XML 53 R15.htm IDEA: XBRL DOCUMENT v2.4.1.9
Commitments and Contingencies
3 Months Ended
Mar. 31, 2015
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies

Except to the extent noted below and in Note 5, Notes 10 and 11 to the consolidated financial statements in NSP-Wisconsin’s Annual Report on Form 10-K for the year ended Dec. 31, 2014 appropriately represent, in all material respects, the current status of commitments and contingent liabilities, and are incorporated herein by reference. The following include commitments, contingencies and unresolved contingencies that are material to NSP-Wisconsin’s financial position.

Guarantees

NSP-Wisconsin provides a guarantee for payment of customer loans related to NSP-Wisconsin’s farm rewiring program. NSP-Wisconsin’s exposure under the guarantee is based upon the net liability under the agreement. The guarantee issued by NSP-Wisconsin limits its exposure to a maximum amount stated in the guarantee. The guarantee contains no recourse provisions and requires no collateral.

The following table presents the guarantee issued and outstanding for NSP-Wisconsin:
(Millions of Dollars)
 
March 31, 2015
 
Dec. 31, 2014
Guarantees issued and outstanding
 
$
1.0

 
$
1.0

Current exposure under these guarantees
 
0.1

 
0.2



Environmental Contingencies

Ashland Manufactured Gas Plant (MGP) Site — NSP-Wisconsin has been named a potentially responsible party (PRP) for contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (the Ashland site) includes property owned by NSP-Wisconsin, which was a site previously operated by a predecessor company as a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park), on which an unaffiliated third party previously operated a sawmill and conducted creosote treating operations; and an area of Lake Superior’s Chequamegon Bay adjoining the park (the Sediments).

The U.S. Environmental Protection Agency (EPA) issued its Record of Decision (ROD) in 2010, which describes the preferred remedy the EPA has selected for the cleanup of the Ashland site. For the Sediments at the Ashland Site, the ROD preferred remedy is a hybrid remedy involving both dry excavation and wet conventional dredging methodologies (the Hybrid Remedy). The ROD also identifies the possibility of a wet conventional dredging only remedy for the Sediments (the Wet Dredge), contingent upon the completion of a successful Wet Dredge pilot study.

In 2011, the EPA issued special notice letters identifying several entities, including NSP-Wisconsin, as PRPs, for future remediation at the Ashland site. As a result of settlement negotiations with NSP-Wisconsin, the EPA agreed to segment the Ashland site into separate areas. The first area (Phase I Project Area) includes soil and groundwater in Kreher Park and the Upper Bluff. The second area includes the Sediments.

In October 2012, a settlement among the EPA, the Wisconsin Department of Natural Resources, the Bad River and Red Cliff Bands of the Lake Superior Tribe of Chippewa Indians and NSP-Wisconsin was approved by the U.S. District Court for the Western District of Wisconsin. This settlement resolves claims against NSP-Wisconsin for its alleged responsibility for the remediation of the Phase I Project Area. Under the terms of the settlement, NSP-Wisconsin agreed to perform the remediation of the Phase I Project Area, but does not admit any liability with respect to the Ashland site. Fieldwork to address the Phase I Project Area at the Ashland site began at the end of 2012 and continues. Demolition activities occurred at the Ashland site in 2013. Soil, including excavation and treatment, as well as containment wall remedies were completed in early 2015. A preliminary design for the groundwater remedy was also submitted to the EPA in April 2014 and those activities are expected to commence in 2015. The current cost estimate for the cleanup of the Phase I Project Area is approximately $57 million, of which approximately $33 million has already been spent. The settlement also resolves claims by the federal, state and tribal trustees against NSP-Wisconsin for alleged natural resource damages at the Ashland site, including both the Phase I Project Area and the Sediments.

Negotiations are ongoing between the EPA and NSP-Wisconsin regarding who will pay for or perform the cleanup of the Sediments and what remedy will be implemented at the site to address the Sediments. It is NSP-Wisconsin’s view that the Hybrid Remedy is not safe or feasible to implement. The EPA’s ROD for the Ashland site includes estimates that the cost of the Hybrid Remedy is between $63 million and $77 million, with a potential deviation in such estimated costs of up to 50 percent higher to 30 percent lower. In November 2013, NSP-Wisconsin submitted a revised Wet Dredge pilot study work plan proposal to the EPA. In May 2014, NSP-Wisconsin entered into a final administrative order on consent for the Wet Dredge pilot study with the EPA. In early 2015, the EPA granted an extension of time to perform the pilot in 2016 so that NSP-Wisconsin can first construct a breakwater at the site to serve as a wave attenuator.

In August 2012, NSP-Wisconsin also filed litigation against other PRPs for their share of the cleanup costs for the Ashland site. Trial for this matter commenced on April 27, 2015. Negotiations between the EPA, NSP-Wisconsin and several of the other PRPs regarding the PRPs’ fair share of the cleanup costs for the Ashland site are also ongoing. A final settlement has been reached between NSP-Wisconsin, along with the EPA, and two of the PRPs, Wisconsin Central Ltd. and Soo Line Railroad Co. (collectively, the “Railroad PRPs”) resolving claims relating to the Railroad PRPs’ share of the costs of cleanup at the Ashland site. NSP-Wisconsin also has entered a second private party settlement agreement with LE Myers Co. Under the agreements, the Railroad PRPs will contribute $10.5 million and LE Myers Co. will contribute $5.4 million to the costs of the cleanup at the Ashland site. The agreement for the Railroad PRPs along with LE Myers Co. was approved by the U.S. District Court for the Western District of Wisconsin in 2015. As discussed below, existing Public Service Commission of Wisconsin (PSCW) policy requires that any payments received from PRPs be used to reduce the amount of the cleanup costs ultimately recovered from customers.

