Rate And Regulatory Matters (Narrative) (Details)
1 Months Ended 3 Months Ended 5 Months Ended 6 Months Ended 9 Months Ended 10 Months Ended 11 Months Ended 12 Months Ended 20 Months Ended
Jul. 31, 2022
USD ($)
Jun. 30, 2022
USD ($)
May 31, 2022
USD ($)
shares
Apr. 30, 2022
USD ($)
Mar. 31, 2022
USD ($)
Feb. 28, 2022
USD ($)
Jan. 31, 2022
USD ($)
Oct. 31, 2021
USD ($)
Aug. 31, 2021
USD ($)
May 31, 2021
USD ($)
Apr. 30, 2021
USD ($)
Mar. 31, 2021
USD ($)
Dec. 31, 1988
Jun. 30, 2022
USD ($)
Aug. 31, 2021
USD ($)
Jun. 30, 2022
USD ($)
Jun. 30, 2021
USD ($)
Dec. 31, 2022
USD ($)
Jun. 30, 2021
USD ($)
Jul. 31, 2021
USD ($)
Dec. 31, 2023
USD ($)
Mar. 31, 2023
USD ($)
Mar. 31, 2022
USD ($)
Dec. 31, 2021
USD ($)
Dec. 31, 2021
USD ($)
Jan. 01, 2022
USD ($)
Sep. 30, 2021
USD ($)
Apr. 30, 2020
USD ($)
Impairment of Long-Lived Assets Held-for-use                               $ (163,321,000) $ 345,339,000                      
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   $ 1,827,581,000                       $ 1,827,581,000   1,827,581,000               $ 1,511,966,000 $ 1,511,966,000      
Proceeds from the issuance of long-term debt                               3,851,061,000 5,008,330,000                      
Regulatory Asset [Abstract]                                                        
Long-term Transition Bond, Noncurrent   335,995,000                       335,995,000   335,995,000               83,639,000 83,639,000      
Deferred Fuel Cost   983,935,000                       983,935,000   983,935,000               324,394,000 324,394,000      
Replacement Reserve Escrow   331,000,000                       331,000,000   331,000,000               49,000,000 49,000,000      
Reduction of income tax expense     $ 283,000,000                                                  
Long-term Transition Bond, Noncurrent   $ 335,995,000                       $ 335,995,000   $ 335,995,000               83,639,000 83,639,000      
4.00% Series mortgage bonds due July 2022                                                        
Debt instrument, interest rate, stated percentage   4.00% 4.00%                     4.00%   4.00%                        
Regulatory Asset [Abstract]                                                        
Repayments of First Mortgage Bond     $ 650,000,000                                                  
Entergy Louisiana [Member]                                                        
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   $ 785,737,000                       $ 785,737,000   $ 785,737,000               847,924,000 847,924,000      
Proceeds from the issuance of long-term debt                               1,777,192,000 2,097,214,000                      
Total Restoration Costs For Repair and Replacement of Electrical System including carrying costs       $ 2,640,000,000                                                
Storm Reserve Escrow Account   290,065,000       $ 290,000,000         $ 290,000,000     290,065,000   290,065,000               0 0      
Regulatory Asset [Abstract]                                                        
Aggregate principal amount of system restoration bonds authorization requested           3,186,000,000                                            
Earned return on common equity     8.33%                                                  
Deferred Fuel Cost   412,695,000                       412,695,000   412,695,000               45,374,000 45,374,000      
Reclassification from utility plant to other regulatory assets   1,942,000,000                       1,942,000,000   1,942,000,000                        
Replacement Reserve Escrow   290,100,000                       290,100,000   $ 290,100,000                        
Fuel Costs                           135,000,000                            
Rate Increase Included in Formula Rate Plan     $ 65,300,000                                                  
Formula rate plan revenue increase     152,900,000                                                  
LCDA issuance of bonds under Act 293 financing     $ 3,194,000,000                                                  
LURC's percentage of annual dividends     1.00%                         1.00%                        
ELL's percentage of annual dividends     99.00%                         99.00%                        
Proceeds from Contributed Capital     $ 1,000,000,000                         $ 1,000,000,000 0                      
Proceeds from capital contribution used to fund Hurricane Ida escrow     1,000,000,000                                                  
Funds withdrawn from Hurricane Ida escrow and applied to restoration costs     1,000,000,000                                                  
Restricted storm escrow funds     290,000,000                                                  
Reduction of income tax expense     290,000,000                                                  
Regulatory charge recorded as a result of reduction in income tax expense     224,000,000                                                  
Regulatory charge recorded as a result of reduction in income tax expense, net of tax     165,000,000                                                  
LURC's beneficial interest in the storm trust     31,600,000                                                  
Entergy Louisiana [Member] | Unsecured Term Loan due June 2023                                                        
Regulatory Asset [Abstract]                                                        
Repayments of Unsecured Debt     $ 1,200,000,000                                                  
Entergy Louisiana [Member] | Mortgage Bonds Zero Point Six Two Percent Series Due November 2023                                                        
Debt instrument, interest rate, stated percentage     0.62%                                                  
Regulatory Asset [Abstract]                                                        
Repayments of First Mortgage Bond     $ 435,000,000                                                  
Entergy Louisiana [Member] | Deferred COVID 19 Costs                                                        
