XML 91 R38.htm IDEA: XBRL DOCUMENT v2.4.0.8
Rate Matters (Details) (USD $)
3 Months Ended 1 Months Ended 3 Months Ended 3 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended 3 Months Ended 3 Months Ended
Mar. 31, 2014
Dec. 31, 2013
Mar. 31, 2014
Tanners Creek Plant, Units 1-4 [Member]
Mar. 31, 2014
Big Sandy Plant, Unit 2 [Member]
Mar. 31, 2014
Regulatory Assets Not Yet Being Recovered [Member]
Dec. 31, 2013
Regulatory Assets Not Yet Being Recovered [Member]
Mar. 31, 2014
Ohio Economic Development Rider [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Dec. 31, 2013
Ohio Economic Development Rider [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Mar. 31, 2014
Expanded Net Energy Charge - Coal Inventory [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Expanded Net Energy Charge - Coal Inventory [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
IGCC Pre-Construction Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
IGCC Pre-Construction Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Under-Recovered Capacity Costs
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Under-Recovered Capacity Costs
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Mountaineer Carbon Capture and Storage Product Validation Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Mountaineer Carbon Capture and Storage Product Validation Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Dec. 31, 2013
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Mar. 31, 2014
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Ormet Special Rate Recovery Mechanism [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Ormet Special Rate Recovery Mechanism [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Dec. 31, 2013
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Mar. 31, 2014
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Expanded Net Energy Charge - Coal Inventory [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Expanded Net Energy Charge - Coal Inventory [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
IGCC Pre-Construction Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
IGCC Pre-Construction Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Mountaineer Carbon Capture and Storage Commercial Scale Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Mountaineer Carbon Capture and Storage Commercial Scale Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Mountaineer Carbon Capture and Storage Product Validation Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Mountaineer Carbon Capture and Storage Product Validation Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Transmission Agreement Phase-In [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Transmission Agreement Phase-In [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Virginia Demand Response Program Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Virginia Demand Response Program Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Appalachian Power Co [Member]
Virginia Environmental Rate Adjustment Clause [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Appalachian Power Co [Member]
Virginia Environmental Rate Adjustment Clause [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Southwestern Electric Power Co [Member]
Dec. 31, 2013
Southwestern Electric Power Co [Member]
Mar. 31, 2014
Southwestern Electric Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Dec. 31, 2013
Southwestern Electric Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Mar. 31, 2014
Southwestern Electric Power Co [Member]
Mountaineer Carbon Capture and Storage Commercial Scale Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Southwestern Electric Power Co [Member]
Mountaineer Carbon Capture and Storage Commercial Scale Facility [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Southwestern Electric Power Co [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Southwestern Electric Power Co [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Southwestern Electric Power Co [Member]
Rate Case Expenses [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Southwestern Electric Power Co [Member]
Rate Case Expenses [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Ohio Power Co [Member]
Dec. 31, 2013
Ohio Power Co [Member]
Mar. 31, 2014
Ohio Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Dec. 31, 2013
Ohio Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Mar. 31, 2014
Ohio Power Co [Member]
Ohio Economic Development Rider [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Dec. 31, 2013
Ohio Power Co [Member]
Ohio Economic Development Rider [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Earning a Return [Member]
Mar. 31, 2014
Ohio Power Co [Member]
Ormet Special Rate Recovery Mechanism [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Ohio Power Co [Member]
Ormet Special Rate Recovery Mechanism [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Ohio Power Co [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Ohio Power Co [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Public Service Co Of Oklahoma [Member]
Dec. 31, 2013
Public Service Co Of Oklahoma [Member]
Mar. 31, 2014
Public Service Co Of Oklahoma [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Dec. 31, 2013
Public Service Co Of Oklahoma [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Mar. 31, 2014
Public Service Co Of Oklahoma [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Public Service Co Of Oklahoma [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Public Service Co Of Oklahoma [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Public Service Co Of Oklahoma [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Tanners Creek Plant, Units 1-4 [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Cook Plant Turbine [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Cook Plant Turbine [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Indiana Deferred Cook Plant Life Cycle Management Project Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Indiana Deferred Cook Plant Life Cycle Management Project Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Indiana Under-Recovered Capacity Costs
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Indiana Under-Recovered Capacity Costs
