COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.
Entergy Arkansas [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.
Entergy Louisiana [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.
Entergy Mississippi [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.
Entergy New Orleans [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.
Entergy Texas [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.
System Energy [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory commissions, and governmental agencies in the ordinary course of business.  While management is unable to predict the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material effect on Entergy’s results of operations, cash flows, or financial condition.  Entergy discusses regulatory proceedings in Note 2 to the financial statements and discusses tax proceedings in Note 3 to the financial statements.
Vidalia Purchased Power Agreement

Entergy Louisiana has an agreement extending through the year 2031 to purchase energy generated by a hydroelectric facility known as the Vidalia project.  Entergy Louisiana made payments under the contract of approximately $146 million in 2015, $152.8 million in 2014, and $181.1 million in 2013.  If the maximum percentage (94%) of the energy is made available to Entergy Louisiana, current production projections would require estimated payments of approximately $150.5 million in 2016, and a total of $1.93 billion for the years 2017 through 2031.  Entergy Louisiana currently recovers the costs of the purchased energy through its fuel adjustment clause.

In an LPSC-approved settlement related to tax benefits from the tax treatment of the Vidalia contract, Entergy Louisiana agreed to credit rates by $11 million each year for up to 10 years, beginning in October 2002.  In October 2011 the LPSC approved a settlement under which Entergy Louisiana agreed to provide credits to customers by crediting billings an additional $20.235 million per year for 15 years beginning January 2012.  Entergy Louisiana recorded a regulatory charge and a corresponding regulatory liability to reflect this obligation.  

ANO Damage, Outage, and NRC Reviews

On March 31, 2013, during a scheduled refueling outage at ANO 1, a contractor-owned and operated heavy-lifting apparatus collapsed while moving the generator stator out of the turbine building.  The collapse resulted in the death of an ironworker and injuries to several other contract workers, caused ANO 2 to shut down, and damaged the ANO turbine building.  The turbine building serves both ANO 1 and 2 and is a non-radiological area of the plant. ANO 2 reconnected to the grid on April 28, 2013 and ANO 1 reconnected to the grid on August 7, 2013.  The total cost of assessment, restoration of off-site power, site restoration, debris removal, and replacement of damaged property and equipment was approximately $95 million.  In addition, Entergy Arkansas incurred replacement power costs for ANO 2 power during its outage and incurred incremental replacement power costs for ANO 1 power because the outage extended beyond the originally-planned duration of the refueling outage.  In February 2014 the APSC approved Entergy Arkansas’s request to exclude from the calculation of its revised energy cost rate $65.9 million of deferred fuel and purchased energy costs incurred in 2013 as a result of the ANO stator incident. The APSC authorized Entergy Arkansas to retain the $65.9 million in its deferred fuel balance with recovery to be reviewed in a later period after more information regarding various claims associated with the ANO stator incident is available.

Entergy Arkansas is pursuing its options for recovering damages that resulted from the stator drop, including its insurance coverage and legal action. Entergy is a member of Nuclear Electric Insurance Limited (NEIL), a mutual insurance company that provides property damage coverage to the members’ nuclear generating plants, including ANO. NEIL has notified Entergy that it believes that a $50 million course of construction sublimit applies to any loss associated with the lifting apparatus failure and stator drop at ANO. Entergy has responded that it disagrees with NEIL’s position and is evaluating its options for enforcing its rights under the policy. During 2014, Entergy Arkansas collected $50 million from NEIL. In July 2013, Entergy Arkansas filed a complaint in the Circuit Court in Pope County, Arkansas against the owner of the heavy-lifting apparatus that collapsed, an engineering firm, a contractor, and certain individuals asserting claims of breach of contract, negligence, and gross negligence in connection with their responsibility for the stator drop.

