Commitments and Contingencies
6 Months Ended
Jun. 30, 2014
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies

Except to the extent noted below and in Note 5, the circumstances set forth in Notes 12, 13 and 14 to the consolidated financial statements included in Xcel Energy Inc.’s Annual Report on Form 10-K for the year ended Dec. 31, 2013, appropriately represent, in all material respects, the current status of commitments and contingent liabilities, including those regarding public liability for claims resulting from any nuclear incident, and are incorporated herein by reference. The following include commitments, contingencies and unresolved contingencies that are material to Xcel Energy’s financial position.

Purchased Power Agreements (PPAs)

Under certain PPAs, NSP-Minnesota, PSCo and SPS purchase power from independent power producing entities for which the utility subsidiaries are required to reimburse natural gas or biomass fuel costs, or to participate in tolling arrangements under which the utility subsidiaries procure the natural gas required to produce the energy that they purchase. These specific PPAs create a variable interest in the associated independent power producing entity.

The Xcel Energy utility subsidiaries had approximately 3,698 MW and 3,338 MW of capacity under long-term PPAs as of June 30, 2014 and Dec. 31, 2013, respectively, with entities that have been determined to be variable interest entities. Xcel Energy has concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities’ economic performance. These agreements have expiration dates through 2033.

Guarantees and Indemnifications

Xcel Energy Inc. and its subsidiaries provide guarantees and bond indemnities under specified agreements or transactions. The guarantees and bond indemnities issued by Xcel Energy Inc. guarantee payment or performance by its subsidiaries. As a result, Xcel Energy Inc.’s exposure under the guarantees and bond indemnities is based upon the net liability of the relevant subsidiary under the specified agreements or transactions. Most of the guarantees and bond indemnities issued by Xcel Energy Inc. and its subsidiaries limit the exposure to a maximum amount stated in the guarantees and bond indemnities. As of June 30, 2014 and Dec. 31, 2013, Xcel Energy Inc. and its subsidiaries had no assets held as collateral related to their guarantees, bond indemnities and indemnification agreements.

The following table presents guarantees and bond indemnities issued and outstanding for Xcel Energy Inc.:
(Millions of Dollars)
 
June 30, 2014
 
Dec. 31, 2013
Guarantees issued and outstanding
 
$
14.6

 
$
19.4

Current exposure under these guarantees
 
0.2

 
0.3

Bonds with indemnity protection
 
32.5

 
32.1



Indemnification Agreements

In connection with the sale of certain Texas electric transmission assets to Sharyland Distribution and Transmission Services, LLC in 2013, SPS agreed to indemnify the purchaser for losses arising out of any breach of the representations, warranties and covenants under the related asset purchase agreement and for losses arising out of certain other matters, including pre-closing liabilities. SPS’ indemnification obligation is capped at $37.1 million, in the aggregate. The indemnification provisions for most representations and warranties expire in December 2014. The remaining representations and warranties, which relate to due organization and transaction authorization, survive indefinitely. As of June 30, 2014 and Dec. 31, 2013, SPS has recorded a $0.4 million liability related to this indemnity.

Xcel Energy Inc. and its subsidiaries provide indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, as well as breaches of representations and warranties, including corporate existence, transaction authorization and income tax matters with respect to assets sold. Xcel Energy Inc.’s and its subsidiaries’ obligations under these agreements may be limited in terms of duration and amount. The maximum potential amount of future payments under these indemnifications cannot be reasonably estimated as the obligated amounts of these indemnifications often are not explicitly stated.

Environmental Contingencies

Ashland Manufactured Gas Plant (MGP) Site — NSP-Wisconsin has been named a potentially responsible party (PRP) for contamination at a site in Ashland, Wis. The Ashland/Northern States Power Lakefront Superfund Site (the Ashland site) includes property owned by NSP-Wisconsin, which was a site previously operated by a predecessor company as a MGP facility (the Upper Bluff), and two other properties: an adjacent city lakeshore park area (Kreher Park), on which an unaffiliated third party previously operated a sawmill and conducted creosote treating operations; and an area of Lake Superior’s Chequamegon Bay adjoining the park (the Sediments).

The U.S. Environmental Protection Agency (EPA) issued its Record of Decision (ROD) in 2010, which describes the preferred remedy the EPA has selected for the cleanup of the Ashland site. For the Sediments at the Ashland Site, the ROD preferred remedy is a hybrid remedy involving both dry excavation and wet conventional dredging methodologies (the Hybrid Remedy). The ROD also identifies the possibility of a wet conventional dredging only remedy for the Sediments (the Wet Dredge), contingent upon the completion of a successful Wet Dredge pilot study.

