a. Rate Proceedings.

In April 2016, MGE filed an application with the PSCW requesting a 1.7% increase to electric rates and a 3.7% increase to gas rates for 2017. The proposed electric and gas rate increases cover costs primarily associated with the state's electric transmission and MGE's natural gas system infrastructure improvements. In its application, MGE has also proposed mechanisms to address potential 2018 electric and gas rate changes, including a rate adjustment for limited issues and escrow accounting on certain costs.

In July 2015, the PSCW approved MGE's request to extend the current accounting treatment for transmission related costs through 2016, conditioned upon MGE not filing a base rate case for 2016. This accounting treatment will allow MGE to reflect any differential between transmission costs reflected in rates and actual costs incurred in its next rate case filing, which occurred in the April 2016 filing.

On December 23, 2014, the PSCW authorized MGE to increase 2015 rates for retail electric customers by 3.8% or $15.4 million and to decrease gas rates by 2.0% or $3.8 million. The increase in retail electric rates cover costs associated with the construction of emission-reduction equipment at Columbia, improvements and reliability of the state's electric transmission system, fuel and purchased power related to coal delivery costs, partially offset by lower cost as a result of market conditions for pension and postretirement benefit costs. The authorized return on common stock equity is 10.2%.

The PSCW also approved changes to customer rates and rate design for gas service that became effective January 1, 2015. Gas rate design consists of a fixed monthly customer charge and a variable charge tied to actual usage, in addition to the separate charge through the PGA for natural gas commodity costs. The change shifted more of the rate recovery to the monthly charge, reflecting the related fixed costs of providing gas services, and reduced the variable usage-based charge. Thus, gas net income is expected to be more evenly distributed during the year and less sensitive to weather.

b. Fuel Rules.

Fuel rules require the PSCW and Wisconsin utilities to defer electric fuel-related costs that fall outside a symmetrical cost tolerance band around the amount approved for a utility in its annual fuel proceedings. Any over/under recovery of the actual costs is determined on an annual basis and is adjusted in future billings to electric retail customers. The fuel rules bandwidth is currently set at plus or minus 2%. Under fuel rules, MGE would defer costs, less any excess revenues, if its actual electric fuel costs exceeded 102% of the electric fuel costs allowed in its latest rate order. Excess revenues are defined as revenues in the year in question that provide MGE with a greater return on common equity than authorized by the PSCW in MGE's latest rate order. Conversely, MGE is required to defer the benefit of lower costs if actual electric fuel costs were less than 98% of the electric fuel costs allowed in that order.

In August 2015, the PSCW approved a $0.00256/kWh fuel credit that began on September 1, 2015, and will continue throughout 2016. The fuel credit established a mechanism to return fuel savings to electric customers as a bill credit. MGE returned $2.6 million of electric fuel-related savings in customer bill credits during the period from September 1, 2015, through December 31, 2015. MGE returned $1.9 million of electric fuel-related savings for the three months ended March 31, 2016. As of December 31, 2015 and March 31, 2016, MGE has a remaining deferred balance of $9.5 million and $7.6 million of electric fuel-related savings that are outside the range authorized by the PSCW, respectively. These costs are subject to PSCW's annual review, expected to be completed in 2016.

In January 2016, the PSCW lowered MGE's 2016 fuel rules monitored costs by $14.8 million as a result of continued lower projected fuel costs in 2016. The return of the fuel savings to customers for 2016 will be addressed during the PSCW's annual review during 2016 of 2015 fuel costs. MGE will defer these fuel savings until a determination is made by the PSCW. As of March 31, 2016, MGE has deferred $3.6 million of these 2016 electric fuel rules monitored costs.