Shortly after the stator incident, the NRC deployed an augmented inspection team to review the plant’s response.  In July 2013 a second team of NRC inspectors visited ANO to evaluate certain items that were identified as requiring follow-up inspection to determine whether performance deficiencies existed. In March 2014 the NRC issued an inspection report on the follow-up inspection that discussed two preliminary findings, one that was preliminarily determined to be “red with high safety significance” for Unit 1 and one that was preliminarily determined to be “yellow with substantial safety significance” for Unit 2, with the NRC indicating further that these preliminary findings may warrant additional regulatory oversight. This report also noted that one additional item related to flood barrier effectiveness was still under review.

In May 2014 the NRC met with Entergy during a regulatory conference to discuss the preliminary red and yellow findings and Entergy’s response to the findings. During the regulatory conference, Entergy presented information on the facts and assumptions the NRC used to assess the potential findings. The NRC used the information provided by Entergy at the regulatory conference to finalize its decision regarding the inspection team’s findings. In a letter dated June 23, 2014, the NRC classified both findings as “yellow with substantial safety significance.” In an assessment follow-up letter for ANO dated July 29, 2014, the NRC stated that given the two yellow findings, it determined that the performance at ANO is in the “degraded cornerstone column,” or column 3, of the NRC’s reactor oversight process action matrix beginning the first quarter 2014. Corrective actions in response to the NRC’s findings have been taken and remain ongoing at ANO.

In September 2014 the NRC issued an inspection report on the flood barrier effectiveness issue that was still under review at the time of the March 2014 inspection report. While Entergy believes that the flood barrier issues that led to the finding have been addressed at ANO, NRC processes still required that the NRC assess the safety significance of the deficiencies. In its September 2014 inspection report, the NRC discussed a preliminary finding of “yellow with substantial safety significance” for the Unit 1 and Unit 2 auxiliary and emergency diesel fuel storage buildings.  The NRC indicated that these preliminary findings may warrant additional regulatory oversight.  Entergy requested a public regulatory conference regarding the inspection, and the conference was held in October 2014. During the regulatory conference, Entergy presented information related to the facts and assumptions used by the NRC in arriving at its preliminary finding of “yellow with substantial safety significance.” In January 2015 the NRC issued its final risk significance determination for the flood barrier violation originally cited in the September 2014 report. The NRC’s final risk significance determination was classified as “yellow with substantial safety significance.”

In March 2015 the NRC issued a letter notifying Entergy of its decision to move ANO into the “multiple/repetitive degraded cornerstone column” (Column 4) of the NRC’s Reactor Oversight Process Action Matrix. Placement into Column 4 requires significant additional NRC inspection activities at the ANO site, including a review of the site’s root cause evaluation associated with the flood barrier and stator issues, an assessment of the effectiveness of the site’s corrective action program, an additional design basis inspection, a safety culture assessment, and possibly other inspection activities consistent with the NRC’s Inspection Procedure. Entergy Arkansas incurred incremental costs of approximately $53 million in 2015 to prepare for the NRC inspection that began in early 2016. Excluding remediation and response costs that may result from the additional NRC inspection activities, Entergy Arkansas also expects to incur approximately $50 million in 2016 in support of NRC inspection activities and to implement Entergy Arkansas’s performance improvement initiatives developed in 2015. A much lesser amount of incremental expenses is expected to be ongoing annually after 2016.