In 2011, the EPA issued special notice letters identifying several entities, including NSP-Wisconsin, as PRPs, for future remediation at the Ashland site. The special notice letters requested that those PRPs participate in negotiations with the EPA regarding how the PRPs intended to conduct or pay for the remediation at the Ashland site. As a result of settlement negotiations with NSP-Wisconsin, the EPA agreed to segment the Ashland site into separate areas. The first area (Phase I Project Area) includes soil and groundwater in Kreher Park and the Upper Bluff. The second area includes the Sediments.

In October 2012, a settlement among the EPA, the Wisconsin Department of Natural Resources, the Bad River and Red Cliff Bands of the Lake Superior Tribe of Chippewa Indians and NSP-Wisconsin was approved by the U.S. District Court for the Western District of Wisconsin. This settlement resolves claims against NSP-Wisconsin for its alleged responsibility for the remediation of the Phase I Project Area. Under the terms of the settlement, NSP-Wisconsin agreed to perform the remediation of the Phase I Project Area, but does not admit any liability with respect to the Ashland site. The settlement reflects a cost estimate for the cleanup of the Phase I Project Area of $40 million. Demolition activities occurred at the Ashland site in 2013. The final design for the soil, including excavation and treatment, as well as containment wall remedies was submitted to the EPA in April 2014 and work commenced in May 2014. A preliminary design for the groundwater remedy was also submitted to the EPA in April 2014 and those activities are expected to commence in 2015. Based on these updated designs, the updated cost estimate for the cleanup of the Phase I Project Area is approximately $52 million, of which $12 million has already been spent. The settlement also resolves claims by the federal, state and tribal trustees against NSP-Wisconsin for alleged natural resource damages at the Ashland site, including both the Phase I Project Area and the Sediments. As part of the settlement, NSP-Wisconsin has conveyed approximately 1,390 acres of land to the State of Wisconsin and tribal trustees. Fieldwork to address the Phase I Project Area at the Ashland site began at the end of 2012 and continues.

Negotiations are ongoing between the EPA and NSP-Wisconsin regarding who will pay for or perform the cleanup of the Sediments and what remedy will be implemented at the site to address the Sediments. In August and September 2013, NSP-Wisconsin performed field studies in the Sediments to gather more data about site conditions. The data from that investigation was received and reported to the EPA at the end of 2013. It is NSP-Wisconsin’s view that this data demonstrates the Hybrid Remedy is not safe or feasible to implement. The EPA’s ROD for the Ashland site includes estimates that the cost of the Hybrid Remedy is between $63 million and $77 million, with a potential deviation in such estimated costs of up to 50 percent higher to 30 percent lower. Also, in September 2013, the EPA requested NSP-Wisconsin consider re-submitting another proposal to perform a Wet Dredge pilot study for a portion of the Sediments. NSP-Wisconsin previously submitted a proposal for a Wet Dredge pilot study in 2011. In November 2013, NSP-Wisconsin submitted a revised Wet Dredge pilot study work plan proposal to the EPA. In May 2014, NSP-Wisconsin entered into a final administrative order on consent for the Wet Dredge pilot study with the EPA. Implementation of the pilot is anticipated in late summer or early fall of 2014.

In August 2012, NSP-Wisconsin also filed litigation against other PRPs for their share of the cleanup costs for the Ashland site. Trial for this matter is scheduled for April 2015. Negotiations between the EPA, NSP-Wisconsin and several of the other PRPs regarding the PRPs’ fair share of the cleanup costs for the Ashland site are also ongoing.

At June 30, 2014 and Dec. 31, 2013, NSP-Wisconsin had recorded a liability of $113.3 million and $104.6 million, respectively, for the Ashland site based upon potential remediation and design costs together with estimated outside legal and consultant costs; of which $33.4 million and $25.2 million, respectively, was considered a current liability. NSP-Wisconsin’s potential liability, the actual cost of remediation and the time frame over which the amounts may be paid are subject to change. NSP-Wisconsin also continues to work to identify and access state and federal funds to apply to the ultimate remediation cost of the entire site. Unresolved issues or factors that could result in higher or lower NSP-Wisconsin remediation costs for the Ashland site include the cleanup approach implemented for the Sediments, which party implements the cleanup, the timing of when the cleanup is implemented, potential contributions by other PRPs and whether federal or state funding may be directed to help offset remediation costs at the Ashland site.