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Other Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Storm Costs [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
Indiana Michigan Power Co [Member]
Stranded Costs on Abandoned Plants [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Dec. 31, 2013
Indiana Michigan Power Co [Member]
Stranded Costs on Abandoned Plants [Member]
Regulatory Assets Not Yet Being Recovered [Member]
Regulatory Assets Currently Not Earning a Return [Member]
Mar. 31, 2014
APCo's Filing for IGCC Plant [Member]
Applicable to West Virginia Jurisdiction [Member]
Mar. 31, 2014
APCo's Filing for IGCC Plant [Member]
Applicable to West Virginia Jurisdiction [Member]
Appalachian Power Co [Member]
Mar. 31, 2014
APCo's Filing for IGCC Plant [Member]
Applicable to FERC Jurisdiction [Member]
Mar. 31, 2014
APCo's Filing for IGCC Plant [Member]
Applicable to FERC Jurisdiction [Member]
Appalachian Power Co [Member]
Mar. 31, 2014
APCo's Filing for IGCC Plant [Member]
Applicable to Virginia Jurisdiction [Member]
Mar. 31, 2014
APCo's Filing for IGCC Plant [Member]
Applicable to Virginia Jurisdiction [Member]
Appalachian Power Co [Member]
Mar. 31, 2014
Cook Plant Life Cycle Management Project [Member]
Mar. 31, 2014
Cook Plant Life Cycle Management Project [Member]
Indiana Michigan Power Co [Member]
Mar. 31, 2014
Cook Plant Life Cycle Management Project [Member]
Indiana Filing [Member]
Mar. 31, 2014
Cook Plant Life Cycle Management Project [Member]
Indiana Filing [Member]
Indiana Michigan Power Co [Member]
Mar. 31, 2014
Indiana 2011 Base Rate Case [Member]
Mar. 31, 2014
Indiana 2011 Base Rate Case [Member]
Indiana Michigan Power Co [Member]
Mar. 31, 2014
Louisiana 2012 Formula Rate Filing [Member]
Mar. 31, 2014
Louisiana 2012 Formula Rate Filing [Member]
Southwestern Electric Power Co [Member]
Apr. 25, 2014
Louisiana 2014 Formula Rate Filing [Member]
Subsequent Event [Member]
Apr. 25, 2014
Louisiana 2014 Formula Rate Filing [Member]
Southwestern Electric Power Co [Member]
Subsequent Event [Member]
Mar. 31, 2014
Ohio Electric Security Plan Filing [Member]
Mar. 31, 2014
Ohio Electric Security Plan Filing [Member]
Deferred Capacity Costs [Member]
Mar. 31, 2014
Ohio Electric Security Plan Filing [Member]
Deferred Fuel Costs [Member]
Mar. 31, 2014
Ohio Electric Security Plan Filing [Member]
Ohio Power Co [Member]
Mar. 31, 2014
Ohio Electric Security Plan Filing [Member]
Ohio Power Co [Member]
Deferred Capacity Costs [Member]
Mar. 31, 2014
Ohio Electric Security Plan Filing [Member]
Ohio Power Co [Member]
Deferred Fuel Costs [Member]
Mar. 31, 2014
Ohio Fuel Adjustment Clause Audit - 2009 [Member]
Mar. 31, 2014
Ohio Fuel Adjustment Clause Audit - 2009 [Member]
Ohio Power Co [Member]
Mar. 31, 2014
Ohio IGCC Plant [Member]
Mar. 31, 2014
Ohio IGCC Plant [Member]
Ohio Power Co [Member]
Apr. 25, 2014
Plant Transfer [Member]
Subsequent Event [Member]
Apr. 25, 2014
Plant Transfer [Member]
Appalachian Power Co [Member]
Subsequent Event [Member]
Mar. 31, 2014
Plant Transfer [Member]
Terms Of Kentucky Power Co Settlement Agreement [Member]
Mar. 31, 2014
Plant Transfer [Member]
Terms Of Kentucky Power Co Settlement Agreement [Member]
Big Sandy Plant, Unit 1 Natural Gas Conversion [Member]
Mar. 31, 2014
Oklahoma 2014 Base Rate Case [Member]
Apr. 25, 2014
Oklahoma 2014 Base Rate Case [Member]
Subsequent Event [Member]
Apr. 25, 2014
Oklahoma 2014 Base Rate Case [Member]
Subsequent Event [Member]
Minimum [Member]
Apr. 25, 2014
Oklahoma 2014 Base Rate Case [Member]
Subsequent Event [Member]
Maximum [Member]
Mar. 31, 2014
Oklahoma 2014 Base Rate Case [Member]
Public Service Co Of Oklahoma [Member]
Apr. 25, 2014
Oklahoma 2014 Base Rate Case [Member]
Public Service Co Of Oklahoma [Member]
Subsequent Event [Member]
Apr. 25, 2014
Oklahoma 2014 Base Rate Case [Member]
Public Service Co Of Oklahoma [Member]
Subsequent Event [Member]
Minimum [Member]
Apr. 25, 2014
Oklahoma 2014 Base Rate Case [Member]
Public Service Co Of Oklahoma [Member]
Subsequent Event [Member]
Maximum [Member]
Mar. 31, 2014
Ormet
Apr. 25, 2014
Ormet
Subsequent Event [Member]
Mar. 31, 2014
Ormet
Ohio Power Co [Member]
Apr. 25, 2014
Ormet
Ohio Power Co [Member]
Subsequent Event [Member]
Apr. 25, 2014
Storm Damage Recovery Rider [Member]
Subsequent Event [Member]
Apr. 25, 2014
Storm Damage Recovery Rider [Member]
Ohio Power Co [Member]
Subsequent Event [Member]
Mar. 31, 2014
Texas 2012 Base Rate Case [Member]
Mar. 31, 2014
Texas 2012 Base Rate Case [Member]
Welsh Plant, Unit 2 [Member]
Mar. 31, 2014
Texas 2012 Base Rate Case [Member]
Southwestern Electric Power Co [Member]
Mar. 31, 2014
Texas 2012 Base Rate Case [Member]
Southwestern Electric Power Co [Member]
Welsh Plant, Unit 2 [Member]
Mar. 31, 2014
Texas Transmission Cost Recovery Factor Filing - 2013 [Member]
Mar. 31, 2014
Texas Transmission Cost Recovery Factor Filing - 2013 [Member]
Southwestern Electric Power Co [Member]
Mar. 31, 2014
Virginia 2014 Biennial Base Rate Case [Member]
Mar. 31, 2014
Virginia 2014 Biennial Base Rate Case [Member]
Appalachian Power Co [Member]
Mar. 31, 2014
Virginia Transmission Rate Adjustment Clause - 2013 [Member]
Mar. 31, 2014
Virginia Transmission Rate Adjustment Clause - 2013 [Member]
Appalachian Power Co [Member]
Regulatory Assets Not Being Recovered [Abstract]                                                                                                                                                                                                                                                                                                      
Regulatory Assets, Noncurrent $ 4,384,000,000 $ 4,376,000,000     $ 250,000,000 $ 330,000,000 $ 0 $ 14,000,000 $ 19,000,000 $ 21,000,000 $ 21,000,000 $ 0 $ 28,000,000 $ 22,000,000 $ 13,000,000 $ 13,000,000 $ 0 $ 4,000,000 $ 34,000,000 $ 37,000,000 $ 10,000,000 $ 36,000,000 $ 21,000,000 $ 22,000,000 $ 104,000,000 $ 161,000,000 $ 1,006,426,000 $ 1,003,890,000 $ 130,904,000 $ 111,218,000 $ 18,818,000 $ 20,528,000 $ 20,528,000 $ 0 $ 1,287,000 $ 1,287,000 $ 13,264,000 $ 13,264,000 $ 513,000 $ 168,000 $ 65,206,000 $ 65,206,000 $ 3,450,000 $ 3,313,000 $ 5,897,000 $ 5,012,000 $ 1,941,000 $ 2,440,000 $ 367,406,000 $ 369,905,000 $ 11,098,000 $ 11,028,000 $ 1,143,000 $ 1,143,000 $ 2,025,000 $ 1,951,000 $ 7,930,000 $ 7,934,000 $ 1,398,055,000 $ 1,378,697,000 $ 12,118,000 $ 107,074,000 $ 0 $ 13,854,000 $ 10,483,000 $ 35,631,000 $ 1,635,000 $ 57,589,000 $ 164,929,000 $ 156,690,000 $ 20,172,000 $ 19,588,000 $ 1,079,000 $ 845,000 $ 19,093,000 $ 18,743,000 $ 505,750,000 $ 524,114,000   $ 37,729,000 $ 35,386,000 $ 4,238,000 $ 3,452,000 $ 0 $ 4,093,000 $ 28,149,000 $ 21,945,000 $ 694,000 $ 164,000 $ 751,000 $ 1,836,000 $ 3,897,000 $ 3,896,000                                   $ 348,000,000 $ 426,000,000   $ 348,000,000 $ 426,000,000                                                                
