NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

Entergy Arkansas [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

Entergy Gulf States Louisiana [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

Entergy Louisiana [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

Entergy Mississippi [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

Entergy New Orleans
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

Entergy Texas [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013. 

 

 

 

 

 

 

System Energy [Member]
 
Rate And Regulatory Matters

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Gulf States Louisiana, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

 

Regulatory Assets

 

            See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries.  The following are updates to that information.

 

Fuel and Purchased Power Cost Recovery

 

Entergy Louisiana

 

            In April 2010 the LPSC authorized its staff to initiate an audit of Entergy Louisiana's fuel adjustment clause filings.  The audit includes a review of the reasonableness of charges flowed through the fuel adjustment clause by Entergy Louisiana for the period from 2005 through 2009.  The LPSC Staff issued its audit report in January 2013.  The LPSC staff recommended that Entergy Louisiana refund approximately $1.9 million, plus interest, to customers and realign the recovery of approximately $1 million from Entergy Louisiana's fuel adjustment clause to base rates.  Two parties have intervened in the proceeding.  A procedural schedule has been established for the identification of issues by the intervenors and for Entergy Louisiana to submit comments regarding the LPSC Staff report, with this process to be completed by October 4, 2013.  If any open issues remain, a procedural schedule will be established to address those issues.  Entergy Louisiana has recorded provisions for the estimated outcome of this proceeding.

 

Entergy Texas

 

             In November 2012, Entergy Texas filed a pleading seeking a PUCT finding that special circumstances exist for limited cost recovery of capacity costs associated with two power purchase agreements until such time that these costs are included in base rates or a purchased capacity recovery rider or other recovery mechanism.  In March 2013 the PUCT Staff and intervenors filed a joint motion to dismiss Entergy Texas's application seeking special circumstances recovery of these capacity costs.  Entergy Texas filed to withdraw this case without prejudice and the judge granted the request in June 2013.

 

At its April 11, 2013 open meeting, the PUCT Commissioners discussed their view that a purchased power capacity rider was good public policy. The PUCT issued an order on May 28, 2013 adopting the rule allowing for a purchased power capacity rider, subject to an offsetting adjustment for load growth. The rule, as adopted, also includes a process for obtaining pre-approval by the PUCT of purchased power agreements. Entergy Texas has the option to recover its capacity costs under the new rider mechanism or could proceed with a full base rate proceeding.

 

Retail Rate Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for detailed information regarding retail rate proceedings involving the Utility operating companies.  The following are updates to that information.

 

Filings with the APSC (Entergy Arkansas)

 

Retail Rates

 

2013 Base Rate Filing

 

            In March 2013, Entergy Arkansas filed with the APSC for a general change in rates, charges, and tariffs.  Recognizing that the final structure of Entergy Arkansas's transmission business has not been determined, the filing presents two alternative scenarios for the APSC to establish the appropriate level of rates for Entergy Arkansas.  In the primary scenario, which assumes that Entergy Arkansas will transition to MISO in December 2013, Entergy Arkansas requests a rate increase of $174 million, including $49 million of revenue being transferred from collection in riders to base rates.  The alternate scenario, which also assumes completion of the proposed spin-merge of the transmission business with ITC, reflects a $218 million total rate increase request.  Both scenarios propose a new transmission rider and a capacity cost recovery rider.  The filing requests a 10.4% return on common equity.  The APSC established a procedural schedule that includes hearings in the proceeding beginning in October 2013. New rates are expected to become effective by January 2014.

 

Filings with the LPSC

 

Retail Rates - Electric

 

(Entergy Gulf States Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Gulf States Louisiana's formula rate plan.  In May 2012, Entergy Gulf States Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected an 11.94% earned return on common equity, which is above the earnings bandwidth and would indicate a $6.5 million cost of service rate decrease was necessary under the formula rate plan.  The filing also reflected a $22.9 million rate decrease for the incremental capacity rider.  Subsequently, in August 2012, Entergy Gulf States Louisiana submitted a revised filing that reflected an earned return on common equity of 11.86% indicating a $5.7 million cost of service rate decrease is necessary under the formula rate plan.  The revised filing also indicates that a reduction of $20.3 million should be reflected in the incremental capacity rider.  The rate reductions were implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Gulf States Louisiana submitted a revised evaluation report that reflects expected retail jurisdictional cost of $16.9 million for the first-year capacity charges for the purchase from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy.  This rate change was implemented effective with the first billing cycle of January 2013.  The 2011 test year filings, as revised, were approved by the LPSC in February 2013.  In April 2013, Entergy Gulf States Louisiana submitted a revised evaluation report increasing the incremental capacity rider by approximately $7.3 million to reflect the cost of an additional capacity contract.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Gulf States Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in November 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Gulf States Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