NSP-Wisconsin has deferred the estimated site remediation costs, as a regulatory asset, based on an expectation that the PSCW will continue to allow NSP-Wisconsin to recover payments for environmental remediation from its customers. The PSCW has consistently authorized in NSP-Wisconsin rates recovery of all remediation costs incurred at the Ashland site, and has authorized recovery of MGP remediation costs by other Wisconsin utilities. External MGP remediation costs are subject to deferral in the Wisconsin retail jurisdiction and are reviewed for prudence as part of the Wisconsin retail rate case process. Under an existing PSCW policy, utilities have recovered remediation costs for MGPs in natural gas rates, amortized over a four- to six-year period. The PSCW historically has not allowed utilities to recover their carrying costs on unamortized regulatory assets for MGP remediation.

In the 2013 rate case decision, the PSCW recognized the potential magnitude of the future liability for the cleanup at the Ashland site and granted an exception to its existing policy at the request of NSP-Wisconsin. The elements of this exception include: (1) approval to begin recovery of estimated Phase 1 Project costs beginning on Jan. 1, 2013; (2) approval to amortize these estimated costs over a ten-year period; and (3) approval to apply a three percent carrying cost to the unamortized regulatory asset. In the 2014 rate case decision, the PSCW continued the cost recovery treatment established in the 2013 rate case, with respect to the 2013 and 2014 cleanup costs for the Phase I Project Area. The PSCW determined the timing of the cleanup of the Sediments was uncertain and declined NSP-Wisconsin’s request to begin cost recovery for this portion of the cleanup in 2014 rates. However, the PSCW allowed NSP-Wisconsin to increase its 2014 amortization expense related to the cleanup by an additional $1.1 million to offset the need for a rate decrease for the natural gas utility. The cost recovery treatment granted by the PSCW in the 2013 and 2014 rate cases will help mitigate the rate impact to natural gas customers and the risk to NSP-Wisconsin from a longer amortization period.

Environmental Requirements

Water and waste
Federal Clean Water Act (CWA) Effluent Limitations Guidelines (ELG) — In June 2013, the EPA published a proposed ELG rule for power plants that use coal, natural gas, oil or nuclear materials as fuel and discharge treated effluent to surface waters as well as utility-owned landfills that receive coal combustion residuals. The final rule is now expected in September 2015. Under the current proposed rule, facilities would need to comply as soon as possible after July 2017 but no later than July 2022. The impact of this rule on Xcel Energy is uncertain at this time.

Federal CWA Section 316 (b) — The federal CWA requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing adverse environmental impacts to aquatic species. In 2011, the EPA published the proposed rule that sets standards for minimization of aquatic species impingement, but leaves entrainment reduction requirements at the discretion of the permit writer and the regional EPA office. A final rule was signed by the EPA in May 2014. NSP-Minnesota service territories will be the most impacted by the requirements. The timing of compliance with the requirements will vary from plant-to-plant since the new rules do not have a final compliance deadline. Since some of the compliance requirements depend on site-specific determinations by state regulators, the exact cost is somewhat uncertain. Xcel Energy estimates the most likely cost for compliance is approximately $48 million with the majority needed for compliance in NSP-Minnesota. Xcel Energy anticipates these costs will be fully recoverable in rates.

Federal CWA Waters of the United States Rule — In April 2014, the EPA and the U.S. Army Corps of Engineers issued a proposed rule that significantly expands the types of water bodies regulated under the CWA. If finalized as proposed, this rule could delay the siting of new pipelines, transmission lines and distribution lines, increase project costs and expand permitting and reporting requirements. The ultimate impact of the proposed rule will depend on the specific requirements of the final rule and cannot be determined at this time. A final rule is not anticipated before the first quarter of 2015.

Air
EPA Greenhouse Gas (GHG) Permitting — In 2011, new EPA permitting requirements became effective for GHG emissions of new and modified large stationary sources, which were applicable to the construction of new power plants or power plant modifications that increase emissions above a certain threshold. These rules were upheld by the United States Court of Appeals for the District of Columbia Circuit (D.C. Circuit), but in June 2014 the U.S. Supreme Court reversed the EPA’s GHG emission thresholds for this program. The Supreme Court decided the EPA could not adopt GHG thresholds that would require permitting for new and modified large stationary sources. However, the Supreme Court also decided if a new or modified stationary source becomes subject to the permitting requirements by exceeding emission thresholds for other pollutants, then GHG emissions may be evaluated as part of the permitting process. Xcel Energy is unable to determine the cost of compliance with these new EPA requirements as it is not clear whether these requirements will apply to future changes at Xcel Energy’s power plants.

