10-Q 1 f10q1q2006.htm FORM 10-Q Converted by EDGARwiz

United States

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549


FORM 10-Q


[X] Quarterly Report Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934


For the quarterly period ended:

March 31, 2006


[   ] Transition report pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934


For the transition period from _______________ to _______________


Commission

File No.

 

Name of Registrant, State of Incorporation, Address

of Principal Executive Offices, and Telephone No.

 

IRS Employer

Identification No.

000-49965

 

MGE Energy, Inc.

(a Wisconsin Corporation)

133 South Blair Street

Madison, Wisconsin 53703

(608) 252-7000

www.mgeenergy.com

 

39-2040501

000-1125

 

Madison Gas and Electric Company

(a Wisconsin Corporation)

133 South Blair Street

Madison, Wisconsin 53703

(608) 252-7000

www.mge.com

 

39-0444025


Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months and (2) have been subject to such filing requirements for the past 90 days: Yes [X]  No [  ]


Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer or a non-accelerated filer. See definition of "accelerated filer and large accelerated filer" in Rule 12b-2 of the Exchange Act.


 

Large Accelerated Filer

Accelerated Filer

Non-accelerated Filer

MGE Energy, Inc.


X

  

Madison Gas and Electric Company


  

X


Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).

MGE Energy, Inc. And Madison Gas and Electric Company

Yes [   ]

No [ X ].


Number of Shares Outstanding of Each Class of Common Stock as of May 1, 2006

MGE Energy, Inc.

Common stock, $1.00 par value, 20,454,496 shares outstanding.

Madison Gas and Electric Company

Common stock, $1.00 par value, 17,347,889 shares outstanding (all of which are owned beneficially and of record by MGE Energy, Inc.).


Table of Contents


PART I. FINANCIAL INFORMATION.

Filing Format

Forward-Looking Statements

Where to Find More Information

Definitions, Abbreviations, and Acronyms Used in the Text and Notes of this Report

Item 1. Financial Statements.

MGE Energy, Inc.

Condensed Consolidated Statements of Income (unaudited)

Condensed Consolidated Statements of Cash Flows (unaudited)

Condensed Consolidated Balance Sheets (unaudited)

Madison Gas and Electric Company

Condensed Consolidated Statements of Income (unaudited)

Condensed Consolidated Statements of Cash Flows (unaudited)

Condensed Consolidated Balance Sheets (unaudited)

MGE Energy, Inc. and Madison Gas and Electric Company

Notes to Condensed Consolidated Financial Statements (unaudited)

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations.

Item 3. Quantitative and Qualitative Disclosures About Market Risk.

Item 4. Controls and Procedures.

PART II. OTHER INFORMATION.

Item 1. Legal Proceedings.

Item 6. Exhibits.

Signatures - MGE Energy, Inc.

Signatures - Madison Gas and Electric Company


PART I. FINANCIAL INFORMATION.


Filing Format


This combined Form 10-Q is being filed separately by MGE Energy, Inc. (MGE Energy) and Madison Gas and Electric Company (MGE). MGE is a wholly owned subsidiary of MGE Energy and represents a substantial portion of its assets, liabilities, revenues, expenses, and operations. Thus, all information contained in this report relates to, and is filed by, MGE Energy. Information that is specifically identified in this report as relating solely to MGE Energy, such as its financial statements and information relating to its nonregulated business, does not relate to, and is not filed by, MGE. MGE makes no representation as to that information. The terms "we" and "our" as used in this report refer to MGE Energy and its consolidated subsidiaries, unless otherwise indicated.


Forward-Looking Statements


This report, and other documents filed by MGE Energy and MGE with the Securities and Exchange Commission (SEC) from time to time, contain forward-looking statements that reflect management's current assumptions and estimates regarding future performance and economic conditions—especially as they relate to future load growth, revenues, expenses, capital expenditures, financial resources, regulatory matters, and the scope and expense associated with future environmental regulation. These forward-looking statements are made pursuant to the provisions of the Private Securities Litigation Reform Act of 1995. Words such as "believe," "expect," "anticipate," "estimate," "could," "should," "intend," and other similar words generally identify forward-looking statements. Both MGE Energy and MGE caution investors that these forward-looking statements are subject to known and unknown risks and uncertainties that may cause actual results to differ materially from those projected, expressed, or implied.


The factors that could cause actual results to differ materially from the forward-looking statements made by a registrant include (a) those factors discussed in the following sections of the Registrants' 2005 Annual Report on Form 10-K: ITEM 1A. Risk Factors and ITEM 7. Management's Discussion and Analysis of Financial Condition and Results of Operations; and (b) other factors discussed herein and in other filings with the United States Securities and Exchange Commission (SEC) by the Registrants.


Readers are cautioned not to place undue reliance on these forward-looking statements, which apply only as of the date of this report. MGE Energy and MGE undertake no obligation to publicly release any revision to these forward-looking statements to reflect events or circumstances after the date of this report.


Where to Find More Information


The public may read and copy any reports or other information that MGE Energy and MGE file with the SEC at the SEC's public reference room at 100 F Street, NE, Washington, D.C. 20549. The public may obtain information on the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330. These documents are also available to the public from commercial document retrieval services, the Web site maintained by the SEC at http://www.sec.gov, MGE Energy's Web site at http://www.mgeenergy.com, and MGE's Web site at http://www.mge.com. Copies may be obtained from our Web sites free of charge. Information contained on MGE Energy's and MGE's Web sites shall not be deemed incorporated into, or to be a part of, this report.


Definitions, Abbreviations, and Acronyms Used in the Text and Notes of this Report


AFUDC

allowance for funds used during construction

Alliant

Alliant Energy Corporation

AMR

automated meter reading

ANR

ANR Pipeline Company

APB

Accounting Research Bulletin

APBO

Accumulated Pension Benefit Obligation

ARB

Accounting Research Bulletin

ARC

Asset Retirement Cost

ATC

American Transmission Company LLC

ARO

Asset Retirement Obligation

Blount

Blount Station

BOCM

Banc One Capital Markets, Inc.

CO2

carbon dioxide

Columbia

Columbia Energy Center

ComEd

Commonwealth Edison Company, a unit of Chicago-based Exelon Corp.

cooling degree days

Measure of the extent to which the average daily temperature is above 65 degrees Fahrenheit, increasing demand for cooling

CPCN

Certificate of Public Convenience and Necessity

CWDC

Central Wisconsin Development Corporation

DNR

Wisconsin Department of Natural Resources

Dth

dekatherms

EITF

Emerging Issues Task Force

Elm Road

Elm Road Generating Station

EPA

U.S. Environmental Protection Agency

EPC

Engineering, Procurement, and Construction

FASB 

Financial Accounting Standards Board

FERC

Federal Energy Regulatory Commission

FIN

FASB  Interpretation No.

FSP

FASB  Staff Position

FTR

Financial Transmission Rights

GCIM

gas cost incentive mechanism

heating degree days (HDD)

Measure of the extent to which the average daily temperature is below 65 degrees Fahrenheit, increasing demand for heating

interconnection agreement

Generation-Transmission Interconnection Agreement

Kewaunee

Kewaunee Nuclear Power Plant

kV

kilovolt

kWh

kilowatt-hour

LIBOR

London Inter Bank Offer Rate

LMP

Locational Marginal Pricing

MACT

Maximum available control technology

MAGAEL

MAGAEL, LLC

MAIN

Mid-America Interconnected Network, Inc.

MGE

Madison Gas and Electric Company

MGE Construct

MGE Construct LLC

MGE Energy

MGE Energy, Inc.

MGE Power

MGE Power LLC

MGE Power Elm Road

MGE Power Elm Road, LLC

MGE Power West Campus

MGE Power West Campus, LLC

MGE Transco

MGE Transco Investment, LLC

MISO

Midwest Independent System Operator (a regional transmission organization)

Moody's

Moody's Investors Service, Inc.

MRO

Midwest Reliability Organization

MW

megawatt

MWh

megawatt-hour

Nasdaq

The Nasdaq National Stock Market

NNG

Northern Natural Gas Company

NOx

nitrogen oxide

NOx SIP Call

Nitrogen oxide State Implementation Plan (federal rule 40 CFR Part 96, commonly known as the NOx SIP Call)

NYMEX

New York Mercantile Exchange

PGA

Purchased Gas Adjustment clause

PJM

PJM Interconnection, LLC (a regional transmission organization)

PSCW

Public Service Commission of Wisconsin

RTO

Regional Transmission Organization

S&P

Standard & Poor's Ratings Group, a division of McGraw-Hill Companies

SAB

Staff Accounting Bulletin

SEC

Securities and Exchange Commission

SFAS

Statement of Financial Accounting Standards (issued by the FASB )

SO2

sulfur dioxide

the State

State of Wisconsin

Stock Plan

Direct Stock Purchase and Dividend Reinvestment Plan of MGE Energy

Super Critical

Super Critical, LLC

UW

University of Wisconsin-Madison

VIE

variable interest entity

WCCF

West Campus Cogeneration Facility

WEPCO

Wisconsin Electric Power Company

Working capital

current assets less current liabilities

WPDES

Wisconsin Pollutant Discharge Elimination System

WPL

Wisconsin Power and Light Company

WPSC

Wisconsin Public Service Corporation


Item 1. Financial Statements.


MGE Energy, Inc.

Condensed Consolidated Statements of Income (unaudited)

(In thousands, except per-share amounts)


 

Three Months Ended

March 31,

 

2006

2005

Revenues:

  

Regulated utility operations


$157,662

$138,227

Nonregulated operations


923

682

Total Revenues


158,585

138,909

   

Expenses:

  

Fuel for electric generation


11,249

9,990

Purchased power


20,756

21,026

Natural gas purchased


63,467

53,837

Other operations and maintenance


30,565

28,872

Depreciation and amortization


7,721

6,625

Other general taxes


3,968

3,497

Total Operating Expenses


137,726

123,847

Operating Income


20,859

15,062

   

Other income


1,698

1,244

Interest expense


(3,830)

(2,818)

Income before income taxes


18,727

13,488

Income tax provision


(7,211)

(5,273)

Net Income


$  11,516

$   8,215

   

Earnings per Share of Common Stock (basic and diluted)


$0.56

$0.40

   

Dividends paid per share of common stock


$0.345

$0.342

   

Average Shares Outstanding (basic and diluted)


20,454

20,421



The accompanying notes are an integral part of the above condensed consolidated financial statements.


MGE Energy, Inc.

Condensed Consolidated Statements of Cash Flows (unaudited)

(In thousands)


 

Three Months Ended

March 31,

 

2006

2005

Operating Activities:

  

Net income


$11,516

$  8,215

Items not affecting cash:

  

Depreciation and amortization


7,721

6,625

Deferred income taxes


(3,116)

(2,850)

Amortization of investment tax credits


(108)

(115)

Equity in earnings in ATC


(1,298)

(1,152)

Amortization of debt issuance costs and bond expense


123

124

Reserve for fuel credit/refund


5,132

-

Other items


264

29

Changes in working capital, excluding cash equivalents, current long-term debt maturities, and short-term debt:

  

Decrease in current assets


23,872

22,257

Retainage receivable


2,425

-

Increase (decrease) in current liabilities


(5,926)

1,145

Recovery of lease payment


-

2,527

Other noncurrent items, net


117

685

Cash Provided by Operating Activities


40,722

37,490

   

Investing Activities:

  

Capital expenditures


(17,360)

(19,588)

ATC - capital contribution


(661)

-

Dividend income from ATC


894

803

Payment from ATC related to WCCF


-

12,964

Advance to WEPCO for ATC work


(204)

-

Change in restricted cash


2,160

155

Other


(47)

(168)

Cash Used for Investing Activities


(15,218)

(5,834)

   

Financing Activities:

  

Issuance of common stock, net


-

2,260

Issuance/(purchase) of treasury stock


119

(184)

Cash dividends paid on common stock


(7,056)

(6,988)

Decrease in short-term debt


(17,500)

(24,525)

Cash overdraft


546

(1,210)

Cash Used for Financing Activities


(23,891)

(30,647)

   

Change in Cash and Cash Equivalents


1,613

1,009

Cash and cash equivalents at beginning of period


3,331

3,561

Cash and cash equivalents at end of period


$  4,944

$  4,570


The accompanying notes are an integral part of the above condensed consolidated financial statements.


MGE Energy, Inc.

Condensed Consolidated Balance Sheets (unaudited)

(In thousands)


 

March 31,

2006

Dec. 31,

2005

ASSETS

  

Current Assets:

  

Cash and cash equivalents


$   4,944

$   3,331

Restricted cash


396

2,556

Accounts receivable, less reserves of $2,910 and $2,734, respectively


48,398

49,272

Other accounts receivable, less reserves of $98 and $93, respectively


5,386

9,079

Unbilled revenues


24,406

30,432

Materials and supplies, at lower of average cost or market


16,103

15,326

Fossil fuel


6,948

5,501

Stored natural gas, at lower of average cost or market


13,942

27,983

Prepaid taxes


8,188

12,436

Other prepayments


5,350

4,989

Total Current Assets


134,061

160,905

   

Other long-term accounts receivables


4,173

3,969

Special billing projects


1,740

1,786

Regulatory assets


32,971

34,024

Deferred charges


11,024

11,120

   

Property, Plant, and Equipment, Net


613,272

611,419

Construction work in progress


64,013

56,238

Total Property, Plant, and Equipment


677,285

667,657

   

Other Property and Investments


38,401

37,446

   

Total Assets


$899,655

$916,907

   

LIABILITIES AND CAPITALIZATION

  

Current Liabilities:

  

Short-term debt


$  65,000

$  82,500

Accounts payable


33,911

49,502

Accrued interest and taxes


11,656

3,328

Deferred income taxes


2,225

4,061

Reserve for fuel credit/refund


5,132

-

Other current liabilities


15,472

13,589

Total Current Liabilities


133,396

152,980

   

Other Credits:

  

Deferred income taxes


98,159

99,329

Investment tax credit - deferred


3,821

3,929

Regulatory liabilities


21,122

21,748

Accrued pension and other postretirement benefits


54,877

55,504

Other deferred liabilities


17,453

17,222

Total Other Credits


195,432

197,732

   

Capitalization:

  

Common stockholders' equity


348,502

343,883

Long-term debt


222,325

222,312

Total Capitalization


570,827

566,195

Commitments and contingencies (see Footnote 13)


-

-

Total Liabilities and Capitalization


$899,655

$916,907


The accompanying notes are an integral part of the above condensed consolidated financial statements.


Madison Gas and Electric Company

Condensed Consolidated Statements of Income (unaudited)

(In thousands)


 

Three Months Ended

March 31,

 

2006

2005

Operating Revenues:

  

Regulated electric revenues


$  72,553

$  63,880

Regulated gas revenues


85,109

74,347

Nonregulated revenues


923

-

Total Operating Revenues


158,585

138,227

   

Operating Expenses:

  

Fuel for electric generation


11,249

9,990

Purchased power


20,756

21,026

Natural gas purchased


63,467

53,837

Other operations and maintenance


30,463

28,764

Depreciation and amortization


7,721

6,625

Other general taxes


3,968

3,496

Income tax provision


6,495

4,563

Total Operating Expenses


144,119

128,301

Net Operating Income


14,466

9,926

   

Other Income and Deductions:

  

AFUDC - equity funds


110

112

Equity earnings in ATC


1,298

1,152

Income tax provision


(716)

(495)

Other deductions


287

(102)

Total Other Income and Deductions


979

667

Income before interest expense


15,445

10,593

   

Interest Expense:

  

Interest on long-term debt


3,485

2,671

Other interest


540

113

AFUDC - borrowed funds


(47)

(43)

Net Interest Expense


3,978

2,741

Net Income before minority interest


$  11,467

$    7,852

Minority interest, net of tax


(2,375)

-

Net Income


$    9,092

$    7,852


The accompanying notes are an integral part of the above condensed consolidated financial statements.


