Commitments and Contingencies
12 Months Ended
Dec. 31, 2012
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies

18.       Commitments and Contingencies.

a.       Purchase Contracts - MGE Energy and MGE.

 

MGE Energy and MGE have entered into various commodity supply, transportation and storage contracts to meet their obligations to deliver electricity and natural gas to customers. As of December 31, 2012, the future minimum commitments related to these purchase contracts were as follows:

 (In thousands) 2013 2014 2015 2016 2017 
 Coal(a)$21,890$9,450$6,340$1,623$1,040 
 Natural Gas           
  Transportation and storage(b) 17,219 16,947 16,793 9,218 197 
  Supply(c) 9,765 0 0 0 0 
 Purchase Power(d) 50,713 49,880 48,050 49,037 49,833 
 Other 926 239 0 0 0 
  $100,513$76,516$71,183$59,878$51,070 

(a)       Total coal commitments for the Columbia and Elm Road Units, including transportation. Fuel procurement for MGE's jointly owned Columbia and Elm Road Units are handled by WPL and WEPCO, respectively, who are the operators of those facilities. If any minimum purchase obligations must be paid under these contracts, management believes these obligations would be considered costs of service and recoverable in rates.

 

(b)       MGE's natural gas transportation and storage contracts require fixed monthly payments for firm supply pipeline transportation and storage capacity. The pricing components of the fixed monthly payments for the transportation and storage contracts are established by FERC but may be subject to change.

 

(c)       These commitments include market-based pricing. Management expects to recover these costs in future customer rates.

 

(d)       MGE has several purchase power agreements to help meet future electric supply requirements. Management expects to recover these costs in future customer rates. In October 2008, MGE entered into a ten-year purchase power agreement to help meet future electric supply requirements. Under this agreement, MGE has agreed to purchase 50 MW of wind power from Osceola Windpower II, LLC, which is located in Iowa. This facility became operational in October 2008. MGE does not have any capacity payment commitments under this agreement. However, MGE is obligated to purchase its ratable share of the energy produced by the project. MGE's commitment related to its ratable share of energy produced by the project has been estimated and is included in the above numbers.

b.       Chattel Paper Agreement and Other Guarantees - MGE Energy and MGE.

 

MGE makes available to qualifying customers a financing program for the purchase and installation of energy-related equipment that will provide more efficient use of utility service at the customer's property. MGE is party to a chattel paper purchase agreement with a financial institution under which it can sell or finance an undivided interest with recourse, in up to $10.0 million of the financing program receivables, until July 31, 2013. At December 31, 2012, 2011, and 2010, respectively, MGE had sold a $4.5 million, $4.3 million, and $3.6 million interest in these receivables. MGE retains the servicing responsibility for these receivables.

 

MGE accounts for servicing rights under the amortization method. Initial determination of the servicing asset fair value is based on the present value of the estimated future cash flows. The discount rate is based on the PSCW authorized weighted cost of capital.

 

MGE maintains responsibility for collecting and remitting loan payments from customers to the financial institution and does not retain any interest in the assets sold to the financial institution. At both December 31, 2012 and 2011, MGE had recorded a servicing asset of $0.2 million. At December 31, 2010, MGE had recorded a servicing asset of $0.1 million. MGE recognized a gain of $0.1 million for each of the years ended December 31, 2012 and 2011 in connection with the sale of loan assets. MGE recognized gains of less than $0.1 million for the year ended December 31, 2010, in connection with the sale of loan assets. The servicing asset amount amortized in 2012 was less than $0.1 million. The loan assets are sold to the financial institution at cost, which approximates fair value in view of their market rates of interest. During 2012, 2011, and 2010, MGE received approximately $1.2 million, $1.5 million, and $0.5 million, respectively, from the financial institution for the sale of loan assets. During those same years, payments of $1.2 million, $0.8 million, and $0.7 million, respectively, were made by MGE to the financial institution.

