Regulatory Assets and Liabilities (Tables)
12 Months Ended
Dec. 31, 2019
Regulated Operations [Abstract]  
Schedule of Regulatory Assets
Regulatory assets and liabilities include the following:
                 
At December 31,
 
2019
 
 
2018
 
(millions)
 
 
 
 
                 
Dominion Energy
 
 
 
   
 
Regulatory assets:
 
 
 
   
 
Deferred cost of fuel used in electric generation
(1)
 
$
48
 
  $
174
 
Deferred project costs and DSM programs for gas utilities
(2)
 
 
21
 
   
17
 
Unrecovered gas costs
(3)
 
 
102
 
   
14
 
Deferred rate adjustment clause costs for Virginia electric utility
(4)(5)
 
 
109
 
   
78
 
Deferred nuclear refueling outage costs
(6)
 
 
68
 
   
69
 
NND Project costs
(7)
 
 
138
 
   
 
PJM transmission rates
(8)
 
 
121
 
   
45
 
Other
 
 
272
 
   
99
 
Regulatory assets-current
 
 
879
 
   
496
 
Deferred cost of fuel used in electric generation
(1)
 
 
 
   
83
 
P
ension and other postretirement benefit costs
(9)
 
 
1,431
 
   
1,497
 
Deferred rate adjustment clause costs for Virginia electric utility
(4)(5)(10)
 
 
235
 
   
230
 
PJM transmission rates
(8)
 
 
85
 
   
192
 
Deferred project costs for gas utilities
(2)
 
 
521
 
   
335
 
Interest rate hedges
(11)
 
 
741
 
   
184
 
AROs and related funding
(12)
 
 
311
 
   
 
Cost of reacquired debt
(13)(14)
 
 
262
 
   
3
 
NND Project costs
(7)
 
 
2,503
 
   
 
Ash pond and landfill closure costs
(15)
 
 
1,016
 
   
27
 
Other
 
 
582
 
   
125
 
Regulatory assets-noncurrent
 
 
7,687
 
   
2,676
 
Total regulatory assets
 
$
8,566
 
  $
3,172
 
Regulatory liabilities:
 
 
 
   
 
Provision for future cost of removal and AROs
(16)
 
$
142
 
  $
117
 
Reserve for refunds and rate credits to electric utility customers
(17)
 
 
143
 
   
71
 
Cost-of-service
impact of 2017 Tax Reform Act
(18)
 
 
4
 
   
104
 
Income taxes refundable through future rates
(19)
 
 
77
 
   
 
Monetization of guarantee settlement
(20)
 
 
67
 
   
 
Other
 
 
64
 
   
64
 
Regulatory liabilities-current
 
 
497
 
   
356
 
Income taxes refundable through future rates
(19)
 
 
5,088
 
   
4,071
 
Provision for future cost of removal and AROs
(16)
 
 
2,302
 
   
1,409
 
Nuclear decommissioning trust
(21)
 
 
1,471
 
   
1,070
 
Monetization of guarantee settlement
(20)
 
 
970
 
   
 
Reserve for refunds and rate credits to electric utility customers
(17)
 
 
656
 
   
 
Overrecovered other postretirement benefit costs
(22)
 
 
189
 
   
120
 
Other
 
 
325
 
   
170
 
Regulatory liabilities-noncurrent
 
 
11,001
 
   
6,840
 
Total regulatory liabilities
 
$
11,498
 
  $
7,196
 
 
 
 
 
 
 
 (1)
Reflects deferred fuel expenses for the Virginia, North Carolina and South Carolina jurisdictions of Dominion Energy’s electric generation operations.
 
 
 
 
 
 (2)
Primarily reflects amounts expected to be collected from or owed to gas customers in Dominion Energy’s service territories associated with current and prospective rider projects, including CEP, PIR and pipeline integrity management. See Note 13 for more information.
 
 
 
 
 
 (3)
Reflects unrecovered or overrecovered gas costs at regulated gas operations, which are recovered or refunded through filings with the applicable regulatory authority.
 
