Commitments, Guarantees and Contingencies
3 Months Ended
Mar. 31, 2022
Commitments and Contingencies Disclosure [Abstract]  
Commitments, Guarantees and Contingencies [Text Block] COMMITMENTS, GUARANTEES AND CONTINGENCIES
Power Purchase and Sale Agreements. Our long-term PPAs have been evaluated under the accounting guidance for variable interest entities. We have determined that either we have no variable interest in the PPAs or, where we do have variable interests, we are not the primary beneficiary; therefore, consolidation is not required. These conclusions are based on the fact that we do not have both control over activities that are most significant to the entity and an obligation to absorb losses or receive benefits from the entity’s performance. Our financial exposure relating to these PPAs is limited to our capacity and energy payments.

Our PPAs are summarized in Note 8. Commitments, Guarantees and Contingencies to the Consolidated Financial Statements in our 2021 Form 10-K, with additional disclosure provided in the following paragraphs.

Square Butte PPA. As of March 31, 2022, Square Butte had total debt outstanding of $218.3 million. Fuel expenses are recoverable through Minnesota Power’s fuel adjustment clause and include the cost of coal purchased from BNI Energy under a long-term contract. Minnesota Power’s cost of power purchased from Square Butte during the three months ended March 31, 2022, was $20.3 million ($19.6 million for the same period in 2021). This reflects Minnesota Power’s pro rata share of total Square Butte costs based on the 50 percent output entitlement. Included in this amount was Minnesota Power’s pro rata share of interest expense of $1.0 million ($1.5 million for the same period in 2021). Minnesota Power’s payments to Square Butte are approved as a purchased power expense for ratemaking purposes by both the MPUC and the FERC.

Minnkota Power PSA. Minnesota Power has a PSA with Minnkota Power, which commenced in 2014. Under the PSA, Minnesota Power is selling a portion of its entitlement from Square Butte to Minnkota Power, resulting in Minnkota Power’s net entitlement increasing and Minnesota Power’s net entitlement decreasing until Minnesota Power’s share is eliminated at the end of 2025. Of Minnesota Power’s 50 percent output entitlement, Minnesota Power sold to Minnkota Power approximately 32 percent in 2022 and 28 percent in 2021.
Coal, Rail and Shipping Contracts. Minnesota Power has coal supply agreements providing for the purchase of a significant portion of its coal requirements through December 2022. Minnesota Power also has coal transportation agreements in place for the delivery of a significant portion of its coal requirements through December 2024. The costs of fuel and related transportation costs for Minnesota Power’s generation are recoverable from Minnesota Power’s retail and municipal utility customers through the fuel adjustment clause.
Environmental Matters.

Our businesses are subject to regulation of environmental matters by various federal, state and local authorities. A number of regulatory changes to the Clean Air Act, the Clean Water Act and various waste management requirements have been promulgated by both the EPA and state authorities over the past several years. Minnesota Power’s facilities are subject to additional requirements under many of these regulations. Minnesota Power is reshaping its generation portfolio, over time, to reduce its reliance on coal, has installed cost-effective emission control technology, and advocates for sound science and policy during rulemaking implementation.

We consider our businesses to be in substantial compliance with currently applicable environmental regulations and believe all necessary permits have been obtained. We anticipate that with many state and federal environmental regulations and requirements finalized, or to be finalized in the near future, potential expenditures for future environmental matters may be material and require significant capital investments. Minnesota Power has evaluated various environmental compliance scenarios using possible outcomes of environmental regulations to project power supply trends and impacts on customers.

We review environmental matters on a quarterly basis. Accruals for environmental matters are recorded when it is probable that a liability has been incurred and the amount of the liability can be reasonably estimated based on current law and existing technologies. Accruals are adjusted as assessment and remediation efforts progress, or as additional technical or legal information becomes available. Accruals for environmental liabilities are included in the Consolidated Balance Sheet at undiscounted amounts and exclude claims for recoveries from insurance or other third parties. Costs related to environmental contamination treatment and cleanup are expensed unless recoverable in rates from customers.