GHG Emission Standard for Existing Sources — In June 2014, the EPA published its proposed rule on GHG emission standards for existing power plants. Comments are due to the EPA on Oct. 16, 2014 and a final rule is anticipated in June 2015. Following adoption of the final rule, states must develop implementation plans by June 2016, with the possibility of an extension to June 2017 (June 2018 if submitting a joint plan with other states). Among other things, the proposed rule would require that state plans include enforceable measures to ensure emissions from existing power plants in the state achieve the EPA’s state-specific interim (2020-2029) and final (2030 and thereafter) emission performance targets. The plan will likely require additional emission reductions in states in which Xcel Energy operates. It is not possible to evaluate the impact of existing source standards until the EPA promulgates a final rule and states have adopted their applicable state plans.

GHG New Source Performance Standard (NSPS) Proposal — In January 2014, the EPA re-proposed a GHG NSPS for newly constructed power plants which would set performance standards (maximum carbon dioxide emission rates) for coal- and natural gas-fired power plants. For coal power plants, the NSPS requires an emissions level equivalent to partial carbon capture and storage (CCS) technology; for gas-fired power plants, the NSPS reflects emissions levels from combined cycle technology with no CCS. The EPA continues to propose that the NSPS not apply to modified or reconstructed existing power plants. In addition, installation of control equipment on existing plants would not constitute a “modification” to those plants under the NSPS program. It is not possible to evaluate the impact of the re-proposed NSPS until its final requirements are known.

GHG NSPS for Modified and Reconstructed Power Plants — In June 2014, the EPA published a proposed NSPS that would apply to GHG emissions from power plants that are modified or reconstructed. Comments are due to the EPA on Oct. 16, 2014 and a final rule is anticipated in June 2015. A modification is a change to an existing source that increases the maximum achievable hourly rate of emissions. A reconstruction involves the replacement of components at a unit to the extent that the capital cost of the new components exceeds 50 percent of the capital cost of an entirely new comparable unit. The proposed standards are not based on and would not require installation of CCS technology. Instead, the proposed standard for coal-fired power plants would require a combination of best operating practices and equipment upgrades. The proposal for gas-fired power plants would require emissions standards based on efficient combined cycle technology. It is not possible to evaluate the impact of these proposed standards until the final requirements are known. In addition, it is not clear whether these requirements, once adopted, would apply to future changes at Xcel Energy’s power plants.

Cross-State Air Pollution Rule (CSAPR) — In 2011, the EPA issued the CSAPR to address long range transport of particulate matter (PM) and ozone by requiring reductions in sulfur dioxide (SO2) and nitrous oxide (NOx) from utilities in the eastern half of the United States. For Xcel Energy, the rule would apply in Minnesota, Wisconsin and Texas. The CSAPR would set more stringent requirements than the proposed Clean Air Transport Rule and require plants in Texas to reduce their SO2 and annual NOx emissions. The rule would also create an emissions trading program.

In August 2012, the D.C. Circuit vacated the CSAPR and remanded it back to the EPA. The D.C. Circuit stated the EPA must continue administering the Clean Air Interstate Rule (CAIR) pending adoption of a valid replacement. In April 2014, the U.S. Supreme Court reversed and remanded the case to the D.C. Circuit. The Supreme Court held that the EPA’s rule design did not violate the Clean Air Act (CAA) and that states had received adequate opportunity to develop their own plans. Because the D.C. Circuit overturned the CSAPR on two over-arching issues, there are many other issues the D.C. Circuit did not rule on that will now need to be considered on remand. In June 2014, the EPA filed a motion with the D.C. Circuit asking it to lift the stay of the CSAPR. The EPA requested CSAPR’s 2012 compliance obligations be imposed starting in January 2015. The D.C. Circuit has not yet ruled on the motion to lift the stay. Because it is not yet known how the litigation over the remaining issues will be resolved or how the D.C. Circuit will rule on the motion to lift the stay, it is not yet known what requirements may be imposed in the future, or their timing.

As the EPA continues administering the CAIR while the CSAPR or a replacement rule is pending, Xcel Energy expects to comply with the CAIR as described below.

CAIR — In 2005, the EPA issued the CAIR to further regulate SO2 and NOx emissions. The CAIR applies to Texas and Wisconsin. The CAIR does not currently apply to Minnesota.

Under the CAIR’s cap and trade structure, companies can comply through capital investments in emission controls or purchase of emission allowances from other utilities making reductions on their systems. NSP-Wisconsin purchased allowances in 2012 and 2013 and plans to continue to purchase allowances in 2014 to comply with the CAIR. In the SPS region, installation of low-NOx combustion control technology was completed in 2012 on Tolk Unit 1 and in 2014 on Tolk Unit 2. These installations will reduce or eliminate SPS’ need to purchase NOx emission allowances. SPS had sufficient SO2 allowances to comply with the CAIR in 2013 and has sufficient allowances through 2015. At June 30, 2014, the estimated annual CAIR NOx allowance cost for Xcel Energy did not have a material impact on the results of operations, financial position or cash flows.

