Leases
12 Months Ended
Dec. 31, 2012
Leases [Line Items]  
Leases

11. Leases

 

Lessee Transactions

 

(PPL, LKE, LG&E and KU)

 

E.W. Brown Combustion Turbines

 

LG&E and KU are participants in a sale-leaseback transaction involving two combustion turbines at the E.W. Brown generating plant. In December 1999, after selling their interests in the combustion turbines, LG&E and KU entered into an 18-year lease of the turbines. LG&E and KU provided funds to fully defease the lease including the repurchase price and have the right to exercise an early purchase option contained in the lease after 15.5 years, which will occur in 2015. The financial statement treatment of this transaction is the same as if LG&E and KU had retained their ownership interest. Since the lease was defeased, there are no remaining minimum lease payments and all related PP&E is reflected on the Balance Sheets. See Note 14 for the balances included on the Balance Sheets related to this transaction. Depreciation expense was insignificant for all periods presented.

 

Upon a default under the lease, LG&E and KU are obligated to pay to the lessor their share of certain amounts. Primary events of default include loss or destruction of the combustion turbines, failure to insure or maintain the combustion turbines and unwinding of the transaction due to governmental actions. No events of default currently exist with respect to the lease. Upon any termination of the lease, whether by default or expiration of its term, title to the combustion turbines reverts to LG&E and KU. The maximum aggregate amount at December 31, 2012 that could be required to be paid by LKE is $5 million, by LG&E is $2 million and by KU is $3 million. LKE has guaranteed the payment of these potential default payments of LG&E and KU.

 

(PPL and PPL Energy Supply)

 

Colstrip Generating Plant

 

In July 2000, PPL Montana sold its interest in the Colstrip generating plants to owner lessors who lease back to PPL Montana, under four 36-year non-cancelable leases, a 50% interest in Colstrip Units 1 and 2 and a 30% interest in Unit 3. This transaction is accounted for as a sale-leaseback and classified as an operating lease. PPL Montana is responsible for its share of the operating expenses associated with its leasehold interests. See Note 14 for information on the sharing agreement for Colstrip Units 3 and 4. PPL Montana currently amortizes material leasehold improvements over no more than the remaining life of the original leases; however, the leases provide two renewal options based on the economic useful life of the generation assets. The leases place certain restrictions on PPL Montana's ability to incur additional debt, sell assets and declare dividends and require PPL Montana to maintain certain financial ratios related to cash flow and net worth. There are no residual value guarantees in these leases. However, upon an event of default or an event of loss, PPL Montana could be required to pay a termination value of amounts sufficient to allow the lessor to repay amounts owing on the lessor notes and make the lessor whole for its equity investment and anticipated return on investment. The events of default include payment defaults, breaches of representations or covenants, acceleration of other indebtedness of PPL Montana, change in control of PPL Montana and certain bankruptcy events. The termination value was estimated to be $301 million at December 31, 2012.

 

Kerr Dam

 

Under the Kerr Hydroelectric Project No. 5 joint operating license issued by the FERC, PPL Montana is responsible to make payments to the Confederated Salish and Kootenai Tribes of the Flathead Nation for the use of certain of their tribal lands in connection with the operation of Kerr Dam. This payment arrangement, subject to escalation based upon inflation, extends until the end of the license term in 2035. Between 2015 and 2025, the tribes have the option to purchase, hold and operate the project, at a conveyance price to be determined in accordance with the provisions in the FERC license. Exercise of the option by the tribes would result in the termination of this payment arrangement obligation for PPL Montana. The payment arrangement has been treated as an operating lease for accounting purposes. In February 2013, the parties to the license submitted the issue of the appropriate amount of the conveyance price to arbitration.

 

(PPL, PPL Energy Supply, LKE, LG&E and KU)

 

Other Leases

 

PPL and its subsidiaries have entered into various agreements for the lease of office space, vehicles, land gas storage and other equipment.

