Commitments and Contingencies
9 Months Ended
Sep. 30, 2011
Commitments and Contingencies
Commitments and Contingencies
As a result of issues generated in the ordinary course of business, Dominion and Virginia Power are involved in legal proceedings before various courts and are periodically subject to governmental examinations (including by regulatory authorities), inquiries and investigations. Certain legal proceedings and governmental examinations involve demands for unspecified amounts of damages, are in an initial procedural phase, involve uncertainty as to the outcome of pending appeals or motions, or involve significant factual issues that need to be resolved, such that it is not possible for the Companies to estimate a range of possible loss. For such matters that the Companies cannot estimate, a statement to this effect is made in the description of the matter. Other matters may have progressed sufficiently through the litigation or investigative processes such that the Companies are able to estimate a range of possible loss. For legal proceedings and governmental examinations for which the Companies are able to reasonably estimate a range of possible losses, an estimated range of possible loss is provided, in excess of the accrued liability (if any) for such matters. This estimated range is based on currently available information and involves elements of judgment and significant uncertainties. This estimated range of possible loss does not represent the Companies' maximum possible loss exposure. The circumstances of such legal proceedings and governmental examinations will change from time to time and actual results may vary significantly from the current estimate. For current proceedings not specifically reported below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on Dominion's or Virginia Power's financial position, liquidity or results of operations.
Environmental Matters
Dominion and Virginia Power are subject to costs resulting from a number of federal, state and local laws and regulations designed to protect human health and the environment. These laws and regulations affect future planning and existing operations. They can result in increased capital, operating and other costs as a result of compliance, remediation, containment and monitoring obligations.

Air
In July 2011, the EPA issued a final replacement rule for CAIR, called CSAPR, that requires 27 states to reduce power plant emissions that cross state lines. CSAPR establishes new SO2 and NOx emissions cap and trade programs that are completely independent of the current ARP. Specifically, CSAPR requires reductions in SO2 and NOx emissions from fossil fuel-fired electric generating units of 25 MW or more through annual NOx emissions caps, NOx emissions caps during the ozone season (May 1 through September 30) and annual SO2 emission caps with differing requirements for two groups of affected states.

Prior to the issuance of CSAPR, Dominion and Virginia Power held $57 million and $43 million, respectively, of SO2 emissions allowances obtained for ARP and CAIR compliance. Due to CSAPR's establishment of a new allowance program and the elimination of CAIR, Dominion and Virginia Power have more SO2 emissions allowances than needed for ARP compliance, which resulted in the impairment of these allowances in the third quarter of 2011. See Note 9 for further details of the impairments.

With respect to Dominion's generation fleet, the impact of the rule is not expected to be material. However, a large number of petitions for review of CSAPR have been filed in federal court and it is anticipated that there will be significant litigation of this rule.  In addition, the EPA has proposed, but not yet finalized, changes to the rule.  Accordingly, future outcomes of litigation and/or final action to modify the rule could affect this assessment. 

The CAA is a comprehensive program utilizing a broad range of regulatory tools to protect and preserve the nation's air quality. At a minimum, states are required to establish regulatory programs to address all requirements of the CAA. However, states may choose to develop regulatory programs that are more restrictive. Many of Dominion's and Virginia Power's facilities are subject to the CAA's permitting and other requirements.

In February 2008, Dominion received a request for information pursuant to Section 114 of the CAA from the EPA. The request concerns historical operating changes and capital improvements undertaken at State Line and Kincaid. In April 2009, Dominion received a second request for information. Dominion provided information in response to both requests. Also in April 2009, Dominion received a Notice and Finding of Violations from the EPA claiming violations of the CAA New Source Review requirements, New Source Performance Standards, the Title V permit program and the stations' respective State Implementation Plans. The Notice states that the EPA may issue an order requiring compliance with the relevant CAA provisions and may seek injunctive relief and/or civil penalties, all pursuant to the EPA's enforcement authority under the CAA.
 
