Commitments and Contingencies
12 Months Ended
Dec. 31, 2015
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies

Commitments

Fuel Contracts — NSP-Wisconsin has entered into various long-term commitments for the purchase and delivery of a significant portion of its current coal and natural gas requirements. These contracts expire in various years between 2016 and 2029. In addition, NSP-Wisconsin is required to pay additional amounts depending on actual quantities shipped under these agreements. As NSP-Wisconsin does not have an automatic electric fuel adjustment clause for Wisconsin retail customers, NSP-Wisconsin utilizes deferred accounting treatment for future rate recovery or refund when fuel costs differ from the amount included in rates by more than two percent on an annual basis, as determined by the PSCW after an opportunity for a hearing and an earnings test based on NSP-Wisconsin’s authorized ROE.

The estimated minimum purchases for NSP-Wisconsin under these contracts as of Dec. 31, 2015 are as follows:
(Millions of Dollars)
 
Coal
 
Natural gas
supply
 
Natural gas
storage and
transportation
2016
 
$
6.7

 
$
9.7

 
$
13.1

2017
 
2.5

 
0.2

 
10.4

2018
 
2.5

 

 
4.7

2019
 
0.8

 

 
3.1

2020
 
0.8

 

 
1.9

Thereafter
 
2.5

 

 
11.6

Total (a)
 
$
15.8

 
$
9.9

 
$
44.8


(a) 
Excludes additional amounts allocated to NSP-Wisconsin through intercompany charges.

Additional expenditures for fuel and natural gas storage and transportation will be required to meet expected future electric generation and natural gas needs.

Leases — NSP-Wisconsin leases a variety of equipment and facilities used in the normal course of business. These leases, primarily for office space, trucks, aircraft, cars and power-operated equipment, are accounted for as operating leases. Total expenses under operating lease obligations were approximately $1.1 million, $1.3 million and $1.4 million for 2015, 2014 and 2013, respectively.

Future commitments under operating leases are:
(Millions of Dollars)
 
 
2016
 
$
0.9

2017
 
1.0

2018
 
0.9

2019
 
0.9

2020
 
0.8

Thereafter
 
7.0

Total
 
$
11.5



Variable Interest Entities — The accounting guidance for consolidation of variable interest entities requires enterprises to consider the activities that most significantly impact an entity’s financial performance, and power to direct those activities, when determining whether an enterprise is a variable interest entity’s primary beneficiary.

NSP-Wisconsin has entered into limited partnerships for the construction and operation of affordable rental housing developments which qualify for low-income housing tax credits. NSP-Wisconsin has determined the low-income housing limited partnerships to be variable interest entities primarily due to contractual arrangements within each limited partnership that establish sharing of ongoing voting control and profits and losses that does not consistently align with the partners’ proportional equity ownership. These limited partnerships are designed to qualify for low-income housing tax credits, and NSP-Wisconsin generally receives a larger allocation of the tax credits than the general partners at inception of the arrangements. NSP-Wisconsin has determined that it has the power to direct the activities that most significantly impact these entities’ economic performance, and therefore NSP-Wisconsin consolidates these limited partnerships in its consolidated financial statements.

Equity financing for these entities has been provided by NSP-Wisconsin and the general partner of each limited partnership, and NSP-Wisconsin’s risk of loss is limited to its capital contributions, adjusted for any distributions and its share of undistributed profits and losses; no significant additional financial support has been, or is in the future, required to be provided to the limited partnerships by NSP-Wisconsin. Mortgage-backed debt typically comprises the majority of the financing at inception of each limited partnership and is paid over the life of the limited partnership arrangement. Obligations of the limited partnerships are generally secured by the housing properties of each limited partnership, and the creditors of each limited partnership have no significant recourse to NSP-Wisconsin or its subsidiaries. Likewise, the assets of the limited partnerships may only be used to settle obligations of the limited partnerships, and not those of NSP-Wisconsin or its subsidiaries.