 

Rent - Operating Leases

 

Rent expense for operating leases was as follows:

 

   2012  2011  2010
          
PPL $116 $109 $90
PPL Energy Supply  62  84  87

  Successor  Predecessor
        Two Months  Ten Months
  Year Ended Year Ended  Ended  Ended
  December 31,  December 31,   December 31,   October 31,
  2012 2011  2010  2010
               
LKE $ 18 $ 18  $ 3  $ 14
LG&E   7   7    1    5
KU   10   10    2    8

Total future minimum rental payments for all operating leases are estimated to be:
                
    PPL      
  PPL Energy Supply LKE LG&E KU
                
2013 $ 109 $ 76 $ 15 $ 5 $ 9
2014   106   78   15   6   8
2015   85   65   12   5   7
2016   37   26   8   3   5
2017   21   13   6   2   4
Thereafter   149   104   34   14   18
Total  $ 507 $ 362 $ 90 $ 35 $ 51
PPL Energy Supply LLC [Member]
 
Leases [Line Items]  
Leases

11. Leases

 

Lessee Transactions

 

(PPL, LKE, LG&E and KU)

 

E.W. Brown Combustion Turbines

 

LG&E and KU are participants in a sale-leaseback transaction involving two combustion turbines at the E.W. Brown generating plant. In December 1999, after selling their interests in the combustion turbines, LG&E and KU entered into an 18-year lease of the turbines. LG&E and KU provided funds to fully defease the lease including the repurchase price and have the right to exercise an early purchase option contained in the lease after 15.5 years, which will occur in 2015. The financial statement treatment of this transaction is the same as if LG&E and KU had retained their ownership interest. Since the lease was defeased, there are no remaining minimum lease payments and all related PP&E is reflected on the Balance Sheets. See Note 14 for the balances included on the Balance Sheets related to this transaction. Depreciation expense was insignificant for all periods presented.

 

Upon a default under the lease, LG&E and KU are obligated to pay to the lessor their share of certain amounts. Primary events of default include loss or destruction of the combustion turbines, failure to insure or maintain the combustion turbines and unwinding of the transaction due to governmental actions. No events of default currently exist with respect to the lease. Upon any termination of the lease, whether by default or expiration of its term, title to the combustion turbines reverts to LG&E and KU. The maximum aggregate amount at December 31, 2012 that could be required to be paid by LKE is $5 million, by LG&E is $2 million and by KU is $3 million. LKE has guaranteed the payment of these potential default payments of LG&E and KU.

 

(PPL and PPL Energy Supply)

 

Colstrip Generating Plant

 

In July 2000, PPL Montana sold its interest in the Colstrip generating plants to owner lessors who lease back to PPL Montana, under four 36-year non-cancelable leases, a 50% interest in Colstrip Units 1 and 2 and a 30% interest in Unit 3. This transaction is accounted for as a sale-leaseback and classified as an operating lease. PPL Montana is responsible for its share of the operating expenses associated with its leasehold interests. See Note 14 for information on the sharing agreement for Colstrip Units 3 and 4. PPL Montana currently amortizes material leasehold improvements over no more than the remaining life of the original leases; however, the leases provide two renewal options based on the economic useful life of the generation assets. The leases place certain restrictions on PPL Montana's ability to incur additional debt, sell assets and declare dividends and require PPL Montana to maintain certain financial ratios related to cash flow and net worth. There are no residual value guarantees in these leases. However, upon an event of default or an event of loss, PPL Montana could be required to pay a termination value of amounts sufficient to allow the lessor to repay amounts owing on the lessor notes and make the lessor whole for its equity investment and anticipated return on investment. The events of default include payment defaults, breaches of representations or covenants, acceleration of other indebtedness of PPL Montana, change in control of PPL Montana and certain bankruptcy events. The termination value was estimated to be $301 million at December 31, 2012.