Madison Gas and Electric Company

Condensed Consolidated Statements of Cash Flows (unaudited)

(In thousands)


 

Three Months Ended

March 31,

 

2006

2005

Operating Activities:

  

Net income


$  9,092

$  7,852

Items not affecting cash:

  

Depreciation and amortization


7,721

6,625

Deferred income taxes


(3,117)

(2,850)

Amortization of investment tax credits


(108)

(115)

Amortization of debt issuance costs and bond expense


123

124

AFUDC - equity funds


(110)

(112)

Equity in earnings of ATC


(1,298)

(1,152)

Minority interest, net of tax


2,375

-

Reserve for fuel credit/refund


5,132

-

Other items


373

141

Changes in working capital, excluding cash equivalents, current long-term debt maturities, and short-term debt:

  

Decrease in current assets


21,588

24,213

(Decrease) in current liabilities


(5,096)

(1,933)

Recovery of lease payment


-

2,527

Other noncurrent items, net


91

678

Cash Provided by Operating Activities


36,766

35,998

   

Investing Activities:

  

Capital expenditures


(17,360)

(19,588)

ATC - capital contribution


(661)

-

Payment from ATC related to WCCF


-

12,964

Dividend income from ATC


894

803

AFUDC - borrowed funds


(47)

(43)

Advance to WEPCO for ATC work


(204)

-

Change in restricted cash


2,160

155

Cash Used for Investing Activities


(15,218)

(5,709)

   

Financing Activities:

  

Cash dividends paid to parent


(6,498)

(6,436)

Cash dividend paid to parent from WCCF


(3,300)

-

Affiliate financing of MGE Power Elm Road or MGE Power West Campus


3,397

711

Equity contribution received by MGE Power West Campus


1,495

6,349

Equity contributions received by MGE Transco and MGE Power Elm Road


1,171

-

Decrease in short-term debt


(17,500)

(28,775)

Other


445

(932)

Cash Used for Financing Activities


(20,790)

(29,083)

   

Change in Cash and Cash Equivalents


758

1,206

Cash and cash equivalents at beginning of period


822

970

Cash and cash equivalents at end of period


$  1,580

$  2,176


The accompanying notes are an integral part of the above condensed consolidated financial statements.


Madison Gas and Electric Company

Condensed Consolidated Balance Sheets (unaudited)

(In thousands)



ASSETS

March 31,

2006

Dec. 31,

2005

Utility Plant (At Original Cost, in Service):

  

Electric


$  653,363

$  646,444

Gas


253,547

251,555

Nonregulated


108,146

108,372

Gross plant in service


1,015,056

1,006,371

Less accumulated provision for depreciation


(401,757)

(394,925)

Net plant in service


613,299

611,446

Construction work in progress


64,013

56,238

Total Utility Plant


677,312

667,684

Other property and investments


827

988

Investment in ATC


36,304

35,239

Total Other Property and Investments


37,131

36,227

Current Assets:

  

Cash and cash equivalents


1,580

822

Restricted cash


396

2,556

Accounts receivable, less reserves of $2,910, and $2,734, respectively


48,376

49,230

Affiliate receivables


6,367

6,376

Other receivables, less reserves of $98, and $93, respectively


4,928

4,596

Unbilled revenues


24,406

30,432

Materials and supplies, at lower of average cost or market


16,103

15,326

Fossil fuel


6,948

5,501

Stored natural gas, at lower of average cost or market


13,942

27,983

Prepaid taxes


7,792

11,380

Other prepayments


5,333

4,959

Total Current Assets


136,171

159,161

Other long-term accounts receivable


4,173

3,969

Special billing projects


1,740

1,786

Regulatory assets


32,971

34,024

Other deferred charges


10,860

10,945

Total Assets


$  900,358

$  913,796

CAPITALIZATION AND LIABILITIES

  

Common stockholder's equity


$  290,562

$  287,966

Minority interest


45,466

43,766

Long-term debt


222,325

222,312

Total Capitalization


558,353

554,044

Current Liabilities:

  

Short-term debt - commercial paper


48,500

66,000

Accounts payable


33,012

48,398

Affiliate payables


19

9

Accrued interest and taxes


13,310

4,319

Accrued payroll related items


4,961

5,953

Deferred income taxes


2,232

4,069

Reserve for fuel credit/refund


5,132

-

Other current liabilities


10,278

7,516

Total Current Liabilities


117,444

136,264

Other Credits:

  

Deferred income taxes


98,450

99,645

Investment tax credit - deferred


3,821

3,929

Regulatory liabilities


21,122

21,748

Accrued pension and other postretirement benefits


54,877

55,504

Affiliate payable long-term


28,838

25,441

Other deferred liabilities


17,453

17,221

Total Other Credits


224,561

223,488

Commitments and contingencies (see Footnote 13)


-

-

Total Capitalization and Liabilities


$  900,358

$  913,796


The accompanying notes are an integral part of the above condensed consolidated financial statements.


MGE Energy, Inc. and Madison Gas and Electric Company

Notes to Condensed Consolidated Financial Statements (unaudited)

March 31, 2006


1.

Basis of Presentation - MGE Energy and MGE.


This report is a combined report of MGE Energy and MGE. References in this report to "MGE Energy" are to MGE Energy, Inc., and its subsidiaries. References in this report to "MGE" are to Madison Gas and Electric Company.


The accompanying condensed consolidated financial statements as of March 31, 2006, and for the three months then ended are unaudited, but include all adjustments that MGE Energy and MGE management consider necessary for a fair presentation of their respective financial statements. All adjustments are of a normal, recurring nature except as otherwise disclosed. The year-end consolidated balance sheet information was derived from the audited balance sheet appearing in MGE Energy's and MGE's annual reports on Form 10-K for the year ended December 31, 2005, but does not include all disclosures required by generally accepted accounting principles. These notes should be read in conjunction with the financial statements and the notes on pages 59 through 109 of the 2005 Form 10-K. Certain amounts in prior periods' financial statements and related notes have been reclassified to conform to the 2006 presentation.


2.

Principles of Consolidation - MGE Energy and MGE.


On August 12, 2002, MGE Energy became the holding company for MGE as the result of completing an exchange of shares of MGE Energy common stock for shares of MGE common stock. The MGE Energy financial statements reflect this transaction for all periods presented. MGE constitutes a substantial portion of the assets, liabilities, and results of operations of MGE Energy and is expected to continue to do so for the foreseeable future.


MGE, a wholly owned subsidiary of MGE Energy, is a regulated electric and gas utility headquartered in Madison, Wisconsin. MGE is the majority owner of MGE Transco which is a nonregulated entity formed to hold and manage the Company's investment in ATC.


Wholly owned subsidiaries of MGE Energy include CWDC, MAGAEL, MGE Construct, and MGE Power. MGE Power owns 100% of MGE Power West Campus and MGE Power Elm Road. MGE Power and its subsidiaries are part of our nonregulated energy operations, which were formed to construct, own, and lease new electric generation projects.


In 2003, MGE began consolidating the financial statements of subsidiaries in which it has a controlling financial interest, pursuant to the requirements of FIN 46R. In accordance with these provisions, MGE has consolidated MGE Power West Campus and MGE Power Elm Road. See Footnotes 3, 9, and 10 to the Consolidated Financial Statements for more discussion of these entities.


All significant intercompany accounts and transactions have been eliminated in consolidation.


3.

Variable Interest Entities - MGE.


In January 2003, the FASB  issued FIN 46, Consolidation of Variable Interest Entities-An Interpretation of ARB No. 51. In December 2003, the FASB  issued the updated and final interpretation FIN 46R. FIN 46 was applicable immediately to VIEs created or obtained after January 31, 2003. FIN 46R was effective on December 31, 2003, for interests in entities that were previously considered special-purpose entities under then existing authoritative guidance.


a.

MGE Power West Campus.


MGE Power West Campus is not a subsidiary of MGE; however, it has been consolidated in the financial statements of MGE as of December 31, 2003, and subsequent periods due to the adoption of FIN 46R. MGE Power West Campus was created for the purpose of owning and leasing new generating assets. MGE Power West Campus' sole principal asset is the WCCF, which it leases to MGE pursuant to a long-term lease. MGE has also contracted to operate the WCCF during the term of the lease. As a result of these contractual relationships, MGE absorbs a majority of the expected losses, residual value, or both, associated with the ownership and operation of the WCCF. MGE has therefore concluded that MGE Power West Campus is a VIE under FIN 46R and MGE is the primary beneficiary.


b.

MGE Power Elm Road.


MGE Power Elm Road is not a subsidiary of MGE; however, it has been consolidated in the financial statements of MGE due to the application of FIN 46R. MGE Power Elm Road was created for the purpose of owning new generating assets. MGE Power Elm Road's sole principal assets are an 8.33% undivided ownership interest in two coal-fired generating plants being constructed in Oak Creek, Wisconsin, which will be leased to MGE for the benefit of its customers. As a result of this contractual relationship, MGE is expected to absorb a majority of the expected losses, residual value, or both, associated with MGE Power Elm Road's ownership interest in these plants. MGE has therefore concluded that MGE Power Elm Road is a VIE under FIN 46R and MGE is the primary beneficiary.


c.

Shared Savings Program.


FIN 46R also requires MGE to assess whether the participants within its Shared Savings program constitute VIEs in which MGE might be considered to be the consolidating entity. MGE has reviewed 84.6% of the total current Shared Savings program balance and has determined that the provisions of FIN 46R are not applicable via the "business scope exception." For the remaining 15.4% of the total current Shared Savings program balance, these entities are not legally obligated to provide the financial information to MGE that is necessary to determine whether MGE must consolidate these entities. MGE will continue to attempt to obtain information from these customers in order to determine whether they should be consolidated by MGE.


4.

Minority Interest - MGE.


a.

MGE Power West Campus.


MGE Power West Campus is owned indirectly by MGE Energy (see Footnote 2 and 3). MGE Energy's proportionate share of the equity and net income (through its wholly owned subsidiary MGE Power) of MGE Power West Campus is classified within the MGE financial statements as minority interest. As of March 31, 2006, and March 31, 2005, MGE Power had invested (net of dividends) $35.1 million and $46.7  million in MGE Power West Campus, respectively. For the three months ended March 31, 2006, MGE Power had earned $1.9 million, net of tax, from its interest in MGE Power West Campus. This amount is recorded as minority interest expense, net of tax, on MGE's consolidated statement of income.


b.

MGE Transco.


On October 28, 2005, MGE Transco was formed. On this date, MGE transferred its investment in ATC to MGE Transco. In exchange for this transfer, MGE received an ownership interest in MGE Transco. As of March 31, 2006, MGE Energy has contributed a total of $2.0 million to MGE Transco. At March 31, 2006, MGE is the majority owner and MGE Energy is the minority owner of this entity. MGE Energy's proportionate share of the equity and net income of MGE Transco is classified within the MGE financial statements as minority interest. For the three months ended March 31, 2006, MGE Energy had earned $0.1 million, net of tax, from its interest in MGE Transco. This amount is recorded as minority interest expense, net of tax, on MGE's consolidated statement of income.


c.

MGE Power Elm Road.


MGE Power Elm Road is owned indirectly by MGE Energy (see Footnote 2 and 3). MGE Energy's proportionate share of the equity and net income (through its wholly owned subsidiary MGE Power) of MGE Power Elm Road is classified within the MGE financial statements as minority interest. As of March 31, 2006, MGE Power had invested $0.5 million in MGE Elm Road. For the three months ended March 31, 2006, MGE Power had earned $0.4 million, net of tax, from its interest in MGE Power Elm Road. This amount is recorded as minority interest expense, net of tax, on MGE's consolidated statement of income.


5.

Equity - MGE Energy.


a.

Common Stock.


On August 15, 2003, MGE Energy entered into a Distribution Agreement (Agreement) with BOCM. Under the terms of this Agreement, MGE Energy may periodically offer and sell up to 1,600,000 shares of its common stock through BOCM as its sales agent or to BOCM as principal. The sales will be made pursuant to a shelf registration statement MGE Energy filed with the SEC. MGE Energy did not sell any shares of common stock under the Agreement during the three months ended March 31, 2006 or 2005.


MGE Energy may issue new shares of its common stock through the Stock Plan. For the three months ended March 31, 2006, MGE Energy did not issue any new shares of common stock under the Stock Plan. However, for the three months ended March 31, 2005, MGE Energy issued 64,877 new shares of common stock under the Stock Plan for net proceeds of $2.3 million.


As of March 2005, MGE Energy switched from generally issuing new shares of common stock for the Stock Plan to purchasing shares on the open market through a securities broker-dealer on behalf of the plan participants. At December 31, 2005, MGE Energy held $0.1 million of treasury stock that had been purchased on the open market. The cost basis of these shares was shown at December 31, 2005, as a reduction to stockholders' equity on the MGE Energy condensed consolidated financial statements.


During the three months ended March 31, 2006, these shares were distributed to participants of the Stock Plan and the aforementioned $0.1 million reduction to stockholder's equity was reversed. No treasury stock was held by MGE Energy as of March 31, 2006.


b.

Preferred Stock - MGE Energy and MGE.


MGE has 1,175,000 shares of $25 par value redeemable preferred stock (cumulative) that is authorized but unissued at March 31, 2006.


c.

Dilutive Shares Calculation - MGE Energy.


MGE Energy does not hold any dilutive securities.


d.

Accumulated Other Comprehensive Income - MGE Energy and MGE.


The accumulated other comprehensive income balance at March 31, 2006, includes the unrealized gains and losses on available-for-sale securities. The following table illustrates the changes in Accumulated Other Comprehensive Income, net of taxes, from December 31, 2005, to March 31, 2006, for MGE Energy and MGE:



(In thousands)

MGE

Energy


MGE

Balance, December 31, 2005


$195

($21)

Change in unrealized loss on available for sale securities, net of tax expense of $27 and $2, respectively



40


2

Balance, March 31, 2006


$235

($19)


6.

Comprehensive Income - MGE Energy and MGE.


The reporting of other comprehensive income is required under the provisions of SFAS 130, Reporting Comprehensive Income. Total comprehensive income represents the change in equity during a period from transactions and other events and circumstances from nonowner sources. MGE Energy and MGE's total comprehensive income is:



(In thousands)

Three Months Ended March 31,

MGE Energy

2006

 

2005

Net Income


$11,516

 

$8,215

Other comprehensive income


40

 

(277)

Total Comprehensive Income


$11,556

 

$7,938

MGE

   

Net Income


$9,092

 

$7,852

Other comprehensive income


2

 

(43)

Total Comprehensive Income


$9,094

 

$7,809


7.

Investments - MGE Energy and MGE.


a.

Available for Sale Securities and Other Investments.


At March 31, 2006, MGE and MGE Energy held $0.8 million and $2.1 million of available for sale securities, respectively. These securities represent publicly traded securities and private equity investments in common stock of companies in various industries. MGE and MGE Energy account for these investments in accordance with the provisions of SFAS 115, Accounting for Certain Investments in Debt and Equity Securities.


b.

ATC.


ATC owns and operates electric transmission facilities in Wisconsin. MGE received an interest in ATC when it, like other Wisconsin electric utilities, contributed its electric transmission facilities to ATC. That interest is presently held by MGE Transco, which is jointly owned by MGE and MGE Energy. See Footnote 4 for further discussion.


MGE Transco, through MGE, has a seat on the Board of Directors of ATC and has a 20% ownership interest in ATC Management, Inc. Due to MGE Transco's ability to exercise significant control over management activities, MGE Transco has accounted for this investment under the equity method of accounting. For the three months ended March 31, 2006 and 2005, MGE and MGE Transco recorded equity earnings from the investment in ATC of $1.3 million (pretax) and $1.2 million (pretax), respectively. Dividend income received from ATC was $0.9 million for the three months ended March 31, 2006, compared to $0.8  million for the three months ended March 31, 2005. Additionally, MGE Transco made capital contributions of $0.7 million for the three months ended March 31, 2006. No capital contributions were made during the three months ended March 31, 2005.


ATC's summarized financial data for the three months ended March 31, 2006 and 2005, is as follows:


(In thousands)

  

Income statement data for the three months

ended March 31, December 31, 31,

2006

2005

Operating revenues


$77,264

$71,909

Operating expenses


(40,848)

(42,228)

Other income


1,530

454

Interest expense, net


(9,588)

(7,959)

Net Income


$28,358

$22,176

   

MGE and MGE Energy's equity earnings in ATC


$1,298

$1,152


8.