At March 31, 2015 and Dec. 31, 2014, NSP-Wisconsin had recorded a liability of $112.4 million and $107.6 million, respectively, for the Ashland site based upon potential remediation and design costs together with estimated outside legal and consultant costs; of which $26.0 million and $28.9 million, respectively, was considered a current liability. NSP-Wisconsin’s potential liability, the actual cost of remediation and the time frame over which the amounts may be paid are subject to change. NSP-Wisconsin also continues to work to identify and access state and federal funds to apply to the ultimate remediation cost of the entire site. Unresolved issues or factors that could result in higher or lower NSP-Wisconsin remediation costs for the Ashland site include the cleanup approach implemented for the Sediments, which party implements the cleanup, the timing of when the cleanup is implemented, potential contributions by other PRPs and whether federal or state funding may be directed to help offset remediation costs at the Ashland site.

NSP-Wisconsin has deferred the estimated site remediation costs, as a regulatory asset, based on an expectation that the PSCW will continue to allow NSP-Wisconsin to recover payments for environmental remediation from its customers. The PSCW has consistently authorized NSP-Wisconsin rate recovery for all remediation costs incurred at the Ashland site, and has authorized recovery of MGP remediation costs by other Wisconsin utilities. Under the established PSCW policy, external MGP remediation costs are subject to deferral in the Wisconsin retail jurisdiction and are reviewed for prudence as part of the Wisconsin retail rate case process. Any payments received from insurance carriers or PRPs are recorded as a reduction of the regulatory asset. Once deferred MGP remediation costs are determined by the PSCW to be prudent, utilities are allowed to recover those deferred costs in natural gas rates, typically over a four- to six-year amortization period. The PSCW historically has not allowed utilities to recover their carrying costs on unamortized regulatory assets for MGP remediation.

The PSCW reviewed the existing MGP cost recovery policy as it applied to the Ashland site in the context of NSP-Wisconsin's 2013 general rate case. In their final decision, dated Dec. 27, 2012, the PSCW recognized the potential magnitude of the future liability for the cleanup at the Ashland site and granted an exception to its existing policy at the request of NSP-Wisconsin. The elements of this exception include: (1) approval to begin recovery of estimated Phase 1 Project costs beginning on Jan. 1, 2013; (2) approval to amortize these estimated costs over a ten-year period; and (3) approval to apply a three percent carrying cost to the unamortized regulatory asset. In a 2014 rate case decision, the PSCW continued the cost recovery treatment with respect to the 2013 and 2014 cleanup costs for the Phase I Project Area and allowed NSP-Wisconsin to increase its 2014 amortization expense related to the cleanup by an additional $1.1 million to offset the need for a rate decrease for the natural gas utility. Cost recovery will continue at the level set in the 2014 rate case though 2015, but will be re-assessed in NSP-Wisconsin’s next natural gas rate case.  

Environmental Requirements

Water and Waste
Coal Ash Regulation NSP-Wisconsin's operations are subject to federal and state laws that impose requirements for handling, storage, treatment, and disposal of solid waste.  On April 17, 2015, the EPA published a final rule regulating the management and disposal of coal combustion byproducts (coal ash) as a nonhazardous waste.  NSP-Wisconsin has ceased coal combustion at Bay Front Unit 5 and will not have any units subject to coal ash regulation. Due to the Interchange Agreement, NSP-Wisconsin may incur costs related to this rule but does not expect these to have a material impact on the results of operations, financial position or cash flows.

Air
Cross-State Air Pollution Rule (CSAPR) — CSAPR addresses long range transport of particulate matter and ozone by requiring reductions in sulfur dioxide (SO2) and nitrous oxide (NOx) from utilities in the eastern half of the United States, including Wisconsin, using an emissions trading program.

In August 2012, the United States District Court of Appeals for the District of Columbia Circuit (D.C. Circuit) vacated the CSAPR and remanded it back to the EPA. The D.C. Circuit stated the EPA must continue administering the Clean Air Interstate Rule pending adoption of a valid replacement. In April 2014, the U.S. Supreme Court reversed and remanded the case to the D.C. Circuit. The Supreme Court held that the EPA’s rule design did not violate the Clean Air Act and that states had received adequate opportunity to develop their own plans. Because the D.C. Circuit overturned the CSAPR on two over-arching issues, there are many other issues the D.C. Circuit did not rule on that will now need to be considered on remand. An opinion is expected late summer 2015. In October 2014, the D.C. Circuit granted the EPA’s request to begin to implement CSAPR by imposing its 2012 compliance obligations starting in January 2015. While the litigation continues, the EPA will administer the CSAPR in 2015.

NSP-Wisconsin can operate within its CSAPR emission allowance allocation for SO2. NSP-Wisconsin anticipates compliance with the CSAPR for NOx in 2015 through operational changes or allowance purchases. CSAPR compliance in 2015 is not expected to have a material impact on the results of operations, financial position or cash flows.

Legal Contingencies

NSP-Wisconsin is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on NSP-Wisconsin’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.