 

MGE would be required to perform under its guarantee if a customer defaulted on its loan. The energy-related equipment installed at the customer sites is used to secure the customer loans. The loan balances outstanding at December 31, 2012, approximate the fair value of the energy-related equipment acting as collateral. The length of the MGE guarantee to the financial institution varies from one to ten years depending on the term of the underlying customer loan. Principal payments for the next five years on the loans are:

 (In thousands) 2013 2014 2015 2016 2017 
 Principal payments$689$547$862$790$376 

c.       Leases - MGE Energy and MGE.

 

MGE has noncancelable operating leases, primarily for combustion turbines, railcars, and computer equipment. The operating leases generally do not contain renewal options, with the exception of certain railcar operating leases. These leases have a renewal option of one year or less. MGE is required to pay all executory costs such as maintenance and insurance for its leases.

 

Future minimum rental payments at December 31, 2012, under agreements classified as operating leases with noncancelable terms in excess of one year are as follows:

 

 (In thousands) 2013 2014 2015 2016 2017 Thereafter 
 Minimum lease payments$2,026$1,557$1,082$791$679$8,606 

Rental expense under operating leases totaled $2.6 million for 2012 and $3.2 million for both 2011 and 2010.

d.       Smart Grid Investment Grant - MGE Energy and MGE.

 

MGE was approved in 2010 by the U.S. Department of Energy (DOE) under the federal stimulus program for a $5.5 million grant for smart grid projects. The DOE grant requires MGE to match the grant funding, bringing the total cost of the projects to more than $11 million. The projects involve the installation of technologies to boost efficiency, enhance service, and improve reliability for customers. The stimulus grant is being used to fund the following projects: advanced metering infrastructure, plug-in hybrid electric vehicles support, and distribution management. As of December 31, 2012, MGE has spent $8.4 million related to these projects and has outstanding agreements to purchase $1.3 million in smart grid related products for 2013.

e.       Environmental - MGE Energy and MGE.

 

Water Quality

 

Water quality regulations promulgated by the EPA and WDNR in accordance with the Federal Water Pollution Control Act, or more commonly known as the Clean Water Act (CWA), impose restrictions on discharges of various pollutants into surface waters. The CWA also regulates surface water quality issues that affect aquatic life, such as water temperatures, intake structures, and wetlands filling. The CWA also includes discharge standards, which require the use of effluent-treatment processes equivalent to categorical "best practicable" or "best available" technologies. The CWA regulates discharges from "point sources" such as power plants through establishing discharge limits in water discharge permits. MGE's power plants operate under Wisconsin Pollution Discharge Elimination System (WPDES) permits to ensure compliance with these discharge limits.

 

The WDNR and the EPA have proposed various regulations that focus on point-source discharges.

 

WDNR's Thermal and Phosphorus Emissions Standards

In December 2010, the WDNR published new regulations for phosphorus and thermal discharges from electric-steam generating plants. Blount's WPDES permit was renewed, effective October 1, 2012, with these new thermal and phosphorus effluent discharge limits in place. We believe that the thermal and phosphorus limits are achievable at all of our generation plants without additional capital expenditures. We will continue to monitor these requirements as our other plant permits come up for renewal.

 

EPA Cooling Water Intake Rules (Section 316(b))

Section 316(b) of the Clean Water Act requires that the cooling water intake structures at electric power plants meet best available technology standards so that mortality from entrainment (drawing aquatic life into a plant's cooling system) and impingement (trapping aquatic life on screens) are reduced. Section 316(b) is implemented in Wisconsin through modifications to plants' WPDES permits. Although new facilities have been required to meet 316(b) standards for some time, regulations for existing facilities have not yet been finalized.

 

In April 2011, the EPA asked for public comment on proposed standards for existing facilities under 316(b). In June 2012, the EPA published two Notices of Data Availability (NODA) seeking public comment on alternate compliance technologies. The EPA has until June 27, 2013 to issue the final rule, pursuant to a recently announced settlement agreement.

