Regulatory Matters
9 Months Ended
Sep. 30, 2018
Regulated Operations [Abstract]  
Regulatory Matters

Note 13. Regulatory Matters

Regulatory Matters Involving Potential Loss Contingencies

As a result of issues generated in the ordinary course of business, the Companies are involved in various regulatory matters. Certain regulatory matters may ultimately result in a loss; however, as such matters are in an initial procedural phase, involve uncertainty as to the outcome of pending reviews or orders, and/or involve significant factual issues that need to be resolved, it is not possible for the Companies to estimate a range of possible loss. For matters for which the Companies cannot estimate a range of possible loss, a statement to this effect is made in the description of the matter. Other matters may have progressed sufficiently through the regulatory process such that the Companies are able to estimate a range of possible loss. For regulatory matters for which the Companies are able to reasonably estimate a range of possible losses, an estimated range of possible loss is provided, in excess of the accrued liability (if any) for such matters. Any estimated range is based on currently available information, involves elements of judgment and significant uncertainties and may not represent the Companies’ maximum possible loss exposure. The circumstances of such regulatory matters will change from time to time and actual results may vary significantly from the current estimate. For current matters not specifically reported below, management does not anticipate that the outcome from such matters would have a material effect on the Companies’ financial position, liquidity or results of operations.

FERC - Electric

Under the Federal Power Act, FERC regulates wholesale sales and transmission of electricity in interstate commerce by public utilities. Dominion Energy’s merchant generators sell electricity in the PJM, CAISO and ISO-NE wholesale markets, and to wholesale purchasers in the states of Virginia, North Carolina, Indiana, Connecticut, Tennessee, Georgia, California, South Carolina and Utah, under Dominion Energy’s market-based sales tariffs authorized by FERC or pursuant to FERC authority to sell as a qualified facility. Virginia Power purchases and, under its FERC market-based rate authority, sells electricity in the wholesale market. In addition, Virginia Power has FERC approval of a tariff to sell wholesale power at capped rates based on its embedded cost of generation. This cost-based sales tariff could be used to sell to loads within or outside Virginia Power’s service territory. Any such sales would be voluntary.

Rates

In April 2008, FERC granted an application for Virginia Power’s electric transmission operations to establish a forward-looking formula rate mechanism that updates transmission rates on an annual basis and approved an ROE effective as of January 1, 2008. The formula rate is designed to recover the expected revenue requirement for each calendar year and is updated based on actual costs. The FERC-approved formula method, which is based on projected costs, allows Virginia Power to earn a current return on its growing investment in electric transmission infrastructure.

In March 2010, Old Dominion Electric Cooperative and North Carolina Electric Membership Corporation filed a complaint with FERC against Virginia Power claiming, among other issues, that the incremental costs of undergrounding certain transmission line projects were unjust, unreasonable and unduly discriminatory or preferential and should be excluded from Virginia Power’s transmission formula rate. A settlement of the other issues raised in the complaint was approved by FERC in May 2012.

In March 2014, FERC issued an order excluding from Virginia Power’s transmission rates for wholesale transmission customers located outside Virginia the incremental costs of undergrounding certain transmission line projects. FERC found it is not just and reasonable for non-Virginia wholesale transmission customers to be allocated the incremental costs of undergrounding the facilities because the projects are a direct result of Virginia legislation and Virginia Commission pilot programs intended to benefit the citizens of Virginia. The order is retroactively effective as of March 2010 and will cause the reallocation of the costs charged to wholesale transmission customers with loads outside Virginia to wholesale transmission customers with loads in Virginia. FERC determined that there was not sufficient evidence on the record to determine the magnitude of the underground increment and held a hearing to determine the appropriate amount of undergrounding cost to be allocated to each wholesale transmission customer in Virginia.

In October 2017, FERC issued an order determining the calculation of the incremental costs of undergrounding the transmission projects and affirming that the costs are to be recovered from the wholesale transmission customers with loads located in Virginia. FERC directed Virginia Power to rebill all wholesale transmission customers retroactively to March 2010 within 30 days of when the proceeding becomes final and no longer subject to rehearing. In November 2017, Virginia Power, North Carolina Electric Membership Corporation and the wholesale transmission customers filed petitions for rehearing. In July 2018, FERC denied the rehearing requests related to the October 2017 order determining the calculation of the undergrounding costs. Several parties have appealed FERC’s decision to the U.S. Court of Appeals for the D.C. Circuit. This matter is pending. While Virginia Power cannot predict the outcome of the matter, it is not expected to have a material effect on results of operations.

