Acquisitions, Dispositions, and Impairment of Long-Lived Assets
12 Months Ended
Dec. 31, 2018
Acquisitions And Dispositions
ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans)

Acquisitions

Union Power Station

In March 2016, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans purchased the Union Power Station, a 1,980 MW (summer rating) power generation facility located near El Dorado, Arkansas, from Union Power Partners, L.P. The Union Power Station consists of four natural gas-fired, combined-cycle gas turbine power blocks, each rated at 495 MW (summer rating). Entergy Louisiana purchased two of the power blocks and a 50% undivided ownership interest in certain assets related to the facility, and Entergy Arkansas and Entergy New Orleans each purchased one power block and a 25% undivided ownership interest in such related assets. The aggregate purchase price for the Union Power Station was approximately $949 million (approximately $237 million for each power block and associated assets).

Palisades Purchased Power Agreement

Entergy’s purchase of the Palisades plant in 2007 included a unit-contingent, 15-year purchased power agreement (PPA) with Consumers Energy for 100% of the plant’s output, excluding any future uprates.  Prices under the PPA range from $43.50/MWh in 2007 to $61.50/MWh in 2022, and the average price under the PPA is $51/MWh.  The PPA was at below-market prices at the time of the acquisition and Entergy amortizes a liability to revenue over the life of the agreement.  The amount amortized each period is based upon the present value, calculated at the date of acquisition, of each year’s difference between revenue under the agreement and revenue based on estimated market prices.  Amounts amortized to revenue were $6 million in 2018, $28 million in 2017, and $13 million in 2016.  Amounts to be amortized to revenue through the remaining life of the agreement will be approximately $10 million in 2019, $11 million in 2020, $12 million in 2021, and $5 million in 2022.

Dispositions

Willow Glen

In December 2018, Entergy Louisiana sold the Willow Glen Power Station, a non-operating gas plant. Entergy Louisiana sold Willow Glen for approximately $12 million in cash and the transfer of the obligation to decommission the plant. Entergy Louisiana assumed a regulatory liability of $5.7 million. Entergy Louisiana realized a pre-tax gain of $14.8 million on the sale. Entergy Louisiana recorded a $31.9 million regulatory liability to recognize the obligation to refund the customer excess collections for decommissioning Willow Glen.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018, the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the asset retirement obligation. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar. The assets and liabilities associated with the sale of Vermont Yankee are classified as held for sale on the Entergy Corporation and Subsidiaries Consolidated Balance Sheet as of December 31, 2018. As of December 31, 2018, the value of the decommissioning trust was $532 million. As of December 31, 2018, the asset retirement cost asset was $127 million, classified within other deferred debits, and the asset retirement cost obligation was $568 million, classified within other non-current liabilities.

FitzPatrick

In August 2016, Entergy entered into an agreement to sell the FitzPatrick plant, an 838 MW nuclear power plant owned by Entergy in the Entergy Wholesale Commodities segment. In March 2017 the NRC approved the sale of the plant to Exelon. The transaction closed in March 2017 for a purchase price of $110 million, which included a $10 million non-refundable signing fee paid in August 2016, in addition to the assumption by Exelon of certain liabilities related to the FitzPatrick plant, resulting in a pre-tax gain on the sale of $16 million. At the transaction close, Exelon paid an additional $8 million for the proration of certain expenses prepaid by Entergy. The disposition-date fair value of the decommissioning trust fund was $805 million, classified within other deferred debits, and the disposition-date fair value of the asset retirement obligation was $727 million, classified within other non-current liabilities. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

As part of the transaction, Entergy entered into a reimbursement agreement with Exelon pursuant to which Exelon reimbursed Entergy for specified out-of-pocket costs associated with Entergy’s operation of FitzPatrick prior to closing of the sale. In the first quarter 2017, Entergy billed Exelon for reimbursement of $98 million of other operation and maintenance expenses, $7 million in lost operating revenues, and $3 million in taxes other than income taxes, partially offset by a $10 million defueling credit to Exelon.

As discussed in Note 3 to the financial statements, as a result of the sale of FitzPatrick on March 31, 2017, Entergy redetermined the plant’s tax basis, resulting in a $44 million income tax benefit in the first quarter 2017.

Top Deer

In November 2016, Entergy sold its 50% membership interest in Top Deer Wind Ventures, LLC, a wind-powered electric generation joint venture owned by Entergy in the Entergy Wholesale Commodities segment and accounted for as an equity method investment. Entergy sold its 50% membership interest in Top Deer for approximately $0.5 million and realized a pre-tax loss of $0.2 million on the sale.

Impairment of Long-lived Assets

2017 and 2018 Impairments

In 2017 and 2018, Entergy continued to execute its strategy to reduce the size of Entergy Wholesale Commodities’ merchant fleet, with planned shutdowns of Pilgrim by May 31, 2019, Indian Point 2 by April 30, 2020, Indian Point 3 by April 30, 2021, and Palisades on May 31, 2022. The remaining two Entergy Wholesale Commodities’ nuclear plants, FitzPatrick and Vermont Yankee, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019.

In 2018, Entergy Wholesale Commodities incurred $532 million, and in 2017 it incurred $538 million, of impairment charges related to nuclear fuel spending, nuclear refueling outage spending, expenditures for capital assets, and asset retirement obligation revisions. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to reduce the size of the Entergy Wholesale Commodities’ merchant fleet. Entergy expects to continue to incur costs associated with nuclear fuel-related spending, expenditures for capital assets and, except for Palisades, expects to continue to charge these costs to expense as incurred because Entergy expects the value of the plants to continue to be impaired.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA to terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy will continue to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently on May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

2018 Pilgrim Impairment

The Pilgrim plant is expected to cease operations on May 31, 2019, at the end of its current fuel cycle. Entergy Nuclear Generation Company filed its Post-Shutdown Decommissioning Activities Report (PSDAR) with the NRC in the fourth quarter 2018 for the Pilgrim plant. As part of the development of the PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2018. The revised estimate resulted in a $117.5 million increase in the decommissioning cost liability and a corresponding impairment charge.

2018 Vermont Yankee Impairment

As discussed above in Dispositions, on January 11, 2019, Entergy sold the Vermont Yankee plant to NorthStar. With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held-for- sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction, and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in $173 million of asset impairment and related charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the revision of the asset retirement obligation.

