Commitments and Contingencies
12 Months Ended
Dec. 31, 2014
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies

Commitments

Fuel Contracts — NSP-Wisconsin has entered into various long-term commitments for the purchase and delivery of a significant portion of its current coal and natural gas requirements. These contracts expire in various years between 2015 and 2029. In addition, NSP-Wisconsin is required to pay additional amounts depending on actual quantities shipped under these agreements. As NSP-Wisconsin does not have an automatic electric fuel adjustment clause for Wisconsin retail customers, NSP-Wisconsin utilizes deferred accounting treatment for future rate recovery or refund when fuel costs differ from the amount included in rates by more than two percent on an annual basis, as determined by the PSCW after an opportunity for a hearing and an earnings test based on NSP-Wisconsin’s authorized ROE.

The estimated minimum purchases for NSP-Wisconsin under these contracts as of Dec. 31, 2014 are as follows:
(Millions of dollars)
 
Coal
 
Natural gas
supply
 
Natural gas
storage and
transportation
2015
 
$
6.6

 
$
12.4

 
$
13.2

2016
 
0.8

 
0.3

 
13.1

2017
 
0.9

 
0.2

 
10.4

2018
 
0.8

 

 
4.7

2019
 
0.8

 

 
3.1

Thereafter
 
3.3

 

 
13.5

Total (a)
 
$
13.2

 
$
12.9

 
$
58.0


(a) 
Excludes additional amounts allocated to NSP-Wisconsin through intercompany charges.

Additional expenditures for fuel and natural gas storage and transportation will be required to meet expected future electric generation and natural gas needs.

Leases — NSP-Wisconsin leases a variety of equipment and facilities used in the normal course of business. These leases, primarily for office space, trucks, aircraft, cars and power-operated equipment, are accounted for as operating leases. Total expenses under operating lease obligations were approximately $1.3 million, $1.4 million and $1.1 million for 2014, 2013 and 2012, respectively.

Future commitments under operating leases are:
(Millions of Dollars)
 
 
2015
 
$
0.9

2016
 
0.9

2017
 
1.0

2018
 
1.0

2019
 
1.0

Thereafter
 
7.9

Total
 
$
12.7



Variable Interest Entities — The accounting guidance for consolidation of variable interest entities requires enterprises to consider the activities that most significantly impact an entity’s financial performance, and power to direct those activities, when determining whether an enterprise is a variable interest entity’s primary beneficiary.

NSP-Wisconsin has entered into limited partnerships for the construction and operation of affordable rental housing developments which qualify for low-income housing tax credits. NSP-Wisconsin has determined the low-income housing limited partnerships to be variable interest entities primarily due to contractual arrangements within each limited partnership that establish sharing of ongoing voting control and profits and losses that does not consistently align with the partners’ proportional equity ownership. These limited partnerships are designed to qualify for low-income housing tax credits, and NSP-Wisconsin generally receives a larger allocation of the tax credits than the general partners at inception of the arrangements. NSP-Wisconsin has determined that it has the power to direct the activities that most significantly impact these entities’ economic performance, and therefore NSP-Wisconsin consolidates these limited partnerships in its consolidated financial statements.

Equity financing for these entities has been provided by NSP-Wisconsin and the general partner of each limited partnership, and NSP-Wisconsin’s risk of loss is limited to its capital contributions, adjusted for any distributions and its share of undistributed profits and losses; no significant additional financial support has been, or is in the future, required to be provided to the limited partnerships by NSP-Wisconsin. Mortgage-backed debt typically comprises the majority of the financing at inception of each limited partnership and is paid over the life of the limited partnership arrangement. Obligations of the limited partnerships are generally secured by the housing properties of each limited partnership, and the creditors of each limited partnership have no significant recourse to NSP-Wisconsin or its subsidiaries. Likewise, the assets of the limited partnerships may only be used to settle obligations of the limited partnerships, and not those of NSP-Wisconsin or its subsidiaries.