Baxter Wilson Plant Event

On September 11, 2013, Entergy Mississippi’s Baxter Wilson (Unit 1) power plant experienced a significant unplanned outage event.  Entergy Mississippi completed the repairs to the unit in December 2014. As of December 31, 2014, Entergy Mississippi incurred $22.3 million of capital spending and $26.6 million of operation and maintenance expenses to return the unit to service. The damage was covered by Entergy Mississippi’s property insurance policy, subject to a $20 million deductible. As of December 31, 2014, Entergy Mississippi recorded an insurance receivable of $28.2 million for the amount expected to be received from its insurance policy and has received all of its previously-accrued insurance proceeds, with $12.9 million allocated to capital spending and $15.3 million allocated to operation and maintenance expenses. In June 2014, Entergy Mississippi filed a rate case with the MPSC, which includes recovery of the costs associated with Baxter Wilson (Unit 1) repair activities, net of applicable insurance proceeds. In December 2014 the MPSC issued an order that provided for a deferral of $6 million in other operation and maintenance expenses associated with the Baxter Wilson outage and that the regulatory asset should accrue carrying costs, with amortization of the regulatory asset to occur over two years beginning in February 2015, and provided that the capital costs will be reflected in rate base. The final accounting of costs to return the unit to service and insurance proceeds will be addressed in Entergy Mississippi’s next formula rate plan filing.

Pilgrim NRC Oversight and Planned Shutdown

In September 2015 the NRC placed Pilgrim in its “multiple/repetitive degraded cornerstone column” (Column 4) of its Reactor Oversight Process Action Matrix due to its finding of continuing weaknesses in Pilgrim’s corrective action program that contributed to repeated unscheduled shutdowns and equipment failures. The preliminary estimate of direct costs of Pilgrim’s response to a planned NRC enhanced inspection ranges from $45 million to $60 million, including approximately $30 million in 2016, in operation and maintenance expense, not including any potential capital investment or other costs to address issues that may arise in the inspection.

Entergy determined in October 2015 that it will close Pilgrim, no later than June 1, 2019, because of poor market conditions, reduced revenues, and increased operational costs. Pilgrim currently has approximately 677 MW of Capacity Supply Obligations in ISO New England through May 2019. If Pilgrim shuts down earlier than June 2019 it could have to buy back its Capacity Supply Obligations at prices higher than the capacity rates Pilgrim is currently scheduled to receive. The precise timing of the shutdown depends on several factors, including further discussion with ISO New England. Management expects the timing of the shutdown will be decided in the first half of 2016.

See Note 1 to the financial statements for discussion of the impairment of the Pilgrim plant and related long-lived assets.

Nuclear Fuel Enrichment Contracts

Entergy subsidiaries are parties to two contracts with American Centrifuge Enrichment, LLC (ACE) under which these subsidiaries purchase nuclear fuel enrichment services.  The term of each contract is from 2011 to 2022; however, each contract provided for cancellation of the parties’ purchase and sale obligations for 2016-2022 if, by August 1, 2014, ACE’s planned Advanced Centrifuge Plant was not in commercial operation and ACE did not identify to Entergy’s reasonable satisfaction how it would meet its contractual delivery obligations through output from ACE.  In August 2014, Entergy sent notice to ACE that the 2016-2022 obligations were canceled by the operation of this contractual provision.  United States Enrichment Corporation (USEC), ACE’s affiliate to which ACE assigned the contracts, filed a demand for arbitration with the American Arbitration Association, claiming damages of approximately $165 million.  In July 2015 the parties reached an agreement resolving the dispute that resulted in the dismissal of USEC’s claims. The resolution of the dispute does not have a material effect on Entergy’s results of operations, financial position, or cash flows.

Nuclear Insurance

Third Party Liability Insurance

The Price-Anderson Act requires that reactor licensees purchase insurance and participate in a secondary insurance pool that provides insurance coverage for the public in the event of a nuclear power plant accident.  The costs of this insurance are borne by the nuclear power industry.  Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025.  The Price-Anderson Act requires nuclear power plants to show evidence of financial protection in the event of a nuclear accident.  This protection must consist of two layers of coverage:

1.
The primary level is private insurance underwritten by American Nuclear Insurers (ANI) and provides public liability insurance coverage of $375 million.  If this amount is not sufficient to cover claims arising from an accident, the second level, Secondary Financial Protection, applies.
2.
Within the Secondary Financial Protection level, each nuclear reactor has a contingent obligation to pay a retrospective premium, equal to its proportionate share of the loss in excess of the primary level, regardless of proximity to the incident or fault, up to a maximum of $127.3 million per reactor per incident (Entergy’s maximum total contingent obligation per incident is $1.4 billion).  This consists of a $121.3 million maximum retrospective premium plus a five percent surcharge, which equates to $127.3 million, that may be payable, if needed, at a rate that is currently set at $19 million per year per incident per nuclear power reactor.
3.
In the event that one or more acts of terrorism cause a nuclear power plant accident, which results in third-party damages – off-site property and environmental damage, off-site bodily injury, and on-site third-party bodily injury (i.e. contractors), the primary level provided by ANI combined with the Secondary Financial Protection would provide $13.5 billion in coverage.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Currently, 103 nuclear reactors are participating in the Secondary Financial Protection program.  The product of the maximum retrospective premium assessment to the nuclear power industry and the number of nuclear power reactors provides over $13.1 billion in secondary layer insurance coverage to compensate the public in the event of a nuclear power reactor accident.  The Price-Anderson Act provides that all potential liability for a nuclear accident is limited to the amounts of insurance coverage available under the primary and secondary layers.

Entergy Arkansas and Entergy Louisiana each have two licensed reactors. System Energy has one licensed reactor (10% of Grand Gulf is owned by a non-affiliated company (SMEPA) that would share on a pro-rata basis in any retrospective premium assessment to System Energy under the Price-Anderson Act).  The Entergy Wholesale Commodities segment includes the ownership, operation, and decommissioning of nuclear power reactors and the ownership of the shutdown Indian Point 1 reactor and Big Rock Point facility.

Property Insurance

Entergy’s nuclear owner/licensee subsidiaries are members of NEIL, a mutual insurance company that provides property damage coverage, including decontamination and premature decommissioning expense, to the members’ nuclear generating plants.  Effective April 1, 2015, Entergy was insured against such losses per the following structures:

Utility Plants (ANO 1 and 2, Grand Gulf, River Bend, and Waterford 3)
Primary Layer (per plant) - $1.5 billion per occurrence
Blanket Excess Layer (shared among the Utility plants) - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  ANO 1 and 2 share in the primary and blanket excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Waterford 3 and River Bend for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plants (FitzPatrick, Pilgrim, and Palisades)
Primary Layer (per plant) - $1.115 billion per occurrence
Total limit (per plant) - $1.115 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption

Note:  Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Palisades for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Indian Point)
Primary Layer (per plant) - $1.5 billion per occurrence
Excess Layer - $100 million per occurrence
Total limit - $1.6 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: The Indian Point Units share in the primary and excess layers with common policies because the policies are issued on a per site basis. Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood coverage at Indian Point for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Vermont Yankee)
Primary Layer (per plant) - $1.06 billion per occurrence
Total limit - $1.06 billion per occurrence
Deductibles:
$2.5 million per occurrence - Turbine/generator damage
$2.5 million per occurrence - Other than turbine/generator damage
$10 million per occurrence plus 10% of amount above $10 million - Damage from a windstorm, flood, earthquake, or volcanic eruption
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Vermont Yankee for the primary layer’s first $500 million in coverage.

Entergy Wholesale Commodities Plant (Big Rock Point)
Primary Layer (per plant) - $500 million per occurrence
Total limit - $500 million per occurrence
    
Note: Flood and earthquake coverage are excluded from the primary layer’s first $500 million in coverage. Entergy currently purchases flood and earthquake coverage at Big Rock Point for the primary layer’s first $500 million in coverage.