 
 (4)
Reflects deferrals under Virginia Power’s electric transmission FERC formula rate and the deferral of costs associated with certain current and prospective rider projects, net of income taxes refundable from the 2017 Tax Reform Act for Virginia Power. See Note 13 for more information.
 
 
 
 
 
 (5)
As a result of actions from the Virginia Commission in the first quarter of 2019 regarding the ratemaking treatment of excess deferred taxes from the adoption of the 2017 Tax Reform Act for all existing rate adjustment clauses, Virginia Power recorded a $29 million ($22 million
after-tax)
charge in operating revenue in the Consolidated Statements of Income for amounts which are probable of being returned to customers.
 
 
 
 
 
 (6)
Legislation enacted in Virginia in April 2014 requires Virginia Power to defer operation and maintenance costs incurred in connection with the refueling of any nuclear-powered generating plant. These deferred costs will be amortized over the refueling cycle, not to exceed 18 months.
 
 
 
 
 
 (7)
Reflects expenditures by DESC associated with the NND Project, which pursuant to the SCANA Merger Approval Order, will be recovered from DESC electric service customers over a
20-year
period ending in 2039. See Note 3 for more information.
 
 
 
 
 
 (8)
Reflects amounts to be recovered through retail rates in Virginia for payments Virginia Power will make to PJM over a
ten-year
period ending 2028 under the terms of a FERC settlement agreement in May 2018 resolving a PJM cost allocation matter.
 
 
 
 
 
 (9)
Represents unrecognized pension and other postretirement employee benefit costs expected to be recovered or refunded through future rates generally over the expected remaining service period of plan participants by certain of Dominion Energy’s rate-regulated subsidiaries.
 
 
 
 
 
(10)
During 2019, Virginia Power recorded a charge of $17 million ($13 million
after-tax)
in impairment of assets and other charges (reflected in the Corporate and Other segment)
to
write-off
the balance of a regulatory asset for which it is no longer seeking recovery.
 
 
 
 
 
(11)
Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted-average useful life of approximately 27 years as of December 31, 2019.
 
 
 
 
 
(12)
Represents deferred depreciation and accretion expense related to legal obligations associated with the future retirement of generation, transmission and distribution properties. The AROs primarily relate to DESC’s electric generating facilities, including Summer, and are expected to be recovered over the related property lives and periods of decommissioning which may range up to approximately 105
 
years.
 
 
 
 
 
(13)
Costs of the reacquisition of debt are deferred and amortized as interest expense over the
would-be
remaining life of the reacquired debt. The reacquired debt costs had a weighted-average life of approximately 26 years as of December 31, 2019.
 
 
 
 
 
(14)
During 2019, DESC purchased certain of its first mortgage bonds as discussed in Note 18. As a result of these transactions, DESC incurred net costs, including write-offs of unamortized discount, premium and debt issuance costs, of $270 million.
 
 
 
 
 
(15)
Primarily reflects legislation enacted in Virginia in March 2019 which requires any CCR unit located at certain Virginia Power stations to be closed by removing the CCRs to an approved landfill or through recycling for beneficial reuse. Subject to approval by the Virginia Commission, amounts are expected to be collected over a period between 15 and 18 years commencing no earlier than 2021. Virginia Power is entitled to collect carrying costs once expenditures have been made. See Note 23 for additional information.
 
 
 
 
 
(16)
Rates charged to customers by Dominion Energy’s regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.
 
 
 
 
 
(17)
Reflects amounts previously collected from retail electric customers of DESC for the NND Project to be credited over an estimated
11-year
period in connection with the SCANA Merger Approval Order and Virginia legislation enacted in March 2018 that required
one-time
rate credits of certain amounts to utility customers in Virginia. See Notes 3 and 13 for additional information.
 
 
 
 
 
(18)
Balance refundable to customers related to the decrease in revenue requirements for recovery of income taxes at the Companies’ regulated electric generation and electric and natural gas distribution operations. See Notes 3 and 13 for additional information.
 