Amounts reflected in NSP-Wisconsin’s consolidated balance sheets for low-income housing limited partnerships include the following:
(Thousands of Dollars)
 
Dec. 31, 2014
 
Dec. 31, 2013
Current assets
 
$
246

 
$
223

Property, plant and equipment, net
 
2,278

 
2,427

Other noncurrent assets
 
122

 
112

Total assets
 
$
2,646

 
$
2,762

 
 
 
 
 
Current liabilities
 
$
1,349

 
$
233

Mortgages and other long-term debt payable
 
486

 
1,687

Other noncurrent liabilities
 
48

 
42

Total liabilities
 
$
1,883

 
$
1,962



Joint Operating System The electric production and transmission system of NSP-Wisconsin is managed as an integrated system with that of NSP-Minnesota, jointly referred to as the NSP System. The electric production and transmission costs of the entire NSP System are shared by NSP-Minnesota and NSP-Wisconsin. A FERC approved agreement between the two companies, called the Interchange Agreement, provides for the sharing of all costs of generation and transmission facilities of the system, including capital costs. Such costs include current and potential obligations of NSP-Minnesota related to its nuclear generating facilities.

NSP-Minnesota’s public liability for claims resulting from any nuclear incident is limited to $13.6 billion under the Price-Anderson amendment to the Atomic Energy Act. NSP-Minnesota has secured $375 million of coverage for its public liability exposure with a pool of insurance companies. The remaining $13.2 billion of exposure is funded by the Secondary Financial Protection Program, available from assessments by the federal government in case of a nuclear accident. NSP-Minnesota is subject to assessments of up to $127.3 million per reactor per accident for each of its three licensed reactors, to be applied for public liability arising from a nuclear incident at any licensed nuclear facility in the United States. The maximum funding requirement is $19.0 million per reactor during any one year. These maximum assessment amounts are both subject to inflation adjustment by the NRC and state premium taxes. The NRC’s last adjustment was effective September 2013.

NSP-Minnesota purchases insurance for property damage and site decontamination cleanup costs from Nuclear Electric Insurance Ltd. (NEIL). The coverage limits are $2.3 billion for each of NSP-Minnesota’s two nuclear plant sites. NEIL also provides business interruption insurance coverage, including the cost of replacement power obtained during certain prolonged accidental outages of nuclear generating units. Premiums are expensed over the policy term. All companies insured with NEIL are subject to retroactive premium adjustments if losses exceed accumulated reserve funds. Capital has been accumulated in the reserve funds of NEIL to the extent that NSP-Minnesota would have no exposure for retroactive premium assessments in case of a single incident under the business interruption and the property damage insurance coverage. However, in each calendar year, NSP-Minnesota could be subject to maximum assessments of approximately $17.9 million for business interruption insurance and $43.6 million for property damage insurance if losses exceed accumulated reserve funds.

Guarantees — NSP-Wisconsin provides a guarantee for payment of customer loans related to NSP-Wisconsin’s farm rewiring program. NSP-Wisconsin’s exposure under the guarantee is based upon the net liability under the agreement. The guarantee issued by NSP-Wisconsin limits the exposure of NSP-Wisconsin to a maximum amount stated in the guarantee. The guarantee contains no recourse provisions and requires no collateral.

The following table presents the guarantee issued and outstanding for NSP-Wisconsin:
(Millions of Dollars)
 
Guarantee
Amount
 
Current
Exposure
 
Term or
Expiration Date
 
Triggering
Event
Guarantee of customer loans for the Farm Rewiring Program
 
$
1.0

 
$
0.2

 
2018
 
(a) 

(a) 
The debtor becomes the subject of bankruptcy or other insolvency proceedings.

Environmental Contingencies

NSP-Wisconsin has been or is currently involved with the cleanup of contamination from certain hazardous substances at several sites. In many situations, NSP-Wisconsin believes it will recover some portion of these costs through insurance claims. Additionally, where applicable, NSP-Wisconsin is pursuing, or intends to pursue, recovery from other PRPs and through the regulated rate process. New and changing federal and state environmental mandates can also create added financial liabilities for NSP-Wisconsin, which are normally recovered through the regulated rate process. To the extent any costs are not recovered through the options listed above, NSP-Wisconsin would be required to recognize an expense.

Site Remediation Various federal and state environmental laws impose liability, without regard to the legality of the original conduct, where hazardous substances or other regulated materials have been released to the environment. NSP-Wisconsin may sometimes pay all or a portion of the cost to remediate sites where past activities of NSP-Wisconsin or other parties have caused environmental contamination. Environmental contingencies could arise from various situations, including sites of former MGPs operated by NSP-Wisconsin, its predecessors, or other entities; and third-party sites, such as landfills, for which NSP-Wisconsin is alleged to be a PRP that sent hazardous materials and wastes to that site.