Air. The electric utility industry is regulated both at the federal and state level to address air emissions. Minnesota Power’s thermal generating facilities mainly burn low-sulfur western sub-bituminous coal. All of Minnesota Power’s coal-fired generating facilities are equipped with pollution control equipment such as scrubbers, baghouses and low NOX technologies. Under currently applicable environmental regulations, these facilities are substantially compliant with emission requirements.
NOTE 6. COMMITMENTS, GUARANTEES AND CONTINGENCIES (Continued)
Environmental Matters (Continued)

Cross-State Air Pollution Rule (CSAPR). The CSAPR requires certain states in the eastern half of the U.S., including Minnesota, to reduce power plant emissions that contribute to ozone or fine particulate pollution in other states. The CSAPR does not require installation of controls but does require facilities have sufficient allowances to cover their emissions on an annual basis. These allowances are allocated to facilities from each state’s annual budget, and can be bought and sold. Based on our review of the NOX and SO2 allowances issued and pending issuance, we currently expect generation levels and emission rates will result in continued compliance with the CSAPR. The EPA’s CSAPR Update Rule issued in March 2021, to revise the 2016 CSAPR Update does not apply to the state of Minnesota and is therefore not currently projected to affect Minnesota Power’s CSAPR compliance. Minnesota Power will continue to monitor ongoing CSAPR rulemakings and compliance implementation.

National Ambient Air Quality Standards (NAAQS). The EPA is required to review the NAAQS every five years. If the EPA determines that a state’s air quality is not in compliance with the NAAQS, the state is required to adopt plans describing how it will reduce emissions to attain the NAAQS. Minnesota Power actively monitors NAAQS developments and compliance costs for existing standards or proposed NAAQS revisions are not currently expected to be material. The EPA is currently reviewing the secondary NAAQS for NOx and SO2, as well as particulate matter. In June 2021, the EPA announced it will reconsider the December 2020 final rule retaining the 2012 particulate matter NAAQS, with a proposed rulemaking anticipated in mid-2022. The EPA has not stated its intent with regard to the 2020 Ozone NAAQS rule finalized in December 2020.

EPA Good Neighbor Plan for 2015 Ozone NAAQS. On April 6, 2022, the EPA published a proposed rule, the Good Neighbor Plan, to address regional ozone transport for the 2015 Ozone NAAQS by reducing NOx emissions during the period of May 1st through September 30th (ozone season). This rule is intended to address certain good neighbor or interstate transport provisions of the Clean Air Act relative to the 2015 Ozone NAAQS. In the justification for the proposed rule, the EPA asserted that 26 states, including Minnesota, are modeled as significant contributors to downwind states’ challenges in attaining or maintaining ozone NAAQS compliance within their state borders. The Good Neighbor Plan proposes to resolve this interstate transport issue by implementing a variety of NOx reduction strategies, including federal implementation plan requirements, NOx emission limitations, and ozone season allowance program requirements, beginning with the 2023 ozone season. The proposed rule would apply to fossil-fuel fired power plants in 25 states and certain other industrial sources in 23 states. Implementation of the rule would occur in part through changes to the existing CSAPR program.

Minnesota Power is reviewing the proposed rule and assessing its potential impacts. Comments are due to the EPA by June 6, 2022. Anticipated compliance costs related to the Good Neighbor Plan cannot yet be estimated; however, the costs could be material, including costs of additional NOx controls, emission allowance program participation, or operational changes, if any are required. Minnesota Power would seek recovery of additional costs through a rate proceeding.

