XML 86 R18.htm IDEA: XBRL DOCUMENT v2.4.1.9
Commitments and Contingencies
12 Months Ended
Dec. 31, 2014
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies

11. Commitments and Contingencies

Operating Leases - We lease certain PP&E under non-cancelable operating leases. Future minimum payments on operating leases with initial or remaining terms of one year or more at December 31, 2014, are as follows:

 

     Operating
Leases
 

2015

   $ 5,367   

2016

     4,474   

2017

     4,177   

2018

     3,909   

2019

     3,397   

Thereafter

     3,805   
  

 

 

 

Total minimum lease payments

$ 25,129   
  

 

 

 

Expenses associated with our operating lease agreements, including month-to-month leases, were $7,425,000 in 2014, $6,401,000 in 2013, and $6,830,000 in 2012. Renewal options are available under certain of the lease agreements for various periods at approximately the existing annual rental amounts.

Purchase and Sales Commitments - We have the following significant purchase and sales commitments.

Bayer Agreement - Subsidiaries within our Chemical Business, El Dorado Nitric Company and its subsidiaries (“EDN”) and EDC, are party to an agreement (the “Bayer Agreement”) with Bayer MaterialScience LLC (“Bayer”). EDN operates Bayer’s nitric acid plant (the “Baytown Facility”) located within Bayer’s chemical manufacturing complex. Under the terms of the Bayer Agreement, Bayer purchases from EDN all of Bayer’s requirements for nitric acid for use in Bayer’s chemical manufacturing complex located in Baytown, Texas that provides a pass-through of certain costs plus a profit. In addition, EDN is responsible for the maintenance and operation of the Baytown Facility. If there is a change in control of EDN, Bayer has the right to terminate the Bayer Agreement upon payment of certain fees to EDN. The Bayer Agreement expires in June 2021, with options for renewal.

Anhydrous ammonia purchase agreement - EDC is party to an anhydrous ammonia purchase agreement with Koch Nitrogen International Sarl (“Koch”). Under the agreement, Koch agrees to supply certain of EDC’s requirements of anhydrous ammonia through December 31, 2015. The terms of this agreement do not include minimum volumes or take-or-pay provisions.

UAN supply agreement – A subsidiary within our Chemical Business, Pryor Chemical Company (“PCC”), is party to a contract with Koch Nitrogen Company, LLC (“Koch Nitrogen”) under which Koch Nitrogen agrees to purchase and distribute at market prices substantially all of the urea ammonium nitrate (“UAN”) produced at the Pryor Facility through June 30, 2016, but either party has an option to terminate the agreement pursuant to the terms of the contract (PCC’s required notice of termination is three months and Koch Nitrogen’s required notice of termination is six months).

Natural gas gathering agreements – Zena owns approximately 12% working interest in certain natural gas properties but is not the operator of these properties. The operator of the natural gas wells developed on these properties has contractually agreed to deliver a minimum daily quantity of natural gas to a certain gathering and pipeline system through December 2026 to ensure capacity availability on that system. This gathering agreement effectively requires a daily minimum demand charge. As a result, Zena’s proportionate share of the annual minimum demand charges is approximately $8.9 million for the next five years and approximately $5.7 million thereafter for a total of approximately $14.6 million.

Other purchase and sales commitments - See Note 12 - Derivatives, Hedges, Financial Instruments and Carbon Credits for our commitments relating to derivative contracts and carbon credits at December 31, 2014. During 2014, certain subsidiaries within the Chemical Business entered into contracts to purchase natural gas for anticipated production needs at certain of our chemical facilities. Since these contracts are considered normal purchases because they provide for the purchase of natural gas that will be delivered in quantities expected to be used over a reasonable period of time in the normal course of business and are documented as such, these contracts are exempt from the accounting and reporting requirements relating to derivatives. At December 31, 2014, our purchase commitments under these contracts included approximately 2.9 million MMBtu of natural gas. These contracts extend through December 2015 at a weighted-average cost of $3.25 per MMBtu ($9.5 million) and a weighted-average market value of $3.01 per MMBtu ($8.8 million). In addition, we had standby letters of credit outstanding of approximately $2.6 million at December 31, 2014. We also had deposits from customers of $6.8 million for forward sales commitments, most of which relate to our Chemical Business at December 31, 2014.