Rate Matters (Textuals) [Abstract]                                                                                                                                                                                                                                                                                                      
Regulatory Assets, Noncurrent 4,384,000,000 4,376,000,000     250,000,000 330,000,000 0 14,000,000 19,000,000 21,000,000 21,000,000 0 28,000,000 22,000,000 13,000,000 13,000,000 0 4,000,000 34,000,000 37,000,000 10,000,000 36,000,000 21,000,000 22,000,000 104,000,000 161,000,000 1,006,426,000 1,003,890,000 130,904,000 111,218,000 18,818,000 20,528,000 20,528,000 0 1,287,000 1,287,000 13,264,000 13,264,000 513,000 168,000 65,206,000 65,206,000 3,450,000 3,313,000 5,897,000 5,012,000 1,941,000 2,440,000 367,406,000 369,905,000 11,098,000 11,028,000 1,143,000 1,143,000 2,025,000 1,951,000 7,930,000 7,934,000 1,398,055,000 1,378,697,000 12,118,000 107,074,000 0 13,854,000 10,483,000 35,631,000 1,635,000 57,589,000 164,929,000 156,690,000 20,172,000 19,588,000 1,079,000 845,000 19,093,000 18,743,000 505,750,000 524,114,000   37,729,000 35,386,000 4,238,000 3,452,000 0 4,093,000 28,149,000 21,945,000 694,000 164,000 751,000 1,836,000 3,897,000 3,896,000                                   348,000,000 426,000,000   348,000,000 426,000,000                                                                
Potential Refund of Carrying Costs Due to an Accumulated Deferred Income Tax Credit                                                                                                                                                                                                                           30,000,000     30,000,000                                                                    
Potential Refund of Unrecognized Equity Carrying Costs Due to an Accumulated Deferred Income Tax Credit                                                                                                                                                                                                                           16,000,000     16,000,000                                                                    
Future Commitment to Support the Development of a Large Solar Farm                                                                                                                                                                                                                           20,000,000     20,000,000                                                                    
PUCO Ordered Fixed Price per MW Day for Customers Who Switch During ESP Period                                                                                                                                                                                                                           188.88     188.88                                                                    
Reliability Pricing Model Rate per MW Day in Effect Through May 2014                                                                                                                                                                                                                           33     33                                                                    
Reliability Pricing Model Rate per MW Day in Effect from June 2014 Through May 2015                                                                                                                                                                                                                           148     148                                                                    
Retail Stability Rider for the Period June 2014 through May 2015 ($ per MWh)                                                                                                                                                                                                                           4.00     4.00                                                                    
Retail Stability Rider through May 2014 ($ Per MWh)                                                                                                                                                                                                                           3.50     3.50                                                                    
Amount of Retail Stability Rider Applied to the Deferred Capacity Costs for the Period June 2014 through May 2015 ($ per MWh)                                                                                                                                                                                                                           1.00     1.00                                                                    
Percentage of Standard Service Offer Load Which Registrant Will Conduct an Energy Only Auction for Delivery through May 2015                                                                                                                                                                                                                           10.00%     10.00%                                                                    
Additional Percentage of Standard Service Offer Load Which Registrant Will Conduct an Energy Only Auction for Delivery Beginning November 2014 through May 2015                                                                                                                                                                                                                           50.00%     50.00%                                                                    
