Commitments And Contingencies
12 Months Ended
Dec. 31, 2014
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES
(a) Capital Purchase Obligations - Various contractual obligations contain minimum future commitments related to capital expenditures for certain construction projects. IPL’s projects include the construction of Marshalltown and the installation of a scrubber at Lansing Unit 4 to reduce SO2 emissions. WPL’s projects include the installation of a scrubber and baghouse at Edgewater Unit 5 to reduce SO2 and mercury emissions, and generation maintenance and performance improvements at Columbia Units 1 and 2. At December 31, 2014, Alliant Energy’s, IPL’s and WPL’s minimum future commitments related to certain contractual obligations for these projects were $25 million, $6 million and $19 million, respectively.
(b) Operating Expense Purchase Obligations - Various commodity supply, transportation and storage contracts meet obligations to provide electricity and natural gas to utility customers. Other operating expense purchase obligations with various vendors provide other goods and services. At December 31, 2014, minimum future commitments related to these operating expense purchase obligations were as follows (in millions):
Alliant Energy
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a):
 
 
 
 
 
 
 
 
 
 
 
 
 
DAEC (IPL) (b)

$119

 

$125

 

$138

 

$131

 

$143

 

$882

 

$1,538

Other
74

 
46

 
44

 
44

 

 

 
208

 
193

 
171

 
182

 
175

 
143

 
882

 
1,746

Natural gas
175

 
69

 
23

 
5

 
2

 
4

 
278

Coal (c)
124

 
78

 
47

 
34

 
8

 

 
291

SO2 emission allowances (d)
12

 
14

 
8

 

 

 

 
34

Other (e)
10

 
1

 

 

 

 

 
11

 

$514

 

$333

 

$260

 

$214

 

$153

 

$886

 

$2,360

IPL
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a):
 
 
 
 
 
 
 
 
 
 
 
 
 
DAEC (b)

$119

 

$125

 

$138

 

$131

 

$143

 

$882

 

$1,538

Other

 
1

 

 

 

 

 
1

 
119

 
126

 
138

 
131

 
143

 
882

 
1,539

Natural gas
108

 
32

 
5

 
2

 
2

 
4

 
153

Coal (c)
61

 
35

 
20

 
11

 

 

 
127

SO2 emission allowances (d)
12

 
14

 
8

 

 

 

 
34

Other (e)
6

 

 

 

 

 

 
6

 
$306
 

$207

 

$171

 

$144

 

$145

 

$886

 

$1,859

WPL
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a)

$74

 

$45

 

$44

 

$44

 

$—

 

$—

 

$207

Natural gas
67

 
37

 
18

 
3

 

 

 
125

Coal (c)
63

 
43

 
27

 
23

 
8

 

 
164

Other (e)
2

 
1

 

 

 

 

 
3

 

$206

 

$126

 

$89

 

$70

 

$8

 

$—

 

$499


(a)
Includes payments required by PPAs for capacity rights and minimum quantities of MWhs required to be purchased. Refer to Note 18 for additional information on purchased power transactions.
(b)
Includes commitments incurred under a PPA, which grants IPL rights to purchase up to 431 MWs of capacity and the resulting energy from DAEC for a term through December 31, 2025. If energy delivered is less than the targeted energy amount, an adjustment payment will be made to IPL, which will be reflected in IPL’s fuel adjustment clause.
(c)
Corporate Services entered into system-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments were assigned to IPL and WPL based on information available as of December 31, 2014 regarding expected future usage, which is subject to change.
(d)
Refer to Note 2 for discussion of $34 million of charges recognized by Alliant Energy and IPL in 2011 for forward contracts to purchase SO2 emission allowances.
(e)
Includes individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 2014.