MGP Sites

Ashland MGP Site — NSP-Wisconsin has been named a PRP for contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (the Ashland site) includes property owned by NSP-Wisconsin, which was a site previously operated by a predecessor company as a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park), on which an unaffiliated third party previously operated a sawmill and conducted wood treating operations; and an area of Lake Superior’s Chequamegon Bay adjoining the park (the Sediments).

The EPA issued its Record of Decision (ROD) in 2010, which describes the preferred remedy the EPA has selected for the cleanup of the Ashland site. For the Sediments at the Ashland Site, the ROD preferred remedy is a hybrid remedy involving both dry excavation and wet conventional dredging methodologies (the Hybrid Remedy). The ROD also identifies the possibility of a wet conventional dredging only remedy for the Sediments (the Wet Dredge), contingent upon the completion of a successful Wet Dredge pilot study.

In 2011, the EPA issued special notice letters identifying several entities, including NSP-Wisconsin, as PRPs, for future remediation at the Ashland site. As a result of settlement negotiations with NSP-Wisconsin, the EPA agreed to segment the Ashland site into separate areas. The first area (Phase I Project Area) includes soil and groundwater in Kreher Park and the Upper Bluff. The second area includes the Sediments.

In October 2012, a settlement among the EPA, the WDNR, the Bad River and Red Cliff Bands of the Lake Superior Tribe of Chippewa Indians and NSP-Wisconsin was approved by the U.S. District Court for the Western District of Wisconsin. This settlement resolves claims against NSP-Wisconsin for its alleged responsibility for the remediation of the Phase I Project Area. Under the terms of the settlement, NSP-Wisconsin agreed to perform the remediation of the Phase I Project Area, but does not admit any liability with respect to the Ashland site. Demolition activities occurred at the Ashland site in 2013. The final design for the soil, including excavation and treatment, as well as containment wall remedies was submitted to the EPA in April 2014 and work commenced in May 2014. A preliminary design for the groundwater remedy was also submitted to the EPA in April 2014 and those activities are expected to commence in 2015. Based on these updated designs, the cost estimate for the cleanup of the Phase I Project Area is approximately $54 million, of which approximately $28 million has already been spent. The settlement also resolves claims by the federal, state and tribal trustees against NSP-Wisconsin for alleged natural resource damages at the Ashland site, including both the Phase I Project Area and the Sediments. Fieldwork to address the Phase I Project Area at the Ashland site began at the end of 2012 and continues.

Negotiations are ongoing between the EPA and NSP-Wisconsin regarding who will pay for or perform the cleanup of the Sediments and what remedy will be implemented at the site to address the Sediments. It is NSP-Wisconsin’s view that the Hybrid Remedy is not safe or feasible to implement. The EPA’s ROD for the Ashland site includes estimates that the cost of the Hybrid Remedy is between $63 million and $77 million, with a potential deviation in such estimated costs of up to 50 percent higher to 30 percent lower. In November 2013, NSP-Wisconsin submitted a revised Wet Dredge pilot study work plan proposal to the EPA. In May 2014, NSP-Wisconsin entered into a final administrative order on consent for the Wet Dredge pilot study with the EPA. In September 2014, the EPA granted an extension of time to perform the pilot in the summer of 2015.

In August 2012, NSP-Wisconsin also filed litigation against other PRPs for their share of the cleanup costs for the Ashland site. Trial for this matter is scheduled for April-May of 2015. Negotiations between the EPA, NSP-Wisconsin and several of the other PRPs regarding the PRPs’ fair share of the cleanup costs for the Ashland site are also ongoing. A settlement in principle has been reached with two PRPs, Wisconsin Central Ltd. and Soo Line Railroad Co. (collectively, the “Railroad PRPs”), the EPA and NSP-Wisconsin resolving claims relating to the Railroad PRPs’ share of the costs of cleanup at the Ashland site. Under the agreement, the Railroad PRPs have agreed to contribute $10.5 million to the costs of the cleanup at the Ashland site. The agreement is currently subject to a 30-day public comment period and must be entered by the U.S. District Court for the Western District of Wisconsin before it will become final. It is anticipated that the agreement will be entered in the first quarter of 2015. As discussed below, existing PSCW policy requires that any payments received from PRPs be used to reduce the amount of the cleanup costs ultimately recovered from customers.