 
 
 
 
(19)
Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will reverse at the weighted average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.
 
 
(20)
Reflects amounts to be refunded to DESC electric service customers over a
20-year
period ending in 2039 associated with the monetization of a bankruptcy settlement agreement. See Note 3 for additional information.
 
 
 
 
 
(21)
Primarily reflects a regulatory liability representing amounts collected from Virginia jurisdictional customers and placed in external trusts (including income, losses and changes in fair value thereon, as applicable) for the future decommissioning of Dominion Energy’s utility nuclear generation stations, in excess of the related AROs.
 
 
 
 
 
(22)
Reflects a regulatory liability for the collection of postretirement benefit costs allowed in rates in excess of expense incurred.
 
 
 
 
 
                 
At December 31,
 
2019
 
 
2018
 
(millions)
 
 
 
 
                 
Virginia Power
 
 
 
   
 
Regulatory assets:
 
 
 
   
 
Deferred cost of fuel used in electric generation
(1)
 
$
48
 
  $
174
 
Deferred rate adjustment clause costs
(2)(3)
 
 
109
 
   
78
 
Deferred nuclear refueling outage costs
(4)
 
 
68
 
   
69
 
PJM transmission rates
(5)
 
 
121
 
   
45
 
Other
 
 
87
 
   
58
 
Regulatory assets-current
 
 
433
 
   
424
 
Deferred rate adjustment clause costs
(2)(3)(6)
 
 
235
 
   
230
 
PJM transmission rates
(5)
 
 
85
 
   
192
 
Interest rate hedges
(7)
 
 
404
 
   
151
 
Deferred cost of fuel used in electric generation
(1)
 
 
 
   
83
 
Ash pond and landfill closure costs
(8)
 
 
1,016
 
   
27
 
Other
 
 
123
 
   
54
 
Regulatory assets-noncurrent
 
 
1,863
 
   
737
 
Total regulatory assets
 
$
2,296
 
  $
1,161
 
Regulatory liabilities:
 
 
 
   
 
Provision for future cost of removal
(9)
 
$
103
 
  $
92
 
Cost-of-service
impact of 2017 Tax Reform Act
(10)
 
 
 
   
95
 
Reserve for rate credits to electric utility customers
(11`)
 
 
 
   
71
 
Income taxes refundable through future rates
(12)
 
 
54
 
   
 
Other
 
 
10
 
   
41
 
Regulatory liabilities-current
 
 
167
 
   
299
 
Income taxes refundable through future rates
(12)
 
 
2,438
 
   
2,579
 
Nuclear decommissioning trust
(13)
 
 
1,471
 
   
1,070
 
Provision for future cost of removal
(9)
 
 
1,054
 
   
940
 
Other
 
 
111
 
   
58
 
Regulatory liabilities-noncurrent
 
 
5,074
 
   
4,647
 
Total regulatory liabilities
 
$
5,241
 
  $
4,946
 
 
 
 
 
 
 
 (1)
Reflects deferred fuel expenses for the Virginia and North Carolina jurisdictions of Virginia Power’s generation operations.
 
 
 
 
 
 (2)
Reflects deferrals under Virginia Power’s electric transmission FERC formula rate and the deferral of costs associated with certain current and prospective rider projects, net of income taxes refundable from the 2017 Tax Reform Act for Virginia Power. See Note 13 for more information.
 
 
 
 
 
 (3)
As a result of actions from the Virginia Commission in the first quarter of 2019 regarding the ratemaking treatment of excess deferred taxes from the adoption of the 2017 Tax Reform Act for all existing rate adjustment clauses, Virginia Power recorded a $29 million ($22 million
after-tax)
charge in operating revenue in the Consolidated Statements of Income for amounts which are probable of being returned to customers.
 
 
 
 
 
 (4)
Legislation enacted in Virginia in April 2014 requires Virginia Power to defer operation and maintenance costs incurred in connection with the refueling of any nuclear-powered generating plant. These deferred costs will be amortized over the refueling cycle, not to exceed 18 months.
 
