15. ENVIRONMENTAL MATTERS

We own, or previously owned, properties that may require environmental remediation or action. We estimate the range of loss for environmental liabilities based on current remediation technology, enacted laws and regulations, industry experience gained at similar sites and an assessment of the probable level of involvement and financial condition of other potentially responsible parties. Due to the numerous uncertainties surrounding the course of environmental remediation and the preliminary nature of several site investigations, in some cases, we may not be able to reasonably estimate the high end of the range of possible loss. In those cases, we have disclosed the nature of the possible loss and the fact that the high end of the range cannot be reasonably estimated. Unless there is an estimate within a range of possible losses that is more likely than other cost estimates within that range, we record the liability at the low end of this range. It is likely that changes in these estimates and ranges will occur throughout the remediation process for each of these sites due to our continued evaluation and clarification concerning our responsibility, the complexity of environmental laws and regulations and the determination by regulators of remediation alternatives.  

Environmental site remediation costs are deferred under regulatory approval from the OPUC and WUTC. In addition, the OPUC authorized an SRRM that allows the Company to recover prudently incurred environmental site remediation costs, subject to an earnings test that will be defined in a future proceeding. Actual cost recovery under SRRM will depend upon future insurance recoveries, future expenditures, annual prudence reviews, and the impacts of any earnings test the OPUC may adopt in a subsequent proceeding. Cost recovery and carrying charges on amounts deferred for costs associated with services provided to Washington customers will be determined in a future proceeding. We annually review all regulatory assets for recoverability and more often if circumstances warrant. If we should determine that all or a portion of these regulatory assets no longer meet the criteria for continued application of regulatory accounting, then we would be required to write off the net unrecoverable balances against earnings in the period such determination is made.

In December 2010, NW Natural commenced litigation against certain of its historical liability insurers in Multnomah County Circuit Court, State of Oregon (see Item 3. Legal Proceedings). NW Natural seeks damages in excess of $50 million in losses it has incurred to date, as well as declaratory relief for additional losses it expects to incur in the future. 

The following table summarizes information regarding liabilities related to environmental sites, which are recorded in other current liabilities and other noncurrent liabilities on the balance sheet at December 31:
 
 
Current Liabilities
 
Non-Current Liabilities
Thousands
 
2012
 
2011
 
2012
 
2011
Portland Harbor site:
 
 
 
 
 
 
 
 
Gasco/Siltronic Sediments
 
$
2,207

 
$
1,614

 
$
36,087

 
$
35,797

Other Portland Harbor
 
1,767

 
1,893

 
3,160

 
7,066

Gasco Upland site
 
18,722

 
14,092

 
5,028

 
8,900

Siltronic Upland site
 
637

 
887

 
379

 
128

Central Service Center site
 
140

 

 
396

 
495

Front Street site
 
993

 
1,697

 

 

Oregon Steel Mills
 

 

 
185

 
120

Total
 
$
24,466

 
$
20,183

 
$
45,235

 
$
52,506




In addition, the following table presents information regarding the total amount of cash paid for environmental sites and the total regulatory asset deferred as of December 31:
Thousands
 
2012
 
2011
Cash paid
 
$
71,124

 
$
55,553

Total regulatory asset deferral(1)
 
126,482

 
105,670



(1) Total regulatory asset deferral includes cash paid, remaining liability, interest, and insurance reimbursement.

PORTLAND HARBOR SITE. The Portland Harbor is an EPA listed Superfund site that is approximately 11 miles long on the Willamette River and is adjacent to NW Natural's Gasco upland and Siltronic upland sites. We have been notified that we are a potentially responsible party to the Superfund site and we have joined with other potentially responsible parties (the Lower Willamette Group or LWG) to develop a Portland Harbor Remedial Investigation/Feasibility Study (RI/FS). The LWG submitted a draft Feasibility Study (FS) to EPA in March 2012 that provides a range of remedial costs for the entire Portland Harbor Superfund Site, which includes the Gasco/Siltronic Sediment site, discussed below. The range of costs estimated for various remedial alternatives for the entire Portland Harbor, as provided in the draft FS, is $169 million to $1.8 billion. NW Natural's potential liability is a portion of the costs of the remedy EPA will select for the entire Portland Harbor Superfund site. The cost of that remedy is expected to be allocated among more than 100 potentially responsible parties. NW Natural is participating in a non-binding allocation process in an effort to settle this potential liability. We manage our liability related to the Superfund site as two distinct remediation projects, the Gasco/Siltronic Sediment and Other Portland Harbor projects.