 

Kerr Dam

 

Under the Kerr Hydroelectric Project No. 5 joint operating license issued by the FERC, PPL Montana is responsible to make payments to the Confederated Salish and Kootenai Tribes of the Flathead Nation for the use of certain of their tribal lands in connection with the operation of Kerr Dam. This payment arrangement, subject to escalation based upon inflation, extends until the end of the license term in 2035. Between 2015 and 2025, the tribes have the option to purchase, hold and operate the project, at a conveyance price to be determined in accordance with the provisions in the FERC license. Exercise of the option by the tribes would result in the termination of this payment arrangement obligation for PPL Montana. The payment arrangement has been treated as an operating lease for accounting purposes. In February 2013, the parties to the license submitted the issue of the appropriate amount of the conveyance price to arbitration.

 

(PPL, PPL Energy Supply, LKE, LG&E and KU)

 

Other Leases

 

PPL and its subsidiaries have entered into various agreements for the lease of office space, vehicles, land gas storage and other equipment.

 

Rent - Operating Leases

 

Rent expense for operating leases was as follows:

 

   2012  2011  2010
          
PPL $116 $109 $90
PPL Energy Supply  62  84  87

  Successor  Predecessor
        Two Months  Ten Months
  Year Ended Year Ended  Ended  Ended
  December 31,  December 31,   December 31,   October 31,
  2012 2011  2010  2010
               
LKE $ 18 $ 18  $ 3  $ 14
LG&E   7   7    1    5
KU   10   10    2    8

Total future minimum rental payments for all operating leases are estimated to be:
                
    PPL      
  PPL Energy Supply LKE LG&E KU
                
2013 $ 109 $ 76 $ 15 $ 5 $ 9
2014   106   78   15   6   8
2015   85   65   12   5   7
2016   37   26   8   3   5
2017   21   13   6   2   4
Thereafter   149   104   34   14   18
Total  $ 507 $ 362 $ 90 $ 35 $ 51
LG And E And KU Energy LLC [Member]
 
Leases [Line Items]  
Leases

11. Leases

 

Lessee Transactions

 

(PPL, LKE, LG&E and KU)

 

E.W. Brown Combustion Turbines

 

LG&E and KU are participants in a sale-leaseback transaction involving two combustion turbines at the E.W. Brown generating plant. In December 1999, after selling their interests in the combustion turbines, LG&E and KU entered into an 18-year lease of the turbines. LG&E and KU provided funds to fully defease the lease including the repurchase price and have the right to exercise an early purchase option contained in the lease after 15.5 years, which will occur in 2015. The financial statement treatment of this transaction is the same as if LG&E and KU had retained their ownership interest. Since the lease was defeased, there are no remaining minimum lease payments and all related PP&E is reflected on the Balance Sheets. See Note 14 for the balances included on the Balance Sheets related to this transaction. Depreciation expense was insignificant for all periods presented.

 

Upon a default under the lease, LG&E and KU are obligated to pay to the lessor their share of certain amounts. Primary events of default include loss or destruction of the combustion turbines, failure to insure or maintain the combustion turbines and unwinding of the transaction due to governmental actions. No events of default currently exist with respect to the lease. Upon any termination of the lease, whether by default or expiration of its term, title to the combustion turbines reverts to LG&E and KU. The maximum aggregate amount at December 31, 2012 that could be required to be paid by LKE is $5 million, by LG&E is $2 million and by KU is $3 million. LKE has guaranteed the payment of these potential default payments of LG&E and KU.

 

(PPL and PPL Energy Supply)

 

Colstrip Generating Plant

 

In July 2000, PPL Montana sold its interest in the Colstrip generating plants to owner lessors who lease back to PPL Montana, under four 36-year non-cancelable leases, a 50% interest in Colstrip Units 1 and 2 and a 30% interest in Unit 3. This transaction is accounted for as a sale-leaseback and classified as an operating lease. PPL Montana is responsible for its share of the operating expenses associated with its leasehold interests. See Note 14 for information on the sharing agreement for Colstrip Units 3 and 4. PPL Montana currently amortizes material leasehold improvements over no more than the remaining life of the original leases; however, the leases provide two renewal options based on the economic useful life of the generation assets. The leases place certain restrictions on PPL Montana's ability to incur additional debt, sell assets and declare dividends and require PPL Montana to maintain certain financial ratios related to cash flow and net worth. There are no residual value guarantees in these leases. However, upon an event of default or an event of loss, PPL Montana could be required to pay a termination value of amounts sufficient to allow the lessor to repay amounts owing on the lessor notes and make the lessor whole for its equity investment and anticipated return on investment. The events of default include payment defaults, breaches of representations or covenants, acceleration of other indebtedness of PPL Montana, change in control of PPL Montana and certain bankruptcy events. The termination value was estimated to be $301 million at December 31, 2012.