Regulatory Asset [Abstract]                                                        
Regulatory Assets   47,800,000                       47,800,000   47,800,000                        
Entergy Louisiana [Member] | Hurricane Ida                                                        
Total Restoration Costs For Repair and Replacement of Electrical System       2,540,000,000                                                
Non-capital storm costs       586,000,000                                                
Deferred Storm and Property Reserve Deficiency, Noncurrent       1,960,000,000   1,000,000,000                     1,000,000,000   $ 1,000,000,000         1,000,000,000 1,000,000,000      
Total Restoration Costs For Repair and Replacement of Electrical System including carrying costs       2,600,000,000                                                
Regulatory Asset [Abstract]                                                        
Aggregate principal amount of system restoration bonds authorization requested                                               1,000,000,000 1,000,000,000      
Entergy Louisiana [Member] | Hurricanes Laura, Delta, Zeta, and Winter Storm Uri                                                        
Total Restoration Costs For Repair and Replacement of Electrical System                     2,060,000,000.00                                  
Non-capital storm costs                     380,000,000                                  
Deferred Storm and Property Reserve Deficiency, Noncurrent           51,000,000         1,680,000,000                                  
Total Restoration Costs For Repair and Replacement of Electrical System including carrying costs       $ 32,000,000   2,100,000,000         $ 2,110,000,000                                  
Entergy Louisiana [Member] | Winter Storm Uri                                                        
Regulatory Asset [Abstract]                                                        
Fuel Costs                             $ 166,000,000                          
Entergy Louisiana [Member] | Subsequent Event [Member] | Hurricanes Laura, Delta, Zeta, and Winter Storm Uri                                                        
Regulatory Asset [Abstract]                                                        
Carrying costs associated with storm restoration costs                                   $ 3,000,000                    
Entergy Louisiana [Member] | Subsequent Event [Member] | Hurricane Ida                                                        
Regulatory Asset [Abstract]                                                        
Carrying costs associated with storm restoration costs                                   57,000,000                    
Entergy Mississippi [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount         $ 69,000,000                                              
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   266,686,000                       266,686,000   266,686,000               95,452,000 95,452,000      
Proceeds from the issuance of long-term debt                               249,746,000 200,543,000                      
Public Utilities, Requested Return on Equity, Percentage         6.70%                                              
Interim increase in formula rate plan revenues   $ 34,300,000     $ 34,500,000                                              
Interim increase in formula rate plan revenues due to adjustments         24,300,000                                              
Regulatory Asset [Abstract]                                                        
Earned return on common equity   5.99%                                                    
Deferred Fuel Cost   $ 246,630,000                       246,630,000   246,630,000               121,878,000 121,878,000      
Replacement Reserve Escrow   41,100,000                       41,100,000   41,100,000               48,900,000 48,900,000      
Potential settlement refund   353,000,000                                                    
Entergy Mississippi [Member] | Formula Rate Plan Historical Year Rate Adjustment Member                                                        
Regulatory Asset [Abstract]                                                        
Regulatory Assets, Noncurrent                                               19,000,000 19,000,000      
Entergy Mississippi [Member] | Deferred COVID 19 Costs                                                        
Regulatory Asset [Abstract]                                                        
Regulatory Assets   13,100,000                       13,100,000   $ 13,100,000                        
Entergy Mississippi [Member] | Grand Gulf [Member]                                                        
Regulatory Asset [Abstract]                                                        
Long-term Contract for Purchase of Electric Power, Share of Plant Output Being Purchased                               40.00%                        
Entergy Mississippi [Member] | Maximum [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount         $ 48,600,000                                              
Public Utilities, Requested Rate Increase (Decrease), Percentage       2.00% 4.00%                                              
Entergy Mississippi [Member] | Subsequent Event [Member]                                                        
Regulatory Asset [Abstract]                                                        
Interim fuel refund for cumulative over-recovery $ 14,100,000                                                      
MPSC settlement refund 235,000,000                                                      
Entergy New Orleans [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount       $ 42,100,000                                                
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   32,408,000                       32,408,000   $ 32,408,000               22,199,000 22,199,000      
Regulatory Asset [Abstract]                                                        
Long-term Transition Bond, Noncurrent   23,866,000                       23,866,000   23,866,000               29,661,000 29,661,000      