Climate Change. The scientific community generally accepts that emissions of GHG are linked to global climate change which creates physical and financial risks. Physical risks could include, but are not limited to: increased or decreased precipitation and water levels in lakes and rivers; increased or other changes in temperatures; and changes in the intensity and frequency of extreme weather events. These all have the potential to affect the Company’s business and operations. We are addressing climate change by taking the following steps that also ensure reliable and environmentally compliant generation resources to meet our customers’ requirements:

Expanding renewable power supply for both our operations and the operations of others;
Providing energy conservation initiatives for our customers and engaging in other demand side management efforts;
Improving efficiency of our generating facilities;
Supporting research of technologies to reduce carbon emissions from generating facilities and carbon sequestration efforts;
Evaluating and developing less carbon intensive future generating assets such as efficient and flexible natural gas-fired generating facilities;
Managing vegetation on right-of-way corridors to reduce potential wildfire or storm damage risks; and
Practicing sound forestry management in our service territories to create landscapes more resilient to disruption from climate-related changes, including planting and managing long-lived conifer species.
NOTE 6. COMMITMENTS, GUARANTEES AND CONTINGENCIES (Continued)
Environmental Matters (Continued)

EPA Regulation of GHG Emissions. In 2019, the EPA finalized several separate rulemakings regarding regulating carbon emissions from electric utility generating units. These rulemakings included repealing the Clean Power Plan (CPP) and adopting the Affordable Clean Energy Rule under Section 111(d) of the Clean Air Act (CAA) to regulate CO2 emissions at existing coal-fired power plants. The CPP was first announced as a proposed rule under Section 111(d) of the CAA for existing power plants entitled “Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Generating Units”. The Affordable Clean Energy Rule established emissions guidelines for states to use when developing plans to limit CO2 coal-fired power plants. The EPA also published regulations for the state implementation of the Affordable Clean Energy Rule and other Section 111(d) rules. Affected facilities for Minnesota Power included Boswell Units 3 and 4, and Taconite Harbor Units 1 and 2, which are currently economically idled.

On January 19, 2021, the D.C. Circuit issued an opinion vacating the Affordable Clean Energy Rule and remanded the Affordable Clean Energy Rule back to the EPA for further consideration, consistent with the D.C. Circuit’s finding that the EPA erred in interpreting the CAA, pending rehearing or appeal. Four petitions for review of the D.C. Circuit’s opinion were subsequently granted by the U.S. Supreme Court on October 29, 2021. Oral arguments were held on February 28, 2022, with a decision expected in mid-2022. In 2021, the EPA also indicated that it intends to issue a proposed rule in July 2022 and a final rule in July 2023 with a new set of emission guidelines for states to follow in submitting state plans to establish and implement standards of performance for GHG emissions from existing fossil fuel-fired electric generating units. Minnesota Power will continue to monitor any related guidelines and rulemakings issued by the EPA or state regulatory authorities.

On April 22, 2021, the Biden Administration announced a goal to reach 100 percent carbon pollution-free electricity by 2035 as part of the Nationally Determined Contributions pledge, which is part of an international effort to limit global warming. At this time, no specific regulatory pathway to achieve these reductions has been proposed. Minnesota Power will continue to monitor these developments.

Minnesota had already initiated several measures consistent with those called for under the now repealed CPP and vacated Affordable Clean Energy Rule. Minnesota Power continues implementing its EnergyForward strategic plan that provides for significant emission reductions and diversifying its electricity generation mix to include more renewable and natural gas energy. We are unable to predict the GHG emission compliance costs we might incur as a result of a replacement for the Affordable Clean Energy Rule or other future laws, regulations or administrative policies; however, the costs could be material. Minnesota Power would seek recovery of additional costs through a rate proceeding.

Additionally on January 13, 2021, the EPA issued a rulemaking to apply CO2 emission New Source Performance Standards (NSPS) to new, modified and reconstructed fossil fuel-fired electric generating units under Section 111(b) of the CAA. Minnesota Power is monitoring the NSPS final rule and any further Section 111(b) developments including their potential impact to the Company. The proposed combined-cycle natural gas-fired generating facility, NTEC, is expected to meet these NSPS requirements.