 

Kerr Dam

 

Under the Kerr Hydroelectric Project No. 5 joint operating license issued by the FERC, PPL Montana is responsible to make payments to the Confederated Salish and Kootenai Tribes of the Flathead Nation for the use of certain of their tribal lands in connection with the operation of Kerr Dam. This payment arrangement, subject to escalation based upon inflation, extends until the end of the license term in 2035. Between 2015 and 2025, the tribes have the option to purchase, hold and operate the project, at a conveyance price to be determined in accordance with the provisions in the FERC license. Exercise of the option by the tribes would result in the termination of this payment arrangement obligation for PPL Montana. The payment arrangement has been treated as an operating lease for accounting purposes. In February 2013, the parties to the license submitted the issue of the appropriate amount of the conveyance price to arbitration.

 

(PPL, PPL Energy Supply, LKE, LG&E and KU)

 

Other Leases

 

PPL and its subsidiaries have entered into various agreements for the lease of office space, vehicles, land gas storage and other equipment.

 

Rent - Operating Leases

 

Rent expense for operating leases was as follows:

 

   2012  2011  2010
          
PPL $116 $109 $90
PPL Energy Supply  62  84  87

  Successor  Predecessor
        Two Months  Ten Months
  Year Ended Year Ended  Ended  Ended
  December 31,  December 31,   December 31,   October 31,
  2012 2011  2010  2010
               
LKE $ 18 $ 18  $ 3  $ 14
LG&E   7   7    1    5
KU   10   10    2    8

Total future minimum rental payments for all operating leases are estimated to be:
                
    PPL      
  PPL Energy Supply LKE LG&E KU
                
2013 $ 109 $ 76 $ 15 $ 5 $ 9
2014   106   78   15   6   8
2015   85   65   12   5   7
2016   37   26   8   3   5
2017   21   13   6   2   4
Thereafter   149   104   34   14   18
Total  $ 507 $ 362 $ 90 $ 35 $ 51
Louisville Gas And Electric Co [Member]
 
Leases [Line Items]  
Leases

11. Leases

 

Lessee Transactions

 

(PPL, LKE, LG&E and KU)

 

E.W. Brown Combustion Turbines

 

LG&E and KU are participants in a sale-leaseback transaction involving two combustion turbines at the E.W. Brown generating plant. In December 1999, after selling their interests in the combustion turbines, LG&E and KU entered into an 18-year lease of the turbines. LG&E and KU provided funds to fully defease the lease including the repurchase price and have the right to exercise an early purchase option contained in the lease after 15.5 years, which will occur in 2015. The financial statement treatment of this transaction is the same as if LG&E and KU had retained their ownership interest. Since the lease was defeased, there are no remaining minimum lease payments and all related PP&E is reflected on the Balance Sheets. See Note 14 for the balances included on the Balance Sheets related to this transaction. Depreciation expense was insignificant for all periods presented.

 

Upon a default under the lease, LG&E and KU are obligated to pay to the lessor their share of certain amounts. Primary events of default include loss or destruction of the combustion turbines, failure to insure or maintain the combustion turbines and unwinding of the transaction due to governmental actions. No events of default currently exist with respect to the lease. Upon any termination of the lease, whether by default or expiration of its term, title to the combustion turbines reverts to LG&E and KU. The maximum aggregate amount at December 31, 2012 that could be required to be paid by LKE is $5 million, by LG&E is $2 million and by KU is $3 million. LKE has guaranteed the payment of these potential default payments of LG&E and KU.