Amounts reflected in NSP-Wisconsin’s consolidated balance sheets for low-income housing limited partnerships include the following:
(Thousands of Dollars)
 
Dec. 31, 2015
 
Dec. 31, 2014
Current assets
 
$
377

 
$
246

Property, plant and equipment, net
 
2,199

 
2,278

Other noncurrent assets
 
127

 
122

Total assets
 
$
2,703

 
$
2,646

 
 
 
 
 
Current liabilities
 
$
1,246

 
$
1,349

Mortgages and other long-term debt payable
 
537

 
486

Other noncurrent liabilities
 
51

 
48

Total liabilities
 
$
1,834

 
$
1,883



Joint Operating System The electric production and transmission system of NSP-Wisconsin is managed as an integrated system with that of NSP-Minnesota, jointly referred to as the NSP System. The electric production and transmission costs of the entire NSP System are shared by NSP-Minnesota and NSP-Wisconsin. A FERC approved agreement between the two companies, called the Interchange Agreement, provides for the sharing of all costs of generation and transmission facilities of the system, including capital costs. Such costs include current and potential obligations of NSP-Minnesota related to its nuclear generating facilities.

NSP-Minnesota’s public liability for claims resulting from any nuclear incident is limited to $13.5 billion under the Price-Anderson amendment to the Atomic Energy Act. NSP-Minnesota has secured $375 million of coverage for its public liability exposure with a pool of insurance companies. The remaining $13.1 billion of exposure is funded by the Secondary Financial Protection Program, available from assessments by the federal government in case of a nuclear accident. NSP-Minnesota is subject to assessments of up to $127.3 million per reactor per accident for each of its three licensed reactors, to be applied for public liability arising from a nuclear incident at any licensed nuclear facility in the United States. The maximum funding requirement is $19.0 million per reactor during any one year. These maximum assessment amounts are both subject to inflation adjustment by the NRC and state premium taxes. The NRC’s last adjustment was effective September 2013.

NSP-Minnesota purchases insurance for property damage and site decontamination cleanup costs from Nuclear Electric Insurance Ltd. (NEIL). The coverage limits are $2.3 billion for each of NSP-Minnesota’s two nuclear plant sites. NEIL also provides business interruption insurance coverage, including the cost of replacement power obtained during certain prolonged accidental outages of nuclear generating units. Premiums are expensed over the policy term. All companies insured with NEIL are subject to retroactive premium adjustments if losses exceed accumulated reserve funds. Capital has been accumulated in the reserve funds of NEIL to the extent that NSP-Minnesota would have no exposure for retroactive premium assessments in case of a single incident under the business interruption and the property damage insurance coverage. However, in each calendar year, NSP-Minnesota could be subject to maximum assessments of approximately $19.9 million for business interruption insurance and $43.7 million for property damage insurance if losses exceed accumulated reserve funds.

Guarantees — NSP-Wisconsin provides a guarantee for payment of customer loans related to NSP-Wisconsin’s farm rewiring program. NSP-Wisconsin’s exposure under the guarantee is based upon the net liability under the agreement. The guarantee issued by NSP-Wisconsin limits the exposure of NSP-Wisconsin to a maximum amount stated in the guarantee. The guarantee contains no recourse provisions and requires no collateral.

The following table presents the guarantee issued and outstanding for NSP-Wisconsin:
(Millions of Dollars)
 
Guarantee
Amount
 
Current
Exposure
 
Term or
Expiration Date
 
Triggering
Event
Guarantee of customer loans for the Farm Rewiring Program
 
$
1.0

 
$
0.1

 
2020
 
(a) 

(a) 
The debtor becomes the subject of bankruptcy or other insolvency proceedings.

Environmental Contingencies

NSP-Wisconsin has been or is currently involved with the cleanup of contamination from certain hazardous substances at several sites. In many situations, NSP-Wisconsin believes it will recover some portion of these costs through insurance claims. Additionally, where applicable, NSP-Wisconsin is pursuing, or intends to pursue, recovery from other PRPs and through the regulated rate process. New and changing federal and state environmental mandates can also create added financial liabilities for NSP-Wisconsin, which are normally recovered through the regulated rate process. To the extent any costs are not recovered through the options listed above, NSP-Wisconsin would be required to recognize an expense.