Dominion believes that it complied with applicable laws and the EPA regulations and interpretations in effect at the time the work in question took place. The CAA authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation at each generating unit, depending on the date of the alleged violation. In addition to any such penalties that may be awarded, an adverse outcome could require substantial capital expenditures or affect the timing of currently budgeted capital expenditures that cannot be determined at this time. Such expenditures could affect future results of operations, cash flows, and financial condition. Dominion is currently unable to make an estimate of the potential financial statement impacts related to these matters.

In June 2010, the Conservation Law Foundation and Healthlink Inc. filed a Complaint in the District Court of Massachusetts against Dominion Energy New England, Inc. alleging that Salem Harbor units 1, 2, 3, and 4 have been and are in violation of visible emissions standards and monitoring requirements of the Massachusetts State Implementation Plan and the station's state and federal operating permits. Although Dominion cannot predict the outcome of this matter at this time, it is not expected to have a material effect on results of operations, financial condition and/or cash flows.
 
Water
In October 2003, the EPA and the Massachusetts Department of Environmental Protection each issued new NPDES permits for Brayton Point. The new permits contained identical conditions that in effect require the installation of cooling towers to address concerns over the withdrawal and discharge of cooling water. Currently, Dominion is constructing the cooling towers and estimates the total cost to install these cooling towers at approximately $600 million, with remaining expenditures of approximately $100 million included in its planned capital expenditures through 2012.

In October 2007, the VSWCB issued a renewed VPDES permit for North Anna. BREDL, and other persons, appealed the VSWCB's decision to the Richmond Circuit Court, challenging several permit provisions related to North Anna's discharge of cooling water. In February 2009, the court ruled that the VSWCB was required to regulate the thermal discharge from North Anna into the waste heat treatment facility. Virginia Power filed a motion for reconsideration with the court in February 2009, which was denied. The final order was issued by the court in September 2009. The court's order allows North Anna to continue to operate pursuant to the currently issued VPDES permit. In October 2009, Virginia Power filed a Notice of Appeal of the court's order with the Richmond Circuit Court, initiating the appeals process to the Virginia Court of Appeals. In June 2010, the Virginia Court of Appeals reversed the Richmond Circuit Court's September 2009 order. The Virginia Court of Appeals held that the lower court had applied the wrong standard of review, and that the VSWCB's determination not to regulate the station's thermal discharge into the waste heat treatment facility was lawful. In July 2010, BREDL and the other original appellants filed a petition for appeal to the Supreme Court of Virginia requesting that it review the Court of Appeals' decision. In December 2010, the Supreme Court of Virginia granted BREDL's petition. Briefing on the merits of the case was completed in February 2011.  The court has scheduled oral arguments for October 31, 2011. Dominion is currently unable to make an estimate of the potential financial statement impacts related to this matter. However, an adverse resolution could ultimately require significant capital expenditures which could have a material effect on Dominion's and Virginia Power's results of operations, financial condition and/or cash flows.

In September 2010, Millstone's NPDES permit was reissued under the CWA. The conditions of the permit require an evaluation of control technologies that could result in additional expenditures in the future, however, Dominion cannot currently predict the outcome of this evaluation. In October 2010, the permit issuance was appealed to the state court by a private plaintiff. The permit is expected to remain in effect during the appeal. Dominion is currently unable to make an estimate of the potential financial statement impacts related to this matter.

Solid and Hazardous Waste
In March 2011, the EPA issued a final rule identifying NHSMs that would be considered solid waste when burned in combustion units, as opposed to being legitimate fuels or ingredients. The rule's premise is that any combusted NHSM is a solid waste unless such material satisfies the rule's criteria for either a fuel or an ingredient. Sources that combust solid waste are considered solid waste incinerators rather than industrial or utility boilers and would have to comply with the EPA's more stringent emission standards for solid waste incinerators. Dominion and Virginia Power have several electric generating units that combust fuel materials that may be subject to the rule. Some units use a technology that combusts residual coal in fly ash to recover additional energy from unburned carbon. This technology also produces a final ash product that is marketable for beneficial reuse in cement production. Because of the uncertainty associated with the rule's potential applicability to this and other processes, in June 2011, Dominion filed a petition for review with the Court of Appeals for the District of Columbia Circuit challenging the final rule. In October 2011, the EPA announced that it would initiate additional rulemaking proceedings to revise the final rule. Although Dominion cannot predict the outcome of this matter at this time, it is not expected to have a material effect on results of operations, financial condition, and/or cash flows.

