XML 31 R10.htm IDEA: XBRL DOCUMENT v3.8.0.1
Deferred Engineering Costs
9 Months Ended
Sep. 30, 2017
Deferred Costs [Abstract]  
Deferred Engineering Costs
DEFERRED ENGINEERING COSTS
Deferred engineering costs of $9.0 million represent detailed engineering services related to the Driftwood Project. Such costs will be deferred until construction commences on the Driftwood Project, at which time they will be transferred to construction in progress.