XML 22 R10.htm IDEA: XBRL DOCUMENT v3.20.2
Deferred Engineering Costs
9 Months Ended
Sep. 30, 2020
Deferred Costs [Abstract]  
Deferred Engineering Costs NOTE 4 — DEFERRED ENGINEERING COSTS    As of September 30, 2020, the deferred engineering balance of approximately $110.5 million represents detailed engineering services related to the planned construction of the Driftwood terminal. This balance will be transferred to construction in progress upon reaching FID.