 

The currently proposed rule and potential alternatives allow for a state permitting agency's discretion in determining best technology available at plants that are under their permitting authority and is not requiring cooling towers in all instances. The WDNR holds permitting authority for Wisconsin. Both Blount and Columbia generating plants are subject to both the impingement and entrainment aspects of the current proposed rule. WCCF is subject to the impingement aspect only. We anticipate that under the current proposed rule, equipment would need to be installed at Blount, WCCF and Columbia to meet these new standards. However it is not presently possible to estimate the potential costs associated with this rule because the rule has not been finalized.

       

Energy Efficiency and Renewables

 

The Wisconsin Energy Efficiency and Renewables Act requires that, by 2015, 10% of the state's electricity be generated from renewable resources. MGE expects the cost to comply with the Act and its accompanying regulations will be recoverable through current and future rates.

 

Air Quality

 

Federal and state air quality regulations impose restrictions on emission of particulates (PM), sulfur dioxide (SO2), nitrogen oxides (NOx) and other pollutants and require permits for operation of emission sources. These permits have been obtained by MGE and must be renewed periodically. Various initiatives, including interstate pollution transport rules, maximum achievable control technology (MACT) standards, new source performance standards (NSPS), the Clean Air Visibility Rule (also known as the Regional Haze Rule), and mercury emissions limits are expected to result in additional operating and capital expenditure costs for electric generating units.

 

Vacation of EPA's Cross State Air Pollution Rule (CSAPR) and Reinstatement of the Clean Air Interstate Rule (CAIR)

EPA has promulgated three interstate air pollution rules consisting of the NOx SIP Call, the Clean Air Interstate Rule (CAIR) and the Cross-State Air Pollution Rule (CSAPR). These rules were each designed to reduce nitrogen oxide (NOx) and/or sulfur dioxide (SO2) air emissions from EGUs, including EGUs located in Wisconsin and other states. NOx and SO2 interact in the atmosphere to form ambient ozone and fine particulate matter pollution. As explained below, only the CAIR currently affects MGE's generation assets.

 

In 2000, the U.S. Court of Appeals for the D.C. Circuit held that Wisconsin had been illegally included in a portion of the NOx SIP Call, but stayed the remaining legal challenges to the rule pending EPA's development of additional interstate transport rules. At this time, the requirements of the NOx SIP Call and the costs of compliance remain uncertain.

 

In 2005, EPA promulgated the CAIR imposing additional controls on NOx and SO2 emissions from EGUs, including EGUs located in Wisconsin. However, in December 2008, the U.S. Court of Appeals for the D.C. Circuit remanded the CAIR to the EPA with directions to revise or replace the rule. The Court's remand order directed that the CAIR remain in effect until the EPA promulgated a replacement rule. The Court's order did not include a deadline for the EPA to act.

 

In August 2011, the EPA responded to the remand of the CAIR by promulgating the CSAPR. However, in August 2012, the U.S. Court of Appeals for the D.C. Circuit vacated CSAPR and instructed the EPA to continue administering the CAIR pending finalizing a valid alternative program to control interstate pollution. In January 2013, the U.S. Court of Appeals for the D.C. Circuit denied EPA's petition for reconsideration decision en banc. At this time, the CAIR remains currently effective.

 

The CAIR, which became effective in 2009 and remains effective currently, generally requires NOx and SO2 emission reductions from fossil fuel-fired EGUs (25 MW or greater) in the eastern half of the United States in two phases and includes a regional cap-and-trade system. The first phase (currently in place) requires annual regional emission reductions from 2003 levels of 55% for NOx and 40% for SO2. The second phase (beginning in 2015) reduces regional NOx and SO2 emissions further from 2003 levels to 65% and 70%, respectively. MGE owns or has partial ownership in several generation units currently subject to the CAIR: Blount, Columbia, Elm Road Units, and its combustion turbines located in West Marinette and Fitchburg.