Taxes - MGE Energy and MGE.


In December 2004, the FASB  issued FSP 109-1, "Application of FASB  Statement No. 109, 'Application for Income Taxes,' to the Tax Deduction on Qualified Production Activities Provided by the American Jobs Creation Act of 2004" (FSP FAS 109-1). The American Jobs Creation Act of 2004 (Act), signed into law on October 22, 2004, provided, generally, for a tax deduction, effective for taxable years beginning after December 31, 2004, for domestic manufacturing activities of up to nine percent (when fully phased-in) of the lesser of "qualified production activities income," as defined in the Act, or taxable income. FSP 109-1 clarified that the tax deduction for domestic manufacturing activities under the Act should be accounted for as a special deduction in accordance with SFAS No. 109, "Accounting for Income Taxes" (SFAS No. 109). MGE estimates its tax deduction for 2006 to be $0.3 million.


9.

West Campus Cogeneration Facility - MGE Energy and MGE.


a.

Construction of the Facility.


MGE Energy, through MGE Power, MGE Power West Campus, and MGE Construct, has built a natural gas-fired cogeneration facility on the UW campus. As of March 31, 2006, MGE Power West Campus had incurred $106.9 million (including capitalized interest) of costs on the project, which is reflected in Plant, Property, and Equipment on MGE Energy and MGE's consolidated balance sheets. Of this amount, $0.3 million has not yet been paid. MGE Power West Campus estimates an additional $0.8 million in capital expenditures related to water mitigation and laydown area restoration costs.


A $5.0 million retainage receivable was recorded by MGE Construct over the construction period of the cogeneration facility. MGE Construct collected $2.5 million of this receivable on August 18, 2005, and $2.4 million on January 5, 2006. The remaining $0.1 million is expected to be collected in the third quarter of 2006.


b.

Lease Accounting.


MGE leases the electric generating assets owned by MGE Power West Campus and is responsible for operating the entire facility. On April 26, 2005, the facility lease between MGE and MGE Power West Campus commenced.


MGE received approval from the PSCW to collect approximately $12.1 million in carrying costs incurred by MGE Power West Campus during construction of the facility. MGE is collecting these costs in rates over a period of 10 years. Of these costs, $4.1 million relates to the capitalized interest and the debt portion of the facility. These costs are recognized over the period in which the facility is being depreciated (40 years). The remaining amount of $8.0 million represents the equity portion and is recognized over the ten-year period for recovery in rates. For the three months ended March 31, 2006, $0.2 million had been recognized as revenue. This amount is included in other nonregulated revenues on MGE Energy's and MGE's condensed consolidated statement of income. The difference between MGE's amortization of the costs for rate-making purposes over the ten-year recovery period and the recognition to revenue for the debt portion over 40 years is recorded as a liability on the condensed consolidated balance sheets. During the three months ended March 31, 2006, MGE Power West Campus also recorded $0.1 million in nonregulated revenues related to management and demolition and removal fees.


c.

Operating Arrangement.


On April 10, 2005, acceptance testing for the steam and chilled water portion of the facility began. On this date, MGE began allocating charges to the UW based on the operating agreement. Under the provisions of this arrangement, the UW is required to reimburse MGE for their allocated portion of fuel and operating expenses. These allocations are based on formulas outlined in the operating agreement. For the three months ended March 31, 2006, the State was allocated $ 0.9 million in fuel and operating costs.


10.

Elm Road-MGE Energy and MGE.


On July 15, 2005, MGE Power Elm Road received a notice to proceed with two 615 MW generating units at Oak Creek, WI from We Energies in conjunction with the Power the Future plan. On September 30, 2005, MGE Power Elm Road exercised its option to acquire an undivided 8.33% ownership interest in each of the two 615 MW generating units. On November 4, 2005, MGE Power Elm Road closed the acquisition. MGE Power Elm Road's estimated share of capital costs for its 8.33% ownership interest in both units is approximately $170 million. At March 31, 2006, MGE Power Elm Road had incurred $29.6  million (excluding capitalized interest) of costs on the project, which is reflected in the Construction Work In Progress balance on MGE and MGE Energy's condensed consolidated balance sheets. Of this amount, $1.9 million has not yet been paid and is accrued for at March 31, 2006.


MGE Power Elm Road calculates capitalized interest in accordance with SFAS No. 34, Capitalization of Interest Cost, on the Elm Road project. For the three months ended March 31, 2006, MGE Power Elm Road recorded $0.3 million in capitalized interest related to the Elm Road project.


On the date of acquisition, MGE Energy and its subsidiaries entered into various agreements, including a facility lease agreement. This facility lease agreement is between MGE Power Elm Road (a nonregulated subsidiary of MGE Energy) and MGE. The financial terms of the facility lease include a capital structure of 55% equity and 45% long-term debt, and return on equity of 12.7%, a lease term of 30 years, and a 5% lease payment reduction in the first five years.


On November 1, 2005, MGE received approval from the PSCW to defer payments made to MGE Power Elm Road for carrying costs during construction of the facility, management fees, and community impact mitigation costs. MGE estimates that the total carrying costs on the Elm Road project will be $52.8 million. This estimate is subject to change based on changes in interest rates, timing of capital expenditures, and the total project cost.


MGE began collecting the carrying costs in rates in 2006. These amounts are being collected over multiple years. Of these costs, approximately $16.8 million relates to the capitalized interest and the debt portion of the facility. These costs will be recognized over the period in which the facility will be depreciated. The remaining $36.0 million represents the equity portion and is being recognized over the period recovered in rates. For the three months ended March 31, 2006, $0.9 million related to the carrying costs were recovered in rates. Of this amount, $0.3 million relates to the debt portion of the facility and was deferred on the consolidated financial statements of MGE and MGE Energy. The remaining $0.6 million represents the equity portion and was recognized as nonregulated revenues in the consolidated financial statements of MGE and MGE Energy. MGE expects to begin collecting management fees and community impact mitigation costs in rates in 2008 and expects to recover them over a four year period.


11.

Asset Retirement Obligations - MGE Energy and MGE.


FIN 47 and SFAS 143


As of December 31, 2005, MGE adopted FIN 47. The adoption of FIN 47 required MGE to update an existing inventory of AROs, originally created for the adoption of SFAS 143, and to determine which, if any, of the conditional AROs could be reasonably estimated. The significant conditional AROs identified by MGE included the costs of abandoning in place gas services and mains, the abatement and disposal of equipment and buildings contaminated with asbestos and polychlorinated biphenyls, and the proper disposal and removal of tanks.


A conditional ARO of $9.2 million was recorded as of December 31, 2005, by MGE and MGE Energy. Changes in management's assumptions regarding settlement dates, settlement methods, or assigned probabilities could have had a material effect on the liabilities recorded by MGE at December 31, 2005, as well as the regulatory asset recorded. Had FIN 47 been applied during the years 2004 and 2003, a liability of $8.7 million and $8.3 million would have been recorded, respectively.


As a result of SFAS 71, the transitional guidance in FIN 47 had no impact on MGE or MGE Energy's Consolidated Statement of Income. Instead, MGE recorded regulatory assets of $3.1 million associated with the adoption of FIN 47. Approximately $5.4 million of the conditional ARO liability recorded by MGE had previously been recorded as costs of removal within its regulatory liability balance and, as a result was reclassified from regulatory liabilities to an ARO liability as of December 31, 2005.


Effective January 1, 2003, MGE applied the provisions of SFAS 143. At this time, MGE recorded an obligation for the fair value of its legal liability for asset retirement obligations associated with removing an electric substation, a combustion turbine generating unit, wind generating facilities, and photovoltaic generating facilities, all of which are located on property not owned by MGE and would be removed upon the ultimate end of the lease.


In April 2005, MGE Power West Campus recorded an obligation for the fair value of its legal liability for asset retirement obligations associated with the demolition and removal of the electric generation facilities of the WCCF. Provisions for these demolition and removal costs are included in the facility lease agreement.


MGE also may have asset retirement obligations relating to the removal of various assets, such as certain electric and gas distribution facilities. These facilities are generally located on property owned by third parties, on which MGE is permitted to operate by lease, permit, easement, license, or service agreement. The asset retirement obligations associated with these facilities cannot be reasonably determined due to the indeterminate life of the related agreements.


The following table shows costs as of December 31, 2004 and 2005, and changes to the asset retirement obligation and accumulated depreciation through March 31, 2006:




(In thousands)

(a)


Original Asset

Retirement

Obligation

(b)


Accumulated

Accretion

(c)

(a + b)

Asset

Retirement

Obligation

(d)


Accumulated

Depreciation-

Related Asset

Balance, December 31, 2004


$713

$761

$1,474

$204

Changes through December 31, 2005


3,221

7,121

10,342

1,481

Balance, December 31, 2005


$3,934

$7,882

$11,816

$1,685

Changes through March 31, 2006


-

165

165

26

Balance, March 31, 2006


$3,934

$8,047

$11,981

$1,711


Non-SFAS 143 Costs


Accumulated costs of removal that are non-SFAS No. 143 obligations are classified within the financial statements as regulatory liabilities. At March 31, 2006, and December 31, 2005, there were $12.5 million and $12.7 million of these costs recorded as regulatory liabilities within the financial statements, respectively. As mentioned above, as a result of the adoption of FIN 47, $5.4 million was reclassified from regulatory liabilities (recorded as non-SFAS 143 costs) to the ARO liability.


12.

Pension and Postretirement Plans - MGE.


MGE maintains qualified and nonqualified pension plans. MGE also provides health care and life insurance benefits for its retired employees. MGE has elected to recognize the cost of its transition obligation (the accumulated postretirement benefit obligation as of January 1, 1993) by amortizing it on a straight-line basis over 20 years.


a.

Net Periodic Cost.


The following table presents the components of MGE's net periodic benefit costs recognized for the three months ended March 31, 2006 and 2005. A portion of the net periodic benefit cost is capitalized within the Condensed Consolidated Balance Sheets.


 

Three Months Ended March 31,

 


Pension Benefits

Postretirement Benefits

(In thousands)

2006

2005

2006

2005

Components of net periodic benefit cost:

    

Service cost


$1,131

$1,033

$470

$   459

Interest cost


2,159

1,917

753

707

Expected return on assets


(2,314)

(2,054)

(244)

(224)

Amortization of:

    

Transition obligation


61

54

107

98

Prior service cost


95

84

55

50

Actuarial gain


324

282

172

167

Net periodic benefit cost


$1,456

$1,316

$1,313

$1,257


During the three months ended March 31, 2006, a plan curtailment for MGE's bargaining pension and post-retirement plans as defined in SFAS 88, Employers' Accounting for Settlements and Curtailments of Defined Benefit Pension Plans and for Termination Benefits had occurred. See Note 14 to the consolidated financial statements for additional discussion of the plan curtailment and the related accounting implications.


b.

Expected Cash Flows.


There are no required contributions for the 2006 plan year. However, MGE may elect to make discretionary deductible contributions. Likewise, there were no required contributions for the 2005 plan year. However, MGE elected to make a discretionary deductible contribution of $4.0 million during the three months ended March 31, 2006, related to the 2005 plan year.


13.

Commitments and Contingencies - MGE Energy and MGE.


a.

Coal and Alternate Fuel Contracts.


MGE has coal supply contracts related to the Blount plant. As of March 31, 2006, total coal commitments related to the Blount plant are estimated to be $12.6 million for 2006. Fuel procurement for MGE's jointly owned Columbia plant is handled by Alliant, the operating company. If any minimum purchase obligations must be paid under these contracts, management believes these obligations would be considered costs of service and recoverable in rates. As of March 31, 2006, MGE's share of the coal commitments for the Columbia plant are estimated to be $1.6 million in 2006, $1.9 million in 2007, $1.7 million in 2008, $1.0 million in 2009, and $0.8 million in 2010.


MGE's Blount plant also utilizes paper-derived fuel. MGE has a fixed commitment with a supplier of this alternate fuel. Commitments under this arrangement are $0.3 million in 2007 and $0.3 million in 2008.


b.

Purchased Power Contracts.


MGE has several purchased power contracts to help meet future electric supply requirements. As of March 31, 2006, MGE's total commitments for purchased power contracts for capacity are estimated to be $13.5 million in 2006, $10.5 million in 2007, $9.1 million in 2008 and 2009, and $9.2 million in 2010. Management expects to recover these costs in future customer rates.


On July 16, 2004, MGE signed a 20-year power purchase agreement with a developer for 40 MW of wind energy to be located near Waupun, Wisconsin. The developer has experienced problems with obtaining site-related permits, and construction has not yet begun. In late March 2006, the developer claimed force majeure as a result of issues associated with obtaining these permits. As a result, the obligations associated with the power purchase agreement are presently indeterminate. Accordingly, this agreement is not reflected in the purchased power commitments figures.


On November 18, 2004, a FERC order was issued which announced a new long-term transmission pricing structure as a result of the Midwest ISO and PJM markets. This order eliminates transmission charges on neighboring systems. Charges for network transmission services will be paid to ATC, the local transmission provider. This change will be effective on April 1, 2006.


As such, FERC has ordered that firm transmission contracts (through and out rates) are no longer allowed after March 31, 2006. However, MGE has a transmission contract for 2006 with an estimated commitment of $0.8 million. The costs related to this transmission agreement are expected to be fully recovered via a purchase arrangement entered into by MGE and another third party. Under this agreement, the third party is obligated to pay MGE for the costs that MGE incurs under the transmission arrangement.


c.

Natural Gas Supply, Transportation, and Storage Contracts.


MGE's transportation and storage contracts require fixed monthly payments for firm supply, pipeline transportation, and storage capacity. The pricing components of the fixed monthly payments for the transportation and storage contracts are established by FERC but may be subject to change. As of March 31, 2006, these payments are estimated to be $14.5 million in 2006, $14.6 million in 2007, $14.5 million in 2008, $14.1 million in 2009, and $13.8 million in 2010. Management expects to recover these costs in future customer rates.


d.

Environmental.


As a result of the Blount 69-kV transmission substation expansion, coal tar-contaminated soil and debris within the excavation zone are being removed and disposed of in accordance with a DNR approved "Removal Action Work Plan." MGE has paid $1.5 million in expenses to complete this cleanup and, based on past PSCW practices, expects to recover cleanup costs in future gas rates. Carrying costs associated with the cleanup expenditures will not be recoverable. On June 23, 2005, the DNR issued a case closure letter related to the Blount 69 kV substation cleanup.


MGE is listed as a potentially responsible party for a site the EPA has placed on the national priorities Superfund list. The Lenz Oil site in Lemont, Illinois, was used for storing and processing waste oil for several years. This site requires clean up under the Comprehensive Environmental Response, Compensation and Liability Act. A group of companies, including MGE, is currently working on cleaning up the site. Management believes that its share of the final cleanup costs will not result in any materially adverse effects on MGE's operations, cash flows, or financial position. Insurance may cover a portion of the cleanup costs. Management believes that the cleanup costs not covered by insurance will be recovered in current and future rates. At March 31, 2006, MGE accrued a $0.1 million gross liability for this matter. The expected range of loss for this item is estimated to be between $0.1 million and $0.2 million.


e.

Chattel Paper Agreement and Other Guarantees - MGE and MGE Energy.


MGE makes available to qualifying customers a financing program for purchasing and installing energy-related equipment that will provide more efficient use of utility service at the customer's property. MGE is party to a chattel paper purchase agreement with a financial institution under which it can sell or finance an undivided interest with recourse, in up to $10.0 million of the financing program receivables, until August 31, 2006. At March 31, 2006, MGE had sold an outstanding $5.1 million interest in these receivables, which MGE accounted for as a sale under SFAS No. 140, Accounting for Transfers and Servicing of Financial Assets and Extinguishment of Liabilities - A Replacement of FASB  Statement No. 125. MGE retains the servicing responsibility for these receivables.


