a. Environmental - MGE Energy and MGE.

MGE Energy and MGE are subject to frequently changing local, state, and federal regulations concerning air quality, water quality, land use, threatened and endangered species, hazardous materials handling, and solid waste disposal. These regulations affect the manner in which they conduct their operations, the costs of those operations, as well as capital and operating expenditures. Several of these environmental rules are subject to legal challenges, reconsideration and/or other uncertainties. Regulatory initiatives, proposed rules, and court challenges to adopted rules, have the potential to have a material effect on our capital expenditures and operating costs. Management believes compliance costs will be recovered in future rates based on previous treatment of environmental compliance projects. These initiatives, proposed rules, and court challenges include:

The EPA's published water effluent limitations guidelines and standards for steam electric power plants, which focus on the reduction of metals and other pollutants in wastewater from new and existing power plants, such as the coal-burning plants at Columbia and the Elm Road Units.

The EPA's cooling water intake rules, which require cooling water intake structures at electric power plants, such as our WCCF, Blount, and Columbia plants, meet best available technology standards so that mortality from entrainment (drawing aquatic life into a plant's cooling system) and impingement (trapping aquatic life on screens) are reduced.

Greenhouse Gas (GHG) reduction guidelines and approval criteria established under the Clean Air Act for states to use in developing plans to control GHG emissions from existing fossil fuel-fired electric generating units (EGUs) and systems (the Clean Power Plan, or CPP). Implementation of the CPP is expected to have a direct impact on existing coal and natural gas fired generating units, including possible changes in dispatch and additional operating costs. In May 2017, the EPA requested the U.S. Court of Appeals for the D.C. Circuit to put on hold, indefinitely, any ongoing challenges to the CPP while the EPA reviews the rule and undertakes any potential rulemaking. In October 2017, the EPA published a proposed rule announcing the EPA's intention to repeal the CPP and has sought public comment on whether to replace the rule, and if so how. In December 2017, the EPA published an Advance Notice of Public Rulemaking (ANPR) to solicit information from the public as it considers a future rule to limit GHG emissions from electric generating units.

Given the pending legal proceedings, and the ANPR, the nature and timing of any final requirements to control GHG emissions is subject to uncertainty. If the CPP remains substantially in its present form, it is expected to have a material impact on MGE. MGE will continue to monitor developments with this proposed rule.

The EPA's rule to regulate ambient levels of a pollutant through the Ozone National Ambient Air Quality Standards (NAAQS). The EPA issued final designations on May 1, 2018, which designated the northeast portion of Milwaukee County as nonattainment. The Elm Road Units are located outside the designated nonattainment area. MGE expects that Ozone NAAQS will not have a material effect on its existing plants based on final designations.

The State of Wisconsin has joined a lawsuit filed by several states challenging the EPA's new ozone standard, alleging that the new standard is not attainable and the EPA is not properly considering background levels in setting its ozone attainment levels. The lawsuit has been stayed at the request of the EPA; however the significance of the challenge, as it might relate to MGE, is now diminished with the final ozone designations.

Rules regulating nitrogen oxide (NOx) and sulfur dioxide (SO2) emissions, including the Cross State Air Pollution Rule (CSAPR) and Clean Air Visibility Rule (CAVR). At this time, regulatory obligations, compliance strategies, and costs remain uncertain due to uncertainties surrounding the ongoing implementation of Phase II of CSAPR and the continued legal challenges surrounding CSAPR and CAVR.

The EPA's Coal Combustion Residuals Rule (CCR), which regulates coal ash as a solid waste, and defines what ash use activities would be considered generally exempt beneficial reuse of coal ash. The rule also regulates landfills, ash ponds, and other surface impoundments for coal combustion residuals by regulating their design, location, monitoring, and operation. Review of our Elm Road Units has indicated that the costs to comply with this rule are not expected to be significant. Columbia's operator has completed a review of their system and has determined that an onsite ash pond will need to be closed by 2023 and replace it with a dry ash handling system. The dry ash handling system installation is planned for 2020-2021. In 2015, MGE recorded an asset retirement obligation for its share of the legal liability associated with the effect of the CCR rule. Actual costs of compliance may be different than the amount recorded due to potential changes in compliance strategies that will be used, as well as other potential cost estimate changes. Management believes compliance costs will be recovered in future rates based on previous treatment of environmental compliance projects.

b. Legal Matters - MGE Energy and MGE.

MGE is involved in various legal matters that are being defended and handled in the normal course of business. MGE maintains accruals for such costs that are probable of being incurred and subject to reasonable estimation. The accrued amount for these matters is not material to the financial statements. MGE does not expect the resolution of these matters to have a material adverse effect on its consolidated results of operations, financial condition, or cash flows.

c. Purchase Contracts - MGE Energy and MGE.

The following table shows MGE Energy and MGE's future commitments related to purchase contracts as of March 31, 2018:

(In thousands)20182019202020212022Thereafter
Saratoga wind$13,578$858$2,266$1,775$1,784$4,429

In December 2017, the PSCW authorized construction of a 66MW wind farm, consisting of 33 turbines, located near Saratoga, Iowa. MGE received specific approval to recover 100% AFUDC on the project. As of March 31, 2018, MGE has incurred $23.3 million of capital expenditures. Construction of the project is expected to be completed by the end of 2018, with an estimated capital cost of $108 million.