PJM Transmission Rates

In April 2007, FERC issued an order regarding its transmission rate design for the allocation of costs among PJM transmission customers, including Virginia Power, for transmission service provided by PJM. For new PJM-planned transmission facilities that operate at or above 500 kV, FERC established a PJM regional rate design where customers pay according to each customer’s share of the region’s load. For recovery of costs of existing facilities, FERC approved the existing methodology whereby a customer pays the cost of facilities located in the same zone as the customer. A number of parties appealed the order to the U.S. Court of Appeals for the Seventh Circuit.

In August 2009, the court issued its decision affirming the FERC order with regard to the existing facilities, but remanded to FERC the issue of the cost allocation associated with the new facilities 500 kV and above for further consideration by FERC. On remand, FERC reaffirmed its earlier decision to allocate the costs of new facilities 500 kV and above according to the customer’s share of the region’s load. A number of parties filed appeals of the order to the U.S. Court of Appeals for the Seventh Circuit. In June 2014, the court again remanded the cost allocation issue to FERC. In December 2014, FERC issued an order setting an evidentiary hearing and settlement proceeding regarding the cost allocation issue. The hearing only concerns the costs of new facilities approved by PJM prior to February 1, 2013. Transmission facilities approved after February 1, 2013 are allocated on a hybrid cost allocation method approved by FERC and not subject to any court review.

In June 2016, PJM, the PJM transmission owners and state commissions representing substantially all of the load in the PJM market submitted a settlement to FERC to resolve the outstanding issues regarding this matter. In May 2018, FERC issued an order accepting the settlement agreement and directed PJM to make a compliance filing with revised tariff records. As a result, in August 2018, Virginia Power began to make payments to PJM, to continue for the next 10 years totaling $276 million, under the terms of revised tariff records, which is partially offset by a $265 million regulatory asset for the amount that will be recovered through retail rates in Virginia. At September 30, 2018, Virginia Power’s Consolidated Balance Sheet includes $170 million included in other current liabilities and $72 million included in other deferred credits and other liabilities.

FERC – Gas

DETI

In July 2017, FERC audit staff communicated to DETI that it had substantially completed an audit of DETI’s compliance with the accounting and reporting requirements of FERC’s Uniform System of Accounts and provided a description of matters and preliminary recommendations. In November 2017, the FERC audit staff issued its audit report, which could have the potential to result in adjustments which could be material to Dominion Energy’s and Dominion Energy Gas’ results of operations. In December 2017, DETI provided its response to the audit report. DETI requested FERC review of contested findings and submitted its plan for compliance with the uncontested portions of the report. In connection with one uncontested issue, DETI recognized a charge of $15 million ($9 million after-tax) recorded within other operations and maintenance expense in Dominion Energy’s and Dominion Energy Gas’ Consolidated Statements of Income during the second quarter of 2017 to write-off the balance of a regulatory asset, originally established in 2008, that is no longer considered probable of recovery. DETI recognized a charge of $129 million ($94 million after-tax) recorded primarily within other operations and maintenance expense in Dominion Energy and Dominion Energy Gas’ Consolidated Statements of Income during the second quarter of 2018 for a disallowance of plant, originally established beginning in 2012, in anticipation of resolution of one matter with FERC. Pending final resolution of the audit process and a determination by FERC, management is unable to estimate the potential impact of the remaining finding and no amounts have been recognized.

2017 Tax Reform Act

Subsequent to the enactment of the 2017 Tax Reform Act, the Companies’ state regulators issued orders requesting that public utilities evaluate the total tax impact on the entity’s cost of service and accrue a regulatory liability attributable to the benefits of the reduction in the corporate income tax rate. Certain of the orders requested that the public utilities submit a response to the state regulatory commissions detailing the total tax impact on the utility’s cost of service.

The Companies began to reserve the impacts of the cost-of-service reduction as regulatory liabilities in January 2018 and will continue until rates are reset pursuant to state regulators’ approvals. The Companies have recorded a reasonable estimate of net income taxes refundable through future rates in the jurisdictions in which they operate and are currently assessing these actions and decisions, which could have a material impact on the Companies’ results of operations, financial condition and/or cash flows.