Notification of Termination of Sales Commitment - Ammonium nitrate supply agreement—Pursuant to a long-term cost-plus supply agreement, EDC has agreed to supply Orica International Pte Ltd (“Orica”) with an annual minimum of 240,000 tons of industrial grade ammonium nitrate (“AN”) produced at our El Dorado Facility. The agreement includes a provision for Orica to pay for product not taken. The agreement also includes a required notice of termination of one year, with the termination date to be no sooner than April 9, 2015. On March 31, 2014, EDC sent to Orica the required one-year notice that EDC will not renew the agreement on or after April 9, 2015.

Planned Capital Additions – A subsidiary of EDC is party to various agreements with Leidos Constructors, LLC and others to engineer, procure and construct an ammonia plant and certain support facilities. The estimated cost for this project ranges from $275 million to $300 million, of which $128 million has been incurred and capitalized at December 31, 2014.

EDC is party to an agreement with Weatherly Inc. for the licensing, engineering, and procurement of major manufacturing equipment for a new 65% strength nitric acid plant (“Nitric Acid Plant”) to be constructed at our El Dorado Facility. EDC is also party to various agreements with Leidos Constructors, LLC and others to engineer, procure and construct the Nitric Acid Plant, a nitric acid concentrator and certain support facilities at the El Dorado Facility. The estimated cost for this project ranges from $125 million to $130 million, of which $96 million has been incurred and capitalized at December 31, 2014.

Wastewater Pipeline Operating Agreement – EDC is party to an operating agreement for the right to use a pipeline to dispose its wastewater. EDC is contractually obligated to pay a portion of the operating costs of the pipeline, which portion is estimated to be $100,000 to $150,000 annually. The initial term of the operating agreement is through December 2053.

Performance and Payment Bonds – We are contingently liable to sureties in respect of certain insurance bonds issued by the sureties in connection with certain contracts entered into by certain subsidiaries in the normal course of business. These insurance bonds primarily represent guarantees of future performance of our subsidiaries. As of December 31, 2014, we have agreed to indemnify the sureties for payments, up to $10.6 million, made by them in respect of such bonds. All of these insurance bonds are expected to expire or be renewed in 2015.

Universal Shelf Registration Statement - In November 2012, we filed a universal shelf registration statement on Form S-3, with the SEC. The shelf registration statement provides that we could offer and sell up to $200 million of our securities consisting of equity (common and preferred), debt (senior and subordinated), warrants and units, or a combination thereof. The shelf registration statement expires in November 2015 unless we decide to file a post effective amendment.

Employment and Severance Agreements - We have an employment agreement and severance agreements with several of our officers. The agreements, as amended, provide for annual base salaries, bonuses and other benefits commonly found in such agreements. In the event of termination of employment due to a change in control (as defined in the agreements), the agreements provide for payments aggregating $15.8 million at December 31, 2014.

 

Legal Matters - Following is a summary of certain legal matters involving the Company:

 

A. Environmental Matters

Our facilities and operations are subject to numerous federal, state and local environmental laws (“Environmental Laws”) and to other laws regarding health and safety matters (“Health Laws”). In particular, the manufacture, production and distribution of products by our Chemical Business are activities that entail environmental and public health risks and impose obligations under the Environmental Laws and the Health Laws, many of which provide for certain performance obligations, substantial fines and criminal sanctions for violations. There can be no assurance that we will not incur material costs or liabilities in complying with such laws or in paying fines or penalties for violation of such laws. The Environmental Laws and Health Laws and enforcement policies thereunder have in the past resulted, and could in the future result, in significant compliance expenses, cleanup costs (for our sites or third-party sites where our wastes were disposed of), penalties or other liabilities relating to the handling, manufacture, use, emission, discharge or disposal of hazardous or toxic materials at or from our facilities or the use or disposal of certain of its chemical products. Historically, significant expenditures have been incurred by subsidiaries within our Chemical Business in order to comply with the Environmental Laws and Health Laws and are reasonably expected to be incurred in the future. We will also be obligated to manage certain discharge water outlets and monitor groundwater contaminants at our Chemical Business facilities should we discontinue the operations of a facility. We do not operate the natural gas wells where we own a working interest and compliance with Environmental Laws and Health Laws is controlled by others, with our Chemical Business being responsible for its proportionate share of the costs involved. As of December 31, 2014, our accrued liabilities for environmental matters totaled $408,000 relating primarily to matters discussed below. It is reasonably possible that a change in the estimate of our liability could occur in the near term. Also see discussion in Note 8 - Asset Retirement Obligations.