Certain contracts are considered leases and are therefore not included here, but are included in Note 10.
(c) Legal Proceedings -
Flood Damage Claims - In June 2013, several plaintiffs purporting to represent a class of residential and commercial property owners filed a complaint against CRANDIC, Alliant Energy and various other defendants in the Iowa District Court for Linn County. Plaintiffs assert claims of negligence and strict liability based on their allegations that CRANDIC (along with other defendants) caused or exacerbated flooding of the Cedar River in June 2008. In July 2013, the case was removed from state court to federal court based on federal jurisdiction. In September 2013, the U.S. District Court for the Northern District of Iowa dismissed the Plaintiffs’ claims and transferred the case for resolution to the Surface Transportation Board, the administrative agency that oversees the Interstate Commerce Commission Termination Act. In October 2013, the Plaintiffs appealed the federal court’s dismissal of the case to the Eighth Circuit Court of Appeals. Alliant Energy and CRANDIC believe the case is without merit and will continue to vigorously contest the case. As a result, Alliant Energy does not currently believe any material losses from these claims are both probable and reasonably estimated, and therefore, has not recognized any material loss contingency amounts for this complaint as of December 31, 2014. Due to the early stages of the claim and the lack of specific damages identified, Alliant Energy is currently unable to provide an estimate of potential loss or range of potential loss.

Other - Alliant Energy, IPL and WPL are involved in other legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although unable to predict the outcome of these matters, Alliant Energy, IPL and WPL believe that appropriate reserves have been established and final disposition of these actions will not have a material effect on their financial condition or results of operations.
(d) Guarantees and Indemnifications -
RMT - In 2013, Alliant Energy sold RMT. RMT provided renewable energy services, including construction and high voltage connection services for wind and solar projects. As part of the sale, Alliant Energy indemnified the buyer for any claims, including claims of warranty under the project obligations that were commenced or are based on actions that occurred prior to the sale, except for liabilities already accounted for through adjustments to the purchase price. The indemnification obligations either cease to exist when the statute of limitation for such claims is met or, in the case of RMT’s projects, when the warranty period under the agreements expires. The warranty periods for RMT’s projects generally range from 12 to 60 months with the latest expiring in 2016.

Alliant Energy also continues to guarantee RMT’s performance obligations related to certain of RMT’s projects that were commenced prior to Alliant Energy’s sale of RMT. As of December 31, 2014, Alliant Energy had $251 million of performance guarantees outstanding with $128 million, $48 million and $75 million currently expected to expire in 2015, 2016 and 2017, respectively. The expiration of these performance guarantees may be extended depending on when all valid warranty claims are resolved for the respective projects.

Although Alliant Energy has received warranty claims related to certain of these projects, it does not currently believe that material losses are both probable and reasonably estimated, and therefore, has not recognized any material liabilities related to these matters as of December 31, 2014. Due to the early stages of the warranty claims, Alliant Energy is currently unable to provide an estimate of potential loss or range of potential loss. Refer to Note 19 for further discussion of RMT, including amounts, Alliant Energy recorded to “Operating expenses” in 2014 related to certain warranty claims.

Whiting Petroleum - In 2004, Alliant Energy sold its remaining interest in Whiting Petroleum. Whiting Petroleum is an independent oil and gas company. Alliant Energy continues to guarantee the obligations related to the abandonment of certain platforms off the coast of California and related onshore plant and equipment that were owned by Whiting Petroleum prior to Alliant Energy’s sale of Whiting Petroleum. The guarantee does not include a maximum limit. As of December 31, 2014, the present value of the abandonment obligations is estimated at $35 million. Alliant Energy believes that no payments will be made under this guarantee. Alliant Energy has not recognized any material liabilities related to this guarantee as of December 31, 2014.
(e) Environmental Matters - Alliant Energy, IPL and WPL are subject to environmental regulations as a result of their current and past operations. These regulations are designed to protect public health and the environment and have resulted in compliance, remediation, containment and monitoring obligations, which are recorded as environmental liabilities. At December 31, current environmental liabilities were included in “Other current liabilities” and non-current environmental liabilities were included in “Other liabilities” on the balance sheets as follows (in millions):
 
Alliant Energy
 
IPL
 
WPL
 
2014
 
2013
 
2014
 
2013
 
2014
 
2013
Current environmental liabilities

$2.0

 

$3.6

 

$1.7

 

$2.8

 

$0.3

 

$0.8

Non-current environmental liabilities
13.5

 
15.4

 
11.9

 
13.6

 
1.6

 
1.7

 

$15.5

 

$19.0

 

$13.6

 

$16.4

 

$1.9

 

$2.5



MGP Sites - IPL and WPL have current or previous ownership interests in various sites that are previously associated with the production of gas for which IPL and WPL have, or may have in the future, liability for investigation, remediation and monitoring costs. IPL and WPL are working pursuant to the requirements of various federal and state agencies to investigate, mitigate, prevent and remediate, where necessary, the environmental impacts to property, including natural resources, at and around these former MGP sites in order to protect public health and the environment. IPL and WPL are currently monitoring and/or remediating 25 and 5 sites, respectively. Included in IPL’s sites is a Minnesota site for which responsibility of monitoring and/or remediating the site is expected to be transferred to the buyer as part of the anticipated sale of IPL’s Minnesota natural gas distribution assets.