In September 2018, the Virginia Commission issued an order directing Virginia Power to submit a filing quantifying the impacts of the 2017 Tax Reform Act in advance of the April 1, 2019 implementation as required by legislation. In October 2018, Virginia Power filed an application with the Virginia Commission to implement final adjustments in its base rates reflecting actual annual reductions in corporate income taxes resulting from the 2017 Tax Reform Act. The proposed annual revenue reduction is approximately $151 million effective April 2019. Additionally, Virginia Power proposed to issue a one-time bill credit to customers within 90 days of this effective date, to true-up the difference between the final revenue reduction for the period January 1, 2018 through March 31, 2019 and the $125 million interim rate reduction implemented on July 1, 2018. Based on Virginia Power’s proposed annual revenue reduction, this one-time bill credit is estimated to total approximately $95 million. The actual credit will be based on actual billing data and customer usage during that 15-month period. This matter is pending.

In August 2018, Virginia Power filed with FERC to waive protocols and begin reflecting projected tax reform benefits of approximately $100 million through the transmission formula rate prior to the normal formula rate process. FERC granted the waiver and the amounts will begin being reflected in customer billings in November 2018 and subsequently reflecting the adjustment effective January 1, 2018.

In October 2018, the North Carolina Utilities Commission issued an order requesting companies file to reduce base rates expeditiously. Virginia Power made its compliance filing in October 2018 and submitted an annual base rate revenue decrease of approximately $14 million effective in early 2019. Virginia Power also proposed to issue a one-time bill credit in early 2019 for its 2018 tax savings collected provisionally from customers, which is estimated to be approximately $13 million. The order allowed for the disposition of excess deferred income taxes to be deferred for consideration until the utilities’ next base rate case, but no longer than 3 years, and initiated a quarterly reporting requirement for such deferred amounts. This matter is pending.

In May 2018, the Utah Commission approved a stipulation submitted by Questar Gas proposing the cost-of-service component of customer rates be reduced by $15 million annually beginning in June 2018. In July 2018, the Utah Commission approved Questar Gas’ request to return an additional $9 million to Utah customers representing the amounts related to the corporate income tax reduction that had been deferred from January 1, 2018 to May 31, 2018.  This additional reduction began amortizing on August 1, 2018 and will be amortized over a one-year period. In October 2018, the Wyoming Commission approved Questar Gas’ request to return deferred amounts through a surcredit beginning November 1, 2018.  The surcredit will remain in effect until rates become effective in the next Wyoming general rate case. The impact of excess deferred income taxes resulting from the 2017 Tax Reform Act on rates charged to customers will be reported to the Utah and Wyoming Commissions by the first quarter of 2019.  

In October 2018, the Ohio Commission issued an order requiring rate-regulated utilities to file an application reflecting the impact of the 2017 Tax Reform Act on current rates by January 1, 2019. East Ohio is currently evaluating this order and plans to file an application in the fourth quarter of 2018.

As directed by the Public Service Commission of West Virginia, Hope is utilizing regulatory accounting to track the effects of the 2017 Tax Reform Act beginning in January 2018 and submitted testimony in July 2018 detailing such effects.  In August 2018, the Public Service Commission of West Virginia approved a settlement implementing base rate reductions effective September 1, 2018. These reductions are not expected to have a material impact on Hope’s financial condition.

In March 2018, FERC announced actions to address the income tax allowance component of regulated entities’ cost-of-service rates as a result of the 2017 Tax Reform Act. FERC issued a notice of proposed rulemaking introducing a process for determining whether jurisdictional natural gas pipelines may be collecting unjust and unreasonable rates as a result of the reduction in the corporate income tax rate. The proposed rule would require all interstate natural gas pipelines to make a one-time informational filing with FERC to provide financial information to allow FERC and other interested parties to analyze the impacts of the changes in tax law. The actions also included the reversal of FERC’s policy allowing master limited partnerships to recover an income tax allowance in cost-of-service rates and requiring other pass-through entities to justify the inclusion of an income tax allowance. FERC also issued a notice of inquiry seeking comments on whether it should take any additional actions to address changes in federal corporate income taxes, the elimination of an income tax allowance for master limited partnerships, excess or deficient accumulated deferred income taxes and bonus depreciation, among other items.  

