Rate Matters

Rate Matters - MGE Energy and MGE.

a. Rate Proceedings.

On April 17, 2014, MGE filed an application with the PSCW requesting a 2.8% increase to electric rates and a 2.3% decrease to gas rates for 2015. Electric and natural gas rates would then be frozen in 2016, subject to review of fuel costs. As a condition of the rate freeze, MGE has requested escrow accounting treatment for transmission related costs starting in 2015. This treatment will allow MGE to reflect any differential in actual costs incurred in its next rate case filing. The proposed electric rate increases cover costs associated with the construction of emission-reduction equipment at Columbia and improvements and reliability of the state's electric transmission system.

On July 26, 2013, the PSCW authorized MGE to freeze electric and natural gas rates at 2013 levels for 2014. The order includes authorizing 100% AFUDC on the Columbia scrubber construction project and deferral of increased costs related to ATC and MISO Schedule 26 fees. As part of the rate freeze plan authorized by the PSCW, effective January 1, 2014 approximately $6.2 million associated with a 2012 fuel rule surplus credit will not be required to be refunded to customers and will be amortized in 2014. The fuel credit will accrue interest at MGE's weighted cost of capital. The authorized return on equity will remain unchanged at 10.3%.

On December 14, 2012, the PSCW authorized MGE to increase 2013 rates for retail electric customers by 3.8% or $14.9 million and to increase gas rates by 1.0% or $1.6 million. The change in retail electric rates was driven by costs for new environmental equipment at Columbia, final construction costs for the Elm Road Units, transmission reliability enhancements, and purchased power costs. The authorized return on common stock equity remains unchanged at 10.3%.

b. Fuel Rules.

Fuel rules require the PSCW and Wisconsin utilities to defer electric fuel-related costs that fall outside a symmetrical cost tolerance band around the amount approved for a utility in its most recent base rate proceedings. Any over/under recovery of the actual costs is determined on an annual basis and will be adjusted in future billings to electric retail customers. The fuel rules bandwidth is currently set at plus or minus 2%. Under fuel rules, MGE would defer costs, less any excess revenues, if its actual electric fuel costs exceeded 102% of the electric fuel costs allowed in its latest rate order. Excess revenues are defined as revenues in the year in question that provide MGE with a greater return on common equity than authorized by the PSCW in MGE's latest rate order. Conversely, MGE is required to defer the benefit of lower costs if actual electric fuel costs were less than 98% of the electric fuel costs allowed in that order.

As of March 31, 2014, MGE did not defer any electric fuel-related savings/costs that are outside the range authorized by the PSCW. As part of the rate freeze plan authorized by the PSCW for 2014, $1.6 million of the approximately $6.2 million associated with the 2012 fuel rule surplus credit was amortized against purchase power expense during the three months ended March 31, 2014.