 

1. Discharge Water Matters

Each of our chemical manufacturing facilities generates process wastewater, which may include cooling tower and boiler water quality control streams, contact storm water (rain water inside the facility area that picks up contaminants) and miscellaneous spills and leaks from process equipment. The process water discharge, storm-water runoff and miscellaneous spills and leaks are governed by various permits generally issued by the respective state environmental agencies as authorized by the United States Environmental Protection Agency (“EPA”), subject to oversight by the EPA. These permits limit the type and amount of effluents that can be discharged and controls the method of such discharge. The following are discharge water matters in relation to the respective permits.

The El Dorado Facility is subject to a state National Pollutant Discharge Elimination System (“NPDES”) discharge water permit issued by the Arkansas Department of Environmental Quality (“ADEQ”). The El Dorado Facility is currently operating under an NPDES discharge water permit, which became effective in 2004 (“2004 NPDES permit”). In 2010, a preliminary draft of a discharge water permit renewal for the El Dorado Facility, which contains more restrictive limits, was issued by the ADEQ.

EDC believes that the El Dorado Facility has generally demonstrated its ability to comply with applicable ammonia and nitrate permit limits, but has, from time to time, had difficulty demonstrating consistent compliance with the more restrictive dissolved minerals permit levels We do not believe this matter regarding meeting the permit requirements as to the dissolved minerals will continue to be an issue as the result of the El Dorado Facility disposing its wastewater (beginning in September 2013), via a pipeline constructed by the City of El Dorado, Arkansas.

During 2012, EDC paid a penalty of $100,000 to settle an Administrative Complaint issued by the EPA, and thereafter handled by the United States Department of Justice (“DOJ”), relating to certain alleged violations of EDC’s 2004 NPDES permit for alleged violations through 2010. The DOJ advised that some action would be taken for alleged violations occurring after 2010. As of the date of this report, no action has been filed by the DOJ against EDC. The cost (or range of costs) cannot currently be reasonably estimated regarding this matter. Therefore, no liability has been established at December 31, 2014.

 

In addition, the El Dorado Facility is currently operating under a consent administrative order (“2006 CAO”) that recognizes the presence of nitrate contamination in the shallow groundwater. The 2006 CAO required EDC to continue semiannual groundwater monitoring, to continue operation of a groundwater recovery system and to submit a human health and ecological risk assessment to the ADEQ relating to the El Dorado Facility. The risk assessment was submitted in August 2007. The final remedy for shallow groundwater contamination, should any remediation be required, will be selected pursuant to a new consent administrative order and based upon the risk assessment. The cost of any additional remediation that may be required will be determined based on the results of the investigation and risk assessment, of which cost (or range of costs) cannot currently be reasonably estimated. Therefore, no liability has been established at December 31, 2014, in connection with this matter.

 

2. Air Matters

One of our subsidiaries, PCC, within our Chemical Business, has been advised that the Oklahoma Department of Environmental Quality, (“ODEQ”) is conducting an investigation into whether the chemical production facility located in Pryor, Oklahoma (the “Pryor Facility”) was in compliance with certain rules and regulations of the ODEQ and whether PCC’s reports of certain air emissions relating primarily to 2011 were intentionally reported incorrectly to the ODEQ. Pursuant to the request of the ODEQ, PCC submitted information and a report to the ODEQ as to the reports filed by the Pryor Facility relating to the air emissions in question. In 2013, investigators with the ODEQ obtained documents from the Pryor Facility in connection with this investigation pursuant to a search warrant and interviewed several employees at the facility. PCC has cooperated with the ODEQ in connection with this investigation. As of December 31, 2014, we are not aware of any recommendations made or to be made by the ODEQ with respect to legal action to be taken or recommended as a result of this ongoing investigation.

 

3. Other Environmental Matters

In 2002, two subsidiaries within our Chemical Business sold substantially all of their operating assets relating to a Kansas chemical facility (“Hallowell Facility”) but retained ownership of the real property. Even though we continued to own the real property, we did not assess our continuing involvement with our former Hallowell Facility to be significant and therefore accounted for the sale as discontinued operations. Our subsidiary retained the obligation to be responsible for, and perform the activities under, a previously executed consent order to investigate the surface and subsurface contamination at the real property and develop a corrective action strategy based on the investigation. In addition, certain of our subsidiaries agreed to indemnify the buyer of such assets for these environmental matters. Based on the assessment discussed above, we account for transactions associated with the Hallowell Facility as discontinued operations.