At Dec. 31, 2014 and 2013, NSP-Wisconsin had recorded a liability of $107.6 million and $104.6 million, respectively, for the Ashland site based upon potential remediation and design costs together with estimated outside legal and consultant costs; of which $28.9 million and $25.2 million, respectively, was considered a current liability. NSP-Wisconsin’s potential liability, the actual cost of remediation and the time frame over which the amounts may be paid are subject to change. NSP-Wisconsin also continues to work to identify and access state and federal funds to apply to the ultimate remediation cost of the entire site. Unresolved issues or factors that could result in higher or lower NSP-Wisconsin remediation costs for the Ashland site include the cleanup approach implemented for the Sediments, which party implements the cleanup, the timing of when the cleanup is implemented, potential contributions by other PRPs and whether federal or state funding may be directed to help offset remediation costs at the Ashland site.

NSP-Wisconsin has deferred the estimated site remediation costs, as a regulatory asset, based on an expectation that the PSCW will continue to allow NSP-Wisconsin to recover payments for environmental remediation from its customers. The PSCW has consistently authorized in NSP-Wisconsin rates recovery of all remediation costs incurred at the Ashland site, and has authorized recovery of MGP remediation costs by other Wisconsin utilities. Under the established PSCW policy, external MGP remediation costs are subject to deferral in the Wisconsin retail jurisdiction and are reviewed for prudence as part of the Wisconsin retail rate case process. Any payments received from insurance carriers or PRPs are recorded as a reduction of the regulatory asset. Once deferred MGP remediation costs are determined by the PSCW to be prudent, utilities are allowed to recover those deferred costs in natural gas rates, typically over a four- to six-year amortization period. The PSCW historically has not allowed utilities to recover their carrying costs on unamortized regulatory assets for MGP remediation.

In the 2013 rate case decision, the PSCW recognized the potential magnitude of the future liability for the cleanup at the Ashland site and granted an exception to its existing policy at the request of NSP-Wisconsin. The elements of this exception include: (1) approval to begin recovery of estimated Phase 1 Project costs beginning on Jan. 1, 2013; (2) approval to amortize these estimated costs over a ten-year period; and (3) approval to apply a three percent carrying cost to the unamortized regulatory asset. In the 2014 rate case decision, the PSCW continued the cost recovery treatment with respect to the 2013 and 2014 cleanup costs for the Phase I Project Area. The PSCW determined the timing of the cleanup of the Sediments was uncertain and declined NSP-Wisconsin’s request to begin cost recovery for this portion of the cleanup in 2014 rates. However, the PSCW allowed NSP-Wisconsin to increase its 2014 amortization expense related to the cleanup by an additional $1.1 million to offset the need for a rate decrease for the natural gas utility.

Other MGP Sites NSP-Wisconsin is currently involved in investigating and/or remediating several other MGP sites where hazardous or other regulated materials may have been deposited. NSP-Wisconsin has identified two sites where former MGP activities have or may have resulted in site contamination and are under current investigation and/or remediation. At some or all of these MGP sites, there are other parties that may have responsibility for some portion of any remediation. NSP-Wisconsin anticipates that the majority of the remediation at these sites will continue through at least 2015. NSP-Wisconsin had accrued $0.2 million and $3.9 million for both of these sites at Dec. 31, 2014 and 2013, respectively. There may be insurance recovery and/or recovery from other PRPs that will offset any costs incurred. NSP-Wisconsin anticipates that any amounts spent will be fully recovered from customers.

Environmental Requirements

Water and Waste
Asbestos Removal — Some of NSP-Wisconsin’s facilities contain asbestos. Most asbestos will remain undisturbed until the facilities that contain it are demolished or removed. NSP-Wisconsin has recorded an estimate for final removal of the asbestos as an ARO. It may be necessary to remove some asbestos to perform maintenance or make improvements to other equipment. The cost of removing asbestos as part of other work is not expected to be material and is recorded as incurred as operating expenses for maintenance projects, capital expenditures for construction projects or removal costs for demolition projects.

Federal Clean Water Act (CWA) Effluent Limitations Guidelines (ELG) — In June 2013, the EPA published a proposed ELG rule for power plants that use coal, natural gas, oil or nuclear materials as fuel and discharge treated effluent to surface waters as well as utility-owned landfills that receive coal combustion residuals. The final rule is now expected in September 2015. Under the current proposed rule, facilities would need to comply as soon as possible after July 2017, but no later than July 2022. The impact of this rule on NSP-Wisconsin is uncertain at this time.

