NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

Entergy Arkansas [Member]
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

Entergy Gulf States Louisiana [Member]
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

Entergy Louisiana [Member]
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

Entergy Mississippi [Member]
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

Entergy New Orleans
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

Entergy Texas [Member]
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value

         

System Energy [Member]
 
Revolving Credit Facilities, Lines Of Credit, Short-Term Borrowings, And Long-Term Debt

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

            Entergy Corporation has in place a credit facility that has a borrowing capacity of $3.5 billion and expires in March 2018.  Entergy Corporation also has the ability to issue letters of credit against 50% of the total borrowing capacity of the credit facility.  The commitment fee is currently 0.275% of the undrawn commitment amount.  Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation.  The weighted average interest rate for the six months ended June 30, 2013 was 1.97% on the drawn portion of the facility.  Following is a summary of the borrowings outstanding and capacity available under the facility as of June 30, 2013.

Capacity (a)
 
Borrowings
 
Letters
of Credit
 
Capacity
Available
(In Millions)
             
$3,500 
 
$190
 
$8
 
$3,302

(a)

The capacity decreases to $3,490 million in March 2017.

Entergy Corporation's facility requires it to maintain a consolidated debt ratio of 65% or less of its total capitalization.  Entergy is in compliance with this covenant.  If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Utility operating companies (except Entergy New Orleans) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the facility maturity date may occur.
 

Entergy Corporation has a commercial paper program with a program limit of up to $1 billion. As of June 30, 2013, Entergy Corporation had $948 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2013 was 0.84%. In July 2013 the Board increased the commercial paper program limit to $1.5 billion.

 


The commitment fees on the credit facilities range from 0.125% to 0.275% of the undrawn commitment amount.
 

            Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy Texas, and System Energy have obtained long-term financing authorizations from the FERC that extend through October 31, 2013. Entergy Arkansas has obtained long-term financing authorization from the APSC that extends through December 2015. Entergy New Orleans has obtained long-term financing authorization from the City Council that extends through July 2014.

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, and System Energy)

       Amounts outstanding on the Entergy Gulf States Louisiana nuclear fuel company variable interest entity's credit facility, if any, are included in long-term debt on its balance sheet and commercial paper outstanding for the other nuclear fuel company variable interest entities is classified as a current liability on the respective balance sheets.  The commitment fees on the credit facilities are 0.125% of the undrawn commitment amount.  Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio of 70% or less of its total capitalization.



            In accordance with regulatory treatment, interest on the nuclear fuel company variable interest entities' credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

Debt Issuances and Redemptions

(Entergy Arkansas)

            In January 2013, Entergy Arkansas arranged for the issuance by (i) Independence County, Arkansas of $45 million of 2.375% Pollution Control Revenue Refinancing Bonds (Entergy Arkansas, Inc. Project) Series 2013 due January 2021, and (ii) Jefferson County, Arkansas of $54.7 million of 1.55% Pollution Control Revenue Refunding Bonds (Entergy Arkansas, Inc. Project) Series 2013 due October 2017, each of which series is secured by a separate series of non-interest bearing first mortgage bonds of Entergy Arkansas. The proceeds of these issuances were applied to the refunding of outstanding series of pollution control revenue bonds previously issued by the respective issuers.

            In May 2013, Entergy Arkansas issued $250 million of 3.05% Series first mortgage bonds due June 2023. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, Entergy Arkansas issued $125 million of 4.75% Series first mortgage bonds due June 2063. Entergy Arkansas used the proceeds to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

            In June 2013, the Entergy Arkansas nuclear fuel company variable interest entity redeemed, at maturity, its $30 million 9% Series H notes.

            In July 2013, Entergy Arkansas entered into a $250 million credit facility terminating January 26, 2015 with the collateral support of a series of $255 million non-interest bearing Entergy Arkansas first mortgage bonds. On July 31, 2013, Entergy Arkansas borrowed $250 million against the credit facility. Entergy Arkansas used the borrowings to pay, at maturity, a portion of its $300 million 5.40% Series first mortgage bonds due August 2013 and for general corporate purposes.

(Entergy Gulf States Louisiana)

            In February 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity issued $70 million of 3.38% Series R notes due August 2020.  The Entergy Gulf States Louisiana nuclear fuel company variable interest entity used the proceeds primarily to purchase additional nuclear fuel.

            In May 2013, the Entergy Gulf States Louisiana nuclear fuel company variable interest entity redeemed, at maturity, its $75 million 5.56% Series N notes.           


(Entergy Louisiana)

           

            In May 2013, Entergy Louisiana issued $100 million of 4.70% Series first mortgage bonds due June 2063. Entergy Louisiana used the proceeds for general corporate purposes.

(Entergy Mississippi)

            In February 2013, Entergy Mississippi redeemed, at maturity, its $100 million 5.15% Series first mortgage bonds.

(Entergy New Orleans)

            In June 2013, Entergy New Orleans issued $100 million of 3.90% Series first mortgage bonds due July 2023.  Entergy New Orleans used the proceeds to pay, at maturity, its $70 million 5.25% Series first mortgage bonds due August 2013 and for general corporate purposes.

Fair Value