Gasco/Siltronic Sediments. In 2009, NW Natural and Siltronic Corporation entered into a separate Administrative Order on Consent with EPA to evaluate and design specific remedies for sediments adjacent to the Gasco upland and Siltronic upland sites. NW Natural submitted a draft Engineering Evaluation/Cost Analysis (EE/CA) to the EPA in May 2012 to provide the estimated cost of potential remedial alternatives for this site. At this time, the estimated costs for the various sediment remedy alternatives in the draft EE/CA range from $38.3 million to $350 million. We have recorded a liability of $34.0 million for the sediment clean-up, which reflects the low end of the EE/CA range. We have recorded an additional liability of $4.3 million for the additional studies and design work needed before the clean-up can occur, and for regulatory oversight throughout the clean-up. At this time, we believe sediments at this site represent the largest portion of our liability related to the Portland Harbor site, discussed above.  

Other Portland Harbor. NW Natural incurs costs related to its membership in the LWG which is performing the RI/FS for EPA. NW Natural also incurs costs related to natural resource damages. In 2008, the Portland Harbor Natural Resource Trustee Council advised a number of potentially responsible parties that it intended to pursue natural resource damage claims at the Portland Harbor Superfund site. The Company and other parties have signed a cooperative agreement with the Natural Resource Trustees to participate in a phased natural resource damage assessment to estimate liabilities to support an early restoration-based settlement of natural resource damage claims. We have accrued a liability for these claims which is at the low end of the range of the potential liability. This liability is not included in the range of costs provided in the draft FS for the Portland Harbor.

Gasco upland site. NW Natural owns a former gas manufacturing plant that was closed in 1956 (Gasco site) and is adjacent to the Portland Harbor site described above. The Gasco site has been under investigation by us for environmental contamination under the ODEQ Voluntary Clean-Up Program. It is not included in the range of remedial costs for the Portland Harbor site. We manage the Gasco site in two parts, the uplands portion and the groundwater source control action.

In May 2007, we completed a revised Remedial Investigation Report for the uplands portion and submitted it to ODEQ for review. We have recognized a liability for this portion of the site remediation which is at the low end of the range of potential liability.

In 2012, ODEQ approved our final design remediation plan for the groundwater source control portion and we began construction in October 2012. Based on the information currently available for groundwater source control at the Gasco site and our current assumptions regarding the effectiveness of the source control system, we have estimated a range of liability between $14 million and $30 million, for which we have recorded an accrued liability which is at the low end of the range of the potential liability. We are uncertain about the range due to potential additional ODEQ requirements and actions needed to meet those requirements, including uncertainty about how to meet the agreed standards set by ODEQ subsequent to the initial testing of the system and as part of the final remedy for the upland portion of the Gasco site.

Other sites. In addition to those sites above, we have environmental exposures at four other sites, Siltronic, Central Service Center, Front Street, and Oregon Steel Mills. Due to the uncertainty of the design of remediation, regulation, timing of the liabilities, and in the case of the Oregon Steel Mills site, pending litigation, liabilities for each of these sites has been recognized at their respective low end of the range of potential liability and the high end of the range cannot be reasonably estimated.

Siltronic upland site. Siltronic is the location of a manufactured gas plant formerly owned by NW Natural.   We are currently conducting an investigation of manufactured gas plant wastes on the uplands at this site for the ODEQ.  
 
Central Service Center site. We are currently performing an environmental investigation of the property under the ODEQ's Independent Cleanup Pathway. This site is on ODEQ's list of sites in which releases of hazardous substances have been confirmed and cleanup is necessary. 
 
Front Street site. The Front Street site was the former location of a gas manufacturing plant we operated. Studies for source control investigation have been presented to ODEQ and a final sampling plan required by ODEQ is currently being developed. 

Oregon Steel Mills site. See “Legal Proceedings,” below.
 
Legal Proceedings
NW Natural is subject to claims and litigation arising in the ordinary course of business. Although the final outcome of any of these legal proceedings cannot be predicted with certainty, including the matter described below, NW Natural does not expect that the ultimate disposition of any of these matters will have a material effect on our financial condition, results of operations or cash flows as we would expect to receive insurance recovery or rate recovery. See also Part II, Item 1, “Legal Proceedings.”
 
OREGON STEEL MILLS SITE. In 2004, NW Natural was served with a third-party complaint by the Port of Portland (the Port) in a Multnomah County Circuit Court case, Oregon Steel Mills, Inc. v. The Port of Portland. The Port alleges that in the 1940s and 1950s petroleum wastes generated by our predecessor, Portland Gas & Coke Company, and 10 other third-party defendants were disposed of in a waste oil disposal facility operated by the United States or Shaver Transportation Company on property then owned by the Port and now owned by Oregon Steel Mills. The complaint seeks contribution for unspecified past remedial action costs incurred by the Port regarding the former waste oil disposal facility as well as a declaratory judgment allocating liability for future remedial action costs.  No date has been set for trial. Although the final outcome of this proceeding cannot be predicted with certainty, we do not expect that the ultimate disposition of this matter will have a material effect on our financial condition, results of operations or cash flows.