Environmental liabilities related to these MGP sites are recorded based upon periodic studies. Such amounts are based on the best current estimate of the remaining amount to be incurred for investigation, remediation and monitoring costs for those sites where the investigation process has been or is substantially completed, and the minimum of the estimated cost range for those sites where the investigation is in its earlier stages. There are inherent uncertainties associated with the estimated remaining costs for MGP projects primarily due to unknown site conditions and potential changes in regulatory agency requirements. It is possible that future cost estimates will be greater than current estimates as the investigation process proceeds and as additional facts become known. The amounts recognized as liabilities are reduced for expenditures incurred and are adjusted as further information develops or circumstances change. Costs of future expenditures for environmental remediation obligations are not discounted. At December 31, 2014, estimated future costs expected to be incurred for the investigation, remediation and monitoring of the MGP sites, as well as environmental liabilities recorded on the balance sheets for these sites, were as follows (in millions):
 
Alliant Energy
 
IPL
 
WPL
Range of estimated future costs

$12

-
$31
 

$11

-
$29
 

$1

-
$2
Current and non-current environmental liabilities
16
 
14
 
2


Refer to Note 2 for discussion of regulatory assets recorded by IPL and WPL, which reflect the probable future rate recovery of MGP expenditures. Considering the current rate treatment, and assuming no material change therein, Alliant Energy, IPL and WPL believe that the clean-up costs incurred for these MGP sites will not have a material effect on their financial condition or results of operations. Settlement has been reached with all of IPL’s and WPL’s insurance carriers regarding reimbursement for their MGP-related costs and such amounts have been accounted for as directed by the applicable regulatory jurisdiction.

WPL Consent Decree - In 2009, the EPA sent a notice of violation to WPL as an owner and the operator of Edgewater, Nelson Dewey and Columbia alleging that the owners of such EGUs failed to comply with appropriate pre-construction review and permitting requirements and as a result violated the PSD program requirements, Title V Operating Permit requirements of the CAA and the Wisconsin SIP. In 2010, the Sierra Club filed complaints against WPL, as owner and operator of Nelson Dewey and Columbia, and separately as owner and operator of Edgewater, based on allegations that modifications were made at the facilities without complying with the PSD program requirements, Title V Operating Permit requirements of the CAA and state regulatory counterparts contained within the Wisconsin SIP designed to implement the CAA.

In April 2013, WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve the claims relating to Edgewater, Columbia and Nelson Dewey, while admitting no liability. In June 2013, the Consent Decree was approved by the Court, thereby resolving all claims against WPL. Under the Consent Decree, WPL is required to install the following emission controls systems:

SCR system at Edgewater Unit 5 by May 1, 2013 (placed in service in 2012);
Scrubbers and baghouses at Columbia Units 1 and 2 by December 31, 2014 (placed in service in 2014);
Scrubber and baghouse at Edgewater Unit 5 by December 31, 2016; and
SCR system at Columbia Unit 2 by December 31, 2018.

WPL is also required to fuel switch or retire Nelson Dewey Units 1 and 2 and Edgewater Unit 3 by December 31, 2015, and Edgewater Unit 4 by December 31, 2018. In addition, the Consent Decree establishes emission rate limits for SO2, NOx and particulate matter for Columbia Units 1 and 2, Nelson Dewey Units 1 and 2, and Edgewater Units 4 and 5. The Consent Decree also includes annual plant-wide emission caps for SO2 and NOx for Columbia, Edgewater and Nelson Dewey. In addition, WPL will complete approximately $7 million in environmental mitigation projects.

Final recovery of the costs expected to be incurred related to the Consent Decree will be decided by the PSCW in future rate cases or other proceedings. Alliant Energy and WPL currently expect to recover any material costs incurred by WPL related to compliance with the terms of the Consent Decree from WPL’s electric customers, except for costs related to certain of the environmental mitigation projects.