2016 Palisades and Indian Point Impairments

In December 2016, Entergy reached an agreement with Consumers Energy to amend the existing PPA to terminate early, on May 31, 2018. Pursuant to the agreement to amend the PPA, Consumers Energy would pay Entergy $172 million for the early termination of the PPA. The PPA amendment agreement was subject to regulatory approvals, including approval by the Michigan Public Service Commission. Separately, Entergy intended to shut down the Palisades nuclear power plant permanently on October 1, 2018, after refueling in the spring of 2017 and operating through the end of that fuel cycle. As a result of the planned PPA termination and its intention to shut down the plant, Entergy tested the recoverability of the plant and related assets as of December 31, 2016. Entergy and Consumers Energy subsequently agreed, in September 2017, to terminate the PPA amendment agreement and Entergy now intends to shut down the Palisades plant permanently on May 31, 2022.

Indian Point 2 and Indian Point 3 had an application pending for renewed NRC licenses.  Various parties, including the State of New York, expressed opposition to renewal of the licenses.  Under federal law, nuclear power plants may continue to operate beyond their original license expiration dates while their timely filed renewal applications are pending NRC approval.  Indian Point 2 reached the expiration date of its original NRC operating license on September 28, 2013, and Indian Point 3 reached the expiration date of its original NRC operating license on December 12, 2015. Upon expiration of their operating licenses, each plant entered into a period of extended operation under the timely renewal rule.

In January 2017, Entergy announced that it reached a settlement with New York State to shut down Indian Point 2 by April 30, 2020 and Indian Point 3 by April 30, 2021, and resolve all New York State-initiated legal challenges to Indian Point’s operating license renewal. As part of the settlement, New York State agreed to issue Indian Point’s water quality certification and Coastal Zone Management Act consistency certification and to withdraw its objection to license renewal before the NRC. New York State also agreed to issue a water discharge permit, which is required regardless of whether the plant is seeking a renewed NRC license. The shutdowns are conditioned, among other things, upon such actions being taken by New York State. As a result of its evaluation of alternatives to the continued operation of the Indian Point plants, and taking into consideration the status of negotiations with the State of New York, Entergy tested the recoverability of the plants and related assets as of December 31, 2016.

The tests for Palisades and Indian Point indicated that the probability-weighted undiscounted net cash flows did not exceed the carrying values of the plants and related assets as of December 31, 2016.

As of December 31, 2016 the estimated fair value of the Palisades plant and related long-lived assets was $206 million, while the carrying value was $558 million, resulting in an impairment charge of $352 million. Materials and supplies were evaluated and written down by $48 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Palisades was $400 million ($258 million net-of-tax). The pre-impairment carrying value of $558 million included the effect of a $129 million increase in Palisades’ estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Palisades decommissioning cost revision.

As of December 31, 2016 the estimated fair value of the Indian Point plants and related long-lived assets was $433 million, while the carrying value was $2,619 million, resulting in an impairment charge of $2,186 million. Materials and supplies were evaluated and written down by $157 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Indian Point was $2,343 million ($1,511 million net-of-tax). The pre-impairment carrying value of $2,619 million included the effect of a $392 million increase in Indian Point’s estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Indian Point decommissioning cost revision.

Overall Regarding All Impairments

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.

The fair value analyses for Palisades and Indian Point in 2016 were performed based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimates of fair value were based on the prices that Entergy would expect to receive in hypothetical sales of Palisades and Indian Point plants and related assets to a market participant. In order to determine these prices, Entergy used significant observable inputs, including quoted forward power and gas prices, where available. Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis) and estimated weighted-average costs of capital, were also used in the estimation of fair value. In addition, Entergy made certain assumptions regarding future tax deductions associated with the plants and related assets, the amount and timing of recoveries from future litigation with the DOE related to spent fuel storage costs, and the expected operating life of the plant.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, are classified as Level 3 in the fair value hierarchy discussed in Note 15 to the financial statements.

The following table sets forth a description of significant unobservable inputs used in the valuation of the Palisades and Indian Point plants and related assets:
Significant Unobservable Inputs
 
Amount
 
Weighted-Average
2016
 
 
 
 
Weighted-average cost of capital
 
 
 
 
Indian Point (a)
 
7.0%-7.5%
 
7.2%
Palisades
 
6.5%
 
6.5%
 
 
 
 
 
Long-term pre-tax operating margin (cash basis)
 
 
 
 
Indian Point
 
19.7%
 
19.7%
Palisades (b) (c)
 
17.8%-38.8%
 
34.6%

(a)
The cash flows extending through the 2021 shutdown at Indian Point 3 were assigned a higher discount factor to incorporate the increased risk associated with longer operations.
(b)
Most of the Palisades output is sold under a 15-year power purchase agreement, entered at the plant’s acquisition in 2007, that expires in 2022. The power purchase agreement prices currently exceed market prices and escalate each year, up to $61.50/MWh in 2022.
(c)
The fair value of Palisades at December 31, 2016 is based on the probability weighting of whether the PPA will terminate before the originally scheduled termination in 2022.

Entergy’s Accounting Policy and Entergy Wholesale Commodities Accounting groups, which report to the Chief Accounting Officer, were primarily responsible for determining the valuation of the Palisades and Indian Point plants and related assets, in consultation with external advisors. Entergy’s Accounting Policy group obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair values of the asset groups.
Entergy Arkansas [Member]  
Acquisitions And Dispositions
ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans)

Acquisitions

Union Power Station

In March 2016, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans purchased the Union Power Station, a 1,980 MW (summer rating) power generation facility located near El Dorado, Arkansas, from Union Power Partners, L.P. The Union Power Station consists of four natural gas-fired, combined-cycle gas turbine power blocks, each rated at 495 MW (summer rating). Entergy Louisiana purchased two of the power blocks and a 50% undivided ownership interest in certain assets related to the facility, and Entergy Arkansas and Entergy New Orleans each purchased one power block and a 25% undivided ownership interest in such related assets. The aggregate purchase price for the Union Power Station was approximately $949 million (approximately $237 million for each power block and associated assets).

