XML 51 R9.htm IDEA: XBRL DOCUMENT v3.23.2
Commitments and Contingencies
6 Months Ended
Jun. 30, 2023
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.
Entergy Arkansas [Member]  
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.
Entergy Louisiana [Member]  
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.
Entergy Mississippi [Member]  
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.
Entergy New Orleans [Member]  
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.
Entergy Texas [Member]  
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.
System Energy [Member]  
Commitments And Contingencies COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)
Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business.  While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report.  Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

ANO Damage, Outage, and NRC Reviews

See Note 8 to the financial statements in the Form 10-K for a discussion of the ANO stator incident, subsequent NRC reviews, and the deferral of replacement power costs.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation.

In March 2023 the DOE submitted an offer of judgment to resolve claims in the fourth round ANO damages case. The $41 million offer was accepted by Entergy Arkansas, and the U.S. Court of Federal Claims issued a judgment in that amount in favor of Entergy Arkansas and against the DOE. Entergy Arkansas received payment from the U.S. Treasury in April 2023. The effects of recording the judgment were reductions to plant, nuclear fuel expense, other operation and maintenance expense, materials and supplies, and taxes other than income taxes. The ANO damages awarded included $18 million related to costs previously recorded as plant, $10 million related to costs previously recorded as other operation and maintenance expense, $8 million related to costs previously recorded as nuclear fuel expense, $3 million related to costs previously recorded as materials and supplies, and $2 million related to costs previously recorded as taxes other than income taxes.

In July 2023 the DOE submitted an offer of judgment to resolve claims in the Indian Point Unit 2 fourth round and Unit 3 third round combined damages case. The $59 million offer was accepted by Entergy and Holtec International, as the current owner. The U.S. Court of Federal Claims issued a final judgment in that amount in favor of Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC (previously Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC) and against the DOE. Holtec received payment from the U.S. Treasury in July 2023. Consistent with certain terms agreed upon in connection with the sale of Indian Point Energy Center in May 2021, Holtec transferred $40 million to Entergy for its pro-rata share of the litigation proceeds in August 2023. The remainder of the judgment was retained by Holtec.
Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Grand Gulf - Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements.

Nelson Industrial Steam Company

Entergy Louisiana is a partner in the Nelson Industrial Steam Company (NISCO) partnership which owns two petroleum coke generating units. In April 2023 these generating units suspended operations in the MISO market, and Entergy Louisiana currently is working with the partners to wind up the NISCO partnership, which will ultimately result in ownership of the generating units transferring to Entergy Louisiana. In May 2023, Entergy Louisiana filed an application with the FERC for transaction authorization pursuant to Section 203 of the Federal Power Act. In June 2023 the LPSC filed a notice to intervene in the proceeding. Entergy Louisiana is evaluating the effect of the transaction on its results of operations, cash flows, and financial condition, but at this time does not expect the effect to be material.