Earned return on common equity       6.88%                                                
Authorized return on common equity       9.35%                                                
Deferred Fuel Cost   23,992,000                       23,992,000   23,992,000               0 0      
Long-term Transition Bond, Noncurrent   23,866,000                       23,866,000   23,866,000               29,661,000 29,661,000      
Entergy New Orleans [Member] | Deferred COVID 19 Costs                                                        
Regulatory Asset [Abstract]                                                        
Regulatory Assets   14,500,000                       14,500,000   14,500,000                        
Entergy New Orleans [Member] | Hurricane Zeta                                                        
Total Restoration Costs For Repair and Replacement of Electrical System                   $ 36,000,000                                    
Regulatory Asset [Abstract]                                                        
Excess withdrawn replacement reserve escrow     7,000,000                                                  
Withdrawal from storm reserves     44,000,000                 $ 44,000,000                                
Prudently incurred storm restoration costs     $ 33,000,000                                                  
Estimated costs included in filing for total restoration costs for repair and replacement of electrical system                   $ 7,000,000                                    
Entergy New Orleans [Member] | Hurricane Ida                                                        
Total Restoration Costs For Repair and Replacement of Electrical System   170,000,000                                                    
Regulatory Asset [Abstract]                                                        
Replacement Reserve Escrow                                                     $ 39,000,000  
Excess withdrawn replacement reserve escrow   7,000,000                       7,000,000   7,000,000                        
Reduction to requested total restoration costs for repair and replacement of electrical system   46,000,000                                                    
Entergy New Orleans [Member] | Electricity [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount       $ 34,100,000                                                
Regulatory Asset [Abstract]                                                        
Additional revenue increase due to previously approved amounts       4,700,000                                                
Entergy New Orleans [Member] | Natural Gas, US Regulated [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount       3,300,000                                                
Entergy New Orleans [Member] | Subsequent Event [Member] | Hurricane Ida                                                        
Regulatory Asset [Abstract]                                                        
Carrying costs associated with storm restoration costs                                   9,000,000                    
Entergy New Orleans [Member] | Subsequent Event [Member] | Electricity [Member]                                                        
Regulatory Asset [Abstract]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amended, Amount $ 17,100,000                                                      
Entergy Texas [Member]                                                        
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   245,788,000                       245,788,000   245,788,000               183,965,000 183,965,000      
Proceeds from the issuance of long-term debt                               286,842,000 0                      
Regulatory Asset [Abstract]                                                        
Long-term Transition Bond, Noncurrent   312,129,000                       312,129,000   312,129,000               53,979,000 53,979,000      
Deferred Fuel Cost   189,472,000                       189,472,000   189,472,000               48,280,000 48,280,000      
Interim fuel surcharge, including interest, for under-recovery of fuel and purchased power costs                                                 51,700,000      
Long-term Transition Bond, Noncurrent   312,129,000                       312,129,000   312,129,000               53,979,000 53,979,000      
Interim fuel surcharge, including interest, for under-recovery of fuel and purchased power costs                                                 51,700,000      
Entergy Texas [Member] | Aggregate Senior secured restoration bonds (securitization bonds)                                                        
Regulatory Asset [Abstract]                                                        
Proceeds from Issuance of Debt       290,850,000                                                
Entergy Texas [Member] | Deferred COVID 19 Costs                                                        
Regulatory Asset [Abstract]                                                        
Regulatory Assets   10,400,000                       10,400,000   10,400,000                        
Entergy Texas [Member] | Hurricanes Laura and Delta and Winter Storm Uri                                                        
Regulatory Asset [Abstract]                                                        
Aggregate principal amount of system restoration bonds authorization requested                                                   $ 242,900,000    
Reclassification from utility plant to other regulatory assets         $ 153,000,000                                   $ 153,000,000          
Entergy Texas [Member] | Hurricanes Laura and Delta and Winter Storm Uri | Aggregate Senior secured restoration bonds (securitization bonds)                                                        
Regulatory Asset [Abstract]                                                        
Proceeds from Issuance of Debt       290,850,000                                                
Entergy Arkansas [Member]                                                        
