Commitments and Contingencies
Commitments and Contingencies

Commitments

Fuel Contracts — NSP-Wisconsin has entered into various long-term commitments for the purchase and delivery of a significant portion of its current coal and natural gas requirements. These contracts expire in various years between 2018 and 2029. In addition, NSP-Wisconsin is required to pay additional amounts depending on actual quantities shipped under these agreements. As NSP-Wisconsin does not have an automatic electric fuel adjustment clause for Wisconsin retail customers, NSP-Wisconsin utilizes deferred accounting treatment for future rate recovery or refund when fuel costs differ from the amount included in rates by more than two percent on an annual basis, as determined by the PSCW after an opportunity for a hearing and an earnings test based on NSP-Wisconsin’s authorized ROE.

The estimated minimum purchases for NSP-Wisconsin under these contracts as of Dec. 31, 2017 are as follows:
(Millions of Dollars)
 
Coal
 
Natural gas
supply
 
Natural gas
storage and
transportation
2018
 
$
6.4

 
$
9.4

 
$
13.3

2019
 
0.6

 
0.4

 
12.3

2020
 
0.6

 
0.3

 
10.1

2021
 
0.7

 
0.3

 
9.5

2022
 
0.7

 
0.2

 
8.2

Thereafter
 
0.7

 

 
30.5

Total (a)
 
$
9.7

 
$
10.6

 
$
83.9


(a) 
Excludes additional amounts allocated to NSP-Wisconsin through intercompany charges.

Additional expenditures for fuel and natural gas storage and transportation will be required to meet expected future electric generation and natural gas needs.

Leases — NSP-Wisconsin leases a variety of equipment and facilities. These leases, primarily for office space, vehicles, aircraft and power-operated equipment, are accounted for as operating leases. Total expenses under operating lease obligations were approximately $1.2 million, $1.2 million and $1.1 million for 2017, 2016 and 2015, respectively.

Future commitments under operating leases are:
(Millions of Dollars)
 
 
2018
 
$
0.9

2019
 
0.9

2020
 
0.9

2021
 
0.8

2022
 
0.8

Thereafter
 
4.6

Total
 
$
8.9



Variable Interest Entities — The accounting guidance for consolidation of variable interest entities requires enterprises to consider the activities that most significantly impact an entity’s financial performance, and power to direct those activities, when determining whether an enterprise is a variable interest entity’s primary beneficiary.

NSP-Wisconsin has entered into limited partnerships for the construction and operation of affordable rental housing developments which qualify for low-income housing tax credits. NSP-Wisconsin has determined the low-income housing limited partnerships to be variable interest entities primarily due to contractual arrangements within each limited partnership that establish sharing of ongoing voting control and profits and losses that does not consistently align with the partners’ proportional equity ownership. NSP-Wisconsin has determined that it has the power to direct the activities that most significantly impact these entities’ economic performance, and therefore NSP-Wisconsin consolidates these limited partnerships in its consolidated financial statements.

Equity financing for these entities has been provided by NSP-Wisconsin and the general partner of each limited partnership, and NSP-Wisconsin’s risk of loss is limited to its capital contributions, adjusted for any distributions and its share of undistributed profits and losses; no significant additional financial support has been, or is required to be provided to the limited partnerships by NSP-Wisconsin. Obligations of the limited partnerships are generally secured by the housing properties of each limited partnership, and the creditors of each limited partnership have no significant recourse to NSP-Wisconsin or its subsidiaries. Likewise, the assets of the limited partnerships may only be used to settle obligations of the limited partnerships, and not those of NSP-Wisconsin or its subsidiaries.

Amounts reflected in NSP-Wisconsin’s consolidated balance sheets for low-income housing limited partnerships include the following:
(Thousands of Dollars)
 
Dec. 31, 2017
 
Dec. 31, 2016
Current assets
 
$
426

 
$
375

Property, plant and equipment, net
 
1,882

 
2,025

Other noncurrent assets
 
137

 
125

Total assets
 
$
2,445

 
$
2,525

 
 
 
 
 
Current liabilities
 
$
1,214

 
$
1,269

Mortgages and other long-term debt payable
 
486

 
486

Other noncurrent liabilities
 
56

 
54

Total liabilities
 
$
1,756

 
$
1,809



Joint Operating System The electric production and transmission system of NSP-Wisconsin is managed as an integrated system with that of NSP-Minnesota, jointly referred to as the NSP System. The electric production and transmission costs of the entire NSP System are shared by NSP-Minnesota and NSP-Wisconsin. A FERC approved agreement between the two companies, called the Interchange Agreement, provides for the sharing of all costs of generation and transmission facilities of the system, including capital costs. Such costs include current and potential obligations of NSP-Minnesota related to its nuclear generating facilities.