 

(PPL and PPL Energy Supply)

 

Colstrip Generating Plant

 

In July 2000, PPL Montana sold its interest in the Colstrip generating plants to owner lessors who lease back to PPL Montana, under four 36-year non-cancelable leases, a 50% interest in Colstrip Units 1 and 2 and a 30% interest in Unit 3. This transaction is accounted for as a sale-leaseback and classified as an operating lease. PPL Montana is responsible for its share of the operating expenses associated with its leasehold interests. See Note 14 for information on the sharing agreement for Colstrip Units 3 and 4. PPL Montana currently amortizes material leasehold improvements over no more than the remaining life of the original leases; however, the leases provide two renewal options based on the economic useful life of the generation assets. The leases place certain restrictions on PPL Montana's ability to incur additional debt, sell assets and declare dividends and require PPL Montana to maintain certain financial ratios related to cash flow and net worth. There are no residual value guarantees in these leases. However, upon an event of default or an event of loss, PPL Montana could be required to pay a termination value of amounts sufficient to allow the lessor to repay amounts owing on the lessor notes and make the lessor whole for its equity investment and anticipated return on investment. The events of default include payment defaults, breaches of representations or covenants, acceleration of other indebtedness of PPL Montana, change in control of PPL Montana and certain bankruptcy events. The termination value was estimated to be $301 million at December 31, 2012.

 

Kerr Dam

 

Under the Kerr Hydroelectric Project No. 5 joint operating license issued by the FERC, PPL Montana is responsible to make payments to the Confederated Salish and Kootenai Tribes of the Flathead Nation for the use of certain of their tribal lands in connection with the operation of Kerr Dam. This payment arrangement, subject to escalation based upon inflation, extends until the end of the license term in 2035. Between 2015 and 2025, the tribes have the option to purchase, hold and operate the project, at a conveyance price to be determined in accordance with the provisions in the FERC license. Exercise of the option by the tribes would result in the termination of this payment arrangement obligation for PPL Montana. The payment arrangement has been treated as an operating lease for accounting purposes. In February 2013, the parties to the license submitted the issue of the appropriate amount of the conveyance price to arbitration.

 

(PPL, PPL Energy Supply, LKE, LG&E and KU)

 

Other Leases

 

PPL and its subsidiaries have entered into various agreements for the lease of office space, vehicles, land gas storage and other equipment.

 

Rent - Operating Leases

 

Rent expense for operating leases was as follows:

 

   2012  2011  2010
          
PPL $116 $109 $90
PPL Energy Supply  62  84  87

  Successor  Predecessor
        Two Months  Ten Months
  Year Ended Year Ended  Ended  Ended
  December 31,  December 31,   December 31,   October 31,
  2012 2011  2010  2010
               
LKE $ 18 $ 18  $ 3  $ 14
LG&E   7   7    1    5
KU   10   10    2    8

Total future minimum rental payments for all operating leases are estimated to be:
                
    PPL      
  PPL Energy Supply LKE LG&E KU
                
2013 $ 109 $ 76 $ 15 $ 5 $ 9
2014   106   78   15   6   8
2015   85   65   12   5   7
2016   37   26   8   3   5
2017   21   13   6   2   4
Thereafter   149   104   34   14   18
Total  $ 507 $ 362 $ 90 $ 35 $ 51
Kentucky Utilities Co [Member]
 
Leases [Line Items]  
Leases

11. Leases

 

Lessee Transactions

 

(PPL, LKE, LG&E and KU)

 

E.W. Brown Combustion Turbines

 

LG&E and KU are participants in a sale-leaseback transaction involving two combustion turbines at the E.W. Brown generating plant. In December 1999, after selling their interests in the combustion turbines, LG&E and KU entered into an 18-year lease of the turbines. LG&E and KU provided funds to fully defease the lease including the repurchase price and have the right to exercise an early purchase option contained in the lease after 15.5 years, which will occur in 2015. The financial statement treatment of this transaction is the same as if LG&E and KU had retained their ownership interest. Since the lease was defeased, there are no remaining minimum lease payments and all related PP&E is reflected on the Balance Sheets. See Note 14 for the balances included on the Balance Sheets related to this transaction. Depreciation expense was insignificant for all periods presented.