In July 2018, FERC issued a final rule adopting and modifying the procedures for determining whether jurisdictional natural gas pipelines may be collecting unjust and unreasonable rates in light of the reduction in the corporate income tax rate. These procedures are generally the same as the proposals issued in March; however the final rule modifies the treatment of the income tax allowance for master limited partnerships and other pass-through entities in the informational filing. Specifically, this final rule does not require master limited partnerships to eliminate their income tax allowances when completing the informational filing, and allows entities that are wholly-owned by corporations to include an income tax allowance. Although the informational filing does not require the elimination of the income tax allowance for master limited partnerships, and provides options to master limited partnerships to address the income tax allowance that were previously unavailable including providing evidence that a double recovery of income taxes does not exist, there can be no assurance that master limited partnerships would be allowed to include an income tax allowance in the future.

Beginning in October 2018, Dominion Energy and Dominion Energy Gas have filed or expect to file the required informational reports with FERC indicating no changes to current rates charged to customers. Given the associated uncertainty, Dominion Energy and Dominion Energy Gas are currently unable to predict the outcome of these matters; however, any change in rates permitted to be charged to customers could have a material impact on results of operations, financial condition and/or cash flows.

Other Regulatory Matters

Other than the following matters, there have been no significant developments regarding the pending regulatory matters disclosed in Note 13 to the Consolidated Financial Statements in the Companies’ Annual Report on Form 10-K for the year ended December 31, 2017, as updated in Current Report on Form 8-K, filed June 6, 2018, and Note 13 to the Consolidated Financial Statements in the Companies’ Quarterly Report on Form 10-Q for the quarters ended March 31, 2018 and June 30, 2018.

Virginia Regulation

Virginia Fuel Expenses

In May 2018, Virginia Power filed its annual fuel factor with the Virginia Commission to recover an estimated $1.5 billion in Virginia jurisdictional projected fuel expenses for the rate year beginning July 1, 2018. Virginia Power’s proposed fuel rate represents a fuel revenue increase of $222 million when applied to projected kilowatt-hour sales for the period July 1, 2018 to June 30, 2019. In August 2018, the Virginia Commission approved Virginia Power’s fuel rate with an increase of $209 million.

Grid Transformation and Security Act of 2018

In March 2018, the Governor of Virginia signed into law legislation to reinstate base rate reviews on a triennial basis other than the first review, which will be a quadrennial review, occurring for Virginia Power in 2021 for the four successive 12-month test periods beginning January 1, 2017 and ending December 31, 2020. This review for Virginia Power will occur one year earlier than under the Regulation Act legislation enacted in February 2015.

 

In the triennial review proceedings, earnings that are more than 70 basis points above the utility’s authorized return on equity that might have been refunded to customers may be reduced by approved investment amounts in qualifying solar or wind generation facilities or electric distribution grid transformation projects that Virginia Power elects to include in a customer credit reinvestment offset. The legislation declares that electric distribution grid transformation projects are in the public interest and provides that the costs of such projects may be recovered through a rate adjustment clause if not the subject of a customer credit reinvestment offset. Any costs that are the subject of a customer credit reinvestment offset may not be recovered in base rates for the service life of the projects and may not be included in base rates in future triennial review proceedings.

 

The legislation also includes provisions requiring Virginia Power to provide current customers one-time rate credits totaling $200 million and to reduce base rates to reflect reductions in income tax expense resulting from the 2017 Tax Reform Act. As a result, Virginia Power incurred a $215 million ($160 million after-tax) charge in connection with this legislation, including the impact on certain non-jurisdictional customers which follow Virginia Power’s jurisdictional customer rate methodology. In July 2018, Virginia Power credited $138 million to current customers’ bills.

In addition, Virginia Power will reduce base rates on an annual basis by $125 million effective July 2018, to reflect the estimated effect of the 2017 Tax Reform Act, which is subject to adjustment in April 2019. In May and June 2018, Virginia Power submitted filings detailing the implementation plan for interim reductions in rates for generation and distribution services pursuant to the Grid Transformation and Security Act of 2018.

Rate Adjustment Clauses

Below is a discussion of significant riders associated with various Virginia Power projects:

The Virginia Commission previously approved Riders C1A and C2A in connection with cost recovery for DSM programs. In October 2018, Virginia Power requested approval to implement ten new energy efficiency programs and one new demand-response DSM program for five years, subject to future extensions, with a $262 million cost cap, and proposed a total $49 million revenue requirement for the rate year beginning July 1, 2019, which represents an $18 million increase over the previous year. This matter is pending.