Remaining Percentage of Standard Service Offer Load Which Registrant Will Conduct an Energy Only Auction for Delivery from January 2015 through May 2015                                                                                                                                                                                                                           40.00%     40.00%                                                                    
Requested Return on Equity on Capital Costs for Certain Riders                                                                                                                                                                                                                           10.65%     10.65%                                                                    
Estimated Average Decrease in Customer Rates Over Three Years                                                                                                                                                                                                                           9.00%     9.00%                                                                    
Intended Retail Stability Rider Rate To Be Continued Until Capacity Deferral Balance Is Collected                                                                                                                                                                                                                           4.00     4.00                                                                    
Recommended Amount of Storm Cost Recovery as Approved in Stipulation Agreement                                                                                                                                                                                                                                                                               55,000,000 55,000,000                    
Reduction in the 2012 Storm Expenses as Approved in the Stipulation Agreement                                                                                                                                                                                                                                                                               6,000,000 6,000,000                    
2008 Coal Contract Settlement Proceeds to be Applied to Deferred Fuel Adjustment Clause as Orginially Ordered by the PUCO                                                                                                                                                                                                                                       65,000,000 65,000,000                                                            
Net Favorable Fuel Adjustment Recorded in 2012 Based on Fuel Adjustment Clause Audit Rehearing                                                                                                                                                                                                                                       30,000,000 30,000,000                                                            
Remaining Retail Gain Not Already Flowed Through Fuel Adjustment Clause                                                                                                                                                                                                                                       35,000,000 35,000,000                                                            
Maximum Amount of Ormet's October and November 2012 Unpaid Balance Allowed to be Recovered in the Economic Development Rider                                                                                                                                                                                                                                                                       20,000,000   20,000,000                          
Amount of Foregone Revenues to be Collected Through the Economic Development Rider as Proposed in the Stipulation Agreement                                                                                                                                                                                                                                                                       49,000,000   49,000,000                          
Amount of Foregone Revenues to be Collected Through the Economic Development Rider as Approved in the Economic Development Rider Filing                                                                                                                                                                                                                                                                       39,000,000   39,000,000                          
Remaining Ormet Deferral Allowed to be Requested Upon PUCO Adoption of Ormet Stipulation Agreement                                                                                                                                                                                                                                                                       10,000,000   10,000,000                          
Amount of Remaining Foregone Revenues Objected to by an Intervenor                                                                                                                                                                                                                                                                         5,000,000   5,000,000                        
Deferred Fuel Adjustment Clause Related to Ormet Interim Arrangement as of September 2009                                                                                                                                                                                                                                                                       64,000,000   64,000,000                          
Unrecognized Equity Carrying Costs Related to Ormet Interim Arrangement as of September 2009                                                                                                                                                                                                                                                                       2,000,000   2,000,000                          