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   371,705,000                       371,705,000   371,705,000               241,127,000 241,127,000      
Proceeds from the issuance of long-term debt                               223,882,000 694,137,000                      
Regulatory Asset [Abstract]                                                        
Energy Cost Recovery Rider Rate Per kWh                                             0.00959          
Deferred Fuel Cost   111,147,000                       111,147,000   111,147,000               108,862,000 108,862,000      
Entergy Arkansas [Member] | Deferred COVID 19 Costs                                                        
Regulatory Asset [Abstract]                                                        
Regulatory Assets   36,600,000                       36,600,000   36,600,000                        
Entergy Arkansas [Member] | 2021 February Winter Storms                                                        
Regulatory Asset [Abstract]                                                        
Deferred Fuel Cost         32,000,000                                   $ 32,000,000          
Entergy Arkansas [Member] | Subsequent Event [Member]                                                        
Regulatory Asset [Abstract]                                                        
Energy Cost Recovery Rider Rate Per kWh                                           $ 0.016390            
Requested Energy Cost Recovery Rider Rate Per kWh                                           $ 0.01785            
Annual revenue constraint per rate class percentage 400.00%                                                      
System Energy [Member]                                                        
Public Utilities, Property, Plant and Equipment, Construction Work in Progress   79,596,000                       79,596,000   79,596,000               $ 97,968,000 $ 97,968,000      
Proceeds from the issuance of long-term debt                               $ 556,696,000 $ 453,981,000                      
Regulatory Asset [Abstract]                                                        
Earned return on common equity                               10.94%                        
Recommended adjustment to earned return on equity                       9.32%                                
Estimated return on equity complaint refund                               $ 61,000,000                        
Return on equity complaint, estimated annual rate reduction   50,000,000                       50,000,000   50,000,000                        
Regulatory charge related to System Energy settlement   551,000,000                                                    
Regulatory charge related to System Energy settlement - net of tax   413,000,000                                                    
Previously recorded liability related to applicable litigation   37,000,000                                                    
Regulatory Liability related to potential settlement refund   588,000,000                       588,000,000   $ 588,000,000                        
System Energy [Member] | Maximum [Member]                                                        
Regulatory Asset [Abstract]                                                        
ALJ recommended equity capital structure, percentage                       48.15%                                
System Energy [Member] | Subsequent Event [Member]                                                        
Regulatory Asset [Abstract]                                                        
Authorized return on common equity 9.65%                                                      
Public Utilities, Approved Equity Capital Structure, Percentage 52.00%                                                      
Potential settlement refund $ 588,250,000                                                      
Entergy Finance Company, LLC                                                        
Regulatory Asset [Abstract]                                                        
Class preferred non voting membership interest units acquired in wholly owned subsidiary | shares     31,635,718.7221                                                  
Preferred Stock, Dividend Rate, Percentage     7.00%                                                  
Proceeds from issuance of preferred interest distributed from EFC to EHC     $ 1,400,000,000                                                  
Proceeds from issuance of preferred interest distributed from EFC to ETR     1,700,000,000                                                  
Preferred Stock, Liquidation Preference, Value     $ 100                                                  
Entergy Holdings Company, LLC | Hurricane Katrina and Hurricane Rita                                                        
Regulatory Asset [Abstract]                                                        
Class preferred non voting membership interest units acquired in wholly owned subsidiary | shares     6,843,780.24                                                  
Entergy Holdings Company, LLC | Hurricane Gustav and Hurricane Ike                                                        
Regulatory Asset [Abstract]                                                        
Class preferred non voting membership interest units acquired in wholly owned subsidiary | shares     4,126,940.15                                                  
Entergy Holdings Company, LLC | Hurricane Isaac                                                        
Regulatory Asset [Abstract]                                                        
Class preferred non voting membership interest units acquired in wholly owned subsidiary | shares     2,935,152.69                                                  
Grand Gulf [Member] | System Energy [Member]                                                        
Variable Interest Entity, Qualitative or Quantitative Information, Ownership Percentage                               11.50%                        
Legacy Entergy Louisiana [Member] | Entergy Louisiana [Member]                                                        
