NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.
Entergy Arkansas [Member]  
Commitments And Contingencies
NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.
Entergy Louisiana [Member]  
Commitments And Contingencies
NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.
Entergy Mississippi [Member]  
Commitments And Contingencies
NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.
Entergy New Orleans [Member]  
Commitments And Contingencies
NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.
Entergy Texas [Member]  
Commitments And Contingencies
NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.
System Energy [Member]  
Commitments And Contingencies
NOTE 1.  COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.
    
As discussed in the Form 10-K, in December 2019 the U.S. Court of Federal Claims issued a judgment in the amount of $80 million in favor of Entergy Arkansas to resolve claims in the third round ANO damages case and issued a judgment in the amount of $7 million in favor of Entergy FitzPatrick Properties (formerly Entergy Nuclear FitzPatrick) in the second round FitzPatrick damages case. Payment of both judgments was received from the U.S. Treasury in January 2020.

In April 2020 the U.S. Court of Federal Claims issued a final judgment in the amount of $33 million in favor of Entergy Louisiana against the DOE in the second round Waterford 3 damages case. Entergy Louisiana received payment from the U.S. Treasury in June 2020. The effects of recording the judgment were reductions to plant, nuclear fuel expense, and other operation and maintenance expense. The Waterford 3 damages awarded included $20 million related to costs previously recorded as nuclear fuel expense, $8 million related to costs previously recorded as other operation and maintenance expenses, and $5 million in costs previously capitalized.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.
Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf-Related Agreements
See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.