Water. The Clean Water Act requires NPDES permits be obtained from the EPA (or, when delegated, from individual state pollution control agencies) for any wastewater discharged into navigable waters. We have obtained all necessary NPDES permits, including NPDES storm water permits for applicable facilities, to conduct our operations.
NOTE 6. COMMITMENTS, GUARANTEES AND CONTINGENCIES (Continued)
Environmental Matters (Continued)

Steam Electric Power Generating Effluent Limitations Guidelines. In 2015, the EPA issued revised federal effluent limitation guidelines (ELG) for steam electric power generating stations under the Clean Water Act. It set effluent limits and prescribed BACT for several wastewater streams, including flue gas desulphurization (FGD) water, bottom ash transport water and coal combustion landfill leachate. In 2017, the EPA announced a two-year postponement of the ELG compliance date of November 1, 2018, to November 1, 2020, while the agency reconsidered the bottom ash transport water and FGD wastewater provisions. On April 12, 2019, the U.S. Court of Appeals for the Fifth Circuit vacated and remanded back to the EPA portions of the ELG that allowed for continued discharge of legacy wastewater and leachate. On October 13, 2020, the EPA published a final ELG Rule allowing re-use of bottom ash transport water in FGD scrubber systems with limited discharges related to maintaining system water balance. The rule sets technology standards and numerical pollutant limits for discharges of bottom ash transport water and FGD wastewater. Compliance deadlines depend on subcategory, with compliance generally required as soon as possible, beginning after October 13, 2021, but no later than December 31, 2025, or December 31, 2028, in some specific cases. The rule also established new subcategories for retiring high-flow and low-utilization units, and established a voluntary incentives program for FGD wastewater. In accordance with the January 2021 Executive Order 13990, the EPA was mandated to conduct a review of actions and polices taken during the prior administration, including the 2020 ELG Rule. On September 14, 2021, the EPA published a notice of availability for preliminary effluent guidelines program plan. In the plan, the EPA confirmed the agency is initiating a rulemaking process to strengthen wastewater pollution limitations from FGD and bottom ash transport water discharges while the 2020 ELG Rule remains in effect. The EPA is expected to publish a proposed rule in the fall of 2022.

The ELG's potential impact on Minnesota Power operations is primarily at Boswell. Boswell currently discharges bottom ash contact water through its NPDES permit, and also has a closed-loop FGD system that does not discharge to surface waters, but may do so in the future. With Boswell’s planned conversion to dry FGD handling and storage, ongoing FGD water generation will be reduced, and the majority of FGD waters will be legacy waters to be dewatered from existing impoundments. Re-use and onsite consumption for the majority of FGD waters is planned at Boswell.

Under the new ELG rule, most bottom ash transport water discharge to surface waters must cease no later than December 31, 2025, except for small discharges needed to retain water balance. The majority of bottom ash transport water will either need to be re-used in a closed-loop process or routed to a FGD scrubber. At Boswell, the bottom ash handling systems are planned to be converted to a dry process, which will eliminate the discharge of bottom ash transport water.

The EPA’s additional reconsideration of legacy wastewater discharge requirements has the potential to reduce timelines for dewatering Boswell’s existing ponds. The timing of a draft rule addressing legacy wastewater and leachate is currently unknown.

At this time, we estimate that the planned dry conversion of bottom ash handling and storage at Boswell in response to the CCR revisions requiring closure of clay-lined impoundments, as well as other water re-use practices, will reduce or eliminate the need for additional significant compliance costs for ELG bottom ash water and FGD requirements. Compliance costs we might incur related to other ELG waste streams (e.g., legacy leachate) or other potential future water discharge regulations cannot be estimated; however, the costs could be material, including costs associated with wastewater treatment and re-use. Minnesota Power would seek recovery of additional costs through a rate proceeding.