Palisades Purchased Power Agreement

Entergy’s purchase of the Palisades plant in 2007 included a unit-contingent, 15-year purchased power agreement (PPA) with Consumers Energy for 100% of the plant’s output, excluding any future uprates.  Prices under the PPA range from $43.50/MWh in 2007 to $61.50/MWh in 2022, and the average price under the PPA is $51/MWh.  The PPA was at below-market prices at the time of the acquisition and Entergy amortizes a liability to revenue over the life of the agreement.  The amount amortized each period is based upon the present value, calculated at the date of acquisition, of each year’s difference between revenue under the agreement and revenue based on estimated market prices.  Amounts amortized to revenue were $6 million in 2018, $28 million in 2017, and $13 million in 2016.  Amounts to be amortized to revenue through the remaining life of the agreement will be approximately $10 million in 2019, $11 million in 2020, $12 million in 2021, and $5 million in 2022.

Dispositions

Willow Glen

In December 2018, Entergy Louisiana sold the Willow Glen Power Station, a non-operating gas plant. Entergy Louisiana sold Willow Glen for approximately $12 million in cash and the transfer of the obligation to decommission the plant. Entergy Louisiana assumed a regulatory liability of $5.7 million. Entergy Louisiana realized a pre-tax gain of $14.8 million on the sale. Entergy Louisiana recorded a $31.9 million regulatory liability to recognize the obligation to refund the customer excess collections for decommissioning Willow Glen.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018, the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the asset retirement obligation. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar. The assets and liabilities associated with the sale of Vermont Yankee are classified as held for sale on the Entergy Corporation and Subsidiaries Consolidated Balance Sheet as of December 31, 2018. As of December 31, 2018, the value of the decommissioning trust was $532 million. As of December 31, 2018, the asset retirement cost asset was $127 million, classified within other deferred debits, and the asset retirement cost obligation was $568 million, classified within other non-current liabilities.

FitzPatrick

In August 2016, Entergy entered into an agreement to sell the FitzPatrick plant, an 838 MW nuclear power plant owned by Entergy in the Entergy Wholesale Commodities segment. In March 2017 the NRC approved the sale of the plant to Exelon. The transaction closed in March 2017 for a purchase price of $110 million, which included a $10 million non-refundable signing fee paid in August 2016, in addition to the assumption by Exelon of certain liabilities related to the FitzPatrick plant, resulting in a pre-tax gain on the sale of $16 million. At the transaction close, Exelon paid an additional $8 million for the proration of certain expenses prepaid by Entergy. The disposition-date fair value of the decommissioning trust fund was $805 million, classified within other deferred debits, and the disposition-date fair value of the asset retirement obligation was $727 million, classified within other non-current liabilities. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

As part of the transaction, Entergy entered into a reimbursement agreement with Exelon pursuant to which Exelon reimbursed Entergy for specified out-of-pocket costs associated with Entergy’s operation of FitzPatrick prior to closing of the sale. In the first quarter 2017, Entergy billed Exelon for reimbursement of $98 million of other operation and maintenance expenses, $7 million in lost operating revenues, and $3 million in taxes other than income taxes, partially offset by a $10 million defueling credit to Exelon.

As discussed in Note 3 to the financial statements, as a result of the sale of FitzPatrick on March 31, 2017, Entergy redetermined the plant’s tax basis, resulting in a $44 million income tax benefit in the first quarter 2017.

Top Deer

In November 2016, Entergy sold its 50% membership interest in Top Deer Wind Ventures, LLC, a wind-powered electric generation joint venture owned by Entergy in the Entergy Wholesale Commodities segment and accounted for as an equity method investment. Entergy sold its 50% membership interest in Top Deer for approximately $0.5 million and realized a pre-tax loss of $0.2 million on the sale.

Impairment of Long-lived Assets

2017 and 2018 Impairments

In 2017 and 2018, Entergy continued to execute its strategy to reduce the size of Entergy Wholesale Commodities’ merchant fleet, with planned shutdowns of Pilgrim by May 31, 2019, Indian Point 2 by April 30, 2020, Indian Point 3 by April 30, 2021, and Palisades on May 31, 2022. The remaining two Entergy Wholesale Commodities’ nuclear plants, FitzPatrick and Vermont Yankee, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019.

In 2018, Entergy Wholesale Commodities incurred $532 million, and in 2017 it incurred $538 million, of impairment charges related to nuclear fuel spending, nuclear refueling outage spending, expenditures for capital assets, and asset retirement obligation revisions. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to reduce the size of the Entergy Wholesale Commodities’ merchant fleet. Entergy expects to continue to incur costs associated with nuclear fuel-related spending, expenditures for capital assets and, except for Palisades, expects to continue to charge these costs to expense as incurred because Entergy expects the value of the plants to continue to be impaired.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA to terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy will continue to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently on May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

2018 Pilgrim Impairment

The Pilgrim plant is expected to cease operations on May 31, 2019, at the end of its current fuel cycle. Entergy Nuclear Generation Company filed its Post-Shutdown Decommissioning Activities Report (PSDAR) with the NRC in the fourth quarter 2018 for the Pilgrim plant. As part of the development of the PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2018. The revised estimate resulted in a $117.5 million increase in the decommissioning cost liability and a corresponding impairment charge.

2018 Vermont Yankee Impairment

As discussed above in Dispositions, on January 11, 2019, Entergy sold the Vermont Yankee plant to NorthStar. With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held-for- sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction, and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in $173 million of asset impairment and related charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the revision of the asset retirement obligation.

2016 Palisades and Indian Point Impairments

In December 2016, Entergy reached an agreement with Consumers Energy to amend the existing PPA to terminate early, on May 31, 2018. Pursuant to the agreement to amend the PPA, Consumers Energy would pay Entergy $172 million for the early termination of the PPA. The PPA amendment agreement was subject to regulatory approvals, including approval by the Michigan Public Service Commission. Separately, Entergy intended to shut down the Palisades nuclear power plant permanently on October 1, 2018, after refueling in the spring of 2017 and operating through the end of that fuel cycle. As a result of the planned PPA termination and its intention to shut down the plant, Entergy tested the recoverability of the plant and related assets as of December 31, 2016. Entergy and Consumers Energy subsequently agreed, in September 2017, to terminate the PPA amendment agreement and Entergy now intends to shut down the Palisades plant permanently on May 31, 2022.

Indian Point 2 and Indian Point 3 had an application pending for renewed NRC licenses.  Various parties, including the State of New York, expressed opposition to renewal of the licenses.  Under federal law, nuclear power plants may continue to operate beyond their original license expiration dates while their timely filed renewal applications are pending NRC approval.  Indian Point 2 reached the expiration date of its original NRC operating license on September 28, 2013, and Indian Point 3 reached the expiration date of its original NRC operating license on December 12, 2015. Upon expiration of their operating licenses, each plant entered into a period of extended operation under the timely renewal rule.