 
 
 
 
 (5)
Reflects amounts to be recovered through retail rates in Virginia for payments Virginia Power will make to PJM over a
ten-year
period ending 2028 under the terms of a FERC settlement agreement in May 2018 resolving a PJM cost allocation matter.
 
 
 (6)
During 2019, Virginia Power recorded a charge of $17 million ($13 million
after-tax)
in impairment of assets and other charges (reflected in the Corporate and Other segment)
 
to
write-off
the balance of a regulatory asset for which it is no longer seeking recovery.
 (7)
Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted-average useful life of approximately 24 years as of December 31, 2019.
 (8)
Primarily reflects legislation enacted in Virginia in March 2019 which requires any CCR unit located at certain Virginia Power stations to be closed by removing the CCR to an approved landfill or through recycling for beneficial reuse. Subject to approval by the Virginia Commission, amounts are expected to be collected over a period between 15 and 18 years commencing no earlier than 2021. Virginia Power is entitled to collect carrying costs once expenditures have been made. See Note 23 for additional information.
 (9)
Rates charged to customers by Virginia Power’s regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.
(10)
Balance refundable to customers related to the decrease in revenue requirements for recovery of income taxes at regulated electric generation and distribution operations. See Note 13 for additional information.
(11)
Charge associated with Virginia legislation enacted in March 2018 that required
one-time
rate credits of certain amounts to utility customers. See Note 13 for additional information.
(12)
Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will reverse at the weighted average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.
(13)
Primarily reflects a regulatory liability representing amounts collected from Virginia jurisdictional customers and placed in external trusts (including income, losses and changes in fair value thereon) for the future decommissioning of Virginia Power’s utility nuclear generation stations, in excess of the related AROs.
At December 31,
 
2019
 
 
2018
 
(millions)
 
 
 
 
                 
Dominion Energy Gas
 
 
 
   
 
Regulatory assets:
 
 
 
   
 
Unrecovered gas costs
(1)
 
$
2
 
  $
1
 
Other
 
 
6
 
   
7
 
Regulatory assets-current
(2)
 
 
8
 
   
8
 
Unrecognized pension and other postretirement benefit costs
(3)
 
 
 
   
15
 
Interest rate hedges
(4)
 
 
32
 
   
33
 
Other
 
 
8
 
   
4
 
Regulatory assets-noncurrent
 
 
40
 
   
52
 
Total regulatory assets
 
$
48
 
  $
60
 
Regulatory liabilities:
 
 
 
   
 
Provision for future cost of removal and AROs
(5)
 
$
18
 
  $
9
 
Overrecovered gas costs
(1)
 
 
8
 
   
7
 
Other
 
 
15
 
   
8
 
Regulatory liabilities-current
(6)
 
 
41
 
   
24
 
Income taxes refundable through future rates
(7)
 
 
560
 
   
530
 
Provision for future cost of removal and AROs
(6)
 
 
95
 
   
113
 
Overrecovered other postretirement benefit costs
(8)
 
 
133
 
   
106
 
Other
 
 
12
 
   
16
 
Regulatory liabilities-noncurrent
 
 
800
 
   
765
 
Total regulatory liabilities
 
$
841
 
  $
789
 
 
 (1)
Reflects unrecovered or overrecovered gas costs at regulated gas operations, which are recovered or refunded through filings with the applicable regulatory authority.
 (2)
Current regulatory assets are presented in other current assets in Dominion Energy Gas’ Consolidated Balance Sheets.
 (3)
Represents unrecognized pension and other postretirement employee benefit costs expected to be recovered or refunded through future rates generally over the expected remaining service period of plan participants by certain of Dominion Energy Gas’ rate-regulated subsidiaries.
 (4)
Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted average useful life of approximately 30 years.
 (5)
Rates charged to customers by Dominion Energy Gas’ regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.
 (6)
Current regulatory liabilities are presented in other current liabilities in Dominion Energy Gas’ Consolidated Balance Sheets.
 (7)
Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will reverse at the weighted average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.
 (8)
Reflects a regulatory liability for the collection of postretirement benefit costs allowed in rates in excess of expense incurred.
Schedule of Regulatory Liabilities
Regulatory assets and liabilities include the following:
                 