The CERCLA, as amended, provides for immediate response and removal actions coordinated by the EPA in the event of threatened releases of hazardous substances into the environment and authorizes the U.S. government either to clean up sites at which hazardous substances have created actual or potential environmental hazards or to order persons responsible for the situation to do so. Under the CERCLA, as amended, generators and transporters of hazardous substances, as well as past and present owners and operators of contaminated sites, can be strictly, jointly and severally liable for the cost of cleanup. These potentially responsible parties can be ordered to perform a cleanup, be sued for costs associated with an EPA-directed cleanup, voluntarily settle with the U.S. government concerning their liability for cleanup costs, or voluntarily begin a site investigation and site remediation under state oversight.

From time to time, Dominion or Virginia Power may be identified as a potentially responsible party to a Superfund site. The EPA (or a state) can either allow such a party to conduct and pay for a remedial investigation, feasibility study and remedial action or conduct the remedial investigation and action itself and then seek reimbursement from the potentially responsible parties. Each party can be held jointly, severally and strictly liable for the cleanup costs. These parties can also bring contribution actions against each other and seek reimbursement from their insurance companies. As a result, Dominion or Virginia Power may be responsible for the costs of remedial investigation and actions under the Superfund law or other laws or regulations regarding the remediation of waste. Except as noted below, the Companies do not believe this will have a material effect on results of operations, financial condition and/or cash flows.

In September 2011, the EPA issued a UAO to Virginia Power and 22 other parties, ordering specific remedial action of certain areas at the Ward Transformer Superfund site located in Raleigh, North Carolina.  Virginia Power does not believe it is a liable party under CERCLA based on its alleged connection to the site. Virginia Power has until early November 2011 to respond to the EPA regarding its willingness to undertake the work set forth in the UAO. 

The EPA may seek to enforce a UAO in court pursuant to its enforcement authority under CERCLA, and may seek recovery of its costs in undertaking removal or remedial action.  If the court determines that a respondent failed to comply with the UAO without sufficient cause, the EPA may also seek civil penalties of up to $37,500 per day for the violation and punitive damages of up to three times the costs incurred by EPA as a result of the party's failure to comply with the UAO. Virginia Power is currently unable to make an estimate of the potential financial statement impacts related to the Ward Transformer matter.

Dominion has determined that it is associated with 17 former manufactured gas plant sites. Studies conducted by other utilities at their former manufactured gas plant sites have indicated that those sites contain coal tar and other potentially harmful materials. None of the 17 former sites with which Dominion is associated is under investigation by any state or federal environmental agency. At one of the former sites, Dominion is conducting a state-approved post closure groundwater monitoring program and an environmental land use restriction has been recorded. Another site has been accepted into a state-based voluntary remediation program and Dominion has not yet estimated the future remediation costs. Due to the uncertainty surrounding these sites, Dominion is unable to make an estimate of the potential financial statement impacts related to these sites.

Climate Change Legislation and Regulation
Massachusetts, Rhode Island and Connecticut, among other states, have joined the RGGI, a multi-state effort to reduce CO2 emissions in the Northeast implemented through state specific regulations. Under the initiative, aggregate CO2 emissions from power plants in participating states are required to be stabilized at current levels from 2009 to 2015. Further reductions from current levels would be required to be phased in starting in 2016 such that by 2019 there would be a 10% reduction in participating state power plant CO2 emissions. During 2011 and possibly continuing through 2012, RGGI will undergo a program review which could impact regulations and implementation of RGGI. The impact of this program review on Dominion's fossil fired generation operations in RGGI states is unknown at this time. Dominion is currently unable to make an estimate of the potential financial statement impacts related to these matters.