Other Environmental Contingencies - In addition to the environmental liabilities discussed above, various environmental rules are monitored that may have a significant impact on future operations. Several of these environmental rules are subject to legal challenges, reconsideration and/or other uncertainties. Given uncertainties regarding the outcome, timing and compliance plans for these environmental matters, the complete financial impact of each of these rules is not able to be determined; however future capital investments and/or modifications to EGUs to comply with certain of these rules could be significant. Specific current, proposed or potential environmental matters are included below, along with a brief description of these environmental rules.

Air Quality -
CSAPR is an emissions trading program that requires SO2 and NOx emissions reductions at certain IPL and WPL fossil-fueled EGUs through installation of emission controls and/or purchases of allowances. Compliance with emissions limits began in 2015, with additional emissions limits reductions beginning in 2017.

CAVR requires states to develop and implement plans to address visibility impairment in designated national parks and wilderness areas. These implementation plans require BART emission controls at certain IPL and WPL fossil-fueled EGUs and other additional measures needed for reducing state contributions to regional haze.

MATS Rule requires compliance with emission limits for mercury and other HAPs and work practice standards for existing coal-fired EGUs. Compliance is required by April 2015; however, an entity can request an additional year for compliance for certain EGUs. The Wisconsin DNR approved an extension to the MATS compliance deadline to April 2016 for WPL’s Edgewater Unit 3 and Nelson Dewey Units 1 and 2.

Industrial Boiler and Process Heater MACT Rule requires compliance with HAPs emission limitations and work practice standards at certain IPL and WPL EGUs and fossil-fueled auxiliary boilers and process heaters located at EGUs by January 2016.

Ozone NAAQS Rule may require a reduction of NOx emissions in certain non-attainment areas based on classifications assigned by the EPA. In 2012, the EPA issued a final rule that classified Sheboygan County in Wisconsin as marginal ozone non-attainment, which requires this area to achieve compliance with the ozone NAAQS by December 2015. WPL operates Edgewater and Sheboygan Falls in Sheboygan County, Wisconsin.

SO2 NAAQS Rule establishes SO2 standards for certain areas of the U.S. currently exceeding the SO2 standard based on ambient monitoring data. IPL and WPL do not currently operate any EGUs in any areas that have non-attainment designations.

CAA Section 111(d) proposal would reduce CO2 emissions from existing fossil-fueled EGUs. The EPA is proposing a two-part goal structure: an “interim goal” that each state meets an average threshold over the period from 2020 through 2029, and a “final goal” based on a three-year rolling average that each state meets beginning in 2030. State plans that provide details of how these guidelines are to be met would be required by June 30, 2016. The EPA’s proposal allows for a one-year extension to submit state-only plans and a two-year extension if a state elects to join a regional multi-state program. The EPA is currently expected to issue final standards in 2015.

CAA Section 111(b) proposal would establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown and WPL’s proposed Riverside expansion are expected to be impacted by these proposed standards and would be constructed to achieve compliance with these standards. The EPA is currently expected to issue final standards in 2015.

Water Quality -
Section 316(b) of the Federal Clean Water Act regulates cooling water intake structures and minimizes adverse environmental impacts to fish and other aquatic life. Compliance will be incorporated during periodic facility permit renewal cycles, with final compliance anticipated by 2022.

Effluent Limitation Guidelines proposal would require changes to discharge limits for wastewater from steam generating facilities. Compliance would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines.

Hydroelectric Fish Passage Device - WPL is currently required to install an agency-approved fish passage device at its Prairie du Sac hydro plant by December 31, 2020.

Land and Solid Waste -
CCR Rule establishes minimum criteria for disposing of CCR in landfills and surface impoundments (ash ponds), and allows for continued operation of ash ponds if they meet certain performance criteria. The schedule for compliance with this rule has not yet been established.
(f) Credit Risk - IPL and WPL provide regulated electricity and natural gas services to residential, commercial, industrial and wholesale customers in the Midwest region of the U.S. The geographic concentration of these customers did not contribute significantly to overall credit risk exposure. In addition, as a result of a diverse customer base, IPL and WPL did not have any significant credit risk concentration for receivables arising from the sale of electricity or natural gas services.