At December 31,
 
2019
 
 
2018
 
(millions)
 
 
 
 
                 
Dominion Energy
 
 
 
   
 
Regulatory assets:
 
 
 
   
 
Deferred cost of fuel used in electric generation
(1)
 
$
48
 
  $
174
 
Deferred project costs and DSM programs for gas utilities
(2)
 
 
21
 
   
17
 
Unrecovered gas costs
(3)
 
 
102
 
   
14
 
Deferred rate adjustment clause costs for Virginia electric utility
(4)(5)
 
 
109
 
   
78
 
Deferred nuclear refueling outage costs
(6)
 
 
68
 
   
69
 
NND Project costs
(7)
 
 
138
 
   
 
PJM transmission rates
(8)
 
 
121
 
   
45
 
Other
 
 
272
 
   
99
 
Regulatory assets-current
 
 
879
 
   
496
 
Deferred cost of fuel used in electric generation
(1)
 
 
 
   
83
 
P
ension and other postretirement benefit costs
(9)
 
 
1,431
 
   
1,497
 
Deferred rate adjustment clause costs for Virginia electric utility
(4)(5)(10)
 
 
235
 
   
230
 
PJM transmission rates
(8)
 
 
85
 
   
192
 
Deferred project costs for gas utilities
(2)
 
 
521
 
   
335
 
Interest rate hedges
(11)
 
 
741
 
   
184
 
AROs and related funding
(12)
 
 
311
 
   
 
Cost of reacquired debt
(13)(14)
 
 
262
 
   
3
 
NND Project costs
(7)
 
 
2,503
 
   
 
Ash pond and landfill closure costs
(15)
 
 
1,016
 
   
27
 
Other
 
 
582
 
   
125
 
Regulatory assets-noncurrent
 
 
7,687
 
   
2,676
 
Total regulatory assets
 
$
8,566
 
  $
3,172
 
Regulatory liabilities:
 
 
 
   
 
Provision for future cost of removal and AROs
(16)
 
$
142
 
  $
117
 
Reserve for refunds and rate credits to electric utility customers
(17)
 
 
143
 
   
71
 
Cost-of-service
impact of 2017 Tax Reform Act
(18)
 
 
4
 
   
104
 
Income taxes refundable through future rates
(19)
 
 
77
 
   
 
Monetization of guarantee settlement
(20)
 
 
67
 
   
 
Other
 
 
64
 
   
64
 
Regulatory liabilities-current
 
 
497
 
   
356
 
Income taxes refundable through future rates
(19)
 
 
5,088
 
   
4,071
 
Provision for future cost of removal and AROs
(16)
 
 
2,302
 
   
1,409
 
Nuclear decommissioning trust
(21)
 
 
1,471
 
   
1,070
 
Monetization of guarantee settlement
(20)
 
 
970
 
   
 
Reserve for refunds and rate credits to electric utility customers
(17)
 
 
656
 
   
 
Overrecovered other postretirement benefit costs
(22)
 
 
189
 
   
120
 
Other
 
 
325
 
   
170
 
Regulatory liabilities-noncurrent
 
 
11,001
 
   
6,840
 
Total regulatory liabilities
 
$
11,498
 
  $
7,196
 
 
 
 
 
 
 
 (1)
Reflects deferred fuel expenses for the Virginia, North Carolina and South Carolina jurisdictions of Dominion Energy’s electric generation operations.
 
 
 
 
 
 (2)
Primarily reflects amounts expected to be collected from or owed to gas customers in Dominion Energy’s service territories associated with current and prospective rider projects, including CEP, PIR and pipeline integrity management. See Note 13 for more information.
 
 
 
 
 
 (3)
Reflects unrecovered or overrecovered gas costs at regulated gas operations, which are recovered or refunded through filings with the applicable regulatory authority.
 