Permitted Water Discharges – Sulfate. In 2017, the MPCA released a draft water quality standard in an attempt to update Minnesota’s existing 10 mg/L sulfate limit for waters used for the production of wild rice with the proposed rulemaking heard before an administrative law judge (ALJ). In 2018, the ALJ rejected significant portions of the proposed rulemaking and the MPCA subsequently withdrew the rulemaking. The existing 10 mg/L limit remains in place, but the MPCA is currently prohibited under state law from listing wild rice waters as impaired or requiring sulfate reduction technology.

In April 2021, the MPCA’s proposed list of impaired waters submitted pursuant to the Clean Water Act was partially rejected by the EPA due to the absence of wild rice waters listed for sulfate impairment. The EPA transmitted a final list of 32 EPA-added wild rice waters to the MPCA on November 5, 2021. This list could subsequently be used to set sulfate limits in discharge permits for power generation facilities and municipal and industrial customers, including paper and pulp facilities, and mining operations. At this time we are unable to determine the specific impacts these developments may have on Minnesota Power operations, if any. Minnesota Power would seek recovery of additional costs through a rate proceeding.
NOTE 6. COMMITMENTS, GUARANTEES AND CONTINGENCIES (Continued)
Environmental Matters (Continued)

Solid and Hazardous Waste. The Resource Conservation and Recovery Act of 1976 regulates the management and disposal of solid and hazardous wastes. We are required to notify the EPA of hazardous waste activity and, consequently, routinely submit reports to the EPA.

Coal Ash Management Facilities. Minnesota Power produces the majority of its coal ash at Boswell, with small amounts of ash generated at Hibbard Renewable Energy Center. Ash storage and disposal methods include storing ash in clay-lined onsite impoundments (ash ponds), disposing of dry ash in a lined dry ash landfill, applying ash to land as an approved beneficial use, and trucking ash to state permitted landfills.

Coal Combustion Residuals from Electric Utilities (CCR). In 2015, the EPA published the final rule regulating CCR as nonhazardous waste under Subtitle D of the Resource Conservation and Recovery Act (RCRA) in the Federal Register. The rule includes additional requirements for new landfill and impoundment construction as well as closure activities related to certain existing impoundments. Costs of compliance for Boswell and Laskin are expected to be incurred primarily over the next 15 years and be between approximately $65 million and $120 million. Compliance costs for CCR at Taconite Harbor are not expected to be material. Minnesota Power would seek recovery of additional costs through a rate proceeding.

Minnesota Power continues to work on minimizing costs through evaluation of beneficial re-use and recycling of CCR and CCR-related waters. In 2017, the EPA announced its intention to formally reconsider the CCR rule under Subtitle D of the RCRA. In March 2018, the EPA published the first phase of the proposed rule revisions in the Federal Register. In 2018, the EPA finalized revisions to elements of the CCR rule, including extending certain deadlines by two years, the establishment of alternative groundwater protection standards for certain constituents and the potential for risk-based management options at facilities based on site characteristics. In 2018, a U.S. District Court for the District of Columbia decision vacated specific provisions of the CCR rule. The court decision resulted in a change to the status of three existing clay-lined impoundments at Boswell that must now be considered unlined. The EPA proposed additional rule revisions in 2019 to address outstanding issues from litigation and closure timelines for unlined impoundments, respectively. The first of these rules, CCR Part A Rule, was finalized in September 2020. The Part A Rule revision requires unlined impoundments to cease disposal of waste as soon as technically feasible but no later than April 11, 2021. This deadline has tolled forward as the EPA did not make any variance application determinations by that date. Minnesota Power sought EPA approval to extend the closure date for the two active Boswell impoundments in November 2020 through a variance application, and continues to operate the impoundments pending a final determination by the EPA. Additionally, the EPA released a proposed Part B rulemaking in February 2020 that addressed options for beneficial reuse of CCR materials, alternative liner demonstrations, and other CCR regulatory revisions. Portions of the Part B Rule addressing alternative liner equivalency standards were finalized in November 2020. According to the EPA’s regulatory agenda, finalization of the remainder of the proposed Part B Rule was expected in mid-2021, but has not yet been published. Expected compliance costs at Boswell due to the court decision and subsequent rule revisions are reflected in our estimate of compliance costs for the CCR rule noted previously. Minnesota Power would seek recovery of additional costs through a rate proceeding.