 

Our evaluation of the CAIR demonstrates that MGE will be in compliance with the CAIR's Phase I requirements without capital expenditures or modifications to our operations. We have also evaluated our potential expenditures if the CAIR remains in place for the Phase II reductions. Based on our Phase II evaluation, MGE will be able to meet Phase II NOx emissions reductions through using our NOx allowances provided through the rule, and we will meet Phase II SO2 emissions reductions through installation of pollution controls. New SO2 controls at Columbia are already underway and are planned to be completed by early 2014 (see the discussion regarding the Columbia environmental project below). Once the new environmental control project is completed at Columbia, it is expected that the plant will emit SO2 below anticipated Phase II CAIR allocation levels. MGE expects that any costs incurred to meet Phase II of the CAIR will be fully recoverable through rates. MGE will continue monitoring the EPA's actions in response to the August 2012 CSAPR vacature, and the stayed NOx SIP Call litigation.

 

Clean Air Visibility Rule (CAVR)

Air modeling indicates that SO2 and NOx emissions (and to a lesser extent particulate matter, or PM) from Columbia may impair visibility at certain Class I Scenic Areas and may therefore be subject to the best available retrofit technology (BART) regulations, a subsection of the EPA's Clean Air Visibility Rule (CAVR), which may require pollution retrofits. The EPA had proposed that Columbia's compliance with emissions limitations in the CAIR and the CSAPR could also serve as compliance with the BART regulations for SO2 and NOx emissions. However, this proposal is now uncertain because of the D.C. Circuit remanding the CAIR to EPA and vacating the CSAPR. At this time, the BART regulatory obligations, compliance strategies and costs remain uncertain.

 

Wisconsin State Mercury Rule

Beginning January 1, 2015, phase two of the Wisconsin mercury rule will require large coal-fired EGUs (larger than 150 MW) to reduce mercury emissions by 90%, or choose a multi-pollutant reduction approach, which allows a stepped approach to mercury reduction while reducing NOx and SO2 emissions at prescribed rates. The Elm Road Units currently meet this requirement. The Columbia co-owners expect to meet the 90% reduction option by installing baghouses and scrubbers by early 2014 (see the discussion regarding the Columbia environmental project below). With the finalization of the EPA's Mercury and Air Toxics Standard, or MATs, the WDNR is currently evaluating if the state mercury rule should be supplanted by the EPA's rule (see discussion on MATs below).

 

Mercury and Air Toxics Standards (MATs) for Utility Boilers (Also Referred to as the Maximum Achievable Control Technology, or MACT)

In December 2011, the EPA finalized its Mercury and Air Toxics Standards for coal and oil-burning EGU boilers. MATs will require emissions standards for mercury, non-mercury HAPs metals, and acid gases. MGE's Columbia and Elm Road Units are subject to MATs. The Elm Road Unit's current pollution controls and Columbia's planned mercury pollution controls (baghouse and scrubbers) are expected to allow both facilities to comply with the MATs rule (see the discussion regarding Columbia environmental project below).

 

National Ambient Air Quality Standards

The EPA has developed National Ambient Air Quality Standards (NAAQS) for six compounds currently identified as criteria pollutants: nitrogen dioxide, particulate matter, ozone, sulfur dioxide, lead, and carbon monoxide. The NAAQS for criteria pollutants establish acceptable ambient air levels of each pollutant based on a review of their effects to human health and the environment. The EPA is required to review NAAQS every five years. New standards that are lower than existing standards may be developed as a result of these five-year NAAQS review. Monitoring and modeling data may be used to determine whether areas are in compliance. States must develop implementation plans to bring noncomplying areas into compliance and such implementation plans can impose new emissions reductions and/or pollution controls requirements on stationary sources.

 

Certain stationary sources, such as MGE's generation facilities, must meet NAAQS standards for emissions that travel offsite. Stationary source air quality modeling is used to determine whether emissions from permitted sources meet these NAAQS. Failure to meet NAAQS may require a permit applicant to incur capital or operational costs to bring a source into compliance. We cannot predict if MGE's permitted stationary sources will have difficulty meeting new standards not previously modeled. Modeling performed by the WDNR for MGE's permitted facilities has demonstrated compliance with current NAAQS. Additional modeling may be required in future permitting actions.