 
 (4)
Reflects deferrals under Virginia Power’s electric transmission FERC formula rate and the deferral of costs associated with certain current and prospective rider projects, net of income taxes refundable from the 2017 Tax Reform Act for Virginia Power. See Note 13 for more information.
 
 
 
 
 
 (5)
As a result of actions from the Virginia Commission in the first quarter of 2019 regarding the ratemaking treatment of excess deferred taxes from the adoption of the 2017 Tax Reform Act for all existing rate adjustment clauses, Virginia Power recorded a $29 million ($22 million
after-tax)
charge in operating revenue in the Consolidated Statements of Income for amounts which are probable of being returned to customers.
 
 
 
 
 
 (6)
Legislation enacted in Virginia in April 2014 requires Virginia Power to defer operation and maintenance costs incurred in connection with the refueling of any nuclear-powered generating plant. These deferred costs will be amortized over the refueling cycle, not to exceed 18 months.
 
 
 
 
 
 (7)
Reflects expenditures by DESC associated with the NND Project, which pursuant to the SCANA Merger Approval Order, will be recovered from DESC electric service customers over a
20-year
period ending in 2039. See Note 3 for more information.
 
 
 
 
 
 (8)
Reflects amounts to be recovered through retail rates in Virginia for payments Virginia Power will make to PJM over a
ten-year
period ending 2028 under the terms of a FERC settlement agreement in May 2018 resolving a PJM cost allocation matter.
 
 
 
 
 
 (9)
Represents unrecognized pension and other postretirement employee benefit costs expected to be recovered or refunded through future rates generally over the expected remaining service period of plan participants by certain of Dominion Energy’s rate-regulated subsidiaries.
 
 
 
 
 
(10)
During 2019, Virginia Power recorded a charge of $17 million ($13 million
after-tax)
in impairment of assets and other charges (reflected in the Corporate and Other segment)
to
write-off
the balance of a regulatory asset for which it is no longer seeking recovery.
 
 
 
 
 
(11)
Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted-average useful life of approximately 27 years as of December 31, 2019.
 
 
 
 
 
(12)
Represents deferred depreciation and accretion expense related to legal obligations associated with the future retirement of generation, transmission and distribution properties. The AROs primarily relate to DESC’s electric generating facilities, including Summer, and are expected to be recovered over the related property lives and periods of decommissioning which may range up to approximately 105
 
years.
 
 
 
 
 
(13)
Costs of the reacquisition of debt are deferred and amortized as interest expense over the
would-be
remaining life of the reacquired debt. The reacquired debt costs had a weighted-average life of approximately 26 years as of December 31, 2019.
 
 
 
 
 
(14)
During 2019, DESC purchased certain of its first mortgage bonds as discussed in Note 18. As a result of these transactions, DESC incurred net costs, including write-offs of unamortized discount, premium and debt issuance costs, of $270 million.
 
 
 
 
 
(15)
Primarily reflects legislation enacted in Virginia in March 2019 which requires any CCR unit located at certain Virginia Power stations to be closed by removing the CCRs to an approved landfill or through recycling for beneficial reuse. Subject to approval by the Virginia Commission, amounts are expected to be collected over a period between 15 and 18 years commencing no earlier than 2021. Virginia Power is entitled to collect carrying costs once expenditures have been made. See Note 23 for additional information.
 
 
 
 
 
(16)
Rates charged to customers by Dominion Energy’s regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.
 
 
 
 
 
(17)
Reflects amounts previously collected from retail electric customers of DESC for the NND Project to be credited over an estimated
11-year
period in connection with the SCANA Merger Approval Order and Virginia legislation enacted in March 2018 that required
one-time
rate credits of certain amounts to utility customers in Virginia. See Notes 3 and 13 for additional information.
 
 
 
 
 
(18)
Balance refundable to customers related to the decrease in revenue requirements for recovery of income taxes at the Companies’ regulated electric generation and electric and natural gas distribution operations. See Notes 3 and 13 for additional information.
 
 
 
 
 
(19)
Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will reverse at the weighted average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.
 