Regional Haze Rules — The regional haze program is designed to address widespread, regionally homogeneous haze that results from emissions from a multitude of sources. In 2005, the EPA amended the best available retrofit technology (BART) requirements of its regional haze rules, which require the installation and operation of emission controls for industrial facilities emitting air pollutants that reduce visibility in certain national parks and wilderness areas. In their first regional haze state implementation plan (SIP), Colorado, Minnesota and Texas identified the Xcel Energy facilities that will have to reduce SO2, NOx and PM emissions under BART and set emissions limits for those facilities.

PSCo
In 2011, the Colorado Air Quality Control Commission approved a SIP (the Colorado SIP) that included the CACJA emission reduction plan as satisfying regional haze requirements for the facilities included in the CACJA plan. In addition, the Colorado SIP included a BART determination for Comanche Units 1 and 2. The EPA approved the Colorado SIP in 2012. Emission controls at the Hayden and Pawnee plants are projected to cost $359.7 million and are expected to be installed between 2014 and 2017. PSCo anticipates these costs will be fully recoverable in rates.

In March 2013, WildEarth Guardians petitioned the U.S. Court of Appeals for the 10th Circuit to review the EPA’s decision approving the Colorado SIP. WildEarth Guardians has stated it will challenge the BART determination made for Comanche Units 1 and 2. In comments before the EPA, WildEarth Guardians urged that current emission limitations be made more stringent or that selective catalytic reduction (SCR) be added to the units. PSCo intervened in the case. The 10th Circuit is anticipated to hear argument in January 2015, following completion of the briefs in November 2014.

In 2010, two environmental groups petitioned the U.S. Department of the Interior (DOI) to certify that 12 coal-fired boilers and one coal-fired cement kiln in Colorado are contributing to visibility problems in Rocky Mountain National Park. The following PSCo plants are named in the petition: Cherokee, Hayden, Pawnee and Valmont. The groups allege the Colorado BART rule is inadequate to satisfy the CAA mandate of ensuring reasonable further progress towards restoring natural visibility conditions in the park. It is not known when the DOI will rule on the petition.

NSP-Minnesota
In 2009, the Minnesota Pollution Control Agency (MPCA) approved a SIP (the Minnesota SIP) and submitted it to the EPA for approval. The MPCA’s source-specific BART limits for Sherco Units 1 and 2 require combustion controls for NOx and scrubber upgrades for SO2. The MPCA concluded SCRs should not be required because the minor visibility benefits derived from SCRs do not outweigh the substantial costs. The combustion controls have been installed and the scrubber upgrades, to be completed by January 2015, are underway. These emission controls are projected to cost approximately $50 million, of which $44.4 million has already been spent. NSP-Minnesota anticipates these costs will be fully recoverable in rates.

After the CSAPR was adopted in 2011, the MPCA supplemented its Minnesota SIP, determining that CSAPR meets BART requirements, but also implementing its source-specific BART determination for Sherco Units 1 and 2 from the 2009 Minnesota SIP. In June 2012, the EPA approved the Minnesota SIP for electric generating units (EGUs) and also approved the source-specific emission limits for Sherco Units 1 and 2 as strengthening the Minnesota SIP, but avoided characterizing them as BART limits.

In August 2012, the National Parks Conservation Association, Sierra Club, Voyageurs National Park Association, Friends of the Boundary Waters Wilderness, Minnesota Center for Environmental Advocacy and Fresh Energy appealed the EPA’s approval of the Minnesota SIP to the U.S. Court of Appeals for the Eighth Circuit (Eighth Circuit). NSP-Minnesota and other regulated parties were denied intervention. In June 2013, the Eighth Circuit ordered this case to be held in abeyance until the U.S. Supreme Court decided the CSAPR case. It is not yet known how the U.S. Supreme Court’s April 2014 decision on the CSAPR, or the EPA’s June 2014 motion requesting the D.C. Circuit lift its stay of the CSAPR, will impact the Eighth Circuit’s proceedings on the Minnesota SIP. Since the Court’s ruling on CSAPR, the parties to this case have filed motions that continue to hold the case in abeyance while they determine how to proceed. The Eighth Circuit granted these motions and the case is in abeyance until at least Aug. 15, 2014. If this litigation ultimately results in further EPA proceedings concerning the Minnesota SIP, such proceedings may consider whether SCRs should be required for Sherco Units 1 and 2.