In January 2017, Entergy announced that it reached a settlement with New York State to shut down Indian Point 2 by April 30, 2020 and Indian Point 3 by April 30, 2021, and resolve all New York State-initiated legal challenges to Indian Point’s operating license renewal. As part of the settlement, New York State agreed to issue Indian Point’s water quality certification and Coastal Zone Management Act consistency certification and to withdraw its objection to license renewal before the NRC. New York State also agreed to issue a water discharge permit, which is required regardless of whether the plant is seeking a renewed NRC license. The shutdowns are conditioned, among other things, upon such actions being taken by New York State. As a result of its evaluation of alternatives to the continued operation of the Indian Point plants, and taking into consideration the status of negotiations with the State of New York, Entergy tested the recoverability of the plants and related assets as of December 31, 2016.

The tests for Palisades and Indian Point indicated that the probability-weighted undiscounted net cash flows did not exceed the carrying values of the plants and related assets as of December 31, 2016.

As of December 31, 2016 the estimated fair value of the Palisades plant and related long-lived assets was $206 million, while the carrying value was $558 million, resulting in an impairment charge of $352 million. Materials and supplies were evaluated and written down by $48 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Palisades was $400 million ($258 million net-of-tax). The pre-impairment carrying value of $558 million included the effect of a $129 million increase in Palisades’ estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Palisades decommissioning cost revision.

As of December 31, 2016 the estimated fair value of the Indian Point plants and related long-lived assets was $433 million, while the carrying value was $2,619 million, resulting in an impairment charge of $2,186 million. Materials and supplies were evaluated and written down by $157 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Indian Point was $2,343 million ($1,511 million net-of-tax). The pre-impairment carrying value of $2,619 million included the effect of a $392 million increase in Indian Point’s estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Indian Point decommissioning cost revision.

Overall Regarding All Impairments

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.

The fair value analyses for Palisades and Indian Point in 2016 were performed based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimates of fair value were based on the prices that Entergy would expect to receive in hypothetical sales of Palisades and Indian Point plants and related assets to a market participant. In order to determine these prices, Entergy used significant observable inputs, including quoted forward power and gas prices, where available. Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis) and estimated weighted-average costs of capital, were also used in the estimation of fair value. In addition, Entergy made certain assumptions regarding future tax deductions associated with the plants and related assets, the amount and timing of recoveries from future litigation with the DOE related to spent fuel storage costs, and the expected operating life of the plant.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, are classified as Level 3 in the fair value hierarchy discussed in Note 15 to the financial statements.

The following table sets forth a description of significant unobservable inputs used in the valuation of the Palisades and Indian Point plants and related assets:
Significant Unobservable Inputs
 
Amount
 
Weighted-Average
2016
 
 
 
 
Weighted-average cost of capital
 
 
 
 
Indian Point (a)
 
7.0%-7.5%
 
7.2%
Palisades
 
6.5%
 
6.5%
 
 
 
 
 
Long-term pre-tax operating margin (cash basis)
 
 
 
 
Indian Point
 
19.7%
 
19.7%
Palisades (b) (c)
 
17.8%-38.8%
 
34.6%

(a)
The cash flows extending through the 2021 shutdown at Indian Point 3 were assigned a higher discount factor to incorporate the increased risk associated with longer operations.
(b)
Most of the Palisades output is sold under a 15-year power purchase agreement, entered at the plant’s acquisition in 2007, that expires in 2022. The power purchase agreement prices currently exceed market prices and escalate each year, up to $61.50/MWh in 2022.
(c)
The fair value of Palisades at December 31, 2016 is based on the probability weighting of whether the PPA will terminate before the originally scheduled termination in 2022.

Entergy’s Accounting Policy and Entergy Wholesale Commodities Accounting groups, which report to the Chief Accounting Officer, were primarily responsible for determining the valuation of the Palisades and Indian Point plants and related assets, in consultation with external advisors. Entergy’s Accounting Policy group obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair values of the asset groups.
Entergy Louisiana [Member]  
Acquisitions And Dispositions
ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans)

Acquisitions

Union Power Station

In March 2016, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans purchased the Union Power Station, a 1,980 MW (summer rating) power generation facility located near El Dorado, Arkansas, from Union Power Partners, L.P. The Union Power Station consists of four natural gas-fired, combined-cycle gas turbine power blocks, each rated at 495 MW (summer rating). Entergy Louisiana purchased two of the power blocks and a 50% undivided ownership interest in certain assets related to the facility, and Entergy Arkansas and Entergy New Orleans each purchased one power block and a 25% undivided ownership interest in such related assets. The aggregate purchase price for the Union Power Station was approximately $949 million (approximately $237 million for each power block and associated assets).

Palisades Purchased Power Agreement

Entergy’s purchase of the Palisades plant in 2007 included a unit-contingent, 15-year purchased power agreement (PPA) with Consumers Energy for 100% of the plant’s output, excluding any future uprates.  Prices under the PPA range from $43.50/MWh in 2007 to $61.50/MWh in 2022, and the average price under the PPA is $51/MWh.  The PPA was at below-market prices at the time of the acquisition and Entergy amortizes a liability to revenue over the life of the agreement.  The amount amortized each period is based upon the present value, calculated at the date of acquisition, of each year’s difference between revenue under the agreement and revenue based on estimated market prices.  Amounts amortized to revenue were $6 million in 2018, $28 million in 2017, and $13 million in 2016.  Amounts to be amortized to revenue through the remaining life of the agreement will be approximately $10 million in 2019, $11 million in 2020, $12 million in 2021, and $5 million in 2022.

Dispositions

Willow Glen

In December 2018, Entergy Louisiana sold the Willow Glen Power Station, a non-operating gas plant. Entergy Louisiana sold Willow Glen for approximately $12 million in cash and the transfer of the obligation to decommission the plant. Entergy Louisiana assumed a regulatory liability of $5.7 million. Entergy Louisiana realized a pre-tax gain of $14.8 million on the sale. Entergy Louisiana recorded a $31.9 million regulatory liability to recognize the obligation to refund the customer excess collections for decommissioning Willow Glen.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018, the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the asset retirement obligation. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar. The assets and liabilities associated with the sale of Vermont Yankee are classified as held for sale on the Entergy Corporation and Subsidiaries Consolidated Balance Sheet as of December 31, 2018. As of December 31, 2018, the value of the decommissioning trust was $532 million. As of December 31, 2018, the asset retirement cost asset was $127 million, classified within other deferred debits, and the asset retirement cost obligation was $568 million, classified within other non-current liabilities.