Site Remediation Various federal and state environmental laws impose liability, without regard to the legality of the original conduct, where hazardous substances or other regulated materials have been released to the environment. NSP-Wisconsin may sometimes pay all or a portion of the cost to remediate sites where past activities of NSP-Wisconsin or other parties have caused environmental contamination. Environmental contingencies could arise from various situations, including sites of former MGPs operated by NSP-Wisconsin, its predecessors, or other entities; and third-party sites, such as landfills, for which NSP-Wisconsin is alleged to be a PRP that sent wastes to that site.

MGP Sites

Ashland MGP Site — NSP-Wisconsin has been named a PRP for contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (the Site) includes property owned by NSP-Wisconsin, previously operated by a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park); and an area of Lake Superior’s Chequamegon Bay adjoining the park (the Sediments).

In 2010, the EPA issued its Record of Decision (ROD), including their preferred remedy for the Sediments which is a hybrid remedy involving both dry excavation and wet conventional dredging methodologies (the Hybrid Remedy). A wet conventional dredging only remedy (the Wet Dredge), contingent upon the completion of a successful Wet Dredge pilot study, is another possibility.

In 2012, under a settlement agreement, NSP-Wisconsin agreed to perform the remediation of the Phase I Project Area (which includes the Upper Bluff and Kreher Park areas of the Site). Fieldwork began in 2012 and continues. Excavation and containment remedies are complete. A long-term groundwater pump and treatment program is now underway. The final design was approved by the EPA in late 2015. The current cost estimate for the cleanup of the Phase I Project Area is approximately $65 million, of which approximately $47 million has already been spent.

Negotiations are ongoing between the EPA and NSP-Wisconsin regarding who will pay for or perform the cleanup of the Sediments and which remedy will be implemented. The EPA’s ROD includes estimates that the cost of the Hybrid Remedy is between $63 million and $77 million, with a potential deviation in such estimated costs of up to 50 percent higher to 30 percent lower. NSP-Wisconsin believes the Hybrid Remedy is not safe or feasible to implement. In 2015, NSP-Wisconsin constructed a breakwater at the site to serve as wave attenuation and containment for a wet dredge pilot study and full scale sediment remedy at the site. The wet dredge pilot study is anticipated to commence in spring 2016.

As a result of litigation and settlements approved by the U.S. District Court for the Western District of Wisconsin in 2015, three other PRPs have contributed $15.9 million to the remediation of the site. Settlements in principle were also reached with the City of Ashland and the County of Ashland in January 2016, and NSP-Wisconsin anticipates that its litigation efforts against other PRPs are complete.

At Dec. 31, 2015 and 2014, NSP-Wisconsin had recorded a liability of $94.4 million and $107.6 million, respectively, for the Site based upon potential remediation and design costs together with estimated outside legal and consultant costs; of which $17.0 million and $28.9 million, respectively, was considered a current liability. NSP-Wisconsin’s potential liability, the actual cost of remediation and the time frame over which the amounts may be paid are subject to change. NSP-Wisconsin also continues to work to identify and access state and federal funds to apply to the ultimate remediation cost of the entire site. Unresolved issues or factors that could result in higher or lower NSP-Wisconsin remediation costs for the Site include the cleanup approach implemented for the Sediments, which party implements the cleanup, the timing of when the cleanup is implemented and whether federal or state funding may be directed to help offset remediation costs at the Site.

NSP-Wisconsin has deferred the estimated site remediation costs as a regulatory asset. The PSCW has consistently authorized NSP-Wisconsin rate recovery for all remediation costs incurred at the Site. In a December 2012 decision, the PSCW agreed to allow NSP-Wisconsin to pre-collect certain costs, to amortize costs over a ten-year period, and to apply a three percent carrying cost to the unamortized regulatory asset. In December 2015, the PSCW approved NSP-Wisconsin’s 2016 rate case request for an increase to the annual recovery for MGP clean-up costs from $4.7 million to $7.6 million.