In addition, Waterford 3, Grand Gulf, and the Entergy Wholesale Commodities plants, with the exception of Vermont Yankee, are also covered under NEIL’s Accidental Outage Coverage program.  Due to the shutdown of the Vermont Yankee Nuclear Power Plant in December 2014 accidental outage coverage was removed effective October 1, 2014. Accidental outage coverage provides indemnification for the actual cost incurred in the event of an unplanned outage resulting from property damage covered under the NEIL Primary Property Insurance policy, subject to a deductible period.  The indemnification for the actual cost incurred is based on market power prices at the time of the loss. The maximum payout indemnity under this policy is limited to a $327.6 million per occurrence. Weekly indemnities for an unplanned outage, covered under NEIL’s Accidental Outage Coverage program, after the deductible period has passed would be the maximum amounts listed below:
100% of the weekly indemnity for each week for the first payment period of 52 weeks: then
80% of the weekly indemnity for each week for the second payment period of 52 weeks; and thereafter
80% of the weekly indemnity for an additional 58 weeks for the third and final payment period.
    
The following summarizes this coverage effective April 1, 2015:

Waterford 3
$2.95 million weekly indemnity
$413 million maximum indemnity - nuclear
$277 million maximum indemnity - non-nuclear
Deductible: 26 week deductible period

Grand Gulf
$400,000 weekly indemnity (total for four policies)
$56 million maximum indemnity - nuclear (total for four policies)
$37 million maximum indemnity - non- nuclear (total for four policies)
Deductible: 26 week deductible period 

Indian Point 2, Indian Point 3, and Palisades
$4.5 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

FitzPatrick and Pilgrim
$4 million weekly indemnity
$490 million maximum indemnity - nuclear
$327.6 million maximum indemnity - non-nuclear
Deductible: 12 week deductible period

Under the property damage and accidental outage insurance programs, all NEIL insured plants could be subject to assessments should losses exceed the accumulated funds available from NEIL.  Effective April 1, 2015, the maximum amounts of such possible assessments per occurrence were as follows:
 
Assessments
 
(In Millions)
Utility:
 
Entergy Arkansas
$44.6
Entergy Louisiana
$54.7
Entergy Mississippi
$0.10
Entergy New Orleans
$0.10
Entergy Texas
N/A
System Energy
$24.5
 
 
Entergy Wholesale Commodities
$—


Potential assessments for the Entergy Wholesale Commodities plants are covered by insurance obtained through NEIL’s reinsurers.

Entergy maintains property insurance for its nuclear units in excess of the NRC’s minimum requirement of $1.06 billion per site for nuclear power plant licensees.  NRC regulations provide that the proceeds of this insurance must be used, first, to render the reactor safe and stable, and second, to complete decontamination operations.  Only after proceeds are dedicated for such use and regulatory approval is secured would any remaining proceeds be made available for the benefit of plant owners or their creditors.

In the event that one or more acts of terrorism causes property damage under one or more or all nuclear insurance policies issued by NEIL (including, but not limited to, those described above) within 12 months from the date the first property damage occurs, the maximum recovery under all such nuclear insurance policies shall be an aggregate of $3.24 billion plus the additional amounts recovered for such losses from reinsurance, indemnity, and any other sources applicable to such losses.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. The Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. The Terrorism Risk Insurance Reauthorization Act of 2015, however, was signed into law by the President of the United States in January 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

Conventional Property Insurance

Entergy’s conventional property insurance program provides coverage of up to $400 million on an Entergy system-wide basis for all operational perils (direct physical loss or damage due to machinery breakdown, electrical failure, fire, lightning, hail, or explosion) on an “each and every loss” basis; up to $400 million in coverage for certain natural perils (direct physical loss or damage due to earthquake, tsunami, and flood) on an annual aggregate basis; up to $125 million for certain other natural perils (direct physical loss or damage due to a named windstorm and associated storm surge) on an annual aggregate basis; and up to $400 million in coverage for all other natural perils not previously stated (direct physical loss or damage due to a tornado, ice storm, or any other natural peril except named windstorm and associated storm surge, earthquake, tsunami, and flood) on an “each and every loss” basis.  The conventional property insurance program provides up to $50 million in coverage for the Entergy New Orleans gas distribution system on an “each and every loss” basis.  This $50 million limit is subject to: the $400 million annual aggregate limit for the natural perils of earthquake, tsunami, and flood; the $125 million annual aggregate limit for the natural perils of named windstorm and associated storm surge.  The coverage is subject to a $40 million self-insured retention per occurrence for the natural perils of named windstorm and associated storm surge, earthquake, flood, and tsunami; and a $20 million self-insured retention per occurrence for operational perils and all other natural perils not previously stated, which includes tornado and ice storm, but excludes named windstorm and associated storm surge, earthquake, tsunami, and flood.