FitzPatrick

In August 2016, Entergy entered into an agreement to sell the FitzPatrick plant, an 838 MW nuclear power plant owned by Entergy in the Entergy Wholesale Commodities segment. In March 2017 the NRC approved the sale of the plant to Exelon. The transaction closed in March 2017 for a purchase price of $110 million, which included a $10 million non-refundable signing fee paid in August 2016, in addition to the assumption by Exelon of certain liabilities related to the FitzPatrick plant, resulting in a pre-tax gain on the sale of $16 million. At the transaction close, Exelon paid an additional $8 million for the proration of certain expenses prepaid by Entergy. The disposition-date fair value of the decommissioning trust fund was $805 million, classified within other deferred debits, and the disposition-date fair value of the asset retirement obligation was $727 million, classified within other non-current liabilities. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

As part of the transaction, Entergy entered into a reimbursement agreement with Exelon pursuant to which Exelon reimbursed Entergy for specified out-of-pocket costs associated with Entergy’s operation of FitzPatrick prior to closing of the sale. In the first quarter 2017, Entergy billed Exelon for reimbursement of $98 million of other operation and maintenance expenses, $7 million in lost operating revenues, and $3 million in taxes other than income taxes, partially offset by a $10 million defueling credit to Exelon.

As discussed in Note 3 to the financial statements, as a result of the sale of FitzPatrick on March 31, 2017, Entergy redetermined the plant’s tax basis, resulting in a $44 million income tax benefit in the first quarter 2017.

Top Deer

In November 2016, Entergy sold its 50% membership interest in Top Deer Wind Ventures, LLC, a wind-powered electric generation joint venture owned by Entergy in the Entergy Wholesale Commodities segment and accounted for as an equity method investment. Entergy sold its 50% membership interest in Top Deer for approximately $0.5 million and realized a pre-tax loss of $0.2 million on the sale.

Impairment of Long-lived Assets

2017 and 2018 Impairments

In 2017 and 2018, Entergy continued to execute its strategy to reduce the size of Entergy Wholesale Commodities’ merchant fleet, with planned shutdowns of Pilgrim by May 31, 2019, Indian Point 2 by April 30, 2020, Indian Point 3 by April 30, 2021, and Palisades on May 31, 2022. The remaining two Entergy Wholesale Commodities’ nuclear plants, FitzPatrick and Vermont Yankee, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019.

In 2018, Entergy Wholesale Commodities incurred $532 million, and in 2017 it incurred $538 million, of impairment charges related to nuclear fuel spending, nuclear refueling outage spending, expenditures for capital assets, and asset retirement obligation revisions. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to reduce the size of the Entergy Wholesale Commodities’ merchant fleet. Entergy expects to continue to incur costs associated with nuclear fuel-related spending, expenditures for capital assets and, except for Palisades, expects to continue to charge these costs to expense as incurred because Entergy expects the value of the plants to continue to be impaired.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA to terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy will continue to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently on May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

2018 Pilgrim Impairment

The Pilgrim plant is expected to cease operations on May 31, 2019, at the end of its current fuel cycle. Entergy Nuclear Generation Company filed its Post-Shutdown Decommissioning Activities Report (PSDAR) with the NRC in the fourth quarter 2018 for the Pilgrim plant. As part of the development of the PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2018. The revised estimate resulted in a $117.5 million increase in the decommissioning cost liability and a corresponding impairment charge.

2018 Vermont Yankee Impairment

As discussed above in Dispositions, on January 11, 2019, Entergy sold the Vermont Yankee plant to NorthStar. With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held-for- sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction, and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in $173 million of asset impairment and related charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the revision of the asset retirement obligation.

2016 Palisades and Indian Point Impairments

In December 2016, Entergy reached an agreement with Consumers Energy to amend the existing PPA to terminate early, on May 31, 2018. Pursuant to the agreement to amend the PPA, Consumers Energy would pay Entergy $172 million for the early termination of the PPA. The PPA amendment agreement was subject to regulatory approvals, including approval by the Michigan Public Service Commission. Separately, Entergy intended to shut down the Palisades nuclear power plant permanently on October 1, 2018, after refueling in the spring of 2017 and operating through the end of that fuel cycle. As a result of the planned PPA termination and its intention to shut down the plant, Entergy tested the recoverability of the plant and related assets as of December 31, 2016. Entergy and Consumers Energy subsequently agreed, in September 2017, to terminate the PPA amendment agreement and Entergy now intends to shut down the Palisades plant permanently on May 31, 2022.

Indian Point 2 and Indian Point 3 had an application pending for renewed NRC licenses.  Various parties, including the State of New York, expressed opposition to renewal of the licenses.  Under federal law, nuclear power plants may continue to operate beyond their original license expiration dates while their timely filed renewal applications are pending NRC approval.  Indian Point 2 reached the expiration date of its original NRC operating license on September 28, 2013, and Indian Point 3 reached the expiration date of its original NRC operating license on December 12, 2015. Upon expiration of their operating licenses, each plant entered into a period of extended operation under the timely renewal rule.

In January 2017, Entergy announced that it reached a settlement with New York State to shut down Indian Point 2 by April 30, 2020 and Indian Point 3 by April 30, 2021, and resolve all New York State-initiated legal challenges to Indian Point’s operating license renewal. As part of the settlement, New York State agreed to issue Indian Point’s water quality certification and Coastal Zone Management Act consistency certification and to withdraw its objection to license renewal before the NRC. New York State also agreed to issue a water discharge permit, which is required regardless of whether the plant is seeking a renewed NRC license. The shutdowns are conditioned, among other things, upon such actions being taken by New York State. As a result of its evaluation of alternatives to the continued operation of the Indian Point plants, and taking into consideration the status of negotiations with the State of New York, Entergy tested the recoverability of the plants and related assets as of December 31, 2016.

The tests for Palisades and Indian Point indicated that the probability-weighted undiscounted net cash flows did not exceed the carrying values of the plants and related assets as of December 31, 2016.

As of December 31, 2016 the estimated fair value of the Palisades plant and related long-lived assets was $206 million, while the carrying value was $558 million, resulting in an impairment charge of $352 million. Materials and supplies were evaluated and written down by $48 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Palisades was $400 million ($258 million net-of-tax). The pre-impairment carrying value of $558 million included the effect of a $129 million increase in Palisades’ estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Palisades decommissioning cost revision.

As of December 31, 2016 the estimated fair value of the Indian Point plants and related long-lived assets was $433 million, while the carrying value was $2,619 million, resulting in an impairment charge of $2,186 million. Materials and supplies were evaluated and written down by $157 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Indian Point was $2,343 million ($1,511 million net-of-tax). The pre-impairment carrying value of $2,619 million included the effect of a $392 million increase in Indian Point’s estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Indian Point decommissioning cost revision.

Overall Regarding All Impairments

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.

The fair value analyses for Palisades and Indian Point in 2016 were performed based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimates of fair value were based on the prices that Entergy would expect to receive in hypothetical sales of Palisades and Indian Point plants and related assets to a market participant. In order to determine these prices, Entergy used significant observable inputs, including quoted forward power and gas prices, where available. Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis) and estimated weighted-average costs of capital, were also used in the estimation of fair value. In addition, Entergy made certain assumptions regarding future tax deductions associated with the plants and related assets, the amount and timing of recoveries from future litigation with the DOE related to spent fuel storage costs, and the expected operating life of the plant.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, are classified as Level 3 in the fair value hierarchy discussed in Note 15 to the financial statements.

The following table sets forth a description of significant unobservable inputs used in the valuation of the Palisades and Indian Point plants and related assets:
Significant Unobservable Inputs
 
Amount
 
Weighted-Average
2016
 
 
 
 
Weighted-average cost of capital
 
 
 
 
Indian Point (a)
 
7.0%-7.5%
 
7.2%
Palisades
 
6.5%
 
6.5%
 
 
 
 
 
Long-term pre-tax operating margin (cash basis)
 
 
 
 
Indian Point
 
19.7%
 
19.7%
Palisades (b) (c)
 
17.8%-38.8%
 
34.6%

(a)
The cash flows extending through the 2021 shutdown at Indian Point 3 were assigned a higher discount factor to incorporate the increased risk associated with longer operations.
(b)
Most of the Palisades output is sold under a 15-year power purchase agreement, entered at the plant’s acquisition in 2007, that expires in 2022. The power purchase agreement prices currently exceed market prices and escalate each year, up to $61.50/MWh in 2022.
(c)
The fair value of Palisades at December 31, 2016 is based on the probability weighting of whether the PPA will terminate before the originally scheduled termination in 2022.

Entergy’s Accounting Policy and Entergy Wholesale Commodities Accounting groups, which report to the Chief Accounting Officer, were primarily responsible for determining the valuation of the Palisades and Indian Point plants and related assets, in consultation with external advisors. Entergy’s Accounting Policy group obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair values of the asset groups.
Entergy New Orleans [Member]  
Acquisitions And Dispositions
ACQUISITIONS, DISPOSITIONS, AND IMPAIRMENT OF LONG-LIVED ASSETS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans)

Acquisitions

Union Power Station

In March 2016, Entergy Arkansas, Entergy Louisiana, and Entergy New Orleans purchased the Union Power Station, a 1,980 MW (summer rating) power generation facility located near El Dorado, Arkansas, from Union Power Partners, L.P. The Union Power Station consists of four natural gas-fired, combined-cycle gas turbine power blocks, each rated at 495 MW (summer rating). Entergy Louisiana purchased two of the power blocks and a 50% undivided ownership interest in certain assets related to the facility, and Entergy Arkansas and Entergy New Orleans each purchased one power block and a 25% undivided ownership interest in such related assets. The aggregate purchase price for the Union Power Station was approximately $949 million (approximately $237 million for each power block and associated assets).

Palisades Purchased Power Agreement

Entergy’s purchase of the Palisades plant in 2007 included a unit-contingent, 15-year purchased power agreement (PPA) with Consumers Energy for 100% of the plant’s output, excluding any future uprates.  Prices under the PPA range from $43.50/MWh in 2007 to $61.50/MWh in 2022, and the average price under the PPA is $51/MWh.  The PPA was at below-market prices at the time of the acquisition and Entergy amortizes a liability to revenue over the life of the agreement.  The amount amortized each period is based upon the present value, calculated at the date of acquisition, of each year’s difference between revenue under the agreement and revenue based on estimated market prices.  Amounts amortized to revenue were $6 million in 2018, $28 million in 2017, and $13 million in 2016.  Amounts to be amortized to revenue through the remaining life of the agreement will be approximately $10 million in 2019, $11 million in 2020, $12 million in 2021, and $5 million in 2022.

Dispositions

Willow Glen

In December 2018, Entergy Louisiana sold the Willow Glen Power Station, a non-operating gas plant. Entergy Louisiana sold Willow Glen for approximately $12 million in cash and the transfer of the obligation to decommission the plant. Entergy Louisiana assumed a regulatory liability of $5.7 million. Entergy Louisiana realized a pre-tax gain of $14.8 million on the sale. Entergy Louisiana recorded a $31.9 million regulatory liability to recognize the obligation to refund the customer excess collections for decommissioning Willow Glen.

Vermont Yankee

In November 2016, Entergy entered into an agreement to sell 100% of the membership interests in Entergy Nuclear Vermont Yankee, LLC to a subsidiary of NorthStar. Entergy Nuclear Vermont Yankee was the owner of the Vermont Yankee plant. The sale of Entergy Nuclear Vermont Yankee to NorthStar included the transfer of the nuclear decommissioning trust fund and the asset retirement obligation for the spent fuel management and decommissioning of the plant.

In March 2018, Entergy and NorthStar entered into a settlement agreement and a Memorandum of Understanding with State of Vermont agencies and other interested parties that set forth the terms on which the agencies and parties support the Vermont Public Utility Commission’s approval of the transaction. The agreements provide additional financial assurance for decommissioning, spent fuel management and site restoration, and detail the site restoration standards. In October 2018 the NRC issued an order approving the application to transfer Vermont Yankee’s license to NorthStar for decommissioning. In December 2018, the Vermont Public Utility Commission issued an order approving the transaction consistent with the Memorandum of Understanding’s terms. On January 11, 2019, Entergy and NorthStar closed the transaction.

Entergy Nuclear Vermont Yankee had an outstanding credit facility that was used to pay for dry fuel storage costs. This credit facility was guaranteed by Entergy Corporation. A subsidiary of Entergy assumed the obligations under the credit facility. At the closing of the sale transaction, NorthStar caused Entergy Nuclear Vermont Yankee, renamed NorthStar Vermont Yankee, to issue a $139 million promissory note to the Entergy subsidiary that assumed the credit facility obligations. The amount of the note included the balance outstanding on the credit facility, as well as borrowing fees and costs incurred by Entergy in connection with the credit facility.

With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held for sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in an increase in the asset retirement obligation and $173 million of asset impairment and related other charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the asset retirement obligation. Upon closing of the transaction in January 2019, the Vermont Yankee decommissioning trust, along with the decommissioning obligation for the plant, was transferred to NorthStar. The assets and liabilities associated with the sale of Vermont Yankee are classified as held for sale on the Entergy Corporation and Subsidiaries Consolidated Balance Sheet as of December 31, 2018. As of December 31, 2018, the value of the decommissioning trust was $532 million. As of December 31, 2018, the asset retirement cost asset was $127 million, classified within other deferred debits, and the asset retirement cost obligation was $568 million, classified within other non-current liabilities.

FitzPatrick

In August 2016, Entergy entered into an agreement to sell the FitzPatrick plant, an 838 MW nuclear power plant owned by Entergy in the Entergy Wholesale Commodities segment. In March 2017 the NRC approved the sale of the plant to Exelon. The transaction closed in March 2017 for a purchase price of $110 million, which included a $10 million non-refundable signing fee paid in August 2016, in addition to the assumption by Exelon of certain liabilities related to the FitzPatrick plant, resulting in a pre-tax gain on the sale of $16 million. At the transaction close, Exelon paid an additional $8 million for the proration of certain expenses prepaid by Entergy. The disposition-date fair value of the decommissioning trust fund was $805 million, classified within other deferred debits, and the disposition-date fair value of the asset retirement obligation was $727 million, classified within other non-current liabilities. The transaction also included property, plant, and equipment with a net book value of zero, materials and supplies, and prepaid assets.

As part of the transaction, Entergy entered into a reimbursement agreement with Exelon pursuant to which Exelon reimbursed Entergy for specified out-of-pocket costs associated with Entergy’s operation of FitzPatrick prior to closing of the sale. In the first quarter 2017, Entergy billed Exelon for reimbursement of $98 million of other operation and maintenance expenses, $7 million in lost operating revenues, and $3 million in taxes other than income taxes, partially offset by a $10 million defueling credit to Exelon.

As discussed in Note 3 to the financial statements, as a result of the sale of FitzPatrick on March 31, 2017, Entergy redetermined the plant’s tax basis, resulting in a $44 million income tax benefit in the first quarter 2017.

Top Deer

In November 2016, Entergy sold its 50% membership interest in Top Deer Wind Ventures, LLC, a wind-powered electric generation joint venture owned by Entergy in the Entergy Wholesale Commodities segment and accounted for as an equity method investment. Entergy sold its 50% membership interest in Top Deer for approximately $0.5 million and realized a pre-tax loss of $0.2 million on the sale.

Impairment of Long-lived Assets

2017 and 2018 Impairments

In 2017 and 2018, Entergy continued to execute its strategy to reduce the size of Entergy Wholesale Commodities’ merchant fleet, with planned shutdowns of Pilgrim by May 31, 2019, Indian Point 2 by April 30, 2020, Indian Point 3 by April 30, 2021, and Palisades on May 31, 2022. The remaining two Entergy Wholesale Commodities’ nuclear plants, FitzPatrick and Vermont Yankee, have been sold. The FitzPatrick plant was classified as held-for-sale at December 31, 2016, and subsequently sold to Exelon in March 2017. The Vermont Yankee plant was classified as held-for-sale at December 31, 2018, and subsequently sold to NorthStar on January 11, 2019.

In 2018, Entergy Wholesale Commodities incurred $532 million, and in 2017 it incurred $538 million, of impairment charges related to nuclear fuel spending, nuclear refueling outage spending, expenditures for capital assets, and asset retirement obligation revisions. These costs were charged to expense as incurred as a result of the impaired fair value of the Entergy Wholesale Commodities nuclear plants’ long-lived assets due to the significantly reduced remaining estimated operating lives associated with management’s strategy to reduce the size of the Entergy Wholesale Commodities’ merchant fleet. Entergy expects to continue to incur costs associated with nuclear fuel-related spending, expenditures for capital assets and, except for Palisades, expects to continue to charge these costs to expense as incurred because Entergy expects the value of the plants to continue to be impaired.

With respect to Palisades, Entergy and Consumers Energy had agreed to amend the existing PPA to terminate early, on May 31, 2018. In September 2017, however, Entergy and Consumers Energy agreed to terminate the PPA amendment agreement. Entergy will continue to operate Palisades under the current PPA with Consumers Energy, instead of shutting down in the fall of 2018 as previously planned. Entergy intends to shut down the Palisades plant permanently on May 31, 2022. As a result of the change in expected operating life of the Palisades plant, the expected probability-weighted undiscounted net cash flows as of September 30, 2017 exceeded the carrying value of the plant and related assets. Accordingly, nuclear fuel spending, nuclear refueling outage spending, and expenditures for capital assets incurred at Palisades after September 30, 2017 are no longer charged to expense as incurred, but recorded as assets and depreciated or amortized, subject to the typical periodic impairment reviews prescribed in the accounting rules.

2018 Pilgrim Impairment

The Pilgrim plant is expected to cease operations on May 31, 2019, at the end of its current fuel cycle. Entergy Nuclear Generation Company filed its Post-Shutdown Decommissioning Activities Report (PSDAR) with the NRC in the fourth quarter 2018 for the Pilgrim plant. As part of the development of the PSDAR, Entergy obtained a revised decommissioning cost study in the third quarter 2018. The revised estimate resulted in a $117.5 million increase in the decommissioning cost liability and a corresponding impairment charge.

2018 Vermont Yankee Impairment

As discussed above in Dispositions, on January 11, 2019, Entergy sold the Vermont Yankee plant to NorthStar. With the receipt of the NRC and Vermont Public Utility Commission approvals and the resolution among the parties of the significant conditions of the sale, Entergy concluded that as of December 31, 2018 Vermont Yankee was in held-for- sale status. Entergy accordingly evaluated the Vermont Yankee asset retirement obligation in light of the terms of the sale transaction, and evaluated the remaining values of the Vermont Yankee assets. These evaluations resulted in $173 million of asset impairment and related charges in the fourth quarter 2018. See Note 9 to the financial statements for additional discussion of the revision of the asset retirement obligation.

2016 Palisades and Indian Point Impairments

In December 2016, Entergy reached an agreement with Consumers Energy to amend the existing PPA to terminate early, on May 31, 2018. Pursuant to the agreement to amend the PPA, Consumers Energy would pay Entergy $172 million for the early termination of the PPA. The PPA amendment agreement was subject to regulatory approvals, including approval by the Michigan Public Service Commission. Separately, Entergy intended to shut down the Palisades nuclear power plant permanently on October 1, 2018, after refueling in the spring of 2017 and operating through the end of that fuel cycle. As a result of the planned PPA termination and its intention to shut down the plant, Entergy tested the recoverability of the plant and related assets as of December 31, 2016. Entergy and Consumers Energy subsequently agreed, in September 2017, to terminate the PPA amendment agreement and Entergy now intends to shut down the Palisades plant permanently on May 31, 2022.

Indian Point 2 and Indian Point 3 had an application pending for renewed NRC licenses.  Various parties, including the State of New York, expressed opposition to renewal of the licenses.  Under federal law, nuclear power plants may continue to operate beyond their original license expiration dates while their timely filed renewal applications are pending NRC approval.  Indian Point 2 reached the expiration date of its original NRC operating license on September 28, 2013, and Indian Point 3 reached the expiration date of its original NRC operating license on December 12, 2015. Upon expiration of their operating licenses, each plant entered into a period of extended operation under the timely renewal rule.

In January 2017, Entergy announced that it reached a settlement with New York State to shut down Indian Point 2 by April 30, 2020 and Indian Point 3 by April 30, 2021, and resolve all New York State-initiated legal challenges to Indian Point’s operating license renewal. As part of the settlement, New York State agreed to issue Indian Point’s water quality certification and Coastal Zone Management Act consistency certification and to withdraw its objection to license renewal before the NRC. New York State also agreed to issue a water discharge permit, which is required regardless of whether the plant is seeking a renewed NRC license. The shutdowns are conditioned, among other things, upon such actions being taken by New York State. As a result of its evaluation of alternatives to the continued operation of the Indian Point plants, and taking into consideration the status of negotiations with the State of New York, Entergy tested the recoverability of the plants and related assets as of December 31, 2016.

The tests for Palisades and Indian Point indicated that the probability-weighted undiscounted net cash flows did not exceed the carrying values of the plants and related assets as of December 31, 2016.

As of December 31, 2016 the estimated fair value of the Palisades plant and related long-lived assets was $206 million, while the carrying value was $558 million, resulting in an impairment charge of $352 million. Materials and supplies were evaluated and written down by $48 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Palisades was $400 million ($258 million net-of-tax). The pre-impairment carrying value of $558 million included the effect of a $129 million increase in Palisades’ estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Palisades decommissioning cost revision.

As of December 31, 2016 the estimated fair value of the Indian Point plants and related long-lived assets was $433 million, while the carrying value was $2,619 million, resulting in an impairment charge of $2,186 million. Materials and supplies were evaluated and written down by $157 million. In summary, as of December 31, 2016, the total impairment loss and related charges for Indian Point was $2,343 million ($1,511 million net-of-tax). The pre-impairment carrying value of $2,619 million included the effect of a $392 million increase in Indian Point’s estimated decommissioning cost liability and the related asset retirement cost asset. The increase in the estimated decommissioning cost liability primarily resulted from the change in expectation regarding the timing of decommissioning cash flows. See Note 9 to the financial statements for further discussion regarding the Indian Point decommissioning cost revision.

Overall Regarding All Impairments

The impairments and other related charges are recorded as a separate line item in Entergy’s consolidated statements of operations and are included within the results of the Entergy Wholesale Commodities segment. In addition to the impairments and other related charges, Entergy expects to incur additional charges through mid-2022 associated with these strategic transactions. See Note 13 to the financial statements for further discussion of these additional charges.

The fair value analyses for Palisades and Indian Point in 2016 were performed based on the income approach, a discounted cash flow method, to determine the amount of impairment. The estimates of fair value were based on the prices that Entergy would expect to receive in hypothetical sales of Palisades and Indian Point plants and related assets to a market participant. In order to determine these prices, Entergy used significant observable inputs, including quoted forward power and gas prices, where available. Significant unobservable inputs, such as projected long-term pre-tax operating margins (cash basis) and estimated weighted-average costs of capital, were also used in the estimation of fair value. In addition, Entergy made certain assumptions regarding future tax deductions associated with the plants and related assets, the amount and timing of recoveries from future litigation with the DOE related to spent fuel storage costs, and the expected operating life of the plant.  Based on the use of significant unobservable inputs, the fair value measurement for the entirety of the asset group, and for each type of asset within the asset group, are classified as Level 3 in the fair value hierarchy discussed in Note 15 to the financial statements.

The following table sets forth a description of significant unobservable inputs used in the valuation of the Palisades and Indian Point plants and related assets:
Significant Unobservable Inputs
 
Amount
 
Weighted-Average
2016
 
 
 
 
Weighted-average cost of capital
 
 
 
 
Indian Point (a)
 
7.0%-7.5%
 
7.2%
Palisades
 
6.5%
 
6.5%
 
 
 
 
 
Long-term pre-tax operating margin (cash basis)
 
 
 
 
Indian Point
 
19.7%
 
19.7%
Palisades (b) (c)
 
17.8%-38.8%
 
34.6%

(a)
The cash flows extending through the 2021 shutdown at Indian Point 3 were assigned a higher discount factor to incorporate the increased risk associated with longer operations.
(b)
Most of the Palisades output is sold under a 15-year power purchase agreement, entered at the plant’s acquisition in 2007, that expires in 2022. The power purchase agreement prices currently exceed market prices and escalate each year, up to $61.50/MWh in 2022.
(c)
The fair value of Palisades at December 31, 2016 is based on the probability weighting of whether the PPA will terminate before the originally scheduled termination in 2022.

Entergy’s Accounting Policy and Entergy Wholesale Commodities Accounting groups, which report to the Chief Accounting Officer, were primarily responsible for determining the valuation of the Palisades and Indian Point plants and related assets, in consultation with external advisors. Entergy’s Accounting Policy group obtained and reviewed information from other Entergy departments with expertise on the various inputs and assumptions that were necessary to calculate the fair values of the asset groups.