NSP-Minnesota’s public liability for claims resulting from any nuclear incident is limited to $13.4 billion under the Price-Anderson amendment to the Atomic Energy Act. NSP-Minnesota has secured $450 million of coverage for its public liability exposure with a pool of insurance companies. The remaining $13.0 billion of exposure is funded by the Secondary Financial Protection Program, available from assessments by the federal government in case of a nuclear incident. NSP-Minnesota is subject to assessments of up to $127 million per reactor-incident for each of its three licensed reactors, to be applied for public liability arising from a nuclear incident at any licensed nuclear facility in the United States. The maximum funding requirement is $19 million per reactor per incident during any one year. These maximum assessment amounts are both subject to inflation adjustment by the NRC and state premium taxes. The NRC’s last adjustment was effective September 2013.

NSP-Minnesota purchases insurance for property damage and site decontamination cleanup costs from Nuclear Electric Insurance Ltd. (NEIL) and European Mutual Association for Nuclear Insurance (EMANI). The coverage limits are $2.3 billion for each of NSP-Minnesota’s two nuclear plant sites. NEIL also provides business interruption insurance coverage, including the cost of replacement power obtained during certain prolonged accidental outages of nuclear generating units. Premiums are expensed over the policy term. All companies insured with NEIL are subject to retroactive premium adjustments if losses exceed accumulated reserve funds. Capital has been accumulated in the reserve funds of NEIL and EMANI to the extent that NSP-Minnesota would have no exposure for retroactive premium assessments in case of a single incident under the business interruption and the property damage insurance coverage. However, in each calendar year, NSP-Minnesota could be subject to maximum assessments of approximately $19 million for business interruption insurance and $41 million for property damage insurance if losses exceed accumulated reserve funds.

Guarantees — NSP-Wisconsin provides a guarantee for payment of customer loans related to NSP-Wisconsin’s farm rewiring program. NSP-Wisconsin’s exposure under the guarantee is based upon the net liability under the agreement. The guarantee issued by NSP-Wisconsin limits the exposure of NSP-Wisconsin to a maximum amount stated in the guarantee. The guarantee contains no recourse provisions and requires no collateral.

The following table presents the guarantee issued and outstanding for NSP-Wisconsin:
(Millions of Dollars)
 
Guarantee
Amount
 
Current
Exposure
 
Term or
Expiration Date
 
Triggering
Event
Guarantee of customer loans for the Farm Rewiring Program(a)
 
$
1.0

 
$

 
2020
 
(b) 
(a) 
The term of this guarantee expires in 2020, which is the final scheduled repayment date for the loans. As of Dec. 31, 2017, no claims had been made by the lender.
(b) 
The debtor becomes the subject of bankruptcy or other insolvency proceedings.

Environmental Contingencies

NSP-Wisconsin has been or is currently involved with the cleanup of contamination from certain hazardous substances at several sites. In many situations, NSP-Wisconsin believes it will recover some portion of these costs through insurance claims. Additionally, where applicable, NSP-Wisconsin is pursuing, or intends to pursue, recovery from other PRPs and through the regulated rate process. New and changing federal and state environmental mandates can also create added financial liabilities for NSP-Wisconsin, which are normally recovered through the regulated rate process. To the extent any costs are not recovered through the options listed above, NSP-Wisconsin would be required to recognize an expense.

Site Remediation Various federal and state environmental laws impose liability, without regard to the legality of the original conduct, where hazardous substances or other regulated materials have been released to the environment. NSP-Wisconsin may sometimes pay all or a portion of the cost to remediate sites where past activities of NSP-Wisconsin or other parties have caused environmental contamination. Environmental contingencies could arise from various situations, including sites of former MGPs operated by NSP-Wisconsin, its predecessors, or other entities; and third-party sites, such as landfills, for which NSP-Wisconsin is alleged to be a PRP that sent wastes to that site.

MGP Sites

Ashland MGP Site — NSP-Wisconsin was named a PRP for contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (the Site) includes NSP-Wisconsin property, previously operated as a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park); and an area of Lake Superior’s Chequamegon Bay adjoining the park.