Collection of Authorized Pre-Construction Costs                                                                                                                                                                                                                                           24,000,000 24,000,000                                                        
Property, Plant and Equipment, Net     334,000,000 247,000,000                                                                                                                                                     334,000,000                                                                                                                       86,000,000   86,000,000            
Reversal of Previously Recorded Regulatory Disallowances                                                                                                                                                                                                                                                                                   114,000,000   114,000,000              
Resulting Approved Base Rate Increase                                                                                                                                                                                                                                                                                   52,000,000   52,000,000              
Requested Transmission Cost Recovery Factor Revenue                                                                                                                                                                                                                                                                                           10,000,000 10,000,000        
Louisiana Jurisdictional Share of the Turk Plant                                                                                                                                                                                                                   29.00% 29.00%                                                                                
Net Increase in Louisiana Total Rates per the Settlement Agreement                                                                                                                                                                                                                   2,000,000 2,000,000                                                                                
Base Rate Increase per the Settlement Agreement                                                                                                                                                                                                                   85,000,000 85,000,000                                                                                
Fuel Rate Decrease per the Settlement Agreement                                                                                                                                                                                                                   83,000,000 83,000,000                                                                                
Return on Common Equity per the Settlement Agreement                                                                                                                                                                                                                   10.00% 10.00%                                                                                
Requested Annual Increase                                                                                                                                                                                                                       5,000,000 5,000,000                                                                            
Additional Requested Annual Increase                                                                                                                                                                                                                       15,000,000 15,000,000                                                                            
Requested Total Annual Increase                                                                                                                                                                                                                       20,000,000 20,000,000                                                                            
Proposed Base Rate Surcharge                                                                                                                                                                                                                                               113,000,000 113,000,000                                                    
Amount of Deferred Preconstruction IGCC Costs for Future Recovery                                                                                                                                                                                           9,000,000 9,000,000 2,000,000 2,000,000 10,000,000 10,000,000                                                                                                
Requested Increase In Virginia Transmission Rate Adjustment Clause Revenues                                                                                                                                                                                                                                                                                                   50,000,000 50,000,000
Annual Revenue Increase as Approved in Stipulation Agreement                                                                                                                                                                                                                                                                                                   49,000,000 49,000,000
Approved Return On Equity                                                                                                                                                                                                               10.20% 10.20%                                                                             10.90% 10.90%    