Other Environmental Matters.

Manufactured Gas Plant Site. We are reviewing and addressing environmental conditions at a former manufactured gas plant site located in Superior, Wisconsin, and formerly operated by SWL&P. SWL&P has been working with the Wisconsin Department of Natural Resources (WDNR) in determining the extent and location of contamination at the site and surrounding properties. As of March 31, 2022, we have recorded a liability of approximately $18 million for remediation costs at this site after further refining the scope of work and cost estimates as well as incorporating detailed design components specific to the site in 2021 (approximately $18 million as of December 31, 2021); however, SWL&P continues to work with the WDNR on the extent of contamination which may result in additional remediation costs being identified. SWL&P has also recorded an associated regulatory asset as we expect recovery of these remediation costs to be allowed by the PSCW. Remediation costs are expected to be incurred through 2024.
Other Matters.

Letters of Credit and Surety Bonds.

We have multiple credit facility agreements in place that provide the ability to issue standby letters of credit to satisfy contractual security requirements across our businesses. As of March 31, 2022, we had $147.2 million of outstanding letters of credit issued, including those issued under our revolving credit facility.

Regulated Operations. As of March 31, 2022, we had $18.1 million outstanding in standby letters of credit at our Regulated Operations which are pledged as security to MISO and a state agency.

ALLETE Clean Energy. ALLETE Clean Energy’s wind energy facilities have PSAs in place for their entire output and expire in various years between 2022 and 2039. As of March 31, 2022, ALLETE Clean Energy has $93.4 million outstanding in standby letters of credit, the majority of which are pledged as security under these PSAs and PSAs for wind energy facilities under development. ALLETE Clean Energy does not believe it is likely that any of these outstanding letters of credit will be drawn upon.

Corporate and Other.

BNI Energy. As of March 31, 2022, BNI Energy had surety bonds outstanding of $82.4 million related to the reclamation liability for closing costs associated with its mine and mine facilities. Although its coal supply agreements obligate the customers to provide for the closing costs, additional assurance is required by federal and state regulations. BNI Energy’s total reclamation liability is currently estimated at $82.1 million. BNI Energy does not believe it is likely that any of these outstanding surety bonds will be drawn upon.

Investment in Nobles 2. The Nobles 2 wind energy facility requires standby letters of credit as security for certain contractual obligations. As of March 31, 2022, ALLETE South Wind has $11.8 million outstanding in standby letters of credit, related to its portion of the security requirements relative to its ownership in Nobles 2. We do not believe it is likely that any of these outstanding letters of credit will be drawn upon.

South Shore Energy. As of March 31, 2022, South Shore Energy had $23.9 million outstanding in standby letters of credit pledged as security in connection with the development of NTEC. South Shore Energy does not believe it is likely that any of these outstanding letters of credit will be drawn upon.

Legal Proceedings.

We are involved in litigation arising in the normal course of business. Also in the normal course of business, we are involved in tax, regulatory and other governmental audits, inspections, investigations and other proceedings that involve state and federal taxes, safety, and compliance with regulations, rate base and cost of service issues, among other things. We do not expect the outcome of these matters to have a material effect on our financial position, results of operations or cash flows.

Minnesota Power has been named in a lawsuit where a contractor performing work at one of its facilities experienced an injury and subsequently filed a lawsuit seeking compensatory damages. In the second quarter of 2022, Minnesota Power reached an agreement to settle the lawsuit with the plaintiff. The settlement is covered by the Company’s insurance coverage, subject to a deductible which has been previously expensed. The settlement, which was recorded in the financial statements for the period ended March 31, 2022, did not have a material impact on our financial position or results of operations.