MGE maintains responsibility for collecting and remitting loan payments from customers to the financial institution and does not retain any interest in the assets sold to the financial institution. As of March 31, 2006 and 2005, MGE has recorded a servicing asset of $0.2 million and $0.2 million, respectively. In March 31, 2006 and 2005, MGE recognized gains of less than $0.1 million and $0.1 million, respectively, in connection with the sale of loan assets. The servicing asset recognized and the amount amortized for the three months ended March 31, 2006, was less than $0.1 million. The loan assets are sold to the financial institution at cost, which approximates fair value in view of their market rates of interest. During the three months ended March 31, 2006 and 2005, MGE received approximately $0.2 million and $0.1 million, respectively, from the financial institution for the sale of loan assets. During those same periods, payments of $0.3 million and $0.3 million, respectively, were made by MGE to the financial institution.


MGE would be required to perform under its guarantee if a customer defaulted on its loan. The energy-related equipment installed at the customer sites is used to secure the customer loans. The loan balances outstanding at March 31, 2006, approximate the fair value of the energy-related equipment acting as collateral. The length of the MGE guarantee to the financial institution varies from one to ten years depending on the term of the customer loan. Principal payments for the next five years on the loans are $0.6 million in 2006, $0.8 million in 2007, $1.0 million in 2008, $0.6 million in 2009, and $0.8 million in 2010.


MGE Energy also has guaranteed debt service payments on a development project. This is a three year commitment ending in 2009 with a maximum financial exposure of $0.4 million for the term of the guarantee.


f.

WCCF and Elm Road Purchase Commitments - MGE Energy.


 MGE and MGE Construct entered into various contracts for the purchase of equipment and services related to the construction of WCCF. All contracts entered into by MGE have since been assigned to MGE Construct. At March 31, 2006, MGE Construct had $1.0 million of contractual obligations remaining (this includes amounts that will be charged to the State). Of this amount, $0.2 million had been accrued and reflected in MGE and MGE Energy's property, plant, and equipment balance and $0.2 million had been accrued and reflected as an other receivable from the State on the financial statements of MGE Energy. As such, at March 31, 2006, $0.6 million in services contracted for have not yet been rendered. These amounts primarily relate to water mitigation and laydown area restoration.


On November 4, 2005, MGE Power Elm Road acquired a 8.33% ownership interest in each of two 615 MW generating units being constructed in Oak Creek, Wisconsin. Under this agreement, MGE Power Elm Road is required to provide its pro rata share of costs related to the construction of these facilities. MGE Power Elm Road's estimated share of capital costs for its 8.33% ownership interest in both units is approximately $170 million. Based on current forecasts, capital costs for this project will be $23.9 million in 2006 (excludes spending as of March 31, 2006), $50.1 million in 2007, $42.1 million in 2008, $20.4 million in 2009, and $3.5 million in 2010. These amounts may change as a result of modifications to the project estimate or timing differences.


14.

Restructuring Activities - MGE.


On January 19, 2006, MGE announced a plan, subject to certain conditions, that includes discontinuing coal use at the end of 2011 at Blount. The plant will continue to run on natural gas but will be reduced from its current approximate 190 MW capacity to 100 MW when coal burning is discontinued. MGE has determined that 11 non-union and an undetermined number of union positions will be eliminated in 2011 as a result of this exit plan.


On January 19, 2006, MGE entered into severance agreements awarding the 11 non-union employees severance benefits. MGE has accounted for these benefits in accordance with the provisions of SFAS 146, Accounting for Costs Associated with Exit or Disposal Activities. These benefits were recognized initially at the communication date based on the fair value of the liability as of the termination date and are being recognized ratably over the future service period of the employees. As of March 31, 2006, severance benefits have not been awarded to the union employees and the criteria prescribed under SFAS 146 has not yet been met.


MGE anticipates full regulatory recovery of the costs associated with the discontinuance of coal at Blount As such, the severance charges for the non-union employees have been deferred and recognized on the consolidated balance sheet of MGE Energy and MGE as a regulatory asset.


The following table presents the activity in the restructuring accrual from December 31, 2005 through March 31, 2006:



(In thousands)

Accrued severance and retention

Additional expense during the period*

Cash payments during the period

Accrued severance and retention

Balance, December 31, 2005


$-

$-

$-

$-

Changes through March 31, 2006


-

45

-

45

Balance, March 31, 2006


$-

$45

$-

$45


*Amounts are reflected as regulatory assets in the financial statements of MGE Energy and MGE.


The aforementioned exit plan has also resulted in a plan curtailment for MGE's bargaining pension and post-retirement plans as defined in SFAS 88, Employers' Accounting for Settlements and Curtailments of Defined Benefit Pension Plans and for Termination Benefits. To account for this curtailment, MGE and MGE Energy recorded a $0.2 million increase to their pension liability during the three months ended March 31, 2006. MGE expects full regulatory recovery of these costs. As such, this charge was deferred and reflected as a regulatory asset at March 31, 2006, in the consolidated financial statements of MGE and MGE Energy.


15.

Derivative and Hedging Instruments - MGE Energy and MGE.


As part of our regular operations, MGE enters into contracts, including options, swaps, futures, forwards, and other contractual commitments, to manage its exposure to interest rates, commodity prices, and gas margin. MGE evaluates its derivative contracts in accordance with SFAS No. 133, Accounting for Derivative Instruments and Hedging Activities, as amended and interpreted. To the extent that these contracts are derivatives, MGE assesses whether or not the normal purchases or normal sales exclusion applies. For contracts in which this exclusion can not be applied, SFAS No. 133 requires MGE Energy and MGE to recognize all derivatives in the consolidated balance sheets at fair value, with changes in the fair value of derivative instruments to be recorded in current earnings or deferred in accumulated other comprehensive income (loss), depending on whether a derivative is designated as, and is effective as, a hedge and depending on the type of hedge transaction.


If the derivative qualifies for regulatory deferral subject to the provisions of SFAS No. 71, Accounting for the Effects of Certain Types of Regulation, the derivatives are marked to fair value pursuant to SFAS No. 133 and are offset with a corresponding regulatory asset or liability.


As a result of the firm transmission agreements that MGE holds on transmission paths in the MISO and PJM markets, MGE has been awarded FTRs. An FTR is a financial instrument that entitles the holder to a stream of revenues or charges based on the differences in hourly day ahead energy prices between two points on the transmission grid. FTRs are used by MGE to hedge the risk of increased congestion charges. Due to the nature of these instruments as derivatives, they qualify for regulatory deferral. Changes in the fair value of these instruments are recorded as regulatory assets or liabilities. At March 31, 2006, the FTRs held for the MISO and PJM markets were in a unrealized gain position of $0.1 million. The unrealized gain was deferred on the balance sheet in accordance with the provisions of SFAS 71.


MGE also uses gas futures and options. These arrangements are entered into by both the electric and gas segments. The contracts are established to help stabilize the price risk associated with future gas purchases. At March 31, 2006, the cost of these instruments exceeded their fair value by $0.5 million. Of this amount, $0.2 million qualifies for regulatory treatment. Accordingly, this portion of the unrealized loss was deferred in accordance with SFAS 71. The remaining $0.3 million of unrealized loss relates to instruments that do not qualify for regulatory treatment. This amount was accounted for under the provisions of SFAS 133, and has been reflected in the consolidated income statements of MGE and MGE Energy for the three months ended March 31, 2006.


On October 17, 2005, MGE entered into a non-exchange traded weather derivative. This agreement extended from January 2006 until March 2006. This agreement had a premium of $0.1 million. Under this agreement MGE is subject to a floor and a ceiling based on forecasted heating degree days. If actual heating degree days exceed the ceiling, MGE is obligated to make a payment and if heating degree days are below the floor, MGE will receive payment. Any payment or receipt is limited to $0.6 million. MGE is accounting for the HDD Collar using the intrinsic value method pursuant to the requirements of EITF No. 99-2, Accounting for Weather Derivatives. Through March 31, 2006, actual HDD were 3,175, resulting in a $0.6 million gain for MGE.


In October 2004, MGE entered also into a non-exchange-traded HDD Collar. The payment or receipt under this agreement was not permitted to exceed $1.0 million (excluding premium). The term of this agreement extended from November 1, 2004, until March 31, 2005, and the premium for this weather hedge was $0.1 million. Through March 31, 2005, actual HDD were 3,429 resulting in a $0.1 million loss for MGE.


16.

Regional Transmission Organizations - MGE Energy and MGE.


On April 1, 2005, the MISO implemented its bid-based energy market. MISO is a FERC approved RTO that is required to provide real-time energy services and a market based mechanism for congestion management. MGE is a participant in this market. On April 1, 2005, MGE began offering substantially all of its generation on the MISO market and purchasing much of its load requirement from the MISO market in accordance with the MISO Tariff.


Additionally, on May 1, 2004, MGE became a member of PJM. PJM is also an RTO. PJM is a neutral and independent party that coordinates and directs the operation of the region's transmission grid, administers a competitive wholesale electricity market, and plans regional transmission expansion improvements to maintain grid reliability and relieve congestion. MGE has three purchase power agreements, for a total of 115 MW, that are impacted by this market.


MGE reports on a net basis transactions on the MISO and PJM markets in which it buys and sells power within the same period to meet electric energy delivery requirements. This treatment resulted in a $31.8 million and $1.0 million reduction to sales for resale and purchased power expense for the three months ended March 31, 2006 and 2005, respectively.


17.

Rate Matters - MGE Energy and MGE.


a.

Rate proceedings.


On December 12, 2005, the PSCW authorized MGE to increase 2006 electric revenues by $35.9 million and to increase gas revenues by $3.8 million. The increase to electric revenues will cover increased fuel and purchased power costs and the costs of additional facilities needed to meet the rising electric and gas needs of our customers. $3.8 million of the increase in electric revenues relates to the recovery of the carrying costs for Elm Road.


MGE stated its intention during the proceeding to eliminate a base rate case in 2007, although it would request a limited reopener to update costs related to fuel rules, carrying costs for Elm Road, and increased costs related to ATC transmission expenses.


On December 21, 2004, the PSCW authorized MGE to increase 2005 electric revenues by $27.4 million and to decrease 2005 gas revenues by $4.2 million. The increase to electric revenues was for the purpose of covering rising fuel costs, commercial operation of WCCF, and increased transmission expenses.


b.

Fuel rules.


The recovery of MGE's electric fuel costs are subject to fuel rules established by the PSCW. Under the fuel rules effective January 1, 2006, MGE can apply for a fuel surcharge if its actual electric fuel costs exceed 102% of the electric fuel costs allowed in its latest rate order. Conversely, MGE may have to provide a fuel credit to its customers if actual electric fuel costs are less than 99.5% of the electric fuel costs allowed in that order.


Based on the results for the month ended January 31, 2006, MGE estimated that actual electric fuel costs would be less than 99.5% of electric fuel costs allowed for 2006. Accordingly, on February 27, 2006, MGE filed an application with the PSCW requesting an interim fuel credit. On March 9, 2006, the PSCW approved this application and issued an interim order for a fuel credit of $0.00069 per kilowatt-hour. MGE recorded a $1.8 million reduction to other electric revenues related to this credit. This credit is being provided to customers via reduced electric rates from March 9, 2006, through December 31, 2006. As of March 31, 2006, $0.1 million has been credited to electric customers. In this interim order the PSCW also stated that MGE's electric rates set in the final order are subject to refund, together with interest at 11%, pending a full review of MGE's 2006 actual electric fuel costs. As a result of a continued decrease in electric fuel costs for the months ended February 28 and March 31, 2006, as compared to those in its latest rate order, MGE recorded an additional $3.4 million reduction to other electric revenues for the three months ended March 31, 2006, reflecting its estimated obligation under this refund provision.


At March 31, 2006, a regulatory liability of $5.1 million is included in the consolidated balance sheet of MGE and MGE Energy as a result of the aforementioned interim order and subject to refund provision. See Footnote 20 for additional developments related to the fuel rules.


On August 10, 2004, the PSCW reopened MGE's current rate docket for the limited purposes of determining whether a fuel credit was due for 2004 under the fuel rules. On September 30, 2004, MGE filed an application to decrease electric rates for 2004 by $0.0025 per kWh, reflecting its view of the credit due customers under the fuel rules. This amount was subsequently revised to $0.00275 per kWh. Based upon these filings, MGE recorded a reduction in electric revenues to reflect the fuel rules refund in the amount of $3.4 million for 2004, of which $1.8 million was refunded on customers' bills during 2004, and $1.6 million was refunded to customers in January 2005.


18.

New Accounting Pronouncements.


SFAS 156


In March 2006, the FASB  issued SFAS No. 156, Accounting for Servicing of Financial Assets, an amendment of SFAS No. 140. SFAS No. 156 simplifies the accounting for servicing rights and reduces the volatility that results from the use of different measurement attributes for servicing rights and the related financial instruments used to economically hedge risks associated with those servicing rights. SFAS No. 156 also clarifies when to separately account for servicing rights, requires these rights to be initially measured at fair value, and provides the option to subsequently account for those servicing rights (by class) at either fair value or under the amortization method previously required under SFAS No. 140. SFAS No. 156 is effective for the fiscal year beginning after September 15, 2006. Early adoption is permitted as of the beginning of the entity's fiscal year. MGE will not early adopt this statement. As such, this statement will be adopted on January 1, 2007, and does not expect this statement to have a material impact on MGE Energy or MGE's consolidated financial statements.


FSP No. FIN 46(R)-6


In April 2006, the FASB  issued FASB  Staff Position No. FIN 46(R)-6, Determining the Variability to Be Considered in Applying FASB  Interpretation No. 46(R), (FSP No. 46(R)-6). This pronouncement provides guidance on how a reporting enterprise should determine the variability to be considered in applying FASB  interpretation No. 46 (revised December 2003), Consolidation of Variable Interest Entities, which could impact the assessment of whether certain variable interest entities are consolidated. FSP No. 46(R)-6 will be effective for MGE and MGE Energy on July 1, 2006. The provisions of FSP No. 46(R)-6 are applied prospectively. The impact on MGE and MGE Energy in periods subsequent to the effective date is dependent on transactions that could occur in future periods, and therefore cannot be determined until the transaction occurs.


19.

Segment Information - MGE Energy and MGE.


Prior to 2005, MGE Energy operated in three business segments: electric utility operations, gas utility operations, and nonregulated. As of December 31, 2005, MGE Energy added a segment for nonregulated energy operations, transmission investments, and all other nonregulated operations. All prior year segment data has been re-presented to conform with the current year presentation and segment break out.

The electric utility business purchases, generates and distributes electricity, and contracts for transmission service. The gas utility business purchases and distributes natural gas and contracts for the transportation of natural gas. Both the electric and gas segments operate through MGE Energy's principal subsidiary MGE.


The nonregulated energy operations are conducted through MGE Energy's subsidiaries: MGE Power, MGE Power West Campus, and MGE Power Elm Road. These subsidiaries have been formed to construct, own and lease new electric generating capacity. MGE Power West Campus owns a controlling interest in the electric generation plant of the natural gas-fired cogeneration facility on the UW campus, which is leased to the utility, and MGE Power Elm Road has an undivided 8.33% ownership interest in each of two 615 MW generating units being constructed in Oak Creek, Wisconsin. When these units are completed, MGE Power Elm Road's portion will also be leased to the utility.


The transmission investment segment invests in a company that provides electric transmission services. Namely, this segment's operations relate to the investment in ATC, and the transactions therein. This segment includes MGE Transco. See Footnote 7 to the Consolidated Financial Statements for further discussion of MGE Transco and the investment in ATC.


The "All other" segment includes: Corporate, CWDC, Magael, and MGE Construct. These entities' operations consist of investing in companies and property which relate to the regulated operations, financing the regulated operations, or providing construction services to the other subsidiaries.


General corporate expenses include the cost of executive management, corporate accounting and finance, information technology, risk management, human resources and legal functions, and employee benefits that are allocated to electric and gas based on formulas prescribed by the PSCW. Identifiable assets are those used in MGE's operations in each segment. Assets not allocated consist primarily of cash and cash equivalents, restricted cash, investments, other accounts receivable, and prepaid assets.