Requested Annual Amortization of Certain Deferred Costs                                                                                                                                                                                                                                                                                               7,000,000 7,000,000    
Requested Base Rate Increase                                                                                                                                                                                                                                                       38,000,000       38,000,000                                      
Requested Return on Equity                                                                                                                                                                                                                                                       10.50%       10.50%                                      
Proposed Depreciation Increase Included in Requested Rate Increase                                                                                                                                                                                                                                                       29,000,000       29,000,000                                      
Year One Revenues Related to Proposed Recovery of Advanced Metering Costs                                                                                                                                                                                                                                                       7,000,000       7,000,000                                      
Year Three Revenues Related to Proposed Recovery of Advanced Metering Costs                                                                                                                                                                                                                                                       28,000,000       28,000,000                                      
Intervenor Recommended Reduction to the Requested Increase in Annual Base Rate                                                                                                                                                                                                                                                         16,000,000       16,000,000                                    
Intervenor Recommended Reduction in Annual Base Rates                                                                                                                                                                                                                                                         22,000,000       22,000,000                                    
Intervenor Recommended Return on Common Equity Range                                                                                                                                                                                                                                                           9.18% 9.50%     9.18% 9.50%                                
Approved Base Rate Increase                                                                                                                                                                                                               85,000,000 85,000,000                                                                                    
Revised Approved Base Rate Increase                                                                                                                                                                                                               92,000,000 92,000,000                                                                                    
Projected Capital Costs                                                                                                                                                                                                       1,200,000,000 1,200,000,000                                           60,000,000                                                
Construction Work in Progress 2,836,000,000 2,471,000,000                                                 217,713,000 184,701,000                                         309,200,000 281,849,000                 188,636,000 185,428,000                 172,949,000 175,890,000             476,734,000 427,164,000                                           405,000,000 405,000,000                                                                                            
Amount Excluded from Indiana Utility Regulatory Commission LCM Project Approval                                                                                                                                                                                                           23,000,000 23,000,000                                                                                        
Annual Amount of Asset Transfer Rider                                                                                                                                                                                                                                                   44,000,000                                                  
Annual Level of Off System Sales Margins in Base Rates Above Which is Proposed to be Retained by Kentucky Power Company                                                                                                                                                                                                                                                   15,300,000                                                  
Asset Impairments and Other Related Charges                                                                                                                                                                                                                                                   $ 33,000,000