Property, Plant, And Equipment
9 Months Ended
Sep. 30, 2014
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
Entergy Arkansas [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
Entergy Gulf States Louisiana [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
Entergy Louisiana [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
Entergy Mississippi [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
Entergy New Orleans [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
Entergy Texas [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.
System Energy [Member]
 
Property, Plant And Equipment
PROPERTY, PLANT, AND EQUIPMENT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Construction Expenditures in Accounts Payable

Construction expenditures included in accounts payable at September 30, 2014 are $136.3 million for Entergy, $24.0 million for Entergy Arkansas, $18.7 million for Entergy Gulf States Louisiana, $11.7 million for Entergy Louisiana, $3.7 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, $6.9 million for Entergy Texas, and $9.7 million for System Energy.  Construction expenditures included in accounts payable at December 31, 2013 are $166 million for Entergy, $61.9 million for Entergy Arkansas, $13.1 million for Entergy Gulf States Louisiana, $31.1 million for Entergy Louisiana, $2.8 million for Entergy Mississippi, $1.7 million for Entergy New Orleans, $10.9 million for Entergy Texas, and $6.7 million for System Energy.

Impairment of Long-Lived Assets

See “Impairment of Long-Lived Assets” in Note 1 to the financial statements in the Form 10-K for a discussion of the periodic reviews that Entergy performs whenever events or changes in circumstances indicate that the recoverability of long-lived assets is uncertain.  Following are updates to that discussion regarding the Vermont Yankee nuclear power plant.

As discussed in the Form 10-K, in December 2013, Entergy and Vermont entered into a settlement agreement, with an accompanying memorandum of understanding that was filed with the Vermont Public Service Board (VPSB), under which Vermont agreed to support Entergy’s request to operate Vermont Yankee until the end of 2014. The settlement agreement provided for Entergy to make $10 million in economic transition payments, $5 million in clean energy development support, and a transitional $5 million payment to Vermont. Entergy will also set aside a new $25 million fund to ensure the Vermont Yankee site is restored after decommissioning. These terms were contingent upon the VPSB issuing by March 31, 2014 a Certificate of Public Good authorizing Vermont Yankee’s operation through 2014, and otherwise conforming to the terms of the settlement agreement. The settlement agreement also provided for the dismissal or discontinuation of other litigation between Entergy and Vermont; in the case of Entergy’s appeal of the VPSB’s March and November 2012 orders, such dismissal was contingent upon the VPSB’s issuance of such a Certificate of Public Good. On March 28, 2014, the VPSB approved the memorandum of understanding and issued a Certificate of Public Good authorizing Vermont Yankee to operate until December 31, 2014.  In May 2014 the VPSB denied a motion that had been filed by one of the intervenors to amend its approval order. In the settlement agreement, Entergy Vermont Yankee agreed to complete and shall provide to the Vermont parties by December 31, 2014, a site assessment study of the costs and tasks of radiological decommissioning, spent nuclear fuel management, and site restoration of Vermont Yankee.  Entergy Vermont Yankee also agreed that it shall file its Post-Shutdown Decommissioning Activities Report (PSDAR) for Vermont Yankee with the NRC no sooner than sixty days after completing the site assessment study.  As part of the development of the site assessment study and PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2014.  The revised estimate, along with reassessment of the assumptions regarding the timing of decommissioning cash flows, resulted in a $101.6 million increase in the decommissioning cost liability and a corresponding impairment charge, recorded in September 2014.  Impairment charges are recorded as a separate line item in Entergy’s consolidated statements of income for 2014 and 2013 and this impairment charge is included within the results of the Entergy Wholesale Commodities segment.