Alliant Energy, IPL and WPL are subject to credit risk related to the ability of counterparties to meet their contractual payment obligations or the potential non-performance of counterparties to deliver contracted commodities and other goods or services at the contracted price. IPL and WPL are typically net buyers of commodities (primarily electricity, coal and natural gas) required to provide regulated electricity and natural gas services to their customers. As a result, IPL and WPL are also subject to credit risk related to their counterparties’ failures to deliver commodities at the contracted price.

Credit policies are maintained to mitigate credit risk. These credit policies include evaluation of the financial condition of certain counterparties, use of credit risk-related contingent provisions in certain commodity agreements that require credit support from counterparties that exceed certain exposure limits, diversification of counterparties to reduce concentrations of credit risk and the use of standardized agreements that facilitate the netting of cash flows associated with certain counterparties.

IPL has a PPA that grants it rights to purchase capacity and the resulting energy from DAEC through December 31, 2025. This PPA exposes Alliant Energy and IPL to risk of counterparty non-performance. However, financial risk is mitigated by IPL’s fuel-related cost recovery mechanisms. Refer to Note 16(b) for further discussion of the DAEC PPA.

Based on these credit policies, counterparty diversification and utility cost recovery mechanisms, it is unlikely that counterparty non-performance would have a material effect on financial condition or results of operations. However, there is no assurance that these items will protect against all losses from counterparty non-performance.

Refer to Notes 5(a) and 15 for details of allowances for doubtful accounts and credit risk-related contingent features, respectively.
IPL [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES
(a) Capital Purchase Obligations - Various contractual obligations contain minimum future commitments related to capital expenditures for certain construction projects. IPL’s projects include the construction of Marshalltown and the installation of a scrubber at Lansing Unit 4 to reduce SO2 emissions. WPL’s projects include the installation of a scrubber and baghouse at Edgewater Unit 5 to reduce SO2 and mercury emissions, and generation maintenance and performance improvements at Columbia Units 1 and 2. At December 31, 2014, Alliant Energy’s, IPL’s and WPL’s minimum future commitments related to certain contractual obligations for these projects were $25 million, $6 million and $19 million, respectively.
(b) Operating Expense Purchase Obligations - Various commodity supply, transportation and storage contracts meet obligations to provide electricity and natural gas to utility customers. Other operating expense purchase obligations with various vendors provide other goods and services. At December 31, 2014, minimum future commitments related to these operating expense purchase obligations were as follows (in millions):
Alliant Energy
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a):
 
 
 
 
 
 
 
 
 
 
 
 
 
DAEC (IPL) (b)

$119

 

$125

 

$138

 

$131

 

$143

 

$882

 

$1,538

Other
74

 
46

 
44

 
44

 

 

 
208

 
193

 
171

 
182

 
175

 
143

 
882

 
1,746

Natural gas
175

 
69

 
23

 
5

 
2

 
4

 
278

Coal (c)
124

 
78

 
47

 
34

 
8

 

 
291

SO2 emission allowances (d)
12

 
14

 
8

 

 

 

 
34

Other (e)
10

 
1

 

 

 

 

 
11

 

$514

 

$333

 

$260

 

$214

 

$153

 

$886

 

$2,360

IPL
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a):
 
 
 
 
 
 
 
 
 
 
 
 
 
DAEC (b)

$119

 

$125

 

$138

 

$131

 

$143

 

$882

 

$1,538

Other

 
1

 

 

 

 

 
1

 
119

 
126

 
138

 
131

 
143

 
882

 
1,539

Natural gas
108

 
32

 
5

 
2

 
2

 
4

 
153

Coal (c)
61

 
35

 
20

 
11

 

 

 
127

SO2 emission allowances (d)
12

 
14

 
8

 

 

 

 
34

Other (e)
6

 

 

 

 

 

 
6

 
$306
 

$207

 

$171

 

$144

 

$145

 

$886

 

$1,859

WPL
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a)

$74

 

$45

 

$44

 

$44

 

$—

 

$—

 

$207

Natural gas
67

 
37

 
18

 
3

 

 

 
125

Coal (c)
63

 
43

 
27

 
23

 
8

 

 
164

Other (e)
2

 
1

 

 

 

 

 
3

 

$206

 

$126

 

$89

 

$70

 

$8

 

$—

 

