
9 Months Ended
Sep. 30, 2013
Accrual for Environmental Loss Contingencies [Abstract]  
Environmental Matters [Text Block]
13. ENVIRONMENTAL MATTERS

We own, or previously owned, properties that may require environmental remediation or action. We estimate the range of loss for environmental liabilities based on current remediation technology, enacted laws and regulations, industry experience gained at similar sites and an assessment of the probable level of involvement and financial condition of other potentially responsible parties. Due to the numerous uncertainties surrounding the course of environmental remediation and the preliminary nature of several site investigations, in some cases, we may not be able to reasonably estimate the high end of the range of possible loss. In those cases, we have disclosed the nature of the possible loss and the fact that the high end of the range cannot be reasonably estimated. Unless there is an estimate within a range of possible losses that is more likely than other cost estimates within that range, we record the liability at the low end of this range. It is likely that changes in these estimates and ranges will occur throughout the remediation process for each of these sites due to our continued evaluation and clarification concerning our responsibility, the complexity of environmental laws and regulations and the determination by regulators of remediation alternatives.  

Environmental site remediation costs are deferred under regulatory approval from the OPUC and WUTC. In addition, the OPUC authorized a mechanism (SRRM) that allows the Company to recover prudently incurred environmental site remediation costs, subject to an earnings test. Actual cost recovery under SRRM depends upon offsetting future insurance recoveries, prudency review regarding future expenditures, and the impact of an earnings test. Cost recovery and carrying charges on amounts deferred for costs associated with services provided to Washington customers will be determined in a future proceeding. We annually review all regulatory assets for recoverability and more often if circumstances warrant. If we should determine that all or a portion of these regulatory assets no longer meet the criteria for continued application of regulatory accounting, then we would be required to write off the net unrecoverable balances against earnings in the period such determination is made. See Note 15 for information regarding the settlement agreement filed with the OPUC to resolve implementation issues for SRRM.

In December 2010, NW Natural commenced litigation against certain of its historical liability insurers in Multnomah County Circuit Court, State of Oregon (see Item 3. Legal Proceedings). In the complaint, NW Natural sought damages in excess of the $50 million in losses it had incurred through the date of the complaint, as well as declaratory relief for additional losses it expected to incur in the future.

The following table summarizes information regarding liabilities related to environmental sites, which are recorded in other current liabilities and other non-current liabilities on the balance sheet:
 
 
Current Liabilities
 
Non-Current Liabilities
 
 
September 30,
 
December 31,
 
September 30,

December 31,
In thousands
 
2013
 
2012
 
2012
 
2013
 
2012

2012
Portland Harbor site:
 
 
 
 
 
 
 
 
 
 
 
 
Gasco/Siltronic Sediments
 
$
512

 
$
1,748

 
$
2,207

 
$
38,034

 
$
43,628

 
$
36,087

Other Portland Harbor
 
1,812

 
1,188

 
1,767

 
2,315

 
3,186

 
3,160

Gasco Uplands site
 
2,094

 
18,018

 
18,722

 
7,126

 
7,453

 
5,028

Siltronic Uplands site
 
405

 
511

 
637

 
434

 
592

 
379

Central Service Center site
 
150

 
100

 
140

 
271

 
445

 
396

Front Street site
 
411

 
942

 
993

 
158

 
452

 

Oregon Steel Mills
 

 

 

 
179

 
185

 
185

Total
 
$
5,384

 
$
22,507

 
$
24,466

 
$
48,517

 
$
55,941

 
$
45,235



The following table presents information regarding the total amount of cash paid for environmental sites and the total regulatory asset deferred:
 
 
September 30,
 
December 31,
In thousands
 
2013
 
2012
 
2012
Cash paid
 
$
93,264

 
$
64,709

 
$
71,124

Total regulatory asset deferral(1)
 
118,029

 
123,178

 
121,144



(1) Total regulatory asset deferral includes cash paid, remaining liability, and interest, net of insurance reimbursement.

PORTLAND HARBOR SITE. The Portland Harbor is an Environmental Protection Agency (EPA) listed Superfund site that is approximately 11 miles long on the Willamette River and is adjacent to NW Natural's Gasco uplands and Siltronic uplands sites. We have been notified that we are a potentially responsible party to the Superfund site and we have joined with other potentially responsible parties (the Lower Willamette Group or LWG) to develop a Portland Harbor Remedial Investigation/Feasibility Study (RI/FS). The LWG submitted a draft Feasibility Study (FS) to the EPA in March 2012 that provides a range of remedial costs for the entire Portland Harbor Superfund Site, which includes the Gasco/Siltronic Sediment site, discussed below. The range of costs estimated for various remedial alternatives for the entire Portland Harbor, as provided in the draft FS, is $169 million to $1.8 billion. NW Natural's potential liability is a portion of the costs of the remedy the EPA will select for the entire Portland Harbor Superfund site. The cost of that remedy is expected to be allocated among more than 100 potentially responsible parties. NW Natural is participating in a non-binding allocation process in an effort to settle this potential liability. We manage our liability related to the Superfund site as two distinct remediation projects, the Gasco/Siltronic Sediments and Other Portland Harbor projects.

