XML 85 R40.htm IDEA: XBRL DOCUMENT v3.20.2
Rate Matters Regulated Operations (Details) - USD ($)
$ in Millions
3 Months Ended 9 Months Ended
Sep. 30, 2020
Sep. 30, 2020
Dec. 31, 2019
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP $ 23,036.9 $ 23,036.9 $ 22,762.4
Accumulated Depreciation 20,116.6 20,116.6 19,007.6
Net Investment 62,786.4 62,786.4 60,138.1
Materials and Supplies 681.2 681.2 640.7
Asset Retirement Obligation, Revision of Estimate [1],[2],[3],[4]   170.5  
Regulatory Assets, Noncurrent 3,518.8 3,518.8 3,158.8
AEP Texas Inc. [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 0.0 0.0 351.7
Accumulated Depreciation 1,541.5 1,541.5 1,758.1
Net Investment 9,545.0 9,545.0 8,845.1
Materials and Supplies 72.0 72.0 56.7
Asset Retirement Obligation, Revision of Estimate [2],[3]   (16.8)  
Regulatory Assets, Noncurrent 275.4 275.4 280.6
AEP Texas Inc. [Member] | Oklaunion Generating Station [Member]      
Public Utilities, General Disclosures [Line Items]      
Asset Retirement Obligation, Revision of Estimate   (17.0)  
AEP Transmission Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Accumulated Depreciation 531.8 531.8 402.3
Net Investment 10,389.5 10,389.5 9,490.9
Materials and Supplies 13.6 13.6 13.8
Regulatory Assets, Noncurrent 6.8 6.8 4.2
Appalachian Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 6,615.9 6,615.9 6,563.7
Accumulated Depreciation 4,652.7 4,652.7 4,432.3
Net Investment 11,285.8 11,285.8 11,081.9
Materials and Supplies 98.2 98.2 105.2
Asset Retirement Obligation, Revision of Estimate [2],[3]   195.4  
Regulatory Assets, Noncurrent 659.1 659.1 457.2
Indiana Michigan Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 5,239.8 5,239.8 5,099.7
Accumulated Depreciation 3,502.4 3,502.4 3,294.3
Net Investment 7,001.8 7,001.8 6,899.7
Materials and Supplies 171.4 171.4 171.3
Regulatory Assets, Noncurrent 450.2 450.2 482.1
Ohio Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Accumulated Depreciation 2,350.1 2,350.1 2,263.0
Net Investment 7,302.1 7,302.1 6,907.0
Materials and Supplies 67.0 67.0 52.3
Regulatory Assets, Noncurrent 401.7 401.7 351.8
Public Service Co Of Oklahoma [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 1,474.1 1,474.1 1,574.6
Accumulated Depreciation 1,578.3 1,578.3 1,580.1
Net Investment 4,205.5 4,205.5 4,103.3
Materials and Supplies 53.4 53.4 46.8
Asset Retirement Obligation, Revision of Estimate [2],[3]   (4.8)  
Regulatory Assets, Noncurrent 388.9 388.9 375.2
Public Service Co Of Oklahoma [Member] | Oklaunion Generating Station [Member]      
Public Utilities, General Disclosures [Line Items]      
Asset Retirement Obligation, Revision of Estimate   (5.0)  
Public Service Co Of Oklahoma [Member] | Oklaunion Generating Station [Member] | Generating Units Probable of Abandonment [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 0.0 0.0  
Accumulated Depreciation 0.0 0.0  
Net Investment 0.0 0.0  
Accelerated Depreciation Regulatory Asset [5] 38.0 38.0  
Materials and Supplies 3.4 3.4  
Cost of Removal Regulatory Liability 5.2 $ 5.2  
Expected Retirement Date   2020  
Remaining Recovery Period   27 years  
Southwestern Electric Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 4,674.7 $ 4,674.7 4,691.4
Accumulated Depreciation 3,092.6 3,092.6 2,873.7
Net Investment 7,113.1 7,113.1 7,095.2
Materials and Supplies 99.2 99.2 94.0
Asset Retirement Obligation, Revision of Estimate [1],[2],[3]   6.2  
Regulatory Assets, Noncurrent 334.8 334.8 222.4
Southwestern Electric Power Co [Member] | Dolet Hills Power Station [Member]      
Public Utilities, General Disclosures [Line Items]      
Asset Retirement Obligation, Revision of Estimate   21.0  
Southwestern Electric Power Co [Member] | Dolet Hills Power Station [Member] | Generating Units Probable of Abandonment [Member]      
Public Utilities, General Disclosures [Line Items]      
Gross Investment Including CWIP 346.7 346.7  
Accumulated Depreciation 250.0 250.0  
Net Investment 96.7 96.7  
Accelerated Depreciation Regulatory Asset [6] 50.4 50.4  
Materials and Supplies 5.8 5.8  
Cost of Removal Regulatory Liability 24.0 $ 24.0  
Expected Retirement Date   2021  
Remaining Recovery Period   27 years  
Percent of Fuel Supply Provided by DHLC   100.00%  
Asset Retirement Obligation, Revision of Estimate   $ 21.0  
Share of Net Investment in Dolet Hills Power Station 153.0 153.0  
Dolet Hills Lignite Company Unbilled Fixed Costs 36.0 36.0  
Oxbow Unbilled Fixed Costs 10.0 10.0  
Dolet Hills Lignite Company and Oxbow Lignite Billings 111.0    
Requested Fuel Cost Deferral   36.0  
Regulatory Assets Pending Final Regulatory Approval [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [7] 316.6 316.6 181.7
Regulatory Assets Pending Final Regulatory Approval [Member] | Virginia Jurisdictional AMR Meters [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 52.0 52.0 51.0
Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 16.1 16.1 30.8
Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [7] 28.7 28.7 30.6
Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Virginia Jurisdictional AMR Meters [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 52.0 52.0 51.0
Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 3.1 3.1 7.7
Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 6.6 6.6 0.1
Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 47.7 47.7 34.6
Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 167.3 167.3 46.3
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Oklaunion Power Station Accelerated Depreciation [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 38.0 38.0 27.4
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Kentucky Deferred Purchase Power Expenses [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 38.5 38.5 30.2