Federal CWA Section 316(b) Section 316(b) of the federal CWA requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing adverse environmental impacts to aquatic species. The EPA published the final 316(b) rule in August 2014. The rule prescribes technology for protecting fish that get stuck on plant intake screens (known as impingement) and describes a process for site-specific determinations by each state for sites that must protect the small aquatic organisms that pass through the intake screens into the plant cooling systems (known as entrainment). The timing of compliance with the requirements will vary from plant-to-plant since the new rule does not have a final compliance deadline. Many of the compliance requirements depend on site-specific determinations by state regulators; therefore, the exact cost is somewhat uncertain. NSP-Wisconsin estimates the likely cost for complying with impingement requirements is approximately $4 million and anticipates these costs will be fully recoverable in rates.

Federal CWA Waters of the United States Rule — In April 2014, the EPA and the U.S. Army Corps of Engineers issued a proposed rule that significantly expands the types of water bodies regulated under the CWA. If finalized as proposed, this rule could delay the siting of new pipelines, transmission lines and distribution lines, increase project costs and expand permitting and reporting requirements. The ultimate impact of the proposed rule will depend on the specific requirements of the final rule and cannot be determined at this time. A final rule is not anticipated before the second quarter of 2015.

Coal Ash Regulation NSP-Wisconsin’s operations are subject to federal and state laws that impose requirements for handling, storage, treatment and disposal of solid waste. In 2010, the EPA published a proposed rule on the regulation of coal combustion byproducts (coal ash) as hazardous or nonhazardous waste. The EPA issued a pre-publication version of the final rule in December 2014, which once promulgated will impose new rules to regulate coal ash as a nonhazardous solid waste. NSP-Wisconsin has ceased coal combustion at Bay Front Unit 5 and will not have any units subject to coal ash regulation. Due to the Interchange Agreement, NSP-Wisconsin may incur costs related to this rule but does not expect these to have a material impact on the results of operations, financial position or cash flows.

Air
GHG Emission Standard for Existing Sources — In June 2014, the EPA published its proposed rule on GHG emission standards for existing power plants. Comments were due to the EPA on Dec. 1, 2014 and a final rule is anticipated in mid-summer 2015. Following adoption of the final rule, states must develop implementation plans by June 2016, with the possibility of an extension to June 2017 (June 2018 if submitting a joint plan with other states). Among other things, the proposed rule would require that state plans include enforceable measures to ensure emissions from existing power plants in the state achieve the EPA’s state-specific interim (2020-2029) and final (2030 and thereafter) emission performance targets. The plan will likely require additional emission reductions in states in which NSP-Wisconsin operates. It is not possible to evaluate the impact of existing source standards until the EPA promulgates a final rule and states have adopted their applicable state plans.

GHG NSPS Proposal — In January 2014, the EPA re-proposed a GHG NSPS for newly constructed power plants which would set performance standards (maximum carbon dioxide emission rates) for coal- and natural gas-fired power plants. For coal power plants, the NSPS requires an emissions level equivalent to partial carbon capture and storage (CCS) technology; for gas-fired power plants, the NSPS reflects emissions levels from combined cycle technology with no CCS. The EPA continues to propose that the NSPS not apply to modified or reconstructed existing power plants. In addition, installation of control equipment on existing plants would not constitute a “modification” to those plants under the NSPS program. A final rule is anticipated in mid-summer 2015. It is not possible to evaluate the impact of the re-proposed NSPS until its final requirements are known.

GHG NSPS for Modified and Reconstructed Power Plants — In June 2014, the EPA published a proposed NSPS that would apply to GHG emissions from power plants that are modified or reconstructed. A final rule is anticipated in mid-summer 2015. A modification is a change to an existing source that increases the maximum achievable hourly rate of emissions. A reconstruction involves the replacement of components at a unit to the extent that the capital cost of the new components exceeds 50 percent of the capital cost of an entirely new comparable unit. The proposed standards would not require installation of CCS technology. Instead, the proposed standard for coal-fired power plants would require a combination of best operating practices and equipment upgrades. The proposal for gas-fired power plants would require emissions standards based on efficient combined cycle technology. It is not possible to evaluate the impact of these proposed standards until the final requirements are known. In addition, it is not clear whether these requirements, once adopted, would apply to future changes at NSP-Wisconsin’s power plants.