Gasco/Siltronic Sediments. In 2009, NW Natural and Siltronic Corporation entered into a separate Administrative Order on Consent with the EPA to evaluate and design specific remedies for sediments adjacent to the Gasco uplands and Siltronic uplands sites. NW Natural submitted a draft Engineering Evaluation/Cost Analysis (EE/CA) to the EPA in May 2012 to provide the estimated cost of potential remedial alternatives for this site. At this time, the estimated costs for the various sediment remedy alternatives in the draft EE/CA range from $38.5 million to $350 million. We have recorded a liability of $34.0 million for the sediment clean-up, which reflects the low end of the EE/CA range. We have recorded an additional liability of $4.5 million for the additional studies and design work needed before the clean-up can occur, and for regulatory oversight throughout the clean-up. At this time, we believe sediments at this site represent the largest portion of our liability related to the Portland Harbor site, discussed above.  

Other Portland Harbor. NW Natural incurs costs related to its membership in the LWG which is performing the RI/FS for EPA. NW Natural may also incur costs related to natural resource damages from these sites. In 2008, the Portland Harbor Natural Resource Trustee Council advised a number of potentially responsible parties that it intended to pursue natural resource damage claims at the Portland Harbor Superfund site. The Company and other parties have signed a cooperative agreement with the Natural Resource Trustees to participate in a phased natural resource damage assessment to estimate liabilities to support an early restoration-based settlement of natural resource damage claims. Natural resource damage claims may arise only after a remedy for clean-up has been settled. We have accrued a liability for these claims which is at the low end of the range of the potential liability and the high end of the range cannot be reasonably estimated. This liability is not included in the range of costs provided in the draft FS for the Portland Harbor.

GASCO UPLANDS SITE. NW Natural owns a former gas manufacturing plant that was closed in 1958 (Gasco site) and is adjacent to the Portland Harbor site described above. The Gasco site has been under investigation by us for environmental contamination under the Oregon Department of Environmental Quality (ODEQ) Voluntary Clean-Up Program. It is not included in the range of remedial costs for the Portland Harbor site. We manage the Gasco site in two parts, the uplands portion and the groundwater source control action.

In May 2007, we completed a revised Remedial Investigation Report for the uplands portion and submitted it to ODEQ for review. We have recognized a liability for this portion of the site remediation which is at the low end of the range of potential liability.

In September 2013, we completed construction of a groundwater source control system at the Gasco site. We began operating the system in September and will continue monitoring the effects of the system with ODEQ. It is not clear at this time what, if any, additional ODEQ requirements and actions may be needed to meet the standards set by the ODEQ, subsequent to the initial testing of the system or as part of the final remedy for the uplands portion of the Gasco site. We have estimated a liability range from $0.3 million to $18 million, for which we have recorded an accrued liability at the low end of the range due to the uncertainty regarding ODEQ's requirements.

In October 2013, all parties agreed to open a new docket to separately review the prudence of the capital costs associated with constructing the source control system. On October 28, 2013, the Commission approved placing these Gasco construction costs into rates effective November 1, 2013 even though the OPUC has not yet approved the SRRM stipulation. These amounts are subject to refund, with interest, in the event the Commission determines, through this separate docket, that any of these costs were incurred imprudently. Under this approach, $19.0 million of costs were included in Oregon rates effective November 1. The prudency review for this project is expected to be completed early in 2014.

OTHER SITES. In addition to those sites above, we have environmental exposures at four other sites, Siltronic, Central Service Center, Front Street, and Oregon Steel Mills. Due to the uncertainty of the design of remediation, regulation, timing of the liabilities, and in the case of the Oregon Steel Mills site, pending litigation, liabilities for each of these sites have been recognized at their respective low end of the range of potential liability and the high end of the range cannot be reasonably estimated. See “Legal Proceedings” below.
 
Legal Proceedings
NW Natural is subject to claims and litigation arising in the ordinary course of business. Although the final outcome of any of these legal proceedings cannot be predicted with certainty, including the matter described below, NW Natural does not expect the ultimate disposition of any of these matters will have a material effect on our financial condition, results of operations or cash flows. See also Part II, Item 1, “Legal Proceedings.”
 
OREGON STEEL MILLS SITE. In 2004, NW Natural was served with a third-party complaint by the Port of Portland (the Port) in a Multnomah County Circuit Court case, Oregon Steel Mills, Inc. v. The Port of Portland. The Port alleges that in the 1940s and 1950s petroleum wastes generated by our predecessor, Portland Gas & Coke Company, and 10 other third-party defendants, were disposed of in a waste oil disposal facility operated by the United States or Shaver Transportation Company on property then owned by the Port and now owned by Oregon Steel Mills. The complaint seeks contribution for unspecified past remedial action costs incurred by the Port regarding the former waste oil disposal facility as well as a declaratory judgment allocating liability for future remedial action costs. No date has been set for trial. Although the final outcome of this proceeding cannot be predicted with certainty, we do not expect that the ultimate disposition of this matter will have a material effect on our financial condition, results of operations or cash flows.