In 2012, NSP-Wisconsin agreed to remediate the Phase I Project Area (which includes the Upper Bluff and Kreher Park areas of the Site), under a settlement agreement with the EPA. In January 2017, NSP-Wisconsin agreed to remediate the Phase II Project Area (the Sediments), under a settlement agreement with the EPA. The settlement agreements were approved by the U.S. District Court for the Western District of Wisconsin. NSP-Wisconsin initiated a full scale wet dredge remedy of the Sediments in 2017. Going forward, NSP-Wisconsin anticipates completion of restoration activities of the Sediments in 2018 with finalization of Phase I Project Area construction and restoration activities in 2019. Groundwater treatment activities at the Site will continue.

The current cost estimate for the entire site (both Phase I Project Area and the Sediments) is approximately $168 million, of which approximately $138 million has been spent. As of Dec. 31, 2017 and 2016, NSP-Wisconsin had recorded a total liability of $30 million and $64 million, respectively, for the entire site.

NSP-Wisconsin has deferred the unrecovered portion of the estimated Site remediation costs as a regulatory asset. The PSCW has authorized NSP-Wisconsin rate recovery for all remediation costs incurred at the Site. In 2012, the PSCW agreed to allow NSP-Wisconsin to pre-collect certain costs, to amortize costs over a ten-year period and to apply a three percent carrying cost to the unamortized regulatory asset. In December 2017, the PSCW approved an NSP-Wisconsin natural gas rate case which included recovery of additional expenses associated with remediating the Site. The annual recovery of MGP clean-up costs will increase from $12 million in 2017 to $18 million in 2018.

Other MGP, Landfill or Disposal Sites In addition to the site in Ashland, Wis., NSP-Wisconsin is currently involved in investigating and/or remediating an MGP, landfill or other disposal site. NSP-Wisconsin has identified one site where contamination is present and where investigation and/or remediation activities are currently underway. Other parties may have responsibility for some portion of the investigation and/or remediation activities that are underway. NSP-Wisconsin anticipates that these investigation or remediation activities will continue through at least 2018. NSP-Wisconsin had accrued $0.1 million for this site at Dec. 31, 2017 and 2016, respectively. NSP-Wisconsin anticipates that any amounts spent will be fully recovered from customers.

Environmental Requirements

Water and Waste
Asbestos Removal — Some of NSP-Wisconsin’s facilities contain asbestos. Most asbestos will remain undisturbed until the facilities that contain it are demolished or removed. NSP-Wisconsin has recorded an estimate for final removal of the asbestos as an ARO. It may be necessary to remove some asbestos to perform maintenance or make improvements to other equipment. The cost of removing asbestos as part of other work is not expected to be material and is recorded as incurred as operating expenses for maintenance projects, capital expenditures for construction projects or removal costs for demolition projects.

Federal CWA Waters of the United States Rule In 2015, the EPA and the U.S. Army Corps of Engineers (Corps) published a final rule that significantly expanded the types of water bodies regulated under the CWA and broadened the scope of waters subject to federal jurisdiction. In October 2015, the U.S. Court of Appeals for the Sixth Circuit issued a nationwide stay of the final rule and subsequently ruled that it, rather than the federal district courts, had jurisdiction over challenges to the rule.  In January 2017, the U.S. Supreme Court agreed to resolve the dispute as to which court should hear challenges to the rule. A ruling is expected in 2018.

In February 2017, President Trump issued an executive order requiring the EPA and the Corps to review and revise the final rule. On June 27, 2017, the agencies issued a proposed rule that rescinds the final rule and reinstates the prior definition of “Water of the U.S.” The agencies are also undertaking a rulemaking to develop a new definition of “Waters of the U.S.”

Federal CWA Effluent Limitations Guidelines (ELG) — In 2015, the EPA issued a final ELG rule for power plants that use coal, natural gas, oil or nuclear materials as fuel and discharge treated effluent to surface waters as well as utility-owned landfills that receive coal combustion residuals.  In 2017, the EPA delayed the compliance date for flue gas desulfurization wastewater and bottom ash transport until November 2020 while the agency conducts a rulemaking process to potentially revise the effluent limitations and pretreatment standards for these waste streams.