SPS
Harrington Units 1 and 2 are potentially subject to BART. Texas developed a SIP (the Texas SIP) that finds the CAIR equal to BART for EGUs. As a result, no additional controls beyond CAIR compliance would be required. In May 2012, the EPA deferred its review of the Texas SIP in its final rule allowing states to find that CSAPR compliance meets BART requirements for EGUs. It is not yet known how the U.S. Supreme Court’s April 2014 decision on the CSAPR, or the EPA’s June 2014 motion requesting the D.C. Circuit lift its stay of the CSAPR, may impact the EPA’s approval of the BART requirements in the Texas SIP.

In May 2014, the EPA issued a request for information under the CAA related to SO2 control equipment at Tolk Units 1 and 2. The EPA stated it is conducting an analysis of the cost and feasibility of SO2 controls on certain sources, including the Tolk facility, as part of its review of the Texas SIP. The EPA has preliminarily identified Tolk as a contributor to haze in the Wichita Mountains Wildlife Refuge in Oklahoma, and is planning further analysis of SO2 control options. The EPA plans to make a proposal in November 2014 that could include SO2 emission controls at Tolk and anticipates issuing a final decision in August 2015. The costs and timing of potential additional SO2 controls at Tolk are dependent on the EPA’s proposal and final decision, neither of which is yet known.

Reasonably Attributable Visibility Impairment (RAVI) RAVI is intended to address observable impairment from a specific source such as distinct, identifiable plumes from a source’s stack to a national park. In 2009, the DOI certified that a portion of the visibility impairment in Voyageurs and Isle Royale National Parks is reasonably attributable to emissions from NSP-Minnesota’s Sherco Units 1 and 2. The EPA is required to make its own determination whether there is RAVI-type impairment in these parks and examine which sources may cause or contribute to any RAVI impact that is identified. After studying the national parks and evaluating multiple sources, if the EPA finds that Sherco Units 1 and 2 cause or contribute to RAVI in the national parks, the EPA would then evaluate whether the level of controls required by the MPCA is appropriate. The EPA has stated it plans to issue a separate notice on the issue of BART for Sherco Units 1 and 2 under the RAVI program.

In December 2012, a lawsuit against the EPA was filed in the U.S. District Court for the District of Minnesota by the following organizations: National Parks Conservation Association, Minnesota Center for Environmental Advocacy, Friends of the Boundary Waters Wilderness, Voyageurs National Park Association, Fresh Energy and Sierra Club. The lawsuit alleges the EPA has failed to perform a nondiscretionary duty to determine BART for Sherco Units 1 and 2 under the RAVI program. The EPA filed an answer denying the allegations. The District Court denied NSP-Minnesota’s motion to intervene in July 2013. NSP-Minnesota appealed this decision to the Eighth Circuit, which on July 23, 2014, reversed the District Court and found that NSP-Minnesota has standing and a right to intervene.

In June 2014, the EPA and the plaintiffs lodged a consent decree with the District Court. The consent decree recites it will be subject to public comment. The EPA will then evaluate comments and determine whether to enter the consent decree with the District Court. The consent decree establishes a schedule whereby the EPA would issue a proposal on Feb. 27, 2015, determining whether visibility impairment in the national parks is reasonably attributable to Sherco Units 1 and 2. If the EPA determines that it is, the consent decree requires the EPA to make a final RAVI BART determination for these units by Aug. 31, 2015. If the EPA determines that it is not, the EPA would not determine BART for Sherco Units 1 and 2. NSP-Minnesota will contest the proposed consent decree and object to its entry given NSP-Minnesota’s right to intervene in the litigation and thus participate in the negotiation of any purported settlement of the case.

Legal Contingencies

Xcel Energy is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on Xcel Energy’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.