(Entergy Louisiana)

 

            In November 2011 the LPSC approved a one-year extension of Entergy Louisiana's formula rate plan.  In May 2012, Entergy Louisiana made its formula rate plan filing with the LPSC for the 2011 test year.  The filing reflected a 9.63% earned return on common equity, which is within the earnings bandwidth and results in no cost of service rate change under the formula rate plan.  The filing also reflected an $18.1 million rate increase for incremental capacity costs.  In August 2012, Entergy Louisiana submitted a revised filing that reflects an earned return on common equity of 10.38%, which is still within the earnings bandwidth, resulting in no cost of service rate change.  The revised filing also indicates that an increase of $15.9 million should be reflected in the incremental capacity rider.  The rate change was implemented, subject to refund, effective for bills rendered the first billing cycle of September 2012.  Subsequently, in December 2012, Entergy Louisiana submitted a revised evaluation report that reflects two items: 1) a $17 million reduction for the first-year capacity charges for the purchase by Entergy Gulf States Louisiana from Entergy Louisiana of one-third of Acadia Unit 2 capacity and energy, and 2) an $88 million increase for the first-year retail revenue requirement associated with the Waterford 3 replacement steam generator project, which was in-service in December 2012.  These rate changes were implemented, subject to refund, effective with the first billing cycle of January 2013.  In April 2013, Entergy Louisiana and the LPSC staff filed a joint report resolving the 2011 test year formula rate plan and recovery related to the Grand Gulf uprate.  This report was approved by the LPSC in April 2013.  With completion of the Waterford 3 replacement steam generator project, the LPSC is conducting a prudence review in connection with a filing made by Entergy Louisiana in April 2013 with regard to the following aspects of the replacement project: 1) project management; 2) cost controls; 3) success in achieving stated objectives; 4) the costs of the replacement project; and 5) the outage length and replacement power costs.

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the base rate case filed by Entergy Louisiana with the LPSC in February 2013. In April 2013 the LPSC established a procedural schedule providing for hearings in December 2013, with a decision by the LPSC expected in 2014. On July 26, 2013, with the concurrence of Entergy Louisiana based upon an expected 60-day delay of the procedural schedule, the ALJ suspended the procedural schedule pending resolution of the appeal by Entergy Gulf States Louisiana, Entergy Louisiana and the LPSC staff regarding the ALJ's denial of a motion to consolidate the rate cases of Entergy Gulf States Louisiana and Entergy Louisiana. At its July 31, 2013 meeting the LPSC deferred the agenda item relating to the appeal and directed the LPSC staff to develop a plan for consolidation, to be considered by the LPSC in August 2013.

 

Retail Rates - Gas (Entergy Gulf States Louisiana)

 

            In January 2013, Entergy Gulf States Louisiana filed with the LPSC its gas rate stabilization plan for the test year ended September 30, 2012.  The filing showed an earned return on common equity of 11.18%, which resulted in a $43 thousand rate reduction.  In March 2013 the LPSC Staff issued its proposed findings and recommended two adjustments.  The first is to normalize property insurance expense, and the second is to modify the return on equity for gas operations to reflect the return on equity that ultimately is approved by the LPSC in the investigation previously initiated by the LPSC to review the return on equity for Louisiana gas utilities.  Entergy Gulf States Louisiana and the LPSC Staff reached agreement regarding the LPSC Staff's proposed adjustments.  As reflected in an unopposed joint report of proceedings filed by Entergy Gulf States Louisiana and the LPSC Staff on May 16, 2013, Entergy Gulf States Louisiana accepted, with modification, the LPSC Staff's proposed adjustment to property insurance expense and agreed to: (1) a three-year extension of the gas rate stabilization plan with a midpoint return on equity of 9.95%, with a first year midpoint reset; (2) dismissal of the docket initiated by the LPSC to evaluate the allowed return on equity for Entergy Gulf States Louisiana's gas rate stabilization plan; and (3) presentation to the LPSC by November 2014 by Entergy Gulf States Louisiana and the LPSC Staff of their recommendation for implementation of an infrastructure rider to recover expenditures associated with strategic plant investment. The LPSC approved the agreement in May 2013.