Federal CWA Section 316(b) The federal CWA requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing adverse environmental impacts to aquatic species. The EPA published the final 316(b) rule in 2014. The rule prescribes technology for protecting fish that get stuck on plant intake screens (known as impingement) and describes a process for site-specific determinations by each state for sites that must protect the small aquatic organisms that pass through the intake screens into the plant cooling systems (known as entrainment). NSP-Wisconsin believes at least two plants could be required by state regulators to make improvements to reduce entrainment. NSP-Wisconsin estimates the likely cost for complying with impingement requirements may be incurred between 2018 and 2027 and is approximately $4 million, while the total cost of entrainment improvements are anticipated to be immaterial. NSP-Wisconsin anticipates these costs will be fully recoverable in rates.

Air
GHG Emission Standard for Existing Sources (CPP) — In 2015, the EPA issued its final CPP rule for existing power plants.  Among other things, the CPP requires that state plans include enforceable measures to ensure emissions from existing power plants achieve the EPA’s state-specific interim and final emission performance targets. 

The CPP was challenged by multiple parties in the D.C. Circuit Court.  In February 2016, the U.S. Supreme Court issued an order staying the final CPP rule. The stay will remain in effect until the D.C. Circuit Court reaches its decision and the U.S. Supreme Court either declines to review the lower court’s decision or reaches a decision of its own.

In March 2017, President Trump signed an executive order requiring the EPA Administrator to review the CPP rule and if appropriate publish proposed rules suspending, revising or rescinding it. Accordingly, the EPA requested that the D.C. Circuit Court hold the litigation in abeyance until the EPA completes its work under the executive order. The D.C. Circuit granted the EPA’s request and is holding the litigation in abeyance, while considering briefs by the parties on whether the court should remand the challenges to the EPA rather than holding them in abeyance, determining whether and how the court continues or ends the stay that currently applies to the CPP.

In October 2017, the EPA published a proposed rule to repeal the CPP, based on an analysis that the CPP exceeds the EPA’s statutory authority under the CAA. In the proposal, the EPA stated it has not yet determined whether it will promulgate a new rule to regulate GHG emissions from existing EGUs. In December 2017, the EPA issued an Advanced Notice of Proposed Rulemaking to take and consider comments on whether to issue a future rule and what such a rule should include.

Revisions to the NAAQS for Ozone — In 2015, the EPA revised the NAAQS for ozone by lowering the eight-hour standard from 75 parts per billion (ppb) to 70 ppb. In November 2017, the EPA published final designations of areas that meet the 2015 ozone standard. NSP-Wisconsin meets the 2015 ozone standard in all areas where its generating units operate.

Asset Retirement Obligations

Recorded AROs — AROs have been recorded for property related to the following: electric production (steam, other and hydro), electric distribution and transmission, natural gas distribution, and general property. The electric production obligations include asbestos, processed water and ash-containment facilities, storage tanks and control panels. The asbestos recognition associated with electric production includes certain specific plants. AROs also have been recorded for NSP-Wisconsin steam production related to processed water and ash-containment facilities such as solid waste landfills.

NSP-Wisconsin has recognized AROs for the retirement costs of natural gas mains and lines and for the removal of electric transmission and distribution equipment, which consists of obligations associated with polychlorinated biphenyl, lithium batteries, mercury and street lighting lamps. The common general ARO includes obligations related to storage tanks.

A reconciliation of NSP-Wisconsin’s AROs for the years ended Dec. 31, 2017 and 2016 is as follows:
(Thousands of Dollars)
 
Beginning Balance
Jan. 1, 2017
 
Liabilities Recognized
 
Accretion
 
Cash Flow Revisions
 
Ending Balance
   Dec. 31, 2017 (a)
Electric plant
 
 
 
 
 
 
 
 
 
 
Steam production asbestos
 
$
2,194

 
$
949

(b) 
$
50

 
$

 
$
3,193

Steam production ash containment
 
452

 

 
15

 

 
467

Electric distribution
 
32

 

 
3

 

 
35

Other
 
376

 

 
12

 

 
388

Natural gas plant
 
 
 
 
 
 
 
 
 
 
Gas distribution
 
8,293

 

 
339

 
1,661

(c) 
10,293

Common and other property
 
 
 
 
 
 
 
 
 
 
Common miscellaneous
 
45

 

 
2

 

 
47

Total liability (d)
 
$
11,392

 
$
949

 
$
421

 
$
1,661

 
$
14,423



(a) 
There were no ARO liabilities settled during the year ended Dec. 31, 2017.
(b) 
The liability recognized relates to asbestos at the French Island plant.
(c) 
Changes in the gas distribution ARO are mainly related to increased labor costs.
(d) 
Included in other long-term liabilities balance in the consolidated balance sheet.