CSAPR CSAPR addresses long range transport of PM and ozone by requiring reductions in SO2 and NOx from utilities in the eastern half of the United States, including Wisconsin, using an emissions trading program.

In August 2012, the D.C. Circuit vacated the CSAPR and remanded it back to the EPA. The D.C. Circuit stated the EPA must continue administering CSAPR’s predecessor rule pending adoption of a valid replacement. In April 2014, the U.S. Supreme Court reversed and remanded the case to the D.C. Circuit. The Supreme Court held that the EPA’s rule design did not violate the CAA and that states had received adequate opportunity to develop their own plans. Because the D.C. Circuit overturned the CSAPR on two over-arching issues, there are many other issues the D.C. Circuit did not rule on that will now need to be considered on remand. In October 2014, the D.C. Circuit granted the EPA’s request to begin to implement CSAPR by imposing its 2012 compliance obligations starting in January 2015. In addition, the D.C. Circuit set a briefing schedule and plans to hear arguments on the remaining issues in the case in February 2015. While the litigation continues, the EPA will begin to administer the CSAPR in 2015.

NSP-Wisconsin can operate within its CSAPR emission allowance allocation for SO2 due to cessation of coal combustion at Bay Front Unit 5. NSP-Wisconsin anticipates compliance with the CSAPR for NOx in 2015 through operational changes or allowance purchases. CSAPR compliance in 2015 is not expected to have a material impact on the results of operations, financial position or cash flows.

Electric Generating Unit (EGU) Mercury and Air Toxics Standards (MATS) Rule — The final EGU MATS rule became effective in April 2012. The EGU MATS rule sets emission limits for acid gases, mercury and other hazardous air pollutants and requires coal-fired utility facilities greater than 25 MW to demonstrate compliance within three to four years of the effective date. NSP-Wisconsin will not have any units subject to EGU MATS because it has ceased coal combustion in Bay Front Unit 5. In 2014, the U.S. Supreme Court decided to review the D.C. Circuit’s decision that upheld the MATS standard. It is not yet known what impact the Supreme Court’s decision may have on the MATS standard or its implementation schedule.

Industrial Boiler (IB) MACT Rules — In 2011, the EPA finalized IB MACT rules to regulate boilers and process heaters fueled with coal, biomass and liquid fuels, which would apply to NSP-Wisconsin’s Bay Front Units 1 and 2. The controls to meet the requirements were substantially complete as of Dec. 31, 2014, with final work targeted to be finished in May 2015. The final capital cost is estimated to be approximately $21 million.

Revisions to the National Ambient Air Quality Standards (NAAQS) for PM — In December 2012, the EPA lowered the primary health-based NAAQS for annual average fine PM and retained the current daily standard for fine PM. In areas where NSP-Wisconsin operates power plants, current monitored air concentrations are below the level of the final annual primary standard. In December 2014, the EPA issued its final designations, which did not include areas in any states in which NSP-Wisconsin operates.

Revisions to the NAAQS for Ozone — In December 2014, the EPA proposed to revise the NAAQS for ozone by lowering the eight-hour standard from 0.075 parts per million (ppm) to a level within the range of 0.065-0.070 ppm. The EPA is also taking comment on a level for the standard as low as 0.060 ppm. Current monitored air quality concentrations in areas of Wisconsin where NSP-Wisconsin operates are below the range of the proposed standard. The EPA is expected to adopt a new ozone standard in a final rule to be issued in October 2015. Depending on the level of the standard, impacted states would study the sources of the nonattainment and make emission reduction plans to attain the standards. These plans would be due to the EPA in 2020 or 2021. Such plans could include installation of further NOx controls on power plants. It is not possible to evaluate the impact of this proposal until the final standard is adopted, the designation of nonattainment areas is made in late 2017 based on air quality data years 2014-2016, and any required state plans are developed.