Sales between electric and gas segments are based on PSCW approved tariffed rates. Additionally, intersegment operations related to the leasing arrangement between the electric segment and MGE Power West Campus/ MGE Power Elm Road are based on terms previously approved by the PSCW. Consistent with internal reporting and in accordance with the provisions of SFAS 131, management has presented the direct financing capital lease between MGE and MGE Power West Campus as an operating lease for purpose of segment reporting. Lease payments made by MGE to MGE Power West Campus are shown as operating expenses. The lease payments received by MGE Power West Campus from MGE are shown as lease income in interdepartmental revenues. The depreciation expense associated with the WCCF is reflected in the nonregulated energy segment.


The following table shows segment information for MGE Energy's and MGE's operations:


(In thousands)

      

MGE Energy

Three months ended March 31, 2006



Electric



Gas

Non-

regulated

Energy


Transmission

Investment


All

Others

Consolidation/

Elimination

Entries


Consolidated

Total

Operating revenues


$72,553

$85,109

$923

$ -

$ -

$ -

$158,585

Interdepartmental revenues


114

5,779

3,759

-

-

(9,652)

-

Total operating revenues/(loss)


72,667

90,888

4,682

-

-

(9,652)

158,585

Depreciation and amortization


(4,970)

(2,065)

(686)

-

-

-

(7,721)

Other operating expenses


(61,736)

(77,752)

(66)

(2)

(101)

9,652

(130,005)

Operating income


5,961

11,071

3,930

(2)

(101)

-

20,859

Other income/(loss)


310

87

-

1,298

3

-

1,698

Interest income/(expense), net


(2,589)

(730)

(659)

-

148

-

(3,830)

Income/(loss) before taxes


3,682

10,428

3,271

1,296

50

-

18,727

Income tax benefit/(provision)


(1,235)

(4,119)

(1,313)

(521)

(23)

-

(7,211)

Net income/(loss)


$2,447

$6,309

$1,958

$775

$27

$ -

$11,516


(In thousands)

      

MGE Energy

Three months ended March 31, 2005



Electric



Gas

Non-

regulated

Energy


Transmission

Investment


All

Others

Consolidation/

Elimination

Entries


Consolidated

Total

Operating revenues


$63,880

$74,347

$ -

$ -

$682

$ -

$138,909

Interdepartmental revenues


98

2,316

-

-

-

(2,414)

-

Total operating revenues/(loss)


63,978

76,663

-

-

682

(2,414)

138,909

Depreciation and amortization


(4,688)

(1,937)

-

-

-

-

(6,625)

Other operating expenses


(54,845)

(64,621)

(6)

-

(109)

2,359

(117,222)

Operating income


4,445

10,105

(6)

-

573

(55)

15,062

Other income/(loss)


80

9

-

1,152

3

-

1,244

Interest income/(expense), net


(2,190)

(629)

-

-

1

-

(2,818)

Income/(loss) before taxes


2,335

9,485

(6)

1,152

577

(55)

13,488

Income tax benefit/(provision)


(816)

(3,783)

2

(462)

(233)

19

(5,273)

Net income/(loss)


$1,519

$5,702

$(4)

$690

$344

$(36)

$8,215


The following table shows segment information for MGE's operations:


MGE

Three months ended March 31, 2006



Electric



Gas

Non-

regulated

Energy


Transmission

Investment


All

Others

Consolidation/

Elimination

Entries


Consolidated

Total

Operating revenues


$72,553

$85,109

$923

$ -

$ -

$ -

$158,585

Interdepartmental revenues


114

5,779

3,759

-

-

(9,652)

-

Total operating revenues/(loss)


72,667

90,888

4,682

-

-

(9,652)

158,585

Depreciation and amortization


(4,970)

(2,065)

(686)

-

-

-

(7,721)

Other operating expenses*


(62,836)

(81,833)

(1,379)

(2)

-

9,652

(136,398)

Operating income/(loss)*


4,861

6,990

2,617

(2)

-

-

14,466

Other income/(loss)


175

49

-

777

-

(22)

979

Interest income/(expense), net


(2,589)

(730)

(659)

-

-

-

(3,978)

Income/(loss) before minority interest


2,447

6,309

1,958

775

-

(22)

11,467

Minority interest, net of tax


-

-

-

-

-

(2,375)

(2,375)

Net income/(loss)


$2,447

$6,309

$1,958

$775

$ -

$(2,397)

$9,092


MGE

Three months ended March 31, 2005



Electric



Gas

Non-

regulated

Energy


Transmission

Investment


All

Others

Consolidation/

Elimination

Entries


Consolidated

Total

Operating revenues


$63,880

$74,347

$ -

$ -

$ -

$ -

$138,227

Interdepartmental revenues


98

2,316

-

-

-

(2,414)

-

Total operating revenues/(loss)


63,978

76,663

-

-

-

(2,414)

138,227

Depreciation and amortization


(4,688)

(1,937)

-

-

-

-

(6,625)

Other operating expenses*


(55,631)

(68,400)

(4)

-

-

2,359

(121,676)

Operating income/(loss)*


3,659

6,326

(4)

-

-

(55)

9,926

Other income/(loss)


50

5

-

690

-

(78)

667

Interest income/(expense), net


(2,190)

(629)

-

-

-

78

(2,741)

Income/(loss) before minority interest


1,519

5,702

(4)

690

-

(55)

7,852

Minority interest, net of tax


-

-

-

-

-

-

-

Net income/(loss)


$1,519

$5,702

$(4)

$690

$ -

$(55)

$7,852


*Amounts are shown net of the related tax expense, consistent with the presentation on the consolidated MGE Income Statement.


The following table shows segment information for MGE Energy's and MGE's assets and capital expenditures:


(In thousands)

Utility

Consolidated


MGE Energy



Electric



Gas


Assets not Allocated


Nonregulated Energy


Transmission

Investment



All Others

Consolidation/

Elimination

Entries



Total

Assets:

        

March 31, 2006


$542,371

$205,589

$16,341

$147,298

$36,314

$276,205

$(324,463)

$899,655

December 31, 2005


533,896

233,139

21,013

143,101

35,239

276,565

(326,046)

916,907

         

Capital Expenditures:

        

Three months ended March 31, 2006



10,051


1,137


-


6,172


-


-


-


17,360

Year ended December 31, 2005



40,340


10,264


-


35,167


-


-


-


85,771

         

MGE

        

Assets:


        

March 31, 2006


$542,371

$205,589

$16,341

$147,048

$36,314

$ -

$(47,305)

$900,358

December 31, 2005


533,896

233,139

21,013

142,875

35,239

-

(52,366)

913,796

         

Capital Expenditures:

        

Three months ended March 31, 2006



10,051


1,137


-


6,172


-


-


-


17,360

Year ended December 31, 2005



40,340


10,264


-


35,167


-


-


-


85,771


MGE Energy asset consolidation/elimination entries at March 31, 2006, include the following:



(In thousands)

Three months ended

March 31, 2006

Parent investment in affiliate subsidiaries


$269,064

Netting of tax positions


2,789

Affiliate receivables related to WCCF


11,964

Affiliate receivables related to Elm Road


29,145

Elimination of deferred charges related to WCCF


10,961

Elimination of deferred charges related to Elm Road


364

Misc. affiliate receivables


176

Total MGE Energy asset consolidation/elimination entries


$324,463


MGE asset consolidation/elimination entries at March 31, 2006, include the following:



(In thousands)

Three months ended

March 31, 2006

MGE investment in MGE Transco


$34,142

Netting of tax positions


1,192

Elimination of deferred charges related to WCCF


10,961

Elimination of deferred charges related to Elm Road


364

Affiliate receivables related to Elm Road


307

Misc. affiliate receivables and other


339

Total MGE asset consolidation/elimination entries


$47,305


20.

Subsequent Events- MGE Energy and MGE.


a.

Fuel Rules-MGE Energy and MGE.


On April 21, 2006, MGE filed a stipulation with the PSCW seeking to further amend its pending application to decrease electric rates as a result of a continued decrease in actual electric fuel costs, when compared to those fuel costs projected in MGE's most recent rate order. This credit is based upon newly computed annual average fuel costs for MGE's 2006, test year, using actual fuel costs for January, February and March and revised forecasts for April through July. Fuel costs used in this computation for August through December continue to be based upon those costs approved in MGE's latest rate order. MGE's forecasted fuel costs for April through July will be based on the NYMEX futures contract prices for natural gas as of April 13, 2006.


MGE estimates that, if approved, this stipulation will reduce electric revenues from April to December 2006 by $6.9 million. Electric rates during this period will also be subject to refund pursuant to the March 9, 2006, PSCW interim order. If approved, the stipulation would also amend the PSCW fuel rules monitoring range to plus or minus 2%.


The impact of the lower than expected fuel costs for the months ended January 31, February 28, and March 31, 2006, have been reflected as a reduction to other electric revenues in the consolidated financial statements of MGE Energy and MGE for the three months ended March 31, 2006. See Footnote 17 for further discussion.


b.

ATC Capital Contribution-MGE Energy and MGE.


On April 28, 2006, MGE Transco made a $0.6 million capital contribution to ATC. Additionally, on April 21, 2006, MGE Energy's and MGE's Board of Directors approved the transfer of certain assets to ATC. Namely, in the second quarter 2006 MGE plans to transfer $1.6 million in transmission assets to ATC. In exchange, MGE will receive $0.8 million in cash consideration and an additional $0.8 million investment in ATC. MGE will transfer this investment to MGE Transco in exchange for an additional ownership interest in this entity. See Footnote 7 for discussion of the accounting of MGE Transco's investment in ATC and Footnote 4 for discussion of MGE's accounting for their investment in MGE Transco.


c.

Amendment to Credit Agreement- MGE Energy.


On April 25, 2006, MGE Energy amended its credit agreement. This amendment eliminated a provision that would have required MGE Energy to pay down the line of credit for at least one day during the year.


Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations.


General


MGE Energy is a holding company operating through subsidiaries in five business segments: electric utility operations, gas utility operations, nonregulated energy operations, transmission investments, and all other. Our principal subsidiary is MGE, which conducts our electric utility and gas utility operations. MGE generates and distributes electricity to nearly 136,000 customers in Dane County, Wisconsin, including the city of Madison, and purchases and distributes natural gas to nearly 137,000 customers in the Wisconsin counties of Columbia, Crawford, Dane, Iowa, Juneau, Monroe, and Vernon.


Our nonregulated energy operations and all other segment, have been formed to construct, lease, and own new electric generating capacity. Our nonregulated energy operations relate principally to the leasing of the cogeneration project on the UW-Madison campus. The WCCF facility began producing electricity on April 26, 2005. The nonregulated energy operations relating to this cogeneration plant are included in MGE's consolidated financial statements as a result of the accounting requirements of FIN 46R. On November 4, 2005, MGE Power Elm Road finalized an agreement to acquire an undivided 8.33% ownership interest in each of two 615 MW generating units being constructed in Oak Creek, Wisconsin. This entity is also included in the nonregulated energy operations segment and is included in MGE's consolidated financial statements as a result of the accounting requirements of FIN 46R.


The transmission investment segment consists of our equity earnings in ATC.


Our primary focus today and for the foreseeable future is our core utility customers at MGE. MGE continues to face the challenge of providing its customers with reliable power at competitive prices. MGE plans to meet this challenge by building more efficient generation projects and continuing its efforts to control operational costs. We believe it is critical to maintain a strong credit standing and financial strength in MGE as well as the parent company in order to accomplish these goals.


Results of Operations


Executive Summary - MGE Energy and MGE


In the first quarter of 2006, our earnings were $11.5 million or $0.56 per share compared to $8.2 million or $0.40 per share in the same period in the prior year. During the first quarter of 2006, utility operations experienced an increase in electric revenues of $8.7 million. This increase is attributable to an increase in rates that became effective in January 2006, an increase in sales for resale, and an increase in commercial and other-retail/municipal sales. These increases were offset by a reduction in other electric revenues. The increase in rates was implemented to cover forecasted increases in fuel costs and the costs of additional facilities, including MGE Power Elm Road and MGE Power West Campus. For the three months ended March 31, 2006, fuel used for electric generation increased $1.3 million, or 12.6 %, compared to the three months ended March 31, 2005, and purchased power expense decreased by $0.3 million or 1.3% during this same period.


Under the fuel rules effective January 1, 2006, MGE may have to provide a fuel credit to its customers if actual electric fuel costs are less than 99.5% of the electric fuel costs in its latest rate order. As a result of lower actual fuel costs during the three months ended March 31, 2006, the PSCW issued an interim order implementing a $0.00069 per kWh fuel credit based on actual January fuel costs and instituted a subject to refund provision. For the three months ended March 31, 2006, MGE recorded a $5.2 million reduction to other electric revenues as a result of these fuel rules and the aforementioned PSCW order.


MGE expects fuel and purchased power costs for the second quarter of 2006 to continue to be lower than those included in its most recent rate order. Accordingly, on April 21, 2006, MGE filed a stipulation with the PSCW seeking to further amend its pending application to decrease electric rates as a result of a continued decrease in actual electric fuel costs, when compared to those fuel costs projected in MGE's most recent rate order. This credit is based upon newly computed annual average fuel costs for MGE's 2006 test year, using actual fuel costs for January, February, and March and revised forecasts for April through July. Fuel costs used in this computation for August through December continue to be based upon those costs approved in MGE's latest rate order. MGE's forecasted fuel costs for April through July will be based on the NYMEX futures contract prices for natural gas as of April 13, 2006. MGE estimates that, if approved, this stipulation will reduce electric revenues from April to December 2006 by $6.9 million. Electric rates during this period will also be subject to refund pursuant to the March 9, 2006, PSCW interim order. If approved, the stipulation would also amend the PSCW fuel rules monitoring range to plus or minus 2%.


During the three months ended March 31, 2006, gas revenues increased $10.8 million. This increase is due to higher costs of gas and higher revenues as a result of GCIM. These increases were slightly offset by a decrease in retail and transportation sales. For the three months ended March 31, 2006, natural gas purchased expense increased $9.6 million or 17.9%, largely due to higher natural gas prices.


Operation and maintenance expenses increased due to higher electric transmission, distribution, and general expenses. These increases were partially offset by lower gas maintenance expenses.


Electric Utility Operations


Electric sales and revenues


The following table compares MGE's electric retail revenues and electric kWh sales by customer class for the three months ended March 31:


 

Revenues

Sales

(In thousands)

2006

2005

% Change

2006

2005

% Change

Residential


$27,160

$24,183

12.3%

199,970

204,280

(2.1%)

Commercial


39,181

32,526

20.5%

416,952

410,298

1.6%

Industrial


4,714

3,862

22.1%

67,617

68,185

(0.8%)

Other - retail/municipal


6,159

4,772

29.1%

81,528

75,173

8.5%

Total retail


77,214

65,343

18.2%

766,067

757,936

1.1%

Sales for resale


1,240

286

333.6%

13,699

3,181

330.7%

Other revenues


(5,901)

(1,749)

(237.4)

   

Total


$72,553

$63,880

13.6%

779,766

761,117

2.5%


Electric operating revenues were up $8.7 million or 13.6% for the three months ended March 31, 2006, due to the following:



(In millions)

Three months ended

March 31, 2006

Rate changes


$11.2

Volume


0.7

Sales for resale


1.0

Other revenues


(4.2)

Total


$8.7


Rates. On December 12, 2005, the PSCW authorized MGE to increase 2006 electric revenue by $35.9 million to cover rising fuel and purchased power costs and the cost of additional facilities needed to meet the rising electric needs of MGE's customers.


On March 9, 2006, the PSCW approved an interim fuel credit to reduce electric rates by $0.00069 per kWh as a result of lower January fuel costs than those in MGE's latest rate order. This credit was applied to rates as of March 9, 2006, and resulted in a $0.1 million reduction to rates for the three months ended March 31, 2006.


Volume. During the three months ended March 31, 2006, there was a 1.1% increase in total retail sales volumes. This increase represents increased usage by industrial and other-retail/municipal customers.