Three of Dominion's facilities, Brayton Point, Salem Harbor and Manchester Street, are subject to RGGI. Beginning with calendar year 2009, RGGI requires that Dominion cover each ton of CO2 direct stack emissions from these facilities with either an allowance or an offset. The allowances can be purchased through auction or through a secondary market. Dominion has participated in RGGI allowance auctions to date and has procured allowances to meet its estimated compliance requirements under RGGI for 2009, 2010, 2011 and partially for 2012, therefore Dominion does not expect compliance with RGGI to have a material impact on its results of operations or financial condition. However, during August 2011, a lawsuit was filed in New York seeking to retroactively rescind RGGI participation by that state. Currently, a percentage of Dominion's RGGI allowances have been acquired from New York. The acquisition cost of these allowances totaled approximately $34 million, of which the majority have been expensed as consumed. If Dominion is unable to tender New York allowances for RGGI compliance or RGGI does not exchange these allowances for other state allowances, replacement allowances would have to be purchased for 2009 through 2011 compliance. Dominion cannot predict the outcome of the case at this time. Dominion is currently unable to make an estimate of the potential financial statement impacts related to these matters.

In August 2011, the EPA announced a delay in the schedule for proposing regulations which would establish GHG performance standards for new, modified and existing fossil-fired electric generating units. Regulations were expected to be proposed by July 2011 and finalized by May 2012. The schedule for a proposed rulemaking is now delayed beyond October 2011.

Guarantees
Dominion
At September 30, 2011, Dominion had issued $86 million of guarantees, primarily to support equity method investees. No significant amounts related to these guarantees have been recorded. As of September 30, 2011, Dominion’s exposure under these guarantees was $54 million, primarily related to certain reserve requirements associated with non-recourse financing.

Dominion also enters into guarantee arrangements on behalf of its consolidated subsidiaries, primarily to facilitate their commercial transactions with third parties. To the extent that a liability subject to a guarantee has been incurred by one of Dominion's consolidated subsidiaries, that liability is included in its Consolidated Financial Statements. Dominion is not required to recognize liabilities for guarantees issued on behalf of its subsidiaries unless it becomes probable that it will have to perform under the guarantees. Terms of the guarantees typically end once obligations have been paid. Dominion currently believes it is unlikely that it would be required to perform or otherwise incur any losses associated with guarantees of its subsidiaries' obligations.

At September 30, 2011, Dominion had issued the following subsidiary guarantees:
 
Stated Limit
 
Value(1)
(millions)
 
 
 
Subsidiary debt(2)
$
363

 
$
363

Commodity transactions(3)
3,182

 
429

Lease obligation for power generation facility(4)
748

 
748

Nuclear obligations(5)
231

 
50

Other(6)
517

 
141

Total
$
5,041

 
$
1,731

(1)
Represents the estimated portion of the guarantee's stated limit that is utilized as of September 30, 2011 based upon prevailing economic conditions and fact patterns specific to each guarantee arrangement. For those guarantees related to obligations that are recorded as liabilities by Dominion's subsidiaries, the value includes the recorded amount.
(2)
Guarantees of debt of certain DEI subsidiaries. In the event of default by the subsidiaries, Dominion would be obligated to repay such amounts.
(3)
Guarantees related to energy trading and marketing activities and other commodity commitments of certain subsidiaries, including subsidiaries of Virginia Power and DEI. These guarantees were provided to counterparties in order to facilitate physical and financial transactions in gas, oil, electricity, pipeline capacity, transportation and related commodities and services. If any of these subsidiaries fail to perform or pay under the contracts and the counterparties seek performance or payment, Dominion would be obligated to satisfy such obligation. Dominion and its subsidiaries receive similar guarantees as collateral for credit extended to others. The value provided includes certain guarantees that do not have stated limits.
(4)
Guarantee of a DEI subsidiary's leasing obligation for Fairless, including a residual value guarantee.
(5)
Guarantees related to certain DEI subsidiaries' potential retrospective premiums that could be assessed if there is a nuclear incident under Dominion's nuclear insurance programs and guarantees for a DEI subsidiary's and Virginia Power's commitment to buy nuclear fuel. Excludes Dominion's agreement to provide up to $150 million and $60 million to two DEI subsidiaries to pay the operating expenses of Millstone and Kewaunee, respectively, in the event of a prolonged outage, as part of satisfying certain NRC requirements concerned with ensuring adequate funding for the operations of nuclear power stations.
(6)
Guarantees related to other miscellaneous contractual obligations such as leases, environmental obligations and construction projects. Also includes guarantees related to certain DEI subsidiaries' obligations for equity capital contributions and energy generation associated with Fowler Ridge and NedPower.