 

MGE tracks NAAQS developments to determine if new standards may affect us. MGE is currently tracking two NAAQS developments: (1) determination and placement of monitoring networks in Wisconsin for the 2010 nitrogen dioxide (NO2) NAAQS (Wisconsin is currently considered in attainment with NO2 NAAQS) and (2) stationary source modeling requirements under the 2010 sulfur dioxide (SO2) NAAQS. A concern has been raised regarding whether the current EPA-preferred dispersion model may not be accurate for SO2 stationary source modeling and may overestimate off-site concentrations of SO2 from stationary sources. The WDNR is working to resolve issues with the model.

 

Reciprocating Internal Combustion Engine (RICE) MACT Standard

In January 2013, the EPA finalized amendments to its RICE MACT standard. RICE MACT applies to industrial or electrical engines that are classified as reciprocating internal combustion engines. Engines owned by MGE that would fall under the RICE MACT rule include backup generators and small engines at various locations, including our fleet of distributed generators that serve as electric system backup and emergency dispatch. MGE is still evaluating the impacts to our engines based on this new standard including how the currently finalized rule will impact the dispatch of and/or addition of pollution controls on our aforementioned distributed generators.

 

Greenhouse Gas Regulation

The EPA's Greenhouse Gas "Tailoring Rule" regulates stationary sources for GHG emissions by "phasing in" over time different types of facilities subject to Prevention of Significant Deterioration (PSD) pre-construction program or Title V permitting (i.e. new facilities and existing facilities with certain qualifying modifications). Under the Tailoring Rule, covered new or modified sources must meet Best Available Control Technology (BACT) requirements for emissions that trigger PSD, including GHG emissions. MGE generating facilities may become subject to this rule in the future if modifications at any facilities trigger PSD or if MGE invests in new facilities that trigger PSD.

 

On March 27, 2012, the EPA proposed greenhouse gas (GHG) New Source Performance Standards (NSPS) for coal fired and natural gas combined cycle (NGCC) EGUs. The proposal applies to new EGUs only; the EPA has stated that it does not intend for these rules to apply to modified or existing units at this time. The proposed NSPS is not anticipated to significantly affect MGE's existing generation units.

 

Columbia

 

MGE and two other utilities jointly own Columbia, a coal-fired generating facility, which accounts for 225 MW (29%) of MGE's net summer generating capability. WPL is the plant operator and permit holder, and owns 46.2% of Columbia. Wisconsin Public Service Corporation (WPSC) owns a 31.8% interest, and MGE owns a 22% interest in Columbia. Based upon current available information, compliance with various environmental requirements and initiatives is expected to result in significant additional operating and capital expenditures at Columbia.

 

Columbia Environmental Project

In early 2011, the PSCW issued a Certificate and Order authorizing the construction of scrubbers and bag houses and associated equipment on Columbia Units 1 and 2 to reduce SO2 and mercury emissions. The scrubbers and bag houses are expected to support compliance obligations for current and anticipated air quality regulations, including CAIR, CAIR's eventual replacement, the Mercury and Air Toxics Standards (MATs) and the Wisconsin Mercury Rule. WPL, the plant operator, currently estimates that MGE's share of the capital expenditures required for this project is approximately $140 million. The project is underway and estimated to be completed in early 2014.

 

MGE's share of various contractual commitments entered for the project as of December 31, 2012 is $73.4 million. These costs are expected to be capitalized and included in the consolidated balance sheets of MGE Energy and MGE. See Footnote 20 for further information regarding the Columbia environmental construction project.