Other Revenues. Other electric revenues decreased $4.2 million for the three months ended March 31, 2006, compared to the same period in the prior year. During the three months ended March 31, 2006, MGE recorded a $5.2 million reduction to other electric revenues to account for fuel rules. Namely, on March 9, 2006, the PSCW issued an interim order instituting a fuel credit of $0.00069 per kWh as a result of January actual fuel costs and implementing a subject to refund provision for actual fuel costs for the remainder of the year. $0.1 million of this amount was subsequently reversed as the amount was provided to customers via reduced rates from March 9to March 31, 2006 (see "Rates" note above).


During the three months ended March 31, 2006, MGE recovered in electric rates carrying costs on WCCF and Elm Road. MGE recorded a $0.9 million and a $0.3 million adjustment to other electric revenues to eliminate the recognition of revenue related to these costs in the electric segment as revenue related to these carrying costs is recorded by MGE Power Elm Road and MGE Power West Campus (see discussion of these revenues in the "nonregulated operations revenue" section).


Sales for resale. For the three months ended March 31, 2006, sales for resale increased $1.0 million when compared to the first quarter of 2005. This increase is attributable to MGE's participation in the MISO market. Namely, sales for resale include transactions conducted on the PJM and MISO markets since the establishment and MGE's involvement on May 1, 2004, and April 1, 2005, respectively.


MGE has recorded transactions on the MISO and PJM market, in which it is buying and selling power within the same period to meet its electric energy delivery requirements, on a net basis resulting in a $31.8 million and $1.0 million adjustment to sales for resale and purchased power expense for the period ended March 31, 2006, and March 31, 2005, respectively.


Electric fuel and purchased power


The expense for fuel used for electric generation increased $1.3 million, or 12.6%, during the three months ended March 31, 2006, compared to the same period in the prior year. This increase is primarily due to the increase in fuel cost between the two periods ($2.2 million), partially offset by a decrease in internal generation ($0.9 million).


Conversely, purchased power expense decreased $0.3 million, or 1.3%, during that same period. This decrease in expense reflects a $2.3 million or 10.0% decrease in the per-unit costs of purchased power, offset by a $2.0 million or 9.7% increase in purchased energy.


MGE has recorded transactions on the PJM and MISO markets in which it is buying and selling power within the same period to meet its electric energy delivery requirements on a net basis. This treatment resulted in a $31.8 million and $1.0 million adjustment to purchase power expense for the three months ended March 31, 2006, and March 31, 2005, respectively.


Electric operating expenses


Electric operating expenses increased $5.0 million during the three months ended March 31, 2006, compared to the same period in 2005. The following changes contributed to the net change for 2006:


(In millions)

2006

Increased rent expense (a)


$3.8

Increased transmission costs (b)


0.5

Increased distribution costs


0.1

Increased other general and administrative expenses


0.2

Increased customer services, promotions, and account costs


0.4

Total electric operating expenses


$5.0


(a)

This increase relates to the leasing arrangement between MGE and MGE Power West Campus. In accordance with the terms of this leasing arrangement, the electric segment recorded $3.8 million in rent expense for the three months ended March 31, 2006. Upon consolidation, this amount is eliminated.


(b)

The increase in transmission costs reflects a rate increase, which became effective on January 1, 2006, and an increase in the volume of transmitted electricity over 2005.


Electric maintenance expense


For the three months ended March 31, 2006, electric maintenance expense increased $0.2 million compared to the same period in the prior year.


Electric depreciation expense


Depreciation expense at the electric segment increased by $0.3 million for the three months ended March 31, 2006, when compared to the same period in the prior year. This increase is related to higher levels of electric assets.


Gas Utility Operations


Gas deliveries and revenues


The following table compares MGE's gas retail revenues and gas delivered by customer class during each of the three months ended March 31:


 

Revenues

Deliveries

(In thousands)

2006

2005

% Change

2006

2005

% Change

Residential


$47,482

$42,469

11.8%

38,329

43,223

(11.3%)

Commercial/industrial


34,630

30,186

14.7%

32,268

36,457

(11.5%)

Total retail


82,112

72,655

13.0%

70,597

79,680

(11.4%)

Gas transportation


901

951

(5.3%)

13,777

15,777

(12.7%)

Other revenues


2,096

741

182.9%

   

Total


$85,109

$74,347

14.5%

84,374

95,457

(11.6%)

Heating degree days

(normal 3,478)


   


3,156


3,405


(7.3%)


Gas revenues increased $10.8 million or 14.5% for the three months ended March 31, 2006. These changes are related to the following factors:



(In millions)

Three months ended

March 31, 2006

Gas costs/rates


$17.9

Gas deliveries


(8.4)

Transportation and other effects


1.3

Total


$10.8

Average rate per therm of residential customers


$1.24


Gas costs/rates. The average retail rate per therm for the three months ended March 31, 2006, increased 27.8% compared to 2005. This increase is primarily a result of rising gas costs.


Retail gas deliveries. The 11.4% decrease in retail gas deliveries for the three months ended March 31, 2006, was mainly a result of warmer temperatures reflected by a 7.3% decrease in the number of heating degree days during the quarter compared to last year's first quarter.


Transportation and other revenues. Other revenues increased a total of $1.3 million due to increased income from the GCIM and other miscellaneous decreases. For the three months ended March 31, 2006, as a result of certain opportunity sales, additional income was earned under the capacity incentive mechanism


Natural gas purchased


For the three months ended March 31, 2006, natural gas purchased increased by $9.6 million. The increase in the natural gas purchased was the result of a 27.0% increase in the market price of natural gas, which resulted in an increase of $13.5 million. This increase was partially offset by a decrease in the volume of gas purchased ($3.9 million).


Gas operating expenses


Gas operating expenses increased $0.4 million for the three months ended March 31, 2006, compared to the same period a year ago. The following changes contributed to the net change in gas operating expense for the year:


(In millions)

2006

Increased production costs


$0.1

Increased distribution costs


0.1

Increased customer services, promotions, account costs


0.1

Increased other administrative and general expenses


0.1

Total gas operating expenses


$ 0.4


Gas maintenance expense


Gas maintenance expense decreased by $0.2 million for the three months ended March 31, 2006, compared to the same period in the prior year. This decrease relates to decreases in distribution maintenance projects.


Gas depreciation expense


Gas depreciation expense increased $0.1 million for the three months ended March 31, 2006, compared to the same period in the prior year. This increase is due to an increase in gas plant assets. At March 31, 2006, gross gas plant assets were $253.5 million, compared to $242.9 million at March 31, 2005.


Other Income (Loss)


Other income for the three months ended March 31, 2006, for the electric and gas segments was $0.4 million, compared to $0.1 million for the same period in the prior year. During 2006, the gas and electric segments recognized a total of $0.1 million in AFUDC-equity and a $0.6 million gain on a heating degree collar (see Footnote 15 for further discussion). This income was offset by $0.2 million in losses in equity method investments and $0.1 million in miscellaneous expenses.


For the three months ended March 31, 2005, the gas and electric segments recognized a total of $0.1 million in AFUDC-equity funds and $0.1 million in miscellaneous income. This income was offset by $0.1 million in miscellaneous expenses recorded in the electric and gas segments.


Interest Expense


For the three months ended March 31, 2006, total interest expense for the electric and gas segments increased $0.5 million when compared to the same period in the prior year. For the three months ended March 31, 2006, there was a $0.3 million increase in interest expense on short-term debt at the electric and gas segments as a result of increased levels of short-term debt and a $0.2 million increase in interest expense on long-term debt at the electric and gas segments.


Nonregulated Energy Operations


Nonregulated Energy operating revenues


Operating revenues from nonregulated energy operations were $4.7 million for the three months ended March 31, 2006. This amount includes $3.8 million in interdepartmental revenues related to a leasing arrangement between MGE and MGE Power West Campus which commenced on April 26, 2005. Upon consolidation, these interdepartmental revenues are eliminated.


Also included in operating revenues is the recognition of revenues related to the carrying costs for MGE Power West Campus and MGE Power Elm Road. MGE received approval from the PSCW to collect approximately $12.1 million in carrying costs incurred by MGE Power West Campus during construction of the WCCF facility. MGE is collecting these costs in rates over a period of ten years. A portion of this amount is being recognized over the period recovered in rates and a portion is being recognized over the period in which the facility is being depreciated (40 years). For the three months ended March 31, 2006, MGE Power West Campus recognized $0.2 million related to carrying costs on the WCCF. Additionally, for the three months ended March 31, 2006, MGE Power West Campus recorded $0.1 in revenues related to management and demolition and removal fees.


MGE also received approval from the PSCW to collect approximately $52.8 million in carrying costs expected to be incurred by MGE Power Elm Road during construction of the Elm Road project. A portion of this amount is being recognized over the period recovered in rates ($36.0 million) and a portion is being deferred and will be recognized over the period in which the facility is depreciated ($16.8 million). For the three months ended March 31, 2006, MGE Power Elm Road recognized $0.6 million related to carrying costs on the Elm Road project.


Nonregulated Energy operations and maintenance expense


For the three months ended March 31, 2006, other operations and maintenance expense increased $0.1 million, when compared to the same period in the prior year. This increase is primarily related to higher administrative and general expenses at MGE Power West Campus.


Nonregulated Energy depreciation expense


Depreciation expense began when the WCCF commenced operation on April 26, 2005, and was $0.7 million for the three months ended March 31, 2006.


Nonregulated Energy interest expense, net


For the three months ended March 31, 2006, interest expense, net at the nonregulated energy operations segment increased 100% or $0.7 million, compared to the same period in the prior year. Interest expense at the nonregulated energy segment for the three months ended March 31, 2006, represents interest expense on the long-term borrowings incurred by MGE Power West Campus. On September 30, 2003, MGE Power West Campus issued $30 million of 5.68% senior secured notes maturing September 25, 2033 and on October 27, 2005, issued $20.0 million of 5.19% senior secured notes due September 25, 2033. Interest expense for the three months ended March 31, 2006, related to these borrowings was $0.7 million.


Also included in the nonregulated interest expense is interdepartmental interest expense and capitalized interest at MGE Power Elm Road. During the three months ended March 31, 2006, MGE Power Elm Road was charged $0.3 million in interest expense by Corporate on funds borrowed for the Elm Road Project. This expense is eliminated upon consolidation. The interest expense at MGE Power Elm Road is offset by $0.3 million in capitalized interest. Under the provisions of SFAS 34, MGE Power Elm Road is capitalizing interest on the Elm Road Project.


During construction of the WCCF, MGE Power West Campus recorded capitalized interest in accordance with the provisions of SFAS 34. As such, during the three months ended March 31, 2005, $0.6 million in capitalized interest was recognized as an offset to interest expense. On April 26, 2005, when the electric generation facilities of WCCF began generating electricity, MGE Power West Campus discontinued the capitalization of interest, as the project was deemed to be substantially complete.


Transmission Investment Operations


Transmission Investment other income (loss)


For the three months ended March 31, 2006, other income at the transmission investment segment was $1.3 million, compared to $1.2 million for the same period in the prior year. The transmission investment segment holds our interest in ATC, and its income reflects our equity in the earnings of ATC.


All Other Nonregulated Operations


All Other nonregulated revenues


During the three months ended March 31, 2006, the all other segment did not generate any nonregulated revenues. However, MGE Construct received service fees of $0.7 million from the State for the three months ended March 31, 2005. The service fees earned related to MGE Construct's role as EPC contractor for WCCF. This amount was classified as nonregulated revenue within MGE Energy's financial statements. The total fee of $5.0 million had been recognized at December 31, 2005. This amount was recognized as services were rendered and was collected over a 22-month period.


All Other operations and maintenance expense


All other operations and maintenance expense for the three months ended March 31, 2006, was comparable to that for the three months ended March 31, 2005. Namely, for both periods operations and maintenance expense for the all other segment was $0.1 million. These expenses primarily relate to general and administrative expenses at corporate.


All Other interest income (expense)


All other interest income for the three months ended March 31, 2006, was $0.1 million. This interest income represents interdepartmental interest income from MGE Power Elm Road. This income is eliminated upon consolidation.


Consolidated Other General Taxes


MGE Energy and MGE's other general taxes increased $0.5 million or 13.5% in 2006 primarily because MGE's license fee tax increased. The annual license fee tax expense is based on adjusted operating revenues of the prior year. Tax rates have not increased.


Consolidated Income Taxes


MGE Energy's effective income tax rate is 38.5% for March 31, 2006, compared to 39.1% in 2005. This decrease is primarily attributable to the domestic manufacturing tax deduction provided by the American Jobs Creation Act of 2004 and an increase in the Medicare Part D federal subsidy, which is not taxable.


Minority Interest, Net of Tax


For the three months ended March 31, 2006, MGE Energy (through its wholly owned subsidiary MGE Power) had earned $1.9 million and $0.4 million, net of tax, for its interest in MGE Power West Campus and MGE Power Elm Road, respectively. Additionally, MGE Energy had earned $0.1 million, net of tax for its interest in MGE Transco. These amounts are recorded as minority interest expense, net of tax, on MGE's Consolidated Statement of Income.


Contractual Obligations and Commercial Commitments - MGE Energy and MGE


There were no material changes, other than from the normal course of business, to MGE Energy's and MGE's contractual obligations (representing cash obligations that are considered to be firm commitments) and commercial commitments (representing commitments triggered by future events) during the three months ended March 31, 2006. Further discussion of the contractual obligations and commercial commitments is included in Footnote 13 of this filing and in MGE Energy's and MGE's annual reports on Form 10-K for the year ended December 31, 2005.


Liquidity and Capital Resources


Cash Flows


The following summarizes cash flows during the three months ended March 31, 2006 and 2005, respectively:


 

MGE Energy

MGE

(In thousands)

2006

2005

2006

2005

Cash provided by/(used for):

    

Operating activities


$40,722

$37,490

$36,766

$35,998

Investing activities


(15,218)

(5,834)

(15,218)

(5,709)

Financing activities


(23,891)

(30,647)

(20,790)

(29,083)


Cash Provided by Operating Activities


MGE Energy


MGE Energy's consolidated net cash provided by operating activities is derived mainly from the electric and gas operations of its principal subsidiary, MGE.


Cash provided by operating activities increased $3.2 million for the three months ended March 31, 2006, when compared to the same period in the prior year. This increase is partially attributable to a $3.3 million increase in net income between the periods. Also, during the period, MGE billed $5.1 million (net of $0.1 million returned to customers in March 2006) in electric rates which, pursuant to an interim order issued by the PSCW, is required to be refunded to customers. This credit was recorded as a reduction to other electric revenues in the consolidated income statement of MGE Energy for the three months ended March 31, 2006, and is shown as a non-cash adjustment to net income on the consolidated statement of cash flows of MGE Energy. Depreciation expense increased $1.1 million between the periods primarily as a result of depreciation related to WCCF.


For the three months ended March 31, 2006, current assets decreased $23.9 million compared to $22.3 million for the three months ended March 31, 2005. The decrease in current assets for the three months ended March 31, 2006, is primarily attributable to a decrease in stored natural gas inventory, unbilled revenues, trade receivables, and prepaid taxes. Additionally, during the three months ended March 31, 2006, MGE Construct collected $2.4 million of the retainage receivable from the State under the EPC agreement related to the construction of the WCCF. These decreases are slightly offset by increases in materials and supplies, fossil fuel, and other prepayments.


Current liabilities decreased $5.9 million for the three months ended March 31, 2006, compared to a $1.1 million increase for the three months ended March 31, 2005. This change is primarily attributable to the change in the costs of purchased gas and a change in the deferred credits balance. These deferred credits are related to our purchased gas account and are recognized based on projected gas sales volumes in accordance with the PGA clause.


Cash outflows related to other non-current items, net were $0.1 million for the three months ended March 31, 2006, compared to $0.7 million in the three months ended March 31, 2005.


During the three months ended March 31, 2005, MGE began recovering in electric rates the costs associated with the lease payment for the West Campus Cogeneration plant. These amounts were deferred on MGE Energy's balance sheet until the lease term commenced. At March 31, 2005, $2.5 million was collected from ratepayers and included in operating activities.