Other MGP Sites NSP-Wisconsin is currently involved in investigating and/or remediating several other MGP sites where regulated materials may have been deposited. NSP-Wisconsin has identified one site where former MGP activities may have resulted in site contamination and is under current investigation. At this MGP site, there are other parties that may have responsibility for some portion of any remediation. NSP-Wisconsin anticipates that the majority of the remediation at this site will continue through at least 2016. NSP-Wisconsin had accrued $0.2 million for this site at Dec. 31, 2015 and 2014, respectively. There may be insurance recovery and/or recovery from other PRPs that will offset any costs incurred. NSP-Wisconsin anticipates that any amounts spent will be fully recovered from customers.

Environmental Requirements

Water and Waste
Asbestos Removal — Some of NSP-Wisconsin’s facilities contain asbestos. Most asbestos will remain undisturbed until the facilities that contain it are demolished or removed. NSP-Wisconsin has recorded an estimate for final removal of the asbestos as an ARO. It may be necessary to remove some asbestos to perform maintenance or make improvements to other equipment. The cost of removing asbestos as part of other work is not expected to be material and is recorded as incurred as operating expenses for maintenance projects, capital expenditures for construction projects or removal costs for demolition projects.

Federal Clean Water Act (CWA) Effluent Limitations Guidelines (ELG) — In September 2015, the EPA issued a final ELG rule for power plants that use coal, natural gas, oil or nuclear materials as fuel and discharge treated effluent to surface waters as well as utility-owned landfills that receive coal combustion residuals. NSP-Wisconsin has reviewed the final rule and is in the process of evaluating whether the costs of compliance could have a material impact on the results of operations, financial position or cash flows. NSP-Wisconsin believes that compliance costs would be recoverable through regulatory mechanisms.

Federal CWA Section 316(b) Section 316(b) of the federal CWA requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing adverse environmental impacts to aquatic species. The EPA published the final 316(b) rule in August 2014. The rule prescribes technology for protecting fish that get stuck on plant intake screens (known as impingement) and describes a process for site-specific determinations by each state for sites that must protect the small aquatic organisms that pass through the intake screens into the plant cooling systems (known as entrainment). The timing of compliance with the requirements will vary from plant-to-plant since the new rule does not have a final compliance deadline. Many of the compliance requirements depend on site-specific determinations by state regulators; therefore, the exact cost is somewhat uncertain. NSP-Wisconsin believes at least two plants could be required by state regulators to make improvements to reduce entrainment. NSP-Wisconsin estimates the likely cost for complying with impingement requirements may be incurred between 2016 and 2027 and is approximately $4 million and anticipates these costs will be fully recoverable in rates.

Federal CWA Waters of the United States Rule — In June 2015, the EPA and the U.S. Army Corps of Engineers published a final rule that significantly expands the types of water bodies regulated under the CWA and broadens the scope of waters subject to federal jurisdiction. The expansion of the term “Waters of the U.S.” will subject more utility projects to federal CWA jurisdiction, thereby potentially delaying the siting of new generation projects, pipelines, transmission lines and distribution lines, as well as increasing project costs and expanding permitting and reporting requirements. The rule went into effect in August 2015. In October 2015, the U.S. Court of Appeals for the Sixth Circuit issued a nationwide stay of the final rule, pending further legal proceedings.

Air
GHG Emission Standard for Existing Sources (Clean Power Plan or CPP) — In October 2015, a final rule was published by the EPA for GHG emission standards for existing power plants.  States must develop implementation plans by September 2016, with the possibility of an extension to September 2018, or the EPA will prepare a federal plan for the state.  Among other things, the rule requires that state plans include enforceable measures to ensure emissions from existing power plants achieve the EPA’s state-specific interim (2022-2029) and final (2030 and thereafter) emission performance targets.  The CPP is currently being challenged by multiple parties in the D.C. Circuit Court.  In January 2016, the D.C. Circuit Court denied requests to stay the effectiveness of the rule as well as ordered expedited review of the CPP, with briefings to be completed and oral arguments held by June 2016.  Following the D.C. Circuit Court’s denial of motions for stay, multiple parties filed requests for stay with the U.S. Supreme Court. In February 2016, the U.S. Supreme Court issued an order staying the final CPP rule. The stay will remain in effect until, first, the D.C. Circuit Court and then the U.S. Supreme Court have ruled on the challenges to the CPP.