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Plant Retirement Costs - Unrecovered Plant [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 35.2 35.2 35.2
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Dolet Hills Power Station Accelerated Depreciation [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 50.4 50.4 0.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.0 2.0 0.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.2 2.2 0.7
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | COVID-19 - Virginia      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.0 2.0 0.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Plant Retirement Costs - Materials and Supplies [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.0 0.0 0.5
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Oklaunion Power Station Accelerated Depreciation [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 38.0 38.0 27.4
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Dolet Hills Power Station Accelerated Depreciation [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 50.4 50.4 0.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Plant Retirement Costs - Unrecovered Plant, Louisiana [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 35.2 35.2 35.2
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.2 2.2 0.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 20.3 20.3 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Plant Retirement Costs - Asset Retirement Obligation Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 25.9 25.9 30.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 86.3 86.3 7.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Asset Retirement Obligation [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 8.7 8.7 7.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Vegetation Management Program [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [8] 3.8 3.8 29.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Vegetation Management Program [Member] | 2019 Texas Base Rate Case [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 26.0 26.0  
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Cook Plant Study Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [9] 0.0 0.0 7.6
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 5.3 5.3 6.7
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 10.9 10.9 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Vegetation Management Program [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [8] 3.8 3.8 29.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Vegetation Management Program [Member] | 2019 Texas Base Rate Case [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 26.0 26.0  
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 1.4 1.4 1.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Plant Retirement Costs - Asset Retirement Obligation Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 25.9 25.9 30.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | COVID-19 - West Virginia      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.8 0.8 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 3.1 3.1 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Cook Plant Study Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [9] 0.0 0.0 7.6
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.0 0.0 0.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.9 2.9 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 3.6 3.6 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.1 0.1 0.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.3 0.3 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 9.4 9.4 7.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | COVID-19      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 1.7 1.7 0.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Asset Retirement Obligation - Louisiana [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 8.5 8.5 7.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.0 2.0 3.7
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Storm Related Costs - Louisiana      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent $ 67.3 $ 67.3 $ 0.0
[1] Includes ARO related to Sabine and DHLC.
[2] Includes ARO related to asbestos removal.
[3] Includes ARO related to ash disposal facilities.
[4] Includes ARO related to nuclear decommissioning costs for the Cook Plant of $1.78 billion and $1.73 billion as of September 30, 2020 and December 31, 2019, respectively.
[5] In October 2018, PSO changed depreciation rates to utilize the 2020 end-of-life and defer depreciation expense to a regulatory asset for the amount in excess of the previously OCC-approved depreciation rates for Oklaunion Power Station.
[6] In January 2020, SWEPCo changed depreciation rates to utilize the 2026 end-of-life and defer depreciation expense to a regulatory asset for the amount in excess of the previously APSC-approved depreciation rates for Dolet Hills Power Station. In March 2020, SWEPCo changed depreciation rates again to utilize the accelerated 2021 end-of-life.
[7] APCo is currently in the process of retiring and replacing its Virginia jurisdictional Automated Meter Reading (AMR) meters with AMI meters. As of September 30, 2020 and December 31, 2019, APCo has approximately $52 million and $51 million, respectively, of Virginia jurisdictional AMR meters recorded in Total Property, Plant and Equipment - Net on its balance sheets. APCo is pursuing full recovery of these assets through its Virginia depreciation rates. See “2017-2019 Virginia Triennial Review” section below for additional information.
[8] In April 2020, $26 million of deferred expenses were approved for recovery. See “2019 Texas Base Rate Case” section below for additional information.
[9] Approved for recovery in the first quarter of 2020 in the Indiana Base Rate Case.