$499


(a)
Includes payments required by PPAs for capacity rights and minimum quantities of MWhs required to be purchased. Refer to Note 18 for additional information on purchased power transactions.
(b)
Includes commitments incurred under a PPA, which grants IPL rights to purchase up to 431 MWs of capacity and the resulting energy from DAEC for a term through December 31, 2025. If energy delivered is less than the targeted energy amount, an adjustment payment will be made to IPL, which will be reflected in IPL’s fuel adjustment clause.
(c)
Corporate Services entered into system-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments were assigned to IPL and WPL based on information available as of December 31, 2014 regarding expected future usage, which is subject to change.
(d)
Refer to Note 2 for discussion of $34 million of charges recognized by Alliant Energy and IPL in 2011 for forward contracts to purchase SO2 emission allowances.
(e)
Includes individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 2014.

Certain contracts are considered leases and are therefore not included here, but are included in Note 10.
(c) Legal Proceedings -
Flood Damage Claims - In June 2013, several plaintiffs purporting to represent a class of residential and commercial property owners filed a complaint against CRANDIC, Alliant Energy and various other defendants in the Iowa District Court for Linn County. Plaintiffs assert claims of negligence and strict liability based on their allegations that CRANDIC (along with other defendants) caused or exacerbated flooding of the Cedar River in June 2008. In July 2013, the case was removed from state court to federal court based on federal jurisdiction. In September 2013, the U.S. District Court for the Northern District of Iowa dismissed the Plaintiffs’ claims and transferred the case for resolution to the Surface Transportation Board, the administrative agency that oversees the Interstate Commerce Commission Termination Act. In October 2013, the Plaintiffs appealed the federal court’s dismissal of the case to the Eighth Circuit Court of Appeals. Alliant Energy and CRANDIC believe the case is without merit and will continue to vigorously contest the case. As a result, Alliant Energy does not currently believe any material losses from these claims are both probable and reasonably estimated, and therefore, has not recognized any material loss contingency amounts for this complaint as of December 31, 2014. Due to the early stages of the claim and the lack of specific damages identified, Alliant Energy is currently unable to provide an estimate of potential loss or range of potential loss.

Other - Alliant Energy, IPL and WPL are involved in other legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although unable to predict the outcome of these matters, Alliant Energy, IPL and WPL believe that appropriate reserves have been established and final disposition of these actions will not have a material effect on their financial condition or results of operations.
(e) Environmental Matters - Alliant Energy, IPL and WPL are subject to environmental regulations as a result of their current and past operations. These regulations are designed to protect public health and the environment and have resulted in compliance, remediation, containment and monitoring obligations, which are recorded as environmental liabilities. At December 31, current environmental liabilities were included in “Other current liabilities” and non-current environmental liabilities were included in “Other liabilities” on the balance sheets as follows (in millions):
 
Alliant Energy
 
IPL
 
WPL
 
2014
 
2013
 
2014
 
2013
 
2014
 
2013
Current environmental liabilities

$2.0

 

$3.6

 

$1.7

 

$2.8

 

$0.3

 

$0.8

Non-current environmental liabilities
13.5

 
15.4

 
11.9

 
13.6

 
1.6

 
1.7

 

$15.5

 

$19.0

 

$13.6

 

$16.4

 

$1.9

 

$2.5



MGP Sites - IPL and WPL have current or previous ownership interests in various sites that are previously associated with the production of gas for which IPL and WPL have, or may have in the future, liability for investigation, remediation and monitoring costs. IPL and WPL are working pursuant to the requirements of various federal and state agencies to investigate, mitigate, prevent and remediate, where necessary, the environmental impacts to property, including natural resources, at and around these former MGP sites in order to protect public health and the environment. IPL and WPL are currently monitoring and/or remediating 25 and 5 sites, respectively. Included in IPL’s sites is a Minnesota site for which responsibility of monitoring and/or remediating the site is expected to be transferred to the buyer as part of the anticipated sale of IPL’s Minnesota natural gas distribution assets.