 

Filings with the MPSC (Entergy Mississippi)

 

Formula Rate Plan Filings

 

            In March 2013, Entergy Mississippi submitted its formula rate plan 2012 test year filing.  The filing requested a $36.3 million revenue increase to reset Entergy Mississippi's return on common equity to 10.55%, which is a point within the formula rate plan bandwidth.  On June 6, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, in which both parties agreed that the MPSC should approve a $22.3 million rate incerase for Entergy Mississippi which, with other adjustments reflected in the stipulation, would have the effect of resetting Entergy Mississippi's return on common equity to 10.59% when adjusted for performance under the formula rate plan.  An amended scheduling order was issued on July 22, 2013, setting a final MPSC order to be issued on or before August 15, 2013 and new rates to begin billing on August 28, 2013.

 

Filings with the City Council

 

(Entergy Louisiana)

 

            In March 2013, Entergy Louisiana filed a rate case for the Algiers area, which is in New Orleans and is regulated by the City Council.  Entergy Louisiana is requesting a rate increase of $13 million over three years, including a 10.4% return on common equity and a formula rate plan mechanism identical to its LPSC request.  New rates are currently expected to become effective in second quarter 2014.

 

(Entergy New Orleans)

 

            As discussed in the Form 10-K, in May 2012, Entergy New Orleans filed its electric and gas formula rate plan evaluation reports for the 2011 test year.   The City Council had approved a procedural schedule to resolve disputed items that included a hearing in April 2013, but that hearing was postponed.  On August 1, 2013, the Utility Committee of the City Council unanimously approved a settlement of all issues in the formula rate plan proceeding.  Under the terms of the settlement, Entergy New Orleans will implement an approximately $1.625 million net decrease to the electric rates that were in effect prior to the electric rate increase implemented in October 2012, with no change in gas rates.  Entergy New Orleans will refund to customers approximately $6.0 million over the four-month period from September 2013 through December 2013 to make the electric rate decrease effective as of the first billing cycle of October 2012.  Entergy New Orleans had previously recorded provisions for the majority of the refund to customers, but recorded an additional $1.1 million provision in second quarter 2013 as a result of the settlement.  The Utility Committee's approval will be presented to the City Council for consideration later in August 2013.

 

System Agreement Cost Equalization Proceedings

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceedings regarding the System Agreement.  Following are updates to that discussion.

 

Rough Production Cost Equalization Rates

 

2008 Rate Filing Based on Calendar Year 2007 Production Costs

 

See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding. In March 2013 the LPSC filed a petition for review with the U.S. Court of Appeals for the Fifth Circuit seeking appellate review of the FERC's earlier orders addressing the ALJ's initial decision.

 

2009 Rate Filing Based on Calendar Year 2008 Production Costs

 

     See Note 2 to the financial statements in the Form 10-K for a discussion of this proceeding.  In January 2013 the LPSC filed a protest of Entergy's July 2012 compliance filing submitted in response to the FERC's May 2012 order.

 

2013 Rate Filing Based on Calendar Year 2012 Production Costs

 

 

Several parties intervened in the proceeding at the FERC, including the LPSC, which filed a protest as well. The City Council intervened and filed comments related to including the outcome of a related FERC proceeding in the 2013 cost equalization calculation. The FERC has not yet issued an order addressing the filing.

 

Interruptible Load Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the proceeding regarding the treatment under the System Agreement of the Utility operating companies' interruptible loads.  On March 21, 2013, the FERC issued an order denying the LPSC's request for rehearing of the FERC's June 2011 order wherein the FERC concluded it would exercise its discretion and not order refunds in the interruptible load proceeding.  Based on its review of the LPSC's request for rehearing and the briefs filed as part of the paper hearing established in October 2011, the FERC affirmed its earlier ruling and declined to order refunds under the circumstances of the case.  On May 2, 2013, the LPSC filed a petition for review with the U.S. Court of Appeals for the D.C. Circuit seeking review of FERC's prior orders in the Interruptible Load Proceeding concluding that it would exercise its discretion and not order refunds in the proceeding.  The appeal is pending.   

 

Storm Cost Recovery Filings with Retail Regulators

 

Entergy Gulf States Louisiana and Entergy Louisiana

 

Hurricane Isaac

 