NSP-Wisconsin has undertaken a number of initiatives that reduce GHG emissions and respond to state renewable and energy efficiency goals.  The CPP could require additional emission reductions in states in which NSP-Wisconsin operates.  If state plans do not provide credit for the investments we have already made to reduce GHG emissions, or if they require additional initiatives or emission reductions, then their requirements would potentially impose additional substantial costs.  Until NSP-Wisconsin has more information about SIPs or knows the requirements of the EPA’s upcoming final rule on federal plans for the states that do not develop related plans, NSP-Wisconsin cannot predict the costs of compliance with the final rule once it takes effect.  NSP-Wisconsin believes compliance costs will be recoverable through regulatory mechanisms.  If our regulators do not allow us to recover all or a part of the cost of capital investment or the O&M costs incurred to comply with the CPP or cost recovery is not provided in a timely manner, it could have a material impact on results of operations, financial position or cash flows.

CSAPR CSAPR addresses long range transport of PM and ozone by requiring reductions in SO2 and NOx from utilities in the eastern half of the United States, including Wisconsin, using an emissions trading program. CSAPR compliance in 2015 did not and 2016 is not expected to have a material impact on the results of operations, financial position or cash flows.

CSAPR was adopted to address interstate emissions impacting downwind states’ attainment of the 1997 ozone NAAQS and the 1997 and 2006 particulate NAAQS. As the EPA revises the NAAQS, it will consider whether to make any further reductions to CSAPR emission budgets and whether to change which states are included in the emissions trading program. In December 2015, the EPA proposed adjustments to CSAPR emission budgets which address attainment of the more stringent 2008 ozone NAAQS. If adopted as proposed, the ozone season emission budget for NOx is not expected to impact NSP-Wisconsin.

Revisions to the NAAQS for Ozone — In October 2015, the EPA revised the NAAQS for ozone by lowering the eight-hour standard from 75 parts per billion (ppb) to 70 ppb. Current monitored air quality concentrations in areas of Wisconsin, where NSP-Wisconsin operates, are below the new standard. Therefore, NSP-Wisconsin does not expect a material impact on results of operations, financial position or cash flows.

Asset Retirement Obligations

Recorded AROs — AROs have been recorded for property related to the following: electric production (steam, other and hydro), electric distribution and transmission, natural gas distribution, and general property. The electric production obligations include asbestos, ash-containment facilities, storage tanks and control panels. The asbestos recognition associated with electric production includes certain specific plants. AROs also have been recorded for NSP-Wisconsin steam production related to ash-containment facilities such as bottom ash ponds, evaporation ponds and solid waste landfills.

NSP-Wisconsin has recognized an ARO for the retirement costs of natural gas mains and lines and for the removal of electric transmission and distribution equipment, which consists of many small potential obligations associated with PCBs, mineral oil, storage tanks, lithium batteries, mercury and street lighting lamps. The electric and common general AROs include small obligations related to storage tanks and office buildings.

In April 2015, the EPA published the final rule regulating the management and disposal of coal combustion byproducts (e.g., coal ash) as a nonhazardous waste to the Federal Register. The rule became effective in October 2015. No cash flow revisions were necessary, as a result of the final rule, as of Dec. 31, 2015.

A reconciliation of NSP-Wisconsin’s AROs for the years ended Dec. 31, 2015 and 2014 is as follows:
(Thousands of Dollars)
 
Beginning Balance
Jan. 1, 2015
 
Accretion
 
Cash Flow Revisions
 
Ending Balance
   Dec. 31, 2015 (a)
Electric plant
 
 
 
 
 
 
 
 
Steam production asbestos
 
$
2,049

 
$
45

 
$
51

 
$
2,145

Steam production ash containment
 
374

 
14

 
229

 
617

Electric distribution
 
37

 
1

 
34

 
72

Other
 
412

 
15

 
(36
)
 
391

Natural gas plant
 
 
 
 
 
 
 
 
Gas distribution
 
6,127

 
240

 

 
6,367

Common and other property
 
 
 
 
 
 
 
 
Common miscellaneous
 
91

 
4

 

 
95

Total liability (b)
 
$
9,090

 
$
319

 
$
278

 
$
9,687


(a) 
There were no ARO liabilities recognized or settled during the year ended Dec. 31, 2015.
(b) 
Included in other long-term liabilities balance in the consolidated balance sheet.