Employment, Tort and Commercial Litigation

Merricourt Wind Project Litigation — In April 2011, NSP-Minnesota terminated its agreements with enXco Development Corporation (enXco) for the development of a 150 MW wind project in southeastern North Dakota. NSP-Minnesota’s decision to terminate the agreements was based in large part on the adverse impact this project could have on endangered or threatened species protected by federal law and the uncertainty in cost and timing in mitigating this impact. NSP-Minnesota also terminated the agreements due to enXco’s nonperformance of certain other conditions, including failure to obtain a Certificate of Site Compatibility and the failure to close on the contracts by an agreed upon date of March 31, 2011. NSP-Minnesota recorded a $101 million deposit in the first quarter of 2011, which was collected in April 2011. In May 2011, NSP-Minnesota filed a declaratory judgment action in the U.S. District Court in Minnesota to obtain a determination that it acted properly in terminating the agreements. enXco also filed a separate lawsuit in the same court seeking approximately $240 million for an alleged breach of contract. NSP-Minnesota believes enXco’s lawsuit is without merit. In October 2012, NSP-Minnesota filed a motion for summary judgment. In April 2013, the U.S. District Court granted NSP-Minnesota’s motion and entered judgment in its favor. In April 2013, enXco filed a notice of appeal to the Eighth Circuit. In July 2014, the Eighth Circuit issued a decision that affirmed the U.S. District Court’s dismissal of the lawsuit filed by enXco. It is uncertain at this time whether enXco will challenge this decision. Although Xcel Energy believes the likelihood of loss is remote based on existing case law and the U.S. District Court’s April 2013 decision, it is not possible to estimate the amount or range of reasonably possible loss in the event of an adverse outcome of this matter. No accrual has been recorded for this matter.

Exelon Wind (formerly John Deere Wind) Complaint  Several lawsuits in Texas state and federal courts and regulatory proceedings have arisen out of a dispute concerning SPS’ payments for energy and capacity produced from the Exelon Wind subsidiaries’ projects. There are two main areas of dispute. First, Exelon Wind claims that it established legally enforceable obligations (LEOs) for each of its 12 wind facilities in 2005 through 2008 that require SPS to buy power based on SPS’ forecasted avoided cost as determined in 2005 through 2008. Although SPS has refused to accept Exelon Wind’s LEOs, SPS accepts that it must take energy from Exelon Wind under SPS’ PUCT-approved Qualifying Facilities (QF) Tariff. Second, Exelon Wind has raised various challenges to SPS’ PUCT-approved QF Tariff, which became effective in August 2010. The state and federal lawsuits and regulatory proceedings are in various stages of litigation, including a pending appeal by SPS in the Fifth Circuit Court of Appeals. SPS believes the likelihood of loss in these lawsuits and proceedings is remote based primarily on existing case law and while it is not possible to estimate the amount or range of reasonably possible loss in the event of an adverse outcome, SPS believes such loss would not be material based upon its belief that it would be permitted to recover such costs, if needed, through its various fuel clause mechanisms. No accrual has been recorded for this matter.

Pacific Northwest FERC Refund Proceeding — In July 2001, the FERC ordered a preliminary hearing to determine whether there were unjust and unreasonable charges for spot market bilateral sales in the Pacific Northwest for December 2000 through June 2001. PSCo supplied energy to the Pacific Northwest markets during this period and has been a participant in the hearings. In September 2001, the presiding ALJ concluded that prices in the Pacific Northwest during the referenced period were the result of a number of factors, including the shortage of supply, excess demand, drought and increased natural gas prices. Under these circumstances, the ALJ concluded that the prices in the Pacific Northwest markets were not unreasonable or unjust and no refunds should be ordered. Subsequent to the ruling, the FERC has allowed the parties to request additional evidence. Parties have claimed that the total amount of transactions with PSCo subject to refund is $34 million. In June 2003, the FERC issued an order terminating the proceeding without ordering further proceedings. Certain purchasers filed appeals of the FERC’s orders in this proceeding with the Ninth Circuit Court of Appeals (Ninth Circuit).

In an order issued in August 2007, the Ninth Circuit remanded the proceeding back to the FERC and indicated that the FERC should consider other rulings addressing overcharges in the California organized markets. The Ninth Circuit denied a petition for rehearing in April 2009, and the mandate was issued.

The FERC issued an order on remand establishing principles for the review proceeding in October 2011. In September 2012, the City of Seattle filed its direct case against PSCo and other Pacific Northwest sellers claiming refunds for the period January 2000 through June 2001. The City of Seattle indicated that for the period June 2000 through June 2001 PSCo had sales to the City of Seattle of approximately $50 million. The City of Seattle did not identify specific instances of unlawful market activity by PSCo, but rather based its claim for refunds on market dysfunction in the Western markets. PSCo submitted its answering case in December 2012.

In April 2013, the FERC issued an order on rehearing. The FERC confirmed that the City of Seattle would be able to attempt to obtain refunds back from January 2000, but reaffirmed the transaction-specific standard that the City of Seattle and other complainants would have to comply with to obtain refunds. In addition, the FERC rejected the imposition of any market-wide remedies. Although the FERC order on rehearing established the period for which the City of Seattle could seek refunds as January 2000 through June 2001, it is unclear what claim the City of Seattle has against PSCo prior to June 2000. In the proceeding, the City of Seattle does not allege specific misconduct or tariff violations by PSCo but instead asserts generally that the rates charged by PSCo and other sellers were excessive.