Environmental liabilities related to these MGP sites are recorded based upon periodic studies. Such amounts are based on the best current estimate of the remaining amount to be incurred for investigation, remediation and monitoring costs for those sites where the investigation process has been or is substantially completed, and the minimum of the estimated cost range for those sites where the investigation is in its earlier stages. There are inherent uncertainties associated with the estimated remaining costs for MGP projects primarily due to unknown site conditions and potential changes in regulatory agency requirements. It is possible that future cost estimates will be greater than current estimates as the investigation process proceeds and as additional facts become known. The amounts recognized as liabilities are reduced for expenditures incurred and are adjusted as further information develops or circumstances change. Costs of future expenditures for environmental remediation obligations are not discounted. At December 31, 2014, estimated future costs expected to be incurred for the investigation, remediation and monitoring of the MGP sites, as well as environmental liabilities recorded on the balance sheets for these sites, were as follows (in millions):
 
Alliant Energy
 
IPL
 
WPL
Range of estimated future costs

$12

-
$31
 

$11

-
$29
 

$1

-
$2
Current and non-current environmental liabilities
16
 
14
 
2


Refer to Note 2 for discussion of regulatory assets recorded by IPL and WPL, which reflect the probable future rate recovery of MGP expenditures. Considering the current rate treatment, and assuming no material change therein, Alliant Energy, IPL and WPL believe that the clean-up costs incurred for these MGP sites will not have a material effect on their financial condition or results of operations. Settlement has been reached with all of IPL’s and WPL’s insurance carriers regarding reimbursement for their MGP-related costs and such amounts have been accounted for as directed by the applicable regulatory jurisdiction.

WPL Consent Decree - In 2009, the EPA sent a notice of violation to WPL as an owner and the operator of Edgewater, Nelson Dewey and Columbia alleging that the owners of such EGUs failed to comply with appropriate pre-construction review and permitting requirements and as a result violated the PSD program requirements, Title V Operating Permit requirements of the CAA and the Wisconsin SIP. In 2010, the Sierra Club filed complaints against WPL, as owner and operator of Nelson Dewey and Columbia, and separately as owner and operator of Edgewater, based on allegations that modifications were made at the facilities without complying with the PSD program requirements, Title V Operating Permit requirements of the CAA and state regulatory counterparts contained within the Wisconsin SIP designed to implement the CAA.

In April 2013, WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve the claims relating to Edgewater, Columbia and Nelson Dewey, while admitting no liability. In June 2013, the Consent Decree was approved by the Court, thereby resolving all claims against WPL. Under the Consent Decree, WPL is required to install the following emission controls systems:

SCR system at Edgewater Unit 5 by May 1, 2013 (placed in service in 2012);
Scrubbers and baghouses at Columbia Units 1 and 2 by December 31, 2014 (placed in service in 2014);
Scrubber and baghouse at Edgewater Unit 5 by December 31, 2016; and
SCR system at Columbia Unit 2 by December 31, 2018.

WPL is also required to fuel switch or retire Nelson Dewey Units 1 and 2 and Edgewater Unit 3 by December 31, 2015, and Edgewater Unit 4 by December 31, 2018. In addition, the Consent Decree establishes emission rate limits for SO2, NOx and particulate matter for Columbia Units 1 and 2, Nelson Dewey Units 1 and 2, and Edgewater Units 4 and 5. The Consent Decree also includes annual plant-wide emission caps for SO2 and NOx for Columbia, Edgewater and Nelson Dewey. In addition, WPL will complete approximately $7 million in environmental mitigation projects.

Final recovery of the costs expected to be incurred related to the Consent Decree will be decided by the PSCW in future rate cases or other proceedings. Alliant Energy and WPL currently expect to recover any material costs incurred by WPL related to compliance with the terms of the Consent Decree from WPL’s electric customers, except for costs related to certain of the environmental mitigation projects.

Other Environmental Contingencies - In addition to the environmental liabilities discussed above, various environmental rules are monitored that may have a significant impact on future operations. Several of these environmental rules are subject to legal challenges, reconsideration and/or other uncertainties. Given uncertainties regarding the outcome, timing and compliance plans for these environmental matters, the complete financial impact of each of these rules is not able to be determined; however future capital investments and/or modifications to EGUs to comply with certain of these rules could be significant. Specific current, proposed or potential environmental matters are included below, along with a brief description of these environmental rules.

Air Quality -
CSAPR is an emissions trading program that requires SO2 and NOx emissions reductions at certain IPL and WPL fossil-fueled EGUs through installation of emission controls and/or purchases of allowances. Compliance with emissions limits began in 2015, with additional emissions limits reductions beginning in 2017.