Asset Retirement Obligations

Recorded AROs — AROs have been recorded for property related to the following: electric production (steam, other and hydro), electric distribution and transmission, natural gas distribution, and general property. The electric production obligations include asbestos, ash-containment facilities, storage tanks and control panels. The asbestos recognition associated with the electric production includes certain plants. This asbestos abatement removal obligation originated in 1973 with the CAA, which applied to the demolition of buildings or removal of equipment containing asbestos that can become airborne on removal. AROs also have been recorded for NSP-Wisconsin steam production related to ash-containment facilities such as bottom ash ponds, evaporation ponds and solid waste landfills. The origination dates on the ARO recognition for ash-containment facilities at steam plants were the in-service dates of the various facilities.

NSP-Wisconsin has recognized an ARO for the retirement costs of natural gas mains and lines and for the removal of electric transmission and distribution equipment, which consists of many small potential obligations associated with PCBs, mineral oil, storage tanks, treated poles, lithium batteries, mercury and street lighting lamps. The electric and common general AROs include small obligations related to storage tanks and office buildings. These assets have numerous in-service dates for which it is difficult to assign the obligation to a particular year. Therefore, the obligation was measured using an average service life.

In December 2014, the EPA issued a pre-publication version of a final rule imposing requirements for activities involving coal ash waste. The ruling, once effective, will not result in the creation of a new legal obligation or impact NSP-Wisconsin’s estimated cash flows for the closure of coal ash landfills and impoundments.

A reconciliation of NSP-Wisconsin’s AROs for the years ended Dec. 31, 2014 and 2013 is as follows:
(Thousands of Dollars)
 
Beginning Balance
Jan. 1, 2014
 
Liabilities Recognized
 
Accretion
 
Cash Flow Revisions
 
Ending Balance
Dec. 31, 2014 (a)
Electric plant
 
 
 
 
 
 
 
 
 
 
Steam production asbestos
 
$
2,005

 
$

 
$
44

 
$

 
$
2,049

Steam and other production ash containment
 
361

 

 
13

 

 
374

Electric distribution
 
36

 

 
1

 

 
37

Other
 
289

 
113

 
10

 

 
412

Natural gas plant
 
 
 
 
 
 
 
 
 
 
Gas distribution
 
75

 
402

 
5

 
5,645

 
6,127

Common and other property
 
 
 
 
 
 
 
 
 
 
Common miscellaneous
 
87

 

 
3

 
1

 
91

Total liability (b)
 
$
2,853

 
$
515

 
$
76

 
$
5,646

 
$
9,090

(Thousands of Dollars)
 
Beginning Balance
Jan. 1, 2013
 
Liabilities Recognized
 
Accretion
 
Cash Flow Revisions
 
Ending Balance
Dec. 31, 2013 (a)
Electric plant
 
 
 
 
 
 
 
 
 
 
Steam production asbestos
 
$
1,962

 
$

 
$
43

 
$

 
$
2,005

Steam and other production ash containment
 
125

 

 
12

 
224

 
361

Electric distribution
 
13

 

 
1

 
22

 
36

Other
 
826

 

 
20

 
(557
)
 
289

Natural gas plant
 
 
 
 
 
 
 
 
 
 
Gas distribution
 
75

 

 
5

 
(5
)
 
75

Common and other property
 
 
 
 
 
 
 
 
 
 
Common miscellaneous
 
35

 

 
3

 
49

 
87

Total liability (b)
 
$
3,036

 
$

 
$
84

 
$
(267
)
 
$
2,853


(a) 
There were no ARO liabilities settled during the years ended Dec. 31, 2014 or 2013.
(b) 
Included in the other long-term liabilities balance in the consolidated balance sheets.

Removal Costs NSP-Wisconsin records a regulatory liability for the plant removal costs of generation, transmission and distribution facilities that are recovered currently in rates. Generally, the accrual of future non-ARO removal obligations is not required. However, long-standing ratemaking practices approved by applicable state and federal regulatory commissions have allowed provisions for such costs in historical depreciation rates. These removal costs have accumulated over a number of years based on varying rates as authorized by the appropriate regulatory entities. Given the long time periods over which the amounts were accrued and the changing of rates over time, NSP-Wisconsin has estimated the amount of removal costs accumulated through historic depreciation expense based on current factors used in the existing depreciation rates. Accordingly, the recorded amounts of estimated future removal costs are considered regulatory liabilities. Removal costs as of Dec. 31, 2014 and 2013 were $123 million and $116 million, respectively.

Legal Contingencies

NSP-Wisconsin is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on NSP-Wisconsin’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.

Other Contingencies

See Note 10 for further discussion.