MGE


Cash provided by operating activities was $36.8 million for the three months ended March 31, 2006, compared to $36.0 million for three months ended March 31, 2005. This increase is attributable to a $1.2 million increase in net income between the periods. Also, during the period, MGE billed $5.1 million (net of $0.1 million returned to customers in March 2006) in electric rates which, pursuant to an interim order issued by the PSCW, is required to be refunded to customers. This credit was recorded as a reduction to other electric revenues in the consolidated income statement of MGE for the three months ended March 31, 2006, and is shown as a non-cash adjustment to net income on the consolidated statement of cash flows of MGE. Depreciation expense increased $1.1 million between the periods primarily as a result of depreciation related to WCCF. During the three months ended March 31, 2006, $2.4 million in minority interest, net of tax was recorded. This amount relates to net income earned by MGE Energy from its interest in MGE Power West Campus, MGE Power Elm Road, and MGE Transco.


For the three months ended March 31, 2006, current assets decreased $21.6 million compared to $24.2 million for the three months ended March 31, 2005. The decrease in current assets for the three months ended March 31, 2006, is primarily attributable to a decrease in stored natural gas inventory, unbilled revenues, trade receivables, and prepaid taxes. These decreases are slightly offset by increases in materials and supplies, fossil fuel, and other prepayments.


Current liabilities decreased $5.1 million for the three months ended March 31, 2006, compared to $1.9 million for the three months ended March 31, 2005. This change is primarily attributable to the change in the costs of purchased gas and a change in our deferred credits balance. These credits represent deferred credits related to our purchased gas account and are recognized based on projected gas sales volumes in accordance with the PGA clause.


Cash outflows related to other non-current items, net were $0.1 million for the three months ended March 31, 2006, compared to $0.7 million in the three months ended March 31, 2005.


During the three months ended March 31, 2005, MGE began recovering in electric rates the costs associated with the lease payment for the West Campus Cogeneration plant. These amounts were deferred on MGE's balance sheet until the lease term commenced. At March 31, 2005, $2.5 million was collected from ratepayers and included in operating activities.


Cash Used for Investing Activities


MGE Energy


In the three months ended March 31, 2006, MGE Energy's cash used for investing activities increased $9.4 million. Capital expenditures for the three months ended March 31, 2006, were $17.4 million. This amount represents a $2.2 million decrease from those made in the same period in the prior year. Capital expenditures related to WCCF decreased $8.9 million for the three months ended March 31, 2006, compared to the same period in the prior year, reflecting the substantial completion of that project. This decrease was slightly offset by additional MGE utility plant additions ($1.3 million) and the construction activity for Elm Road ($5.4 million). During the three months ended March 31, 2006, MGE Transco made a $0.7 million capital contribution to ATC. No such contributions were made in 2005. Dividend income received from ATC was $0.9 million during the three months ended March 31, 2006, compared to $0.8 million during the three months ended March 31, 2005. In the first quarter 2005, MGE collected $13.0 million in funds previously advanced to ATC in conjunction with the WCCF project. No additional funds were advanced to ATC directly during 2005; however, funds were indirectly advanced. Namely, during the three months ended March 31, 2006, in connection with the Elm Road project, MGE Power Elm Road advanced $0.2 million in funds to WEPCO, who in turn provided these funds to ATC. These funds will be used by ATC for transmission system upgrades related to the Elm Road project. These funds are expected to be repaid in full. During the three months ended March 31, 2006, there was a $2.2 million decrease in the restricted cash account, compared to a $0.2 million decrease for the same period in the prior year. This change is primarily attributable to a change in the balance required to be held in margin accounts.


MGE


Cash used for investing activities was $15.2 million for the three months ended March 31, 2006, compared to $5.7 million in the same period in the prior year. Capital expenditures for the three months ended March 31, 2006, were $17.4 million. This amount represents a $2.2 million decrease from those made in the same period in the prior year. Capital expenditures related to WCCF decreased $8.9 million for the three months ended March 31, 2006, compared to the same period in the prior year, reflecting the substantial completion of that project. This decrease was slightly offset by additional MGE utility plant additions ($1.3 million) and the construction activity for Elm Road ($5.4 million). During the three months ended March 31, 2006, MGE Transco made capital contributions to ATC totaling $0.7 million. Dividend income from ATC for the three months ended March 31, 2006, was $0.9 million, compared to $0.8 million for the same period in the prior year. In the first quarter of 2005, MGE collected $13.0 million in funds previously advanced to ATC in conjunction with the WCCF project. No additional funds were advanced to ATC directly during 2005; however, funds were indirectly advanced. Namely, during the three months ended March 31, 2006, in connection with the Elm Road project, MGE Power Elm Road advanced $0.2 million in funds to WEPCO, who in turn provided these funds to ATC. These funds will be used by ATC for transmission system upgrades related to the Elm Road project. These funds are expected to be repaid in full.


Cash Used for Financing Activities


MGE Energy


Cash used for MGE Energy's financing activities was $23.9 million for the three months ended March 31, 2006, compared to $30.6 million for the three months ended March 31, 2005. For the three months ended March 31, 2006, net short term debt repayments were $17.5 million compared to $24.5 million for the same period in the prior year. MGE Energy did not issue any additional stock during the three month period ended March 31, 2006. However, $2.3 million in cash proceeds were received under the Stock Plan during the three months ended March 31, 2005. Cash dividends paid for the three months ended March 31, 2006, and March 31, 2005, were $7.1 million and $7.0 million, respectively. The cash dividends for the three months ended March 31, 2006, were higher than those paid for the three months ended March 31, 2005, as result of a higher dividend per share ($0.345 vs. $0.342) and an increase in the number of shares outstanding. At December 31, 2005, MGE Energy held $0.1 million of treasury stock that had been purchased on the open market. During the three months ended March 31, 2006, these shares were distributed to participants of the Stock Plan. No treasury stock was purchased by MGE Energy during the three months period ended March 31, 2006. For the three month period ended March 31, 2005, $0.2 million in treasury stock was purchased (net).


Cash provided by cash overdrafts was $0.5 million for the three months ended March 31, 2006, compared to cash used for overdrafts of $1.2 million for the three months ended March 31, 2005.


MGE


During the three months ended March 31, 2006, cash used for MGE's financing activities was $20.8 million compared to cash provided by financing activities of $29.1 million in the same period in the prior year. For the three months ended March 31, 2006, and March 31, 2005, net short term debt repayments were $17.5 million and $28.8 million, respectively. Cash dividends paid from MGE to MGE Energy for the three months ended March 31, 2006, were $6.5 million. During this same period, cash dividends of $3.3 million were paid by MGE Power West Campus to MGE Energy. These cash outflows were offset by $2.7 million in equity contributions received by MGE Power West Campus, MGE Power Elm Road, and MGE Transco from MGE Energy. These amounts are included in minority interest on the MGE consolidated balance sheet. Additionally, for the three months ended March 31, 2006, $3.4 million in affiliate financing was received by MGE Power Elm Road. These funds were used to finance the Elm Road project. Cash provided by other financing activities was $0.4 million for the three months ended March 31, 2006.


Dividend payments by MGE to MGE Energy are subject to restrictions arising under a PSCW rate order and, to a lesser degree, MGE's First Mortgage Bonds. MGE has covenanted with the holders of its First Mortgage Bonds not to declare or pay any dividend or make any other distribution on or purchase any shares of its common stock unless, after giving effect thereto, the aggregate amount of all such dividends and distributions and all amounts applied to such purchases, after December 31, 1945, shall not exceed the earned surplus (retained earnings) accumulated subsequent to December 31, 1945.


Capitalization Ratios


MGE Energy's capitalization ratios were as follows:


 

MGE Energy

 

March 31,

2006

Dec. 31,

2005

Common shareholders' equity


54.8%

53.0%

Long-term debt


35.0%

34.3%

Short-term debt


10.2%

12.7%


MGE Energy's and MGE's Capital Requirements


MGE Energy's and MGE's liquidity are primarily affected by their capital requirements. During the three months ended March 31, 2006, capital expenditures for MGE Energy and MGE totaled $17.4 million, which included $5.4 million of capital expenditures for Elm Road, $0.8 million of capital expenditures for MGE Power West Campus, and $11.2 million of capital expenditures for utility operations.


As of March 31, 2006, MGE Energy's and MGE's remaining capital commitments related to WCCF are estimated to be $1.0 million. MGE Power Elm Road's remaining capital commitments for Elm Road are estimated to be $140.0 million. Based on current forecasts, capital costs for this project will be $23.9 million in 2006 (excludes spending as of March 31, 2006), $50.1 million in 2007, $42.1 million in 2008, $20.4 million in 2009, and $3.5 million in 2010. These amounts may change as a result of modifications to the project estimate or timing differences. MGE Power Elm Road plans to finance this project primarily through funds received from MGE Energy. MGE Energy expects that these funds will be raised from the sale of securities (via the Stock Plan), short-term debt and normal operations. MGE Energy expects to begin issuing new shares of common stock to satisfy the Stock Plan in the second quarter of 2006.


Total 2006 capital expenditures will be approximately $82.2 million. These capital expenditures are expected to be funded by internally generated funds, short-term debt, and from the sale of securities (via the Stock Plan).


The following table shows MGE's current credit ratings. MGE Energy is not yet rated because it has not issued any debt securities.


 

Standard & Poor's

Moody's

First Mortgage Bonds


Unsecured Medium Term Notes


Commercial Paper


AA

AA-

A1+

Aa2

Aa3

P1


MGE's access to the capital markets, including the commercial paper market and its financing costs in those markets, is dependent on its securities' ratings. None of MGE's borrowings is subject to default or prepayment due to downgrading of securities' ratings, although MGE's future interest expense may be affected by a change in those ratings.


Nonregulated Energy Outlook


Elm Road


On November 4, 2005, MGE Power Elm Road closed on the exercise of an option to acquire an undivided 8.33% ownership interest in each of two 615 MW advanced technology, coal-fired generating units being constructed by We Energies in Oak Creek, Wisconsin. On that date, MGE Power Elm Road also made its initial payment for construction costs. MGE Power Elm Road's estimated share of capital costs for its 8.33% ownership interest in both units is approximately $170 million, which it intends to finance primarily through funds received from MGE Energy. MGE Energy expects that these funds will be raised through the sale of securities (via the Stock Plan), short-term debt, and normal operations. At March 31, 2006, MGE Power Elm Road had incurred $29.6 million (excluding capitalized interest) of costs on the project, which is reflected in the Construction Work In Progress balance on MGE and MGE Energy's condensed consolidated balance sheets. Of this amount, $1.9 million has not yet been paid.


On November 4, 2005, MGE Energy and its subsidiaries entered into various agreements, including a facility lease agreement. This facility lease agreement is between MGE Power Elm Road (a nonregulated subsidiary of MGE Energy) and MGE. The financial terms of the facility lease include a capital structure of 55% equity and 45% long-term debt, and return on equity of 12.7%, a lease term of 30 years, and a 5% rent reduction in the first five years.


On November 1, 2005, MGE received approval from the PSCW to defer payments made to MGE Power Elm Road for carrying costs during construction of the facility, management fees, and community impact mitigation costs. MGE estimates total carrying costs to be approximately $52.8 million. This amount is expected to be collected over multiple years. Of these costs, $16.8 million is estimated to relate to the capitalized interest and the debt portion of the facility. These costs will be deferred and recognized over the period in which the facility will be depreciated. The remaining $36.0 million is estimated to represent the equity portion and is being recognized over the period recovered in rates. MGE expects to begin collecting the management fees and community impact mitigation costs in rates in 2008. These costs are expected to be collected over a four year period. MGE began collecting carrying costs in rates in 2006. As of March 31, 2006, $0.9 million had been collected. Of this amount, $0.3 million relates to the debt portion and was reflected as deferred revenue on the MGE financial statements. As mentioned, this amount will be recognized over the period in which the facility is depreciated. The remaining $0.6 million relates to the equity portion and was recognized as nonregulated revenues.


Business and Regulatory Environment


Wind Power Purchase Agreement


On July 16, 2004, MGE signed a 20-year power purchase agreement with a developer for 40 MW of wind energy to be located near Waupun, Wisconsin. The developer has experienced problems with obtaining site-related permits, and construction has not yet begun. In late March 2006, the developer claimed force majeure as a result of issues associated with obtaining these permits. As a result, the obligations associated with the power purchase agreement are presently indeterminate. Accordingly, this agreement is not reflected in the purchased power commitments figures.


Blount Generating Station


On January 19, 2006, MGE announced a plan subject to certain conditions, that includes discontinuing coal use at the end of 2011 at Blount. The plant is capable of burning coal and natural gas. The plant will continue to run on natural gas but will be reduced from its current approximate 190 MW capacity to 100 MW when coal burning is discontinued. MGE anticipates full regulatory recovery of the costs associated with the discontinuance of the use of coal at Blount. See Footnote 14 for further discussion.


Regulatory Issues - Transmission


On April 1, 2005, the Midwest ISO implemented its bid-based energy market. Midwest ISO, a FERC approved RTO, is required to provide real-time energy services and a market-based mechanism for congestion management. This market-based platform for valuing transmission congestion is premised upon the LMP system that has been implemented in other states.


MGE received FTRs through the Midwest ISO allocation process. The Midwest ISO has also made available additional FTRs through an auction-based system run by the Midwest ISO. See Footnote 16 for further discussion.


New Accounting Principles


FSP No. FIN 46(R)-6


In April 2006, the FASB  issued FASB  Staff Position No. FIN 46(R)-6, Determining the Variability to Be Considered in Applying FASB  Interpretation No. 46(R), (FSP No. 46(R)-6). This pronouncement provides guidance on how a reporting enterprise should determine the variability to be considered in applying FASB  interpretation No. 46 (revised December 2003), Consolidation of Variable Interest Entities, which could impact the assessment of whether certain variable interest entities are consolidated. FSP No. 46(R)-6 will be effective for MGE and MGE Energy on July 1, 2006. The provisions of FSP No. 46(R)-6 are applied prospectively. The impact on MGE and MGE Energy in periods subsequent to the effective date is dependent on transactions that could occur in future periods, and therefore cannot be determined until the transaction occurs.


FIN 46(R)


In January 2003, the FASB  issued FIN 46, Consolidation of Variable Interest Entities - an Interpretation of ARB No. 51. In December 2003, the FASB  issued the updated and final interpretation FIN 46(R). FIN 46(R) requires that an equity investor in a VIE have significant equity at risk (generally a minimum of 10%, which is an increase from 3% required under the previous guidance) and hold a controlling interest, evidenced by voting rights, and absorb a majority of the entity's expected losses, receive a majority of the entity's expected returns, or both. If the equity investor is unable to evidence these characteristics, the entity that retains these ownership characteristics will be required to consolidate the VIE as the primary beneficiary. FIN 46 was applicable immediately to VIEs created or obtained after January 31, 2003. FIN 46(R) was effective on December 31, 2003, for interests in entities that were previously considered special-purpose entities under then existing authoritative guidance.


MGE Power West Campus and MGE Power Elm Road are VIEs pursuant to FIN 46(R), as the equity investment was not sufficient to permit the entity to finance its activities without additional support. MGE concluded a VIE relationship exists between it and these entities due to the long-term lease arrangements between MGE and MGE Power West Campus and MGE and MGE Power Elm Road. MGE Power West Campus and MGE Power Elm Road will lease a major portion of their assets, a power plant and an undivided interest in a power plant, to MGE, pursuant to these leasing arrangements, and MGE will absorb a majority of the expected losses, residual returns, or both.


FIN 46(R) also requires MGE to assess whether the participants within its Shared Savings program constitute VIEs in which MGE might be considered to be the consolidating entity. MGE has reviewed 84.6% of the total Shared Savings program balance and has determined that the provisions of FIN 46(R) are not applicable via the "business scope exception." For the remaining 15.4% of the total Shared Savings program balance, MGE has not performed this assessment. These entities are not legally obligated to provide the financial information to MGE that is necessary to determine whether MGE must consolidate these entities. MGE will continue to attempt to obtain information from these customers in order to determine whether they should be consolidated by MGE.