CAVR requires states to develop and implement plans to address visibility impairment in designated national parks and wilderness areas. These implementation plans require BART emission controls at certain IPL and WPL fossil-fueled EGUs and other additional measures needed for reducing state contributions to regional haze.

MATS Rule requires compliance with emission limits for mercury and other HAPs and work practice standards for existing coal-fired EGUs. Compliance is required by April 2015; however, an entity can request an additional year for compliance for certain EGUs. The Wisconsin DNR approved an extension to the MATS compliance deadline to April 2016 for WPL’s Edgewater Unit 3 and Nelson Dewey Units 1 and 2.

Industrial Boiler and Process Heater MACT Rule requires compliance with HAPs emission limitations and work practice standards at certain IPL and WPL EGUs and fossil-fueled auxiliary boilers and process heaters located at EGUs by January 2016.

Ozone NAAQS Rule may require a reduction of NOx emissions in certain non-attainment areas based on classifications assigned by the EPA. In 2012, the EPA issued a final rule that classified Sheboygan County in Wisconsin as marginal ozone non-attainment, which requires this area to achieve compliance with the ozone NAAQS by December 2015. WPL operates Edgewater and Sheboygan Falls in Sheboygan County, Wisconsin.

SO2 NAAQS Rule establishes SO2 standards for certain areas of the U.S. currently exceeding the SO2 standard based on ambient monitoring data. IPL and WPL do not currently operate any EGUs in any areas that have non-attainment designations.

CAA Section 111(d) proposal would reduce CO2 emissions from existing fossil-fueled EGUs. The EPA is proposing a two-part goal structure: an “interim goal” that each state meets an average threshold over the period from 2020 through 2029, and a “final goal” based on a three-year rolling average that each state meets beginning in 2030. State plans that provide details of how these guidelines are to be met would be required by June 30, 2016. The EPA’s proposal allows for a one-year extension to submit state-only plans and a two-year extension if a state elects to join a regional multi-state program. The EPA is currently expected to issue final standards in 2015.

CAA Section 111(b) proposal would establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown and WPL’s proposed Riverside expansion are expected to be impacted by these proposed standards and would be constructed to achieve compliance with these standards. The EPA is currently expected to issue final standards in 2015.

Water Quality -
Section 316(b) of the Federal Clean Water Act regulates cooling water intake structures and minimizes adverse environmental impacts to fish and other aquatic life. Compliance will be incorporated during periodic facility permit renewal cycles, with final compliance anticipated by 2022.

Effluent Limitation Guidelines proposal would require changes to discharge limits for wastewater from steam generating facilities. Compliance would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines.

Hydroelectric Fish Passage Device - WPL is currently required to install an agency-approved fish passage device at its Prairie du Sac hydro plant by December 31, 2020.

Land and Solid Waste -
CCR Rule establishes minimum criteria for disposing of CCR in landfills and surface impoundments (ash ponds), and allows for continued operation of ash ponds if they meet certain performance criteria. The schedule for compliance with this rule has not yet been established.
(f) Credit Risk - IPL and WPL provide regulated electricity and natural gas services to residential, commercial, industrial and wholesale customers in the Midwest region of the U.S. The geographic concentration of these customers did not contribute significantly to overall credit risk exposure. In addition, as a result of a diverse customer base, IPL and WPL did not have any significant credit risk concentration for receivables arising from the sale of electricity or natural gas services.

Alliant Energy, IPL and WPL are subject to credit risk related to the ability of counterparties to meet their contractual payment obligations or the potential non-performance of counterparties to deliver contracted commodities and other goods or services at the contracted price. IPL and WPL are typically net buyers of commodities (primarily electricity, coal and natural gas) required to provide regulated electricity and natural gas services to their customers. As a result, IPL and WPL are also subject to credit risk related to their counterparties’ failures to deliver commodities at the contracted price.

Credit policies are maintained to mitigate credit risk. These credit policies include evaluation of the financial condition of certain counterparties, use of credit risk-related contingent provisions in certain commodity agreements that require credit support from counterparties that exceed certain exposure limits, diversification of counterparties to reduce concentrations of credit risk and the use of standardized agreements that facilitate the netting of cash flows associated with certain counterparties.

IPL has a PPA that grants it rights to purchase capacity and the resulting energy from DAEC through December 31, 2025. This PPA exