Commitments and Contingencies
9 Months Ended
Sep. 30, 2016
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies

Except to the extent noted below and in Note 5 above, the circumstances set forth in Notes 10 and 11 to the consolidated financial statements included in NSP-Wisconsin’s Annual Report on Form 10-K for the year ended Dec. 31, 2015, and in Note 6 to NSP-Wisconsin’s Quarterly Reports on Form 10-Q for the quarterly periods ended March 31, 2016 and June 30, 2016, appropriately represent, in all material respects, the current status of commitments and contingent liabilities, and are incorporated herein by reference. The following include commitments, contingencies and unresolved contingencies that are material to NSP-Wisconsin’s financial position.

Guarantees

NSP-Wisconsin provides a guarantee for payment of customer loans related to NSP-Wisconsin’s farm rewiring program. NSP-Wisconsin’s exposure under the guarantee is based upon the net liability under the agreement. The guarantee issued by NSP-Wisconsin has a stated maximum amount. The guarantee contains no recourse provisions and requires no collateral. These agreements have expiration dates through 2020.

The following table presents the guarantee issued and outstanding for NSP-Wisconsin:
(Millions of Dollars)
 
Sept. 30, 2016
 
Dec. 31, 2015
Guarantee issued and outstanding
 
$
1.0

 
$
1.0

Current exposure under this guarantee
 
0.1

 
0.1



Environmental Contingencies

Ashland MGP Site — NSP-Wisconsin has been named a potentially responsible party for contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (the Site) includes NSP-Wisconsin property, previously operated as a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park); and an area of Lake Superior’s Chequamegon Bay adjoining the park (the Sediments).

In 2012, under a settlement agreement with the United States Environmental Protection Agency (EPA), NSP-Wisconsin agreed to remediate the Phase I Project Area (which includes the Upper Bluff and Kreher Park areas of the Site). The current cost estimate for the cleanup of the Phase I Project Area is approximately $71.4 million, of which approximately $52.6 million has been spent.

NSP-Wisconsin performed a wet dredge pilot study in the summer of 2016 and demonstrated that a wet dredge remedy can meet the performance standards for remediation of the Sediments. As a result, the EPA authorized NSP-Wisconsin to extend the wet dredge pilot to additional areas of the Site. Settlement negotiations are ongoing between the EPA and NSP-Wisconsin regarding the performance of the full scale cleanup of the Sediments. If a court-approved settlement can be reached with the EPA, NSP-Wisconsin anticipates a full scale wet dredge remedy of the Sediments could be performed beginning as early as 2017, and potentially conclude by 2018.

At Sept. 30, 2016 and Dec. 31, 2015, NSP-Wisconsin had recorded a total liability of $84.6 million and $94.4 million, respectively, for the entire site. NSP-Wisconsin’s potential liability, the actual cost of remediation and the timing of expenditures are subject to change. NSP-Wisconsin also continues to work to identify and access state and federal funds to apply to the remediation cost.

NSP-Wisconsin has deferred the unrecovered portion of the estimated Site remediation costs as a regulatory asset. The PSCW has consistently authorized NSP-Wisconsin rate recovery for all remediation costs incurred at the Site. In 2012, the PSCW agreed to allow NSP-Wisconsin to pre-collect certain costs, to amortize costs over a ten-year period, and to apply a three percent carrying cost to the unamortized regulatory asset. In April 2016, NSP-Wisconsin filed a limited natural gas rate case for recovery of additional expenses associated with remediating the Site. If approved, the annual recovery of MGP clean-up costs would increase from $7.6 million in 2016 to $12.4 million in 2017.

Cross-State Air Pollution Rule (CSAPR) — CSAPR addresses long range transport of particulate matter and ozone by requiring reductions in sulfur dioxide and nitrogen oxide (NOx) from utilities in the eastern half of the United States, including Wisconsin, using an emissions trading program.

CSAPR was adopted to address interstate emissions impacting downwind states’ attainment of the 1997 ozone National Ambient Air Quality Standard (NAAQS) and the 1997 and 2006 particulate NAAQS. As the EPA revises the NAAQS, it will consider whether to make any further reductions to CSAPR emission budgets and whether to change which states are included in the emissions trading program. In December 2015, the EPA proposed adjustments to CSAPR emission budgets which address attainment of the more stringent 2008 ozone NAAQS. The EPA adopted a final rule in September 2016 for the ozone season emission budget for NOx which did not materially impact NSP-Wisconsin.

Legal Contingencies

NSP-Wisconsin is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on NSP-Wisconsin’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.

Employment, Tort and Commercial Litigation

Gas Trading Litigation — e prime, inc. (e prime) is a wholly owned subsidiary of Xcel Energy.  e prime was in the business of natural gas trading and marketing, but has not engaged in natural gas trading or marketing activities since 2003.  Thirteen lawsuits were commenced against e prime and Xcel Energy (and NSP-Wisconsin, in two instances) between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices.

The cases were consolidated in U.S. District Court in Nevada. Five of the cases have since been settled and seven have been dismissed.  One multi-district litigation (MDL) matter remains and it consists of a Colorado class (Breckenridge), a Wisconsin class (NSP-Wisconsin), a Kansas class, and two other cases identified as “Sinclair Oil” and “Farmland.” In May 2016, the MDL judge granted summary judgment dismissing defendants from the Farmland lawsuit. e prime and Xcel Energy have filed a motion seeking clarification that this order includes them. This motion is currently pending and is expected to be heard in December 2016. The e prime defendants filed a summary judgment motion in the Colorado class lawsuit (Breckenridge) and oppositions to class certifications in all the class actions, which is also expected to be heard in December 2016. Trial dates are not expected to occur prior to early 2017. Xcel Energy, NSP-Wisconsin and e prime have concluded that a loss is remote.