A hearing in this case was held before a FERC ALJ and concluded in October 2013. On March 28, 2014, the FERC ALJ issued an initial decision which rejected all of the City of Seattle’s claims against PSCo and other respondents. With respect to the period Jan. 1, 2000 through Dec. 24, 2000, the FERC ALJ rejected the City of Seattle’s assertion that any of the sales made to the City of Seattle resulted in an excessive burden to the City of Seattle, the applicable legal standard for the City of Seattle’s challenges during this period. With respect to the period Dec. 25, 2000 through June 20, 2001, the FERC ALJ concluded that the City of Seattle had failed to establish a causal link between any contracts and any claimed unlawful market activity, the standard required by the FERC in its remand order. The City of Seattle may contest the FERC ALJ’s initial decision by filing a brief on exceptions to the FERC.

Preliminary calculations of the City of Seattle’s claim for refunds from PSCo are approximately $28 million excluding interest. PSCo has concluded that a loss is reasonably possible with respect to this matter; however, given the surrounding uncertainties, PSCo is currently unable to estimate the amount or range of reasonably possible loss in the event of an adverse outcome of this matter. In making this assessment, PSCo considered two factors. First, not withstanding PSCo’s view that the City of Seattle has failed to apply the standard that the FERC has established in this proceeding, and the recognition that this case raises a novel issue and the FERC’s standard has been challenged on appeal to the Ninth Circuit, the outcome of such an appeal cannot be predicted with any certainty. Second, PSCo would expect to make equitable arguments against refunds even if the City of Seattle were to establish that it was overcharged for transactions. If a loss were sustained, PSCo would attempt to recover those losses from other PRPs. No accrual has been recorded for this matter.

Biomass Fuel Handling Reimbursement — NSP-Minnesota has a PPA through which it procures energy from Fibrominn, LLC (Fibrominn). Under this agreement, NSP-Minnesota is charged for certain costs of transporting biomass fuels that are delivered to Fibrominn’s generation facility.  Fibrominn has demanded additional cost reimbursement for certain transportation costs incurred since 2007, as well as reimbursement for similar costs in future periods. Fibrominn claims that it is entitled to reimbursement from NSP-Minnesota for past transportation costs of approximately $20 million. NSP-Minnesota has evaluated Fibrominn’s claim and based on the terms of the PPA with Fibrominn and its current understanding of the facts, NSP-Minnesota disputes the validity of Fibrominn’s claim, on the ground that, among other things, it seeks to impose contractual obligations on NSP-Minnesota that are neither supported by the terms nor the intent of the PPA. NSP-Minnesota has concluded that a loss is reasonably possible with respect to this matter; however, given the surrounding uncertainties, NSP-Minnesota is currently unable to determine the amount of reasonably possible loss. If a loss were sustained, NSP-Minnesota would attempt to recover these fuel-related costs in rates. No accrual has been recorded for this matter.

Nuclear Power Operations and Waste Disposal

Nuclear Waste Disposal Litigation — In 1998, NSP-Minnesota filed a complaint in the U.S. Court of Federal Claims against the United States requesting breach of contract damages for the DOE’s failure to begin accepting spent nuclear fuel by Jan. 31, 1998, as required by the contract between the United States and NSP-Minnesota. NSP-Minnesota sought contract damages in this lawsuit through Dec. 31, 2004. In September 2007, the court awarded NSP-Minnesota $116.5 million in damages. In August 2007, NSP-Minnesota filed a second complaint; this lawsuit claimed damages for the period Jan. 1, 2005 through Dec. 31, 2008.

In July 2011, the United States and NSP-Minnesota executed a settlement agreement resolving both lawsuits, providing an initial $100 million payment from the United States to NSP-Minnesota, and providing a method by which NSP-Minnesota can recover its spent fuel storage costs through 2013, estimated to be an additional $100 million. In January 2014, the United States proposed, and NSP-Minnesota accepted, an extension to the settlement agreement which will allow NSP-Minnesota to recover spent fuel storage costs through 2016. The extension does not address costs for used fuel storage after 2016; such costs could be the subject of future litigation. NSP-Minnesota has received a total of $181.9 million of settlement proceeds as of June 30, 2014. NSP-Minnesota’s next claim submission, in the amount of $33.6 million, was filed May 15, 2014, for costs incurred in 2013. The DOE has until Sept. 1, 2014 to accept or deny the claim, in whole or in part. Amounts received from the installments, except for approved reductions such as legal costs, will be subsequently returned to customers through a reduction of future rate increases or credited through another regulatory mechanism.