 

Upon a default under the lease, LG&E and KU are obligated to pay to the lessor their share of certain amounts. Primary events of default include loss or destruction of the combustion turbines, failure to insure or maintain the combustion turbines and unwinding of the transaction due to governmental actions. No events of default currently exist with respect to the lease. Upon any termination of the lease, whether by default or expiration of its term, title to the combustion turbines reverts to LG&E and KU. The maximum aggregate amount at December 31, 2012 that could be required to be paid by LKE is $5 million, by LG&E is $2 million and by KU is $3 million. LKE has guaranteed the payment of these potential default payments of LG&E and KU.

 

(PPL and PPL Energy Supply)

 

Colstrip Generating Plant

 

In July 2000, PPL Montana sold its interest in the Colstrip generating plants to owner lessors who lease back to PPL Montana, under four 36-year non-cancelable leases, a 50% interest in Colstrip Units 1 and 2 and a 30% interest in Unit 3. This transaction is accounted for as a sale-leaseback and classified as an operating lease. PPL Montana is responsible for its share of the operating expenses associated with its leasehold interests. See Note 14 for information on the sharing agreement for Colstrip Units 3 and 4. PPL Montana currently amortizes material leasehold improvements over no more than the remaining life of the original leases; however, the leases provide two renewal options based on the economic useful life of the generation assets. The leases place certain restrictions on PPL Montana's ability to incur additional debt, sell assets and declare dividends and require PPL Montana to maintain certain financial ratios related to cash flow and net worth. There are no residual value guarantees in these leases. However, upon an event of default or an event of loss, PPL Montana could be required to pay a termination value of amounts sufficient to allow the lessor to repay amounts owing on the lessor notes and make the lessor whole for its equity investment and anticipated return on investment. The events of default include payment defaults, breaches of representations or covenants, acceleration of other indebtedness of PPL Montana, change in control of PPL Montana and certain bankruptcy events. The termination value was estimated to be $301 million at December 31, 2012.

 

Kerr Dam

 

Under the Kerr Hydroelectric Project No. 5 joint operating license issued by the FERC, PPL Montana is responsible to make payments to the Confederated Salish and Kootenai Tribes of the Flathead Nation for the use of certain of their tribal lands in connection with the operation of Kerr Dam. This payment arrangement, subject to escalation based upon inflation, extends until the end of the license term in 2035. Between 2015 and 2025, the tribes have the option to purchase, hold and operate the project, at a conveyance price to be determined in accordance with the provisions in the FERC license. Exercise of the option by the tribes would result in the termination of this payment arrangement obligation for PPL Montana. The payment arrangement has been treated as an operating lease for accounting purposes. In February 2013, the parties to the license submitted the issue of the appropriate amount of the conveyance price to arbitration.

 

(PPL, PPL Energy Supply, LKE, LG&E and KU)

 

Other Leases

 

PPL and its subsidiaries have entered into various agreements for the lease of office space, vehicles, land gas storage and other equipment.

 

Rent - Operating Leases

 

Rent expense for operating leases was as follows:

 

   2012  2011  2010
          
PPL $116 $109 $90
PPL Energy Supply  62  84  87

  Successor  Predecessor
        Two Months  Ten Months
  Year Ended Year Ended  Ended  Ended
  December 31,  December 31,   December 31,   October 31,
  2012 2011  2010  2010
               
LKE $ 18 $ 18  $ 3  $ 14
LG&E   7   7    1    5
KU   10   10    2    8

Total future minimum rental payments for all operating leases are estimated to be:
                
    PPL      
  PPL Energy Supply LKE LG&E KU
                
2013 $ 109 $ 76 $ 15 $ 5 $ 9
2014   106   78   15   6   8
2015   85   65   12   5   7
2016   37   26   8   3   5
2017   21   13   6   2   4
Thereafter   149   104   34   14   18
Total  $ 507 $ 362 $ 90 $ 35 $ 51