The successor (“Chevron”) of a prior owner of the Hallowell Facility has agreed in writing, within certain limitations, to pay and has been paying one-half of the costs of the investigation and interim measures relating to this matter as approved by the Kansas Department of Environmental Quality, subject to reallocation.

Our subsidiary and Chevron are pursuing with the state of Kansas a course of long-term surface and groundwater monitoring to track the natural decline in contamination. Currently, our subsidiary and Chevron are in the process of performing additional surface and groundwater testing. We have accrued for our allocable portion of costs for the additional testing, monitoring and risk assessments that could be reasonably estimated, which is included in our accrued liabilities for environmental matters discussed above. The estimated amount is not discounted to its present value.

In addition during 2010, the Kansas Department of Health and Environment (“KDHE”) notified our subsidiary and Chevron that the Hallowell Facility has been referred to the KDHE’s Natural Resources Trustee, which is to consider and recommend restoration, replacement and/or whether to seek compensation. KDHE will consider the recommendations in its evaluation. Currently, it is unknown what remediation and damages the KDHE would require, if any, but we believe that certain remediation activities will be required to begin during 2015. The ultimate required remediation, if any, is unknown. The nature and extent of a portion of the requirements are also not currently defined, and the associated costs (or range of costs) are not currently reasonably estimable. Therefore, no liability has been established at December 31, 2014, in connection with the KDHE’s Natural Resources Trustee matter.

 

B. Other Pending, Threatened or Settled Litigation

In 2013, an explosion and fire occurred at the West Fertilizer Co. (“West Fertilizer”), located in West, Texas, causing death, bodily injury and substantial property damage. West Fertilizer is not owned or controlled by us, but West Fertilizer had been a customer of EDC, purchasing AN from EDC from time to time. LSB and EDC previously received letters from counsel purporting to represent subrogated insurance carriers, personal injury claimants and persons who suffered property damages informing them that their clients are conducting investigations into the cause of the explosion and fire to determine, among other things, whether AN manufactured by EDC and supplied to West Fertilizer was stored at West Fertilizer at the time of the explosion and, if so, whether such AN may have been one of the contributing factors of the explosion. Other manufacturers of AN also supplied AN to West Fertilizer. Initially, the lawsuits that had been filed named West Fertilizer and another supplier of AN as defendants. There have been certain responses to discovery in connection with the pending lawsuits that possibly some of the AN products at West Fertilizer at the time of the explosion may have been produced by EDC. In 2014, EDC and LSB were named as defendants, together with other AN manufactures and brokers that arranged the transport and delivery of AN to West Fertilizer, in the case styled City of West, Texas v CF Industries, Inc., et al, in the District Court of McLennan County, Texas. Plaintiffs are alleging, among other things, that LSB and EDC were negligent in the production and marketing of fertilizer products sold to West Fertilizer resulting in death, personal injury and property damage. EDC has retained a firm specializing in cause and origin investigations, with particular experience with fertilizer facilities, to assist EDC in its own investigation. LSB and EDC have placed its liability insurance carrier on notice, which carrier is handling the defense for LSB and EDC concerning this matter. Our product liability insurance policies have aggregate limits of general liability totaling $100 million, with a self-insured retention of $250,000. Our legal counsel in this matter has represented to us that while it is extremely early in this litigation, they believe our chances of ultimately confirming the merits of EDC’s legal position are probable. However, if there is an adverse outcome in this matter as to EDC, we are unable to estimate a possible range of loss at this time. As of December 31, 2014, no liability has been established in connection with this matter, but we have incurred professional fees up to our self-insured retention amount.

We are also involved in various other claims and legal actions including claims for damages resulting from water leaks related to our Climate Control products and other product liability occurrences. Most of the product liability claims are covered by our general liability insurance, which generally includes a deductible of $250,000 per claim. For any claims or legal actions that we have assessed the likelihood of our liability as probable, we have recognized our estimated liability up to the applicable deductible. At December 31, 2014, our accrued general liability insurance claims were $541,000 and are included in accrued and other liabilities. It is possible that the actual future development of claims could be different from our estimates but, after consultation with legal counsel, we believe that changes in our estimates will not have a material effect on our business, financial condition, results of operations or cash flows.