SFAS No. 156


In March 2006, the FASB  issued SFAS No. 156, Accounting for Servicing of Financial Assets, an amendment of SFAS No. 140. SFAS No. 156 simplifies the accounting for servicing rights and reduces the volatility that results from the use of different measurement attributes for servicing rights and the related financial instruments used to economically hedge risks associated with those servicing rights. SFAS No. 156 also clarifies when to separately account for servicing rights, requires these rights to be initially measured at fair value, and provides the option to subsequently account for those servicing right (by class) at either fair value or under the amortization method previously required under SFAS No. 140. SFAS No. 156 is effective for the fiscal year beginning after September 15, 2006. Early adoption is permitted as of the beginning of the entity's fiscal year. MGE will not early adopt this statement and does not expect this statement to have a material impact on MGE Energy or MGE's consolidated financial statements.


Item 3. Quantitative and Qualitative Disclosures About Market Risk.


MGE Energy and MGE are potentially exposed to market risk associated with interest rates, commodity prices, weather, and equity returns. MGE currently has no exposure to foreign currency risk. MGE manages some risk exposure through risk management policies and uses derivative instruments. MGE's market risk has not changed between 2005 and 2006. MGE does not enter into speculative trading transactions.


Weather Risk


MGE's sales forecasts, used to establish rates, are set by the PSCW based upon estimated temperatures, which approximate 20-year averages. MGE's electric revenues are sensitive to the summer cooling season and, to some extent, to the winter heating season. A significant portion of MGE's gas system demand is driven by heating. MGE's gas margin (revenues less gas purchased) is collected under a combination of fixed and volumetric rates set by the PSCW based on "normal weather." As a result of weather-sensitive demand and volumetric rates, a portion of MGE's gas margin is at risk for warmer-than-normal weather. MGE may use weather derivatives, pursuant to its risk management program, to reduce the impact of weather volatility on its gas margin.


On October 17, 2005, MGE entered into a non-exchange traded weather derivative. This agreement extended from January 2006 until March 2006 and had a premium of $0.1 million. Additionally, any payment or receipt under this agreement was limited to $0.6 million. The Company is accounting for the HDD Collar using the intrinsic value method pursuant to the requirements of EITF No. 99-2, Accounting for Weather Derivatives. Through March 31, 2006, actual HDD were 3,175, resulting in a $0.6 million gain for MGE.


A summary of actual weather information in the utility segment's service territory during 2006 and 2005 as measured by degree days, may be found in Results of Operations.


Commodity Price Risk


MGE has commodity price risk exposure with respect to the price of natural gas, electricity, coal, and oil. MGE employs established policies and procedures to reduce the market risks associated with changing commodity prices, including the use of commodity and financial instruments (see Footnote 15 of the Notes to Consolidated Financial Statements). MGE's commodity risks are somewhat mitigated by the current ratemaking process in place for recovering electric fuel, purchased energy, and the cost of natural gas purchased for resale. MGE's electric fuel costs are subject to fuel rules established by the PSCW, which further mitigate commodity risk. Under the PGA authorized by the PSCW, MGE passes through to customers the cost of gas, subject to certain limited incentives. Effective January 1, 2006, the PSCW modified MGE's fuel rules bandwidth to a range of -.5% to +2.0%. MGE may be required to refund to customers if its actual electric fuel costs are lower than 99.5% of the projected electric fuel costs in its most recent rate case, and would be allowed to request a surcharge if its actual electric fuel costs are higher than 102% of the projected electric fuel costs in its most recent rate case.


Under the fuel rules, MGE may include the costs and benefits of fuel price risk management tools implemented under a risk management plan approved by the PSCW. In 2005, the PSCW extended its conditional approval of MGE's Electric Procurement Risk Management Program through December 31, 2006.


MGE has a limited number of financial gas commodity contracts. These contracts are primarily comprised of exchange-traded option contracts to manage the cost of gas and over-the-counter financial floating-to-fixed price swaps and calls for the "Winter Set-Price Firm Gas Sales Service" pilot program. The derivative amounts recorded as a result of these gas contracts are offset with a corresponding regulatory asset or liability because these transactions are part of the PGA and not subject to incentive participation.


Interest Rate Risk


Both MGE and MGE Energy have short term borrowings at varying interest rates. MGE issues commercial paper for its short-term borrowings, while MGE Energy draws from its current credit facility to meet its short term borrowing needs. Borrowing levels vary from period to period depending upon capital investments and other factors. Future short-term interest expense and payments will reflect both future short-term interest rates and borrowing levels. MGE Energy and MGE manage interest rate risk by limiting their variable rate exposure and continually monitoring the effects of market changes on interest rates. MGE is not exposed to changes in interest rates on a substantial portion of its long-term debt until that debt matures and is refinanced at market rates.


Equity Price Risk - Pension-Related Assets


MGE currently funds its liabilities related to employee benefits through trust funds. These funds, which include investments in debt and equity securities, are managed by various investment managers. Changes in market value of these investments can have an impact on the future expenses related to these liabilities. MGE's risk of expense and annuity payments, as a result of changes in the market value of the trust funds, is mitigated in part through future rate actions by the PSCW.


Construction Risk


On November 4, 2005, MGE Power Elm Road closed on the exercise of an option to acquire an undivided 8.33% ownership interest in each of two 615 MW advanced technology, coal-fired generating units being constructed by We Energies in Oak Creek, Wisconsin. The PSCW previously issued an order that approves key financial terms of the leased generation contracts including fixed construction cost of the two Elm Road units.


Large construction projects of this type are subject to usual construction risks over which we will have limited or no control and which might adversely affect project costs and completion time. These risks include, but are not limited to, shortages of, the inability to obtain or the cost of labor or materials, the inability of the general contractor or subcontractors to perform under their contracts, strikes, adverse weather conditions, the inability to obtain necessary permits in a timely manner and changes in applicable laws or regulations, governmental actions and events in the global economy. If the final costs for the construction of the Elm Road units exceed the fixed costs allowed in the PSCW order, this excess cannot be recovered from MGE or its customers unless specifically allowed by the PSCW. Project costs above the authorized amount, but below the 5% cap will be subject to a prudence determination by the PSCW.


The start of construction was delayed by litigation. Thus, We Energies estimates that project costs will increase. MGE Power Elm Road's estimated share of the increase is approximately $4.0 million. This represents an increase of approximately 2.4% in the total cost of the project. We Energies believes these costs are ultimately recoverable under the terms of the lease agreements, however, recovery is subject to final calculation of costs and also to review and approval by the PSCW.


In September 2003, several parties filed a request with the Wisconsin Department of Natural Resources (WDNR) for a contested case hearing in connection with the application to the WDNR for a Chapter 30 permit for wetlands and waterways alterations and construction on the bed of Lake Michigan for the construction of the Oak Creek expansion. That request was granted and assigned to an administrative law judge. The hearing took place in August 2004 and in November 2004, the administrative law judge approved the WDNR's issuance of the Chapter 30 permit for the Oak Creek expansion. In December 2004, opponents filed a petition for review of the decision in Dane County Circuit Court. In March 2005, the court dismissed the appeal. The opponents appealed the court's dismissal to the Wisconsin Court of Appeals. In February 2006, the Wisconsin Court of Appeals affirmed the lower court's dismissal of the case. The time for Petitioners to request Supreme Court review has expired, and no petition for review has been filed.


We Energies applied to the WDNR to modify the existing Wisconsin Pollution Discharge Elimination System (WPDES) permit that is required for operation of the water intake and discharge system for the planned Oak Creek expansion and existing Oak Creek generating units. In March 2005, the WDNR determined that the proposed cooling water intake structure and water discharge system meets regulatory requirements and reissued the WPDES permit with specific limitations and conditions. The opponents filed a petition for judicial review in Dane County Circuit Court and a request for a contested case proceeding with the WDNR. In September 2005, the judicial review proceeding in Dane County Circuit Court was dismissed. All parties to this action agreed to the dismissal. The WDNR granted a contested case hearing. The contested case hearing was held on March 7-9, 2006. The remaining issues are currently being briefed by the parties. A final decision is anticipated in the second or third quarter of 2006.


In May 2005, We Energies received the Army Corps of Engineers federal permit necessary for the construction of the Oak Creek expansion. Opponents may appeal the permit in federal court.


Regulatory Recovery Risk


MGE's electric operations burn natural gas in several of its peak power plants or as a supplemental fuel at several coal-fired plants and, in many cases, the cost of purchased power is tied to the cost of natural gas. MGE bears significant regulatory risk for the recovery of such fuel and purchased power costs when they are higher than the base rate established in its current rate structure.


As noted above in Commodity Price Risk, the electric operations of MGE operate under a "fuel rules" adjustment clause for fuel and purchased power costs associated with the generation and delivery of electricity. This clause establishes a base rate for fuel and purchased power. Effective January 1, 2006, the modified PSCW fuel rules provide that MGE may have to provide a fuel credit to its customers if the actual electric fuel cost is less than 99.5% of the electric fuel costs allowed in the latest rate order. Conversely, MGE can apply for a fuel surcharge if actual electric fuel costs exceed 102% of the electric fuel costs allowed in that order.


During the three months ended March 31, 2006, an interim fuel credit of $0.00069 per kWh, or $1.8 million, was put in place as a result of lower than expected fuel costs for January 2006. Additionally, as a result of the subject to refund provisions established by the PSCW on March 9, 2006, a $3.4 million reduction to revenues was recorded. This amount is a result of lower than expected fuel costs for the months ended February 28 and March 31, 2006.


On January 19, 2006, MGE announced a plan to discontinue coal use at the end of 2011 at Blount. MGE anticipates full regulatory recovery of the costs associated with this plan. If such recovery is not awarded, this plan will either be substantially modified or terminated.


Credit Risk - Counterparty


Credit risk is the loss that may result from counterparty nonperformance. MGE is exposed to credit risk primarily through its merchant energy business. MGE uses credit policies to manage its credit risk, which includes utilizing an established credit approval process, monitoring counterparty limits, employing credit mitigation measures such as collateral or prepayment arrangements, and using netting agreements.


Due to the possibility of extreme volatility in the prices of energy commodities and derivatives, the market value of contractual positions with individual counterparties could exceed established credit limits or collateral provided by those counterparties. If such a counterparty were then to fail to perform its obligations under its contract (for example, fail to deliver the electricity MGE originally contracted for), MGE could sustain a loss that could have a material impact on its financial results.


Additionally, if a counterparty were to default and MGE were to liquidate all contracts with that entity, MGE's credit loss would include the loss in value of mark-to-market contracts; the amount owed for settled transactions; and additional payments, if any, to settle unrealized losses on accrual contracts.


MGE is obligated to provide service to all electric and gas customers within its respective franchised territories. As a result, MGE has a broad customer base.


Cash, cash equivalents, and customer accounts receivable are the financial instruments that potentially subject MGE Energy and MGE to concentrations of credit risk. MGE Energy and MGE place their cash and cash equivalents with high credit-quality financial institutions. MGE has limited concentrations of credit risk from customer accounts receivable because of the large number of customers and strong economy in its service territory.


Item 4. Controls and Procedures.


MGE Energy


During the first quarter of 2006, MGE Energy's management, including the principal executive officer and principal financial officer, evaluated its disclosure controls and procedures related to the recording, processing, summarization, and reporting of information in its periodic reports that it files with the SEC. These disclosure controls and procedures have been designed to ensure that material information relating to MGE Energy, including its subsidiaries, is accumulated and made known to MGE Energy's management, including these officers, by other employees of MGE Energy and its subsidiaries as appropriate to allow timely decisions regarding required disclosure, and that this information is recorded, processed, summarized, evaluated, and reported, as applicable, within the time periods specified in the SEC's rules and forms. Due to the inherent limitations of control systems, not all misstatements may be detected. These inherent limitations include the realities that judgments in decision making can be faulty and breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the control. Also, MGE Energy does not control or manage certain of its unconsolidated entities and thus, its access and ability to apply its procedures to those entities is more limited than is the case for its consolidated subsidiaries.


As of March 31, 2006, the principal executive officer and the principal financial officer concluded that MGE Energy's disclosure controls and procedures were effective to accomplish their objectives. MGE Energy intends to continually strive to improve its disclosure controls and procedures to enhance the quality of its financial reporting.


During the quarter ended March 31, 2006, there were no changes in MGE Energy's internal controls over financial reporting that materially affected, or are reasonably likely to materially affect, MGE Energy's internal control over financial reporting.


MGE


During the first quarter of 2006, MGE's management, including the principal executive officer and principal financial officer, evaluated its disclosure controls and procedures related to the recording, processing, summarization, and reporting of information in its periodic reports that it files with the SEC. These disclosure controls and procedures have been designed to ensure that material information relating to MGE, including its subsidiaries, is accumulated and made known to MGE's management, including these officers, by other employees of MGE as appropriate to allow timely decisions regarding required disclosure, and that this information is recorded, processed, summarized, evaluated, and reported, as applicable, within the time periods specified in the SEC's rules and forms. Due to the inherent limitations of control systems, not all misstatements may be detected. These inherent limitations include the realities that judgments in decision making can be faulty and breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the control. Also, MGE does not control or manage certain of its unconsolidated entities and thus, its access and ability to apply its procedures to those entities is more limited than is the case for its consolidated subsidiaries.


As of March 31, 2006, the principal executive officer and the principal financial officer concluded that MGE's disclosure controls and procedures were effective to accomplish their objectives. MGE intends to continually strive to improve its disclosure controls and procedures to enhance the quality of its financial reporting.


During the quarter ended March 31, 2006, there were no changes in MGE's internal control over financial reporting that materially affected, or are reasonable likely to materially affect, MGE's internal control over financial reporting.


PART II. OTHER INFORMATION.


Item 1. Legal Proceedings.


MGE Energy and MGE


MGE Energy and MGE from time to time are involved in various legal proceedings that are handled and defended in the ordinary course of business. While MGE Energy and MGE are unable to predict the outcome of these matters, management does not believe, based upon currently available facts, that the ultimate resolution of any of such proceedings would have a material adverse effect on their overall financial condition or results of operations except as disclosed in MGE Energy's and MGE's annual report on form 10-K for the year ended December 31, 2005.


Item 6. Exhibits.


10.1

First Amendment dated as of April 25, 2006, to Credit Agreement dated as of December 21, 2005, among MGE Energy, Inc., the Lenders party thereto, and JPMorgan Chase Bank, N.A., as Administrative Agent.


Certifications Pursuant to Rule 13a-14(a) and 15d-14(a) of the Securities and Exchange Act of 1934 as to the Quarterly Report on Form 10-Q for the quarter ended March 31, 2006, filed by the following officers for the following companies:


31.1

Filed by Gary J. Wolter for MGE Energy, Inc.

31.2

Filed by Terry A. Hanson for MGE Energy, Inc.

31.3

Filed by Gary J. Wolter for Madison Gas and Electric Company

31.4

Filed by Terry A. Hanson for Madison Gas and Electric Company


Certifications Pursuant to Section 1350 of Chapter 63 of Title 18 United States Code (Sarbanes-Oxley Act of 2002) as to the Quarterly Report on Form 10-Q for the quarter ended March 31, 2006, filed by the following officers for the following companies:


32.1

Filed by Gary J. Wolter for MGE Energy, Inc.

32.2

Filed by Terry A. Hanson for MGE Energy, Inc.

32.3

Filed by Gary J. Wolter for Madison Gas and Electric Company

32.4

Filed by Terry A. Hanson for Madison Gas and Electric Company


Signatures - MGE Energy, Inc.


Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.


 

MGE ENERGY, INC.

Date: May 8, 2006

/s/ Gary J. Wolter

 

Gary J. Wolter

Chairman, President and Chief Executive Officer

(Duly Authorized Officer)

Date: May 8, 2006

/s/ Terry A. Hanson

 

Terry A. Hanson

Vice President, Chief Financial Officer and Secretary

(Chief Financial and Accounting Officer)


Signatures - Madison Gas and Electric Company


Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.


 

MADISON GAS AND ELECTRIC COMPANY

Date: May 8, 2006

/s/ Gary J. Wolter

 

Gary J. Wolter

Chairman, President and Chief Executive Officer

(Duly Authorized Officer)

Date: May 8, 2006

/s/ Terry A. Hanson

 

Terry A. Hanson

Vice President, Chief Financial Officer and Secretary

(Chief Financial and Accounting Officer)