Spent Nuclear Fuel
Under provisions of the Nuclear Waste Policy Act of 1982, Dominion and Virginia Power entered into contracts with the DOE for the disposal of spent nuclear fuel. The DOE failed to begin accepting the spent fuel on January 31, 1998, the date provided by the Nuclear Waste Policy Act and by the Companies' contracts with the DOE. In January 2004, Dominion and Virginia Power filed lawsuits in the U.S. Court of Federal Claims against the DOE requesting damages in connection with its failure to commence accepting spent nuclear fuel. In October 2008, the court issued an opinion and order for Dominion in the amount of approximately $155 million, which includes approximately $112 million in damages incurred by Virginia Power for spent fuel-related costs at Surry and North Anna and approximately $43 million in damages incurred for spent nuclear fuel-related costs at Millstone through June 30, 2006. In December 2008, the government appealed the judgment to the U.S. Court of Appeals for the Federal Circuit. The government's initial brief in the appeal was filed in June 2010. The issues raised by the government on appeal pertained to the damages awarded to Dominion for Millstone. The government did not take issue with the damages awarded to Virginia Power for Surry or North Anna. As a result, Virginia Power recognized a receivable in the amount of $174 million, largely offset against property, plant and equipment and regulatory assets and liabilities, representing certain spent nuclear fuel-related costs incurred through June 30, 2010.

In the second quarter of 2011, the Federal Appeals Court issued a decision affirming the trial court's damages award. The government did not seek rehearing of the Federal Appeals Court decision or seek review by the U.S. Supreme Court. As a result, Dominion recognized a receivable in the amount of $64 million for certain Millstone spent nuclear fuel-related costs incurred through June 30, 2011 that are now considered probable of recovery. Dominion recognized a pre-tax benefit of $24 million, with $17 million recorded in other operations and maintenance expense and $7 million recorded in depreciation, depletion and amortization expense for the six months ended June 30, 2011, with the remainder largely offset against property, plant and equipment. Dominion received payment of the $155 million damages award, including $112 million of damages incurred by Virginia Power, during the third quarter of 2011.

The Companies continue to recognize receivables for certain spent nuclear fuel-related costs that they believe are probable of recovery from the DOE. At September 30, 2011, Dominion's and Virginia Power's receivables for spent nuclear fuel-related costs totaled $99 million and $75 million, respectively. The Companies will continue to manage their spent fuel until it is accepted by the DOE.

Surety Bonds and Letters of Credit
As of September 30, 2011, Dominion had purchased $151 million of surety bonds, including $62 million at Virginia Power, and authorized the issuance of standby letters of credit by financial institutions of $127 million, including $56 million at Virginia Power, to facilitate commercial transactions by its subsidiaries with third parties. Under the terms of the surety bonds, the Companies are obligated to indemnify the respective surety bond company for any amounts paid.

Merchant Generation Operations
Dominion continually reviews its portfolio of assets to determine which assets fit strategically and support its objectives to improve return on invested capital and shareholder value. If Dominion identifies assets that do not support its objectives and believes they may be of greater value to another owner, Dominion may consider such assets for divestiture. In connection with this effort, in the first quarter of 2011, Dominion decided to pursue the sale of Kewaunee. If these efforts are successful, Dominion may be required to present Kewaunee's assets and liabilities that are subject to sale as held for sale in its Consolidated Balance Sheet and Kewaunee's results of operations in discontinued operations in its Consolidated Statements of Income. Held for sale classification would require that amounts be recorded at the lower of book value or sale price less costs to sell and could result in the recording of an impairment charge. Any sale of Kewaunee would be subject to the approval of Dominion's Board of Directors, as well as applicable state and federal approvals.

During the second quarter of 2011, Dominion announced that State Line would shut down by mid-2014, and that it would cease operating two of the four units at Salem Harbor by the end of 2011 and plans to retire all four units on June 1, 2014. In the second quarter of 2011, Dominion recorded a $17 million ($11 million after-tax) charge in other operations and maintenance expense for severance costs related to the expected closings of these merchant generation fac