(Thousands of Dollars)
 
Beginning Balance
Jan. 1, 2016
 
Liabilities Settled
 
Accretion
 
Cash Flow
Revisions
 
Ending Balance
    Dec. 31, 2016 (a)
Electric plant
 
 
 
 
 
 
 
 
 
 
Steam production asbestos
 
$
2,145

 
$

 
$
49

 
$

 
$
2,194

Steam production ash containment
 
617

 

 
18

 
(183
)
 
452

Electric distribution
 
72

 

 
3

 
(43
)
 
32

Other
 
391

 
(29
)
 
14

 

 
376

Natural gas plant
 
 
 
 
 
 
 
 
 
 
Gas distribution
 
6,367

 

 
256

 
1,670

 
8,293

Common and other property
 
 
 
 
 
 
 
 
 
 
Common miscellaneous
 
95

 

 
2

 
(52
)
 
45

Total liability (b)
 
$
9,687

 
$
(29
)
 
$
342

 
$
1,392

 
$
11,392

 
(a) 
There were no ARO liabilities recognized during the year ended Dec. 31, 2016.
(b) 
Included in other long-term liabilities balance in the consolidated balance sheet.

Indeterminate AROs Outside of the known and recorded asbestos AROs, other plants or buildings may contain asbestos due to the age of many of NSP-Wisconsin’s facilities, but no confirmation or measurement of the amount of asbestos or cost of removal could be determined as of Dec. 31, 2017. Therefore, an ARO has not been recorded for these facilities.

Removal Costs NSP-Wisconsin records a regulatory liability for the plant removal costs of generation, transmission and distribution facilities that are recovered currently in rates. Generally, the accrual of future non-ARO removal obligations is not required. However, long-standing ratemaking practices approved by applicable state and federal regulatory commissions have allowed provisions for such costs in historical depreciation rates. These removal costs have accumulated over a number of years based on varying rates as authorized by the appropriate regulatory entities. Given the long time periods over which the amounts were accrued and the changing of rates over time, NSP-Wisconsin has estimated the amount of removal costs accumulated through historic depreciation expense based on current factors used in the existing depreciation rates. Accordingly, the recorded amounts of estimated future removal costs are considered regulatory liabilities. Removal costs as of Dec. 31, 2017 and 2016 were $146 million and $140 million, respectively.

Legal Contingencies

NSP-Wisconsin is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on NSP-Wisconsin’s financial statements. Unless otherwise required by GAAP, legal fees are expensed
as incurred.

Employment, Tort and Commercial Litigation

Gas Trading Litigation — e prime inc. (e prime) is a wholly owned subsidiary of Xcel Energy Inc.  e prime was in the business of natural gas trading and marketing but has not engaged in natural gas trading or marketing activities since 2003.  Thirteen lawsuits were commenced against e prime and Xcel Energy (and NSP-Wisconsin, in two instances) between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices.

e prime, Xcel Energy Inc. and its other affiliates were sued along with several other gas marketing companies. These cases were all consolidated in the U.S. District Court in Nevada. Six of the cases remain active, which includes a multi-district litigation (MDL) matter consisting of a Colorado class (Breckenridge), a Wisconsin class (Arandell Corp.), a Missouri class, a Kansas class, and two other cases identified as “Sinclair Oil” and “Farmland.” In March 2017, summary judgment was granted by the MDL judge in favor of Xcel Energy and e prime in the Sinclair Oil and Farmland cases. In November 2017, the U.S District Court in Nevada granted summary judgment against two plaintiffs in the Arandell Corp. case in favor of Xcel Energy and NSP-Wisconsin, leaving only three individual plaintiffs remaining in the litigation. In addition, the plaintiffs’ motions for class certification and remand back to originating courts in these cases were denied in March 2017. Plaintiffs have appealed the summary judgment motions granted in the Farmland and Sinclair Oil cases and the denial of class certification and remand to the U.S. Court of Appeals for the Ninth Circuit (Ninth Circuit). Oral arguments were heard before the Ninth Circuit in February 2018. A final decision is expected by the end of the first quarter of 2019. Xcel Energy, NSP-Wisconsin and e prime have concluded that a loss is remote.

Other Contingencies