Covered property generally includes power plants, substations, facilities, inventories, and gas distribution-related properties.  Excluded property generally includes above-ground transmission and distribution lines, poles, and towers for substations valued at $5 million or less, coverage for named windstorm and associated storm surge is excluded.  This coverage is in place for Entergy Corporation, the Registrant Subsidiaries, and certain other Entergy subsidiaries, including the owners of the nuclear power plants in the Entergy Wholesale Commodities segment.  Entergy also purchases $300 million in terrorism insurance coverage for its conventional property.  The Terrorism Risk Insurance Reauthorization Act of 2007 created a government program that provides for up to $100 billion in coverage in excess of existing coverage for a terrorist event. As discussed above, the Terrorism Risk Insurance Reauthorization Act of 2007 expired on December 31, 2014. However, The Terrorism Risk Insurance Reauthorization Act of 2015 was signed into law by the President of the United States on January 12, 2015 thereby extending the Terrorism Risk Insurance Act for six years until December 31, 2020.

In addition to the conventional property insurance program, Entergy has purchased additional coverage ($20 million per occurrence) for some of its non-regulated, non-generation assets.  This policy serves to buy-down the $20 million deductible and is placed on a scheduled location basis.  The applicable deductibles are $100,000 to $250,000, except for properties that are damaged by flooding and properties whose values are greater than $20 million; these properties have a $500,000 deductible. Due to the removal of the Vermont Yankee assets from this additional coverage,  as of June 1, 2015, two nuclear locations have a $2.5 million deductible, which coincides with the nuclear property insurance deductible at each respective nuclear site.
Gas System Rebuild Insurance Proceeds (Entergy New Orleans)

Entergy New Orleans received insurance proceeds in 2007 for future construction expenditures associated with rebuilding its gas system, and the October 2006 City Council resolution approving the settlement of Entergy New Orleans’s rate and storm-cost recovery filings requires Entergy New Orleans to record those proceeds in a designated sub-account of other deferred credits until the proceeds are spent on the rebuild project.  This other deferred credit is shown as “Gas system rebuild insurance proceeds” on Entergy New Orleans’s balance sheet.

Employment and Labor-related Proceedings

The Registrant Subsidiaries and other Entergy subsidiaries are responding to various lawsuits in both state and federal courts and to other labor-related proceedings filed by current and former employees, recognized bargaining representatives, and third parties not selected for open positions or providing services directly or indirectly to one or more of the Registrant Subsidiaries and other Entergy subsidiaries.  Generally, the amount of damages being sought is not specified in these proceedings.  These actions include, but are not limited to, allegations of wrongful employment actions; wage disputes and other claims under the Fair Labor Standards Act or its state counterparts; claims of race, gender, age, and disability discrimination; disputes arising under collective bargaining agreements; unfair labor practice proceedings and other administrative proceedings before the National Labor Relations Board or concerning the National Labor Relations Act; claims of retaliation; claims of harassment and hostile work environment; and claims for or regarding benefits under various Entergy Corporation-sponsored plans. Entergy and the Registrant Subsidiaries are responding to these lawsuits and proceedings and deny liability to the claimants.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of Entergy or the Utility operating companies.