 

Title V Operating Permit Petition

In September 2008, the WDNR issued a Title V renewal operating permit to WPL for Columbia. However, a citizen group petitioned the EPA to object to the permit renewal. In October 2009, the EPA issued an order granting in part and denying in part the petition and sent the operating permit back to the WDNR for further review based on the EPA order. In February 2011, the citizen group involved filed an action against the EPA in the U.S. District Court for the Western District of Wisconsin seeking to have the EPA take over the permit process. However, on February 4, 2013 the parties involved dismissed the litigation without prejudice. In June 2012, the EPA notified the plant operator of its intent to assume responsibility for issuing the renewed operating permit for Columbia, but agreed to provide the plant operator with more time to potentially resolve the issues raised in the EPA's order. The matter is still pending. MGE believes the permits currently in effect for Columbia remain in place at this time. MGE continues to follow these developments and is unable to predict the outcome of this matter and its impact on its operations or financial condition.

 

Columbia Clean Air Act Litigation

In December 2009, the EPA sent a notice of violation (NOV) to MGE as one of the co-owners of the Columbia generating station. The NOV alleges that WPL, as operator, and the co-owners (WPS and MGE) failed to comply with appropriate pre-construction review and permitting requirements and, as a result, violated the PSD program requirements, the Title V operating permit requirements of the CAA and the Wisconsin State Implementation Plan (SIP). In September 2010, Sierra Club filed a lawsuit against WPL alleging violations of the CAA at Columbia and other WPL-operated Wisconsin facilities. WPL responded that the projects at Columbia were routine, or not projected to increase emissions, and therefore did not violate the permitting requirements of the CAA. MGE and the other Columbia co-owners are defending against these allegations while actively pursuing settlement options with the EPA and Sierra Club.

 

MGE believes that the parties have reached a tentative agreement on the general terms of a settlement with the EPA and Sierra Club regarding various facilities, including Columbia. Sierra Club has stipulated to a dismissal of its lawsuit, without prejudice, while the parties attempt to reach a final settlement. The parties are currently negotiating a consent decree based upon those general terms, which may change during the negotiations. Once the parties agree to final terms, the court must approve the settlement agreement before it becomes final and effective. In accordance with applicable accounting standards, MGE has accrued an amount for this matter representing its best estimate of its probable liability, based upon its assessment of the settlement discussions. That accrued amount is not material to the financial statements. MGE believes the likelihood of a materially greater liability than the accrued amount is remote based upon the current status of the settlement discussions.

f.       Legal Matters - MGE Energy and MGE.

 

MGE is involved in various legal matters that are being defended and handled in the normal course of business including the Columbia matters discussed above. MGE maintains accruals for such costs that are probable of being incurred and subject to reasonable estimation. The accrued amount for these matters is not material to the financial statements.

g.       Elm Road - MGE Energy and MGE.

The Elm Road Units have an outstanding warranty claim related to costs incurred to repair steam turbine corrosion damage. See Footnote 21 for further information regarding these warranty claims.

h.       Other Commitments.

 

MGE Energy holds investments in nonpublic entities. From time to time, these entities require additional capital infusions from their investors. MGE Energy has committed to contribute $2.0 million in capital for such infusions. The timing of these infusions is dependent on the needs of the investee and is therefore uncertain at this time.

 

In addition, MGE Energy has a three year agreement with a venture debt fund expiring in December 2013. MGE Energy has committed to invest up to a total of $1.0 million into this fund. As of December 31, 2012, MGE Energy has $0.5 million remaining in commitments. The timing of infusions is dependent on the needs of the fund and is therefore uncertain at this time.

 

MGE has a commitment to the City of Madison for certain "green energy" projects. These funds will primarily be used to construct or purchase assets that will be owned by MGE and will be included in the property, plant, and equipment balance on the MGE Energy's and MGE's consolidated financial statements once the costs are incurred. The timing of the capital expenditures is dependent on the feasibility of the individual projects. MGE paid $0.3 million in 2012, and expects to pay less than $0.1 million in both 2015 and 2016.

 

MGE has commitments of approximately $0.3 million, which will be made annually (subject to PSCW approval) from 2013-2034, for water quality environmental projects.

 

MGE has entered into easements related to wind projects. Payments for these easements are $0.1 million in each of the next five years.