Regulatory Asset [Abstract]                                                        
Formula rate plan revenue increase     $ 86,000,000                                                  
Legacy Entergy Gulf States Louisiana [Member] | Entergy Louisiana [Member]                                                        
Regulatory Asset [Abstract]                                                        
Formula rate plan revenue increase     66,900,000                                                  
Distribution Cost Recovery Factor Rider [Member] | Entergy Texas [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount                 $ 40,200,000                                      
Revenue increase resulting from incremental revenue                                     $ 13,900,000                  
Generation Cost Recovery Rider | Entergy Texas [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount           5,000,000 $ 88,300,000                                          
Generation Cost Recovery Rider | Entergy Texas [Member] | Subsequent Event [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount                                   92,800,000                    
Revenue increase resulting from incremental revenue                                   $ 4,500,000                    
Grand Gulf Sale-leaseback Renewal Complaint | System Energy [Member]                                                        
Variable Interest Entity, Qualitative or Quantitative Information, Ownership Percentage                         11.50%                              
Regulatory Asset [Abstract]                                                        
Refund of Lease Payments                                                       $ 17,200,000
Remaining net book value of the leased assets                                                       $ 70,000,000
Rate reduction for ADIT associated with uncertain tax positions resulting from Grand Gulf sale-leaseback   422,000,000                       422,000,000   $ 422,000,000                        
Interest Portion of rate reduction for ADIT associated with uncertain tax positions resulting from Grand Gulf sale-leaseback   139,000,000                       139,000,000   139,000,000                        
Refund related to depreciation expense adjustments   $ 19,000,000                       $ 19,000,000   $ 19,000,000                        
Unit Power Sales Agreement Complaint | System Energy [Member]                                                        
Regulatory Asset [Abstract]                                                        
FERC staff recommended refund       $ 106,600,000 $ 84,100,000                                              
New Orleans City Council Recommended Hypothetical Equity Ratio Prospectively                                               48.15% 48.15%      
New Orleans City Council Witness Recommended Refund                                               $ 98,800,000 $ 98,800,000      
New Orleans City Council proposed refunds related to the money pool     51,700,000                                                  
LPSC estimated refund without interest     286,000,000                                                  
Reduction in the revenue requirement     1,500,000                                                  
Reduction in revenue requirement - money pool credited through UPSA     1,900,000                                                  
Reduction in revenue requirement for every $50M in refunds     1,900,000                                                  
Amount of refunds ordered in a given year     $ 50,000,000                                                  
System Energy Formula Rate Annual Protocols Formal Challenge | Entergy Mississippi [Member]                                                        
Regulatory Asset [Abstract]                                                        
Amount of retail customers receiving bill credit   460,000                       460,000   460,000                        
System Energy Formula Rate Annual Protocols Formal Challenge | Entergy Mississippi [Member] | Subsequent Event [Member]                                                        
Regulatory Asset [Abstract]                                                        
Amount of refunds ordered in a given year 80                                                      
Payments for Legal Settlements 235,000,000                                                      
System Energy Formula Rate Annual Protocols Formal Challenge | System Energy [Member]                                                        
Regulatory Asset [Abstract]                                                        
Estimated financial impact           $ 53,000,000                                            
Transmission Cost Recovery Factor Rider [Member] | Entergy Texas [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount               $ 66,100,000                                        
Revenue increase resulting from incremental revenue                                       $ 15,100,000                
2022 Base Rate Case | Entergy Texas [Member] | Subsequent Event [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount 131,400,000                                                      
2022 Formula Rate Plan | Entergy Arkansas [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount                                               $ 15,200,000        
Regulatory Asset [Abstract]                                                        
Earned return on common equity                                               8.38%        
2022 Formula Rate Plan | Entergy Arkansas [Member] | Subsequent Event [Member]                                                        
Public Utilities, Requested Rate Increase (Decrease), Amount 119,900,000                                       $ 104,800,000              
Public Utilities, Requested Return on Equity, Percentage                                         7.40%              
Regulatory Asset [Abstract]                                                        
Reduced proposed increase in revenue requirement to comply with annual revenue constraint $ 79,300,000