See Note 2 to the financial statements in the Form 10-K for a discussion of Hurricane Isaac and the damage caused to portions of Entergy's service area in Louisiana. In January 2013, Entergy Gulf States Louisiana and Entergy Louisiana withdrew $65 million and $187 million, respectively, from their storm reserve escrow accounts. In April 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a joint application with the LPSC relating to Hurricane Isaac system restoration costs.  Specifically, Entergy Gulf States Louisiana and Entergy Louisiana requested that the LPSC determine the amount of such costs that were prudently incurred and are, thus, eligible for recovery from customers.  Including carrying costs and additional storm escrow funds, Entergy Gulf States Louisiana is seeking an LPSC determination that $73.8 million in system restoration costs were prudently incurred and Entergy Louisiana is seeking an LPSC determination that $247.7 million in system restoration costs were prudently incurred.  Entergy Gulf States Louisiana and Entergy Louisiana intend to replenish their storm escrow accounts to $90 million and $200 million, respectively, primarily through traditional debt markets and have requested special rate treatment of any borrowings for that purpose.  In May 2013, Entergy Gulf States Louisiana and Entergy Louisiana filed a supplemental application proposing a specific means to finance system restoration costs and related requests. Entergy Gulf States Louisiana and Entergy Louisiana are proposing to finance Hurricane Isaac restoration costs through Louisiana Act 55 financing, which was the same method they used for Hurricanes Katrina, Rita, Gustav, and Ike.

 

Entergy Mississippi

 

            On July 1, 2013, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation, wherein both parties agreed that approximately $32 million in storm restoration costs incurred in 2011 and 2012 were prudently incurred and chargeable to the storm damage reserve, while approximately $700,000 in prudently incurred costs were more properly recoverable through the formula rate plan.  Entergy Mississippi and the Mississippi Public Utilities Staff also agreed that the storm damage accrual should be increased from $750,000 per month to $1.75 million per month.  The joint stipulation is pending approval of the MPSC.

 

Texas Power Price Lawsuit

 

See Note 2 to the financial statements in the Form 10-K for a discussion of the lawsuit filed in August 2003 in the district court of Chambers County, Texas by Texas residents on behalf of a purported class of the Texas retail customers of Entergy Gulf States, Inc. who were billed and paid for electric power from January 1, 1994 to the present. The case is pending in state district court, and in March 2012 the court found that the case met the requirements to be maintained as a class action under Texas law. In April 2012 the court entered an order certifying the class. The defendants have appealed the order to the Texas Court of Appeals – First District. The appeal is pending, and proceedings in district court are stayed until the appeal is resolved. Oral arguments before the court of appeals were conducted on April 23, 2013, and the matter awaits that court's decision.

 

Entergy Arkansas Opportunity Sales Proceeding

 

            See Note 2 to the financial statements in the Form 10-K for a discussion of the Entergy Arkansas opportunity sales proceeding.  As required by the procedural schedule established in the calculation proceeding, Entergy filed its direct testimony that included a proposed illustrative re-run, consistent with the directives in FERC's order, of intra-system bills for 2003, 2004, and 2006, the three years with the highest volume of opportunity sales.  Entergy's proposed illustrative re-run of intra-system bills shows that the potential cost for Entergy Arkansas would be up to $12 million for the years 2003, 2004, and 2006, and the potential benefit would be significantly less than that for each of the other Utility operating companies.  Entergy's proposed illustrative re-run of the intra-system bills also shows an offsetting potential benefit to Entergy Arkansas for the years 2003, 2004, and 2006 resulting from the effects of the FERC's order on System Agreement Service Schedules MSS-1, MSS-2, and MSS-3, and the potential offsetting cost would be significantly less than that for each of the other Utility operating companies.  Entergy provided to the LPSC an illustrative intra-system bill recalculation as specified by the LPSC for the years 2003, 2004, and 2006, and the LPSC then filed answering testimony in December 2012.  In its testimony the LPSC claims that the damages that should be paid by Entergy Arkansas to the other Utility operating companies' customers for 2003, 2004, and 2006 are $42 million to Entergy Gulf States, Inc., $7 million to Entergy Louisiana, $23 million to Entergy Mississippi, and $4 million to Entergy New Orleans; and that Entergy Arkansas "shareholders" should pay Entergy Arkansas customers $34 million.  The FERC staff and certain intervenors filed direct and answering testimony in February 2013.  In April 2013, Entergy filed its rebuttal testimony in that proceeding, including a revised illustrative re-run of the intra-system bills for the years 2003, 2004, and 2006.  The revised calculation determines the re-pricing of the opportunity sales based on consideration of moveable resources only and the removal of exchange energy received by Entergy Arkansas, which increases the potential cost for Entergy Arkansas over the three years 2003, 2004, and 2006 by $2.3 million from the potential costs identified in the Utility operating companies' prior filings in September and October 2012.  A hearing was held in May 2013 to quantify the effect of repricing the opportunity sales in accordance with the FERC's decision.  Post-hearing briefs have been filed in the proceeding, and the ALJ's initial decision on the calculation of the effects is due by August 28, 2013.