(Thousands of Dollars)
 
Beginning Balance
Jan. 1, 2014
 
Liabilities Recognized
 
Accretion
 
Cash Flow
   Revisions (a)
 
Ending Balance
    Dec. 31, 2014 (b)
Electric plant
 
 
 
 
 
 
 
 
 
 
Steam production asbestos
 
$
2,005

 
$

 
$
44

 
$

 
$
2,049

Steam production ash containment
 
361

 

 
13

 

 
374

Electric distribution
 
36

 

 
1

 

 
37

Other
 
289

 
113

 
10

 

 
412

Natural gas plant
 
 
 
 
 
 
 
 
 
 
Gas distribution
 
75

 
402

 
5

 
5,645

 
6,127

Common and other property
 
 
 
 
 
 
 
 
 
 
Common miscellaneous
 
87

 

 
3

 
1

 
91

Total liability (c)
 
$
2,853

 
$
515

 
$
76

 
$
5,646

 
$
9,090


(a) 
In 2014, revisions were made to various AROs due to revised estimated cash flows and the timing of those cash flows. Changes in estimated excavation costs and the timing of future retirement activities resulted in revisions to AROs related to gas distribution.
(b) 
There were no ARO liabilities settled during the year ended Dec. 31, 2014.
(c) 
Included in other long-term liabilities balance in the consolidated balance sheet.

Indeterminate AROs Outside of the known and recorded asbestos AROs, other plants or buildings may contain asbestos due to the age of many of NSP-Wisconsin’s facilities, but no confirmation or measurement of the amount of asbestos or cost of removal could be determined as of Dec. 31, 2015. Therefore, an ARO has not been recorded for these facilities.

Removal Costs NSP-Wisconsin records a regulatory liability for the plant removal costs of generation, transmission and distribution facilities that are recovered currently in rates. Generally, the accrual of future non-ARO removal obligations is not required. However, long-standing ratemaking practices approved by applicable state and federal regulatory commissions have allowed provisions for such costs in historical depreciation rates. These removal costs have accumulated over a number of years based on varying rates as authorized by the appropriate regulatory entities. Given the long time periods over which the amounts were accrued and the changing of rates over time, NSP-Wisconsin has estimated the amount of removal costs accumulated through historic depreciation expense based on current factors used in the existing depreciation rates. Accordingly, the recorded amounts of estimated future removal costs are considered regulatory liabilities. Removal costs as of Dec. 31, 2015 and 2014 were $132 million and $123 million, respectively.

Legal Contingencies

NSP-Wisconsin is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on NSP-Wisconsin’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.

Gas Trading Litigation — e prime, inc. (e prime) is a wholly owned subsidiary of Xcel Energy.  e prime was in the business of natural gas trading and marketing, but has not engaged in natural gas trading or marketing activities since 2003.  Thirteen lawsuits were commenced against e prime and Xcel Energy (and NSP-Wisconsin, in two instances) between 2003 and 2009 alleging fraud and anticompetitive activities in conspiring to restrain the trade of natural gas and manipulate natural gas prices. The cases were consolidated in U.S. District Court in Nevada.  In 2009, five of the cases were settled and one was dismissed.  The U.S. District Court in 2011 issued an order dismissing entirely six of the remaining seven lawsuits, and partially dismissing the seventh. Plaintiffs appealed the dismissals to the Ninth Circuit, which reversed the District Court. The matter was ultimately heard by the U.S. Supreme Court in early 2015, which agreed with the Ninth Circuit and remanded the matter to the U.S. District Court. In September 2015, the District Court held a status conference and set deadlines for certain litigation related activities in 2016. A trial date has not yet been set, but is not expected to occur prior to late 2016 or early 2017. Xcel Energy and e prime have concluded that a loss is remote with respect to this matter.

Other Contingencies

See Note 10 for further discussion.