The Virginia Commission previously approved Rider BW in conjunction with Brunswick County. In October 2018, Virginia Power proposed a $123 million revenue requirement for the rate year beginning September 1, 2019, which represents a $7 million increase over the previous year. This matter is pending.

The Virginia Commission previously approved Rider US-2 in conjunction with Scott Solar, Whitehouse, and Woodland. In October 2018, Virginia Power proposed a $16 million revenue requirement for the rate year beginning September 1, 2019, which represents a $3 million increase over the previous year. This matter is pending.

 

The Virginia Commission previously approved Rider T1 concerning transmission rates. In May 2018, Virginia Power proposed a $755 million total revenue requirement consisting of $468 million for the transmission component of Virginia Power’s base rates and $287 million for Rider T1. This total revenue requirement represents a $146 million increase versus the revenues to be produced during the rate year under current rates. In August 2018, the Virginia Commission approved a total revenue requirement of $630 million, including Rider T1, subject to true-up, for the rate year beginning September 1, 2018.  The Virginia Commission’s order required an adjustment to Rider T1 to begin providing projected benefits associated with the 2017 Tax Reform Act to customers in rates effective September 1, 2018. Such projected benefits were not included in the underlying transmission formula rates approved by FERC. Also in August 2018, Virginia Power filed a petition with the Virginia Commission seeking limited reconsideration and rehearing of this approval to adjust the total revenue requirement to $636 million. The reconsideration was granted and this matter is pending.

Coastal Virginia Offshore Wind Project

In August 2018, Virginia Power filed a petition with the Virginia Commission seeking a prudency determination as provided in the Grid Transformation and Security Act of 2018 with respect to the proposed Coastal Virginia Offshore Wind Project consisting of two 6 MW wind turbine generators located approximately 27 miles off the coast of Virginia Beach, Virginia in federal waters, and for a CPCN, if necessary, for the generation tie line connecting the generators to shore.  This project is expected to cost approximately $300 million and to be installed by the end of 2020. This matter is pending.

Electric Transmission Projects

In August 2018, Virginia Power filed an application with the Virginia Commission for a CPCN for a partial rebuild of 138 kV overhead transmission lines in Alleghany County, Virginia and Covington, Virginia. The total estimated cost of the project is approximately $15 million. This matter is pending.

In September 2018, the Virginia Commission granted Virginia Power a CPCN to rebuild and operate in Augusta County, Virginia approximately 18 miles of existing 500 kV transmission line between the Dooms substation and the Valley substation, along with associated substation work. The total estimated cost of the project is approximately $65 million.

In September 2018, the Virginia Commission granted Virginia Power a CPCN to build and operate in Fairfax County, Virginia approximately 4 miles of 230 kV transmission line between the Idylwood and Tysons substations, along with associated substation work. The total estimated cost of the project is approximately $125 million.

North Carolina Regulation

In August 2018, Virginia Power submitted its annual filing to the North Carolina Utilities Commission to adjust the fuel component of its electric rates. Virginia Power proposed a total $24 million increase to the fuel component of its electric rates for the rate year beginning February 1, 2019. As a mitigation alternative, Virginia Power proposed recovering 50% in the February 1, 2019 to the January 31, 2020 rate period and the remaining 50% in the following rate period. This case is pending.

 

Ohio Regulation  

East Ohio has approval for a UEX Rider through which it recovers the bad debt expense of most customers not participating in the PIPP Plus Program. The UEX Rider is adjusted annually to achieve dollar for dollar recovery of East Ohio’s actual write-offs of uncollectible amounts. In September 2018, the Ohio Commission approved East Ohio’s application requesting approval of its UEX Rider to reflect a refund of over-recovered accumulated bad debt expense of $11 million as of March 31, 2018, and recovery of prospective net bad debt expense projected to total $16 million for the twelve-month period from April 2018 to March 2019.

Utah and Wyoming Regulation

In October 2018, the Utah Commission denied Questar Gas’ request for pre-approval to construct an LNG peaking storage facility with a liquefaction rate of 8.2 million cubic feet per day. Questar Gas is reviewing the order and assessing its options, which include filing supplemental information with the Utah Commission for reconsideration.

In October 2018, Questar Gas submitted filings with both the Utah Commission and the Wyoming Commission for an approximately $48 million gas cost decrease reflecting forecasted decreases in commodity costs. The Utah Commission and the Wyoming Commission both approved the filings in October 2018 with rates effective November 2018.