Asbestos Litigation (Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

Numerous lawsuits have been filed in federal and state courts, primarily by contractor employees who worked in the 1940-1980s timeframe, primarily against Entergy Texas, and to a lesser extent the other Utility operating companies, as premises owners of power plants, for damages caused by alleged exposure to asbestos.  Many other defendants are named in these lawsuits as well.  Currently, there are approximately 400 lawsuits involving approximately 4,000 claimants.  Management believes that adequate provisions have been established to cover any exposure.  Additionally, negotiations continue with insurers to recover reimbursements.  Management believes that loss exposure has been and will continue to be handled so that the ultimate resolution of these matters will not be material, in the aggregate, to the financial position, results of operation, or cash flows of the Utility operating companies.

Grand Gulf - Related Agreements

Capital Funds Agreement (Entergy Corporation and System Energy)

System Energy has entered into agreements with Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans whereby they are obligated to purchase their respective entitlements of capacity and energy from System Energy’s interest in Grand Gulf, and to make payments that, together with other available funds, are adequate to cover System Energy’s operating expenses.  System Energy would have to secure funds from other sources, including Entergy Corporation’s obligations under the Capital Funds Agreement, to cover any shortfalls from payments received from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under these agreements.

Unit Power Sales Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy has agreed to sell all of its share of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans in accordance with specified percentages (Entergy Arkansas-36%, Entergy Louisiana-14%, Entergy Mississippi-33%, and Entergy New Orleans-17%) as ordered by the FERC.  Charges under this agreement are paid in consideration for the purchasing companies’ respective entitlement to receive capacity and energy and are payable irrespective of the quantity of energy delivered.  The agreement will remain in effect until terminated by the parties and the termination is approved by the FERC, most likely upon Grand Gulf’s retirement from service.  Monthly obligations are based on actual capacity and energy costs.  The average monthly payments for 2015 under the agreement are approximately $19.2 million for Entergy Arkansas, $7.7 million for Entergy Louisiana, $16.5 million for Entergy Mississippi, and $9.3 million for Entergy New Orleans.

Availability Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans are individually obligated to make payments or subordinated advances to System Energy in accordance with stated percentages (Entergy Arkansas-17.1%, Entergy Louisiana-26.9%, Entergy Mississippi-31.3%, and Entergy New Orleans-24.7%) in amounts that, when added to amounts received under the Unit Power Sales Agreement or otherwise, are adequate to cover all of System Energy’s operating expenses as defined, including an amount sufficient to amortize the cost of Grand Gulf 2 over 27 years (See Reallocation Agreement terms below) and expenses incurred in connection with a permanent shutdown of Grand Gulf.  System Energy has assigned its rights to payments and advances to certain creditors as security for certain obligations.  Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement have exceeded the amounts payable under the Availability Agreement.  Accordingly, no payments under the Availability Agreement have ever been required.  If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments.

Reallocation Agreement (Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy)

System Energy, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans entered into the Reallocation Agreement relating to the sale of capacity and energy from Grand Gulf and the related costs, in which Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans agreed to assume all of Entergy Arkansas’s responsibilities and obligations with respect to Grand Gulf under the Availability Agreement.  FERC’s decision allocating a portion of Grand Gulf capacity and energy to Entergy Arkansas supersedes the Reallocation Agreement as it relates to Grand Gulf.  Responsibility for any Grand Gulf 2 amortization amounts has been individually allocated (Entergy Louisiana-26.23%, Entergy Mississippi-43.97%, and Entergy New Orleans-29.80%) under the terms of the Reallocation Agreement.  However, the Reallocation Agreement does not affect Entergy Arkansas’s obligation to System Energy’s lenders under the assignments referred to in the preceding paragraph.  Entergy Arkansas would be liable for its share of such amounts if Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans were unable to meet their contractual obligations.  No payments of any amortization amounts will be required so long as amounts paid to System Energy under the Unit Power Sales Agreement, including other funds available to System Energy, exceed amounts required under the Availability Agreement, which is expected to be the case for the foreseeable future.