 
(20)
Reflects amounts to be refunded to DESC electric service customers over a
20-year
period ending in 2039 associated with the monetization of a bankruptcy settlement agreement. See Note 3 for additional information.
 
 
 
 
 
(21)
Primarily reflects a regulatory liability representing amounts collected from Virginia jurisdictional customers and placed in external trusts (including income, losses and changes in fair value thereon, as applicable) for the future decommissioning of Dominion Energy’s utility nuclear generation stations, in excess of the related AROs.
 
 
 
 
 
(22)
Reflects a regulatory liability for the collection of postretirement benefit costs allowed in rates in excess of expense incurred.
 
 
 
 
 
                 
At December 31,
 
2019
 
 
2018
 
(millions)
 
 
 
 
                 
Virginia Power
 
 
 
   
 
Regulatory assets:
 
 
 
   
 
Deferred cost of fuel used in electric generation
(1)
 
$
48
 
  $
174
 
Deferred rate adjustment clause costs
(2)(3)
 
 
109
 
   
78
 
Deferred nuclear refueling outage costs
(4)
 
 
68
 
   
69
 
PJM transmission rates
(5)
 
 
121
 
   
45
 
Other
 
 
87
 
   
58
 
Regulatory assets-current
 
 
433
 
   
424
 
Deferred rate adjustment clause costs
(2)(3)(6)
 
 
235
 
   
230
 
PJM transmission rates
(5)
 
 
85
 
   
192
 
Interest rate hedges
(7)
 
 
404
 
   
151
 
Deferred cost of fuel used in electric generation
(1)
 
 
 
   
83
 
Ash pond and landfill closure costs
(8)
 
 
1,016
 
   
27
 
Other
 
 
123
 
   
54
 
Regulatory assets-noncurrent
 
 
1,863
 
   
737
 
Total regulatory assets
 
$
2,296
 
  $
1,161
 
Regulatory liabilities:
 
 
 
   
 
Provision for future cost of removal
(9)
 
$
103
 
  $
92
 
Cost-of-service
impact of 2017 Tax Reform Act
(10)
 
 
 
   
95
 
Reserve for rate credits to electric utility customers
(11`)
 
 
 
   
71
 
Income taxes refundable through future rates
(12)
 
 
54
 
   
 
Other
 
 
10
 
   
41
 
Regulatory liabilities-current
 
 
167
 
   
299
 
Income taxes refundable through future rates
(12)
 
 
2,438
 
   
2,579
 
Nuclear decommissioning trust
(13)
 
 
1,471
 
   
1,070
 
Provision for future cost of removal
(9)
 
 
1,054
 
   
940
 
Other
 
 
111
 
   
58
 
Regulatory liabilities-noncurrent
 
 
5,074
 
   
4,647
 
Total regulatory liabilities
 
$
5,241
 
  $
4,946
 
 
 
 
 
 
 
 (1)
Reflects deferred fuel expenses for the Virginia and North Carolina jurisdictions of Virginia Power’s generation operations.
 
 
 
 
 
 (2)
Reflects deferrals under Virginia Power’s electric transmission FERC formula rate and the deferral of costs associated with certain current and prospective rider projects, net of income taxes refundable from the 2017 Tax Reform Act for Virginia Power. See Note 13 for more information.
 
 
 
 
 
 (3)
As a result of actions from the Virginia Commission in the first quarter of 2019 regarding the ratemaking treatment of excess deferred taxes from the adoption of the 2017 Tax Reform Act for all existing rate adjustment clauses, Virginia Power recorded a $29 million ($22 million
after-tax)
charge in operating revenue in the Consolidated Statements of Income for amounts which are probable of being returned to customers.
 
 
 
 
 
 (4)
Legislation enacted in Virginia in April 2014 requires Virginia Power to defer operation and maintenance costs incurred in connection with the refueling of any nuclear-powered generating plant. These deferred costs will be amortized over the refueling cycle, not to exceed 18 months.
 
 
 
 
 
 (5)
Reflects amounts to be recovered through retail rates in Virginia for payments Virginia Power will make to PJM over a
ten-year
period ending 2028 under the terms of a FERC settlement agreement in May 2018 resolving a PJM cost allocation matter.
 
 
 (6)
During 2019, Virginia Power recorded a charge of $17 million ($13 million
after-tax)
in impairment of assets and other charges (reflected in the Corporate and Other segment)
 
to
write-off
the balance of a regulatory asset for which it is no longer seeking recovery.
 (7)
Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted-average useful life of approximately 24 years as of December 31, 2019.
 (8)
Primarily reflects legislation enacted in Virginia in March 2019 which requires any CCR unit located at certain Virginia Power stations to be closed by removing the CCR to an approved landfill or through recycling for beneficial reuse. Subject to approval by the Virginia Commission, amounts are expected to be collected over a period between 15 and 18 years commencing no earlier than 2021. Virginia Power is entitled to collect carrying costs once expenditures have been made. See Note 23 for additional information.
 (9)
Rates charged to customers by Virginia Power’s regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.
(10)
Balance refundable to customers related to the decrease in revenue requirements for recovery of income taxes at regulated electric generation and distribution operations. See Note 13 for additional information.
(11)
Charge associated with Virginia legislation enacted in March 2018 that required
one-time
rate credits of certain amounts to utility customers. See Note 13 for additional information.
(12)
Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will reverse at the weighted average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.
(13)
Primarily reflects a regulatory liability representing amounts collected from Virginia jurisdictional customers and placed in external trusts (including income, losses and changes in fair value thereon) for the future decommissioning of Virginia Power’s utility nuclear generation stations, in excess of the related AROs.
At December 31,
 
2019
 
 
2018
 
(millions)
 
 
 
 
                 
Dominion Energy Gas
 
 
 
   
 
Regulatory assets:
 
 
 
   
 
Unrecovered gas costs
(1)
 
$
2
 
  $
1
 
Other
 
 
6
 
   
7
 
Regulatory assets-current
(2)
 
 
8
 
   
8
 
Unrecognized pension and other postretirement benefit costs
(3)
 
 
 
   
15
 
Interest rate hedges
(4)
 
 
32
 
   
33
 
Other
 
 
8
 
   
4
 
Regulatory assets-noncurrent
 
 
40
 
   
52
 
Total regulatory assets
 
$
48
 
  $
60
 
Regulatory liabilities:
 
 
 
   
 
Provision for future cost of removal and AROs
(5)
 
$
18
 
  $
9
 
Overrecovered gas costs
(1)
 
 
8
 
   
7
 
Other
 
 
15
 
   
8
 
Regulatory liabilities-current
(6)
 
 
41
 
   
24
 
Income taxes refundable through future rates
(7)
 
 
560
 
   
530
 
Provision for future cost of removal and AROs
(6)
 
 
95
 
   
113
 
Overrecovered other postretirement benefit costs
(8)
 
 
133
 
   
106
 
Other
 
 
12
 
   
16
 
Regulatory liabilities-noncurrent
 
 
800
 
   
765
 
Total regulatory liabilities
 
$
841
 
  $
789
 
 
 (1)
Reflects unrecovered or overrecovered gas costs at regulated gas operations, which are recovered or refunded through filings with the applicable regulatory authority.
 (2)
Current regulatory assets are presented in other current assets in Dominion Energy Gas’ Consolidated Balance Sheets.
 (3)
Represents unrecognized pension and other postretirement employee benefit costs expected to be recovered or refunded through future rates generally over the expected remaining service period of plan participants by certain of Dominion Energy Gas’ rate-regulated subsidiaries.
 (4)
Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted average useful life of approximately 30 years.
 (5)
Rates charged to customers by Dominion Energy Gas’ regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.
 (6)
Current regulatory liabilities are presented in other current liabilities in Dominion Energy Gas’ Consolidated Balance Sheets.
 (7)
Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will reverse at the weighted average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.
 (8)
Reflects a regulatory liability for the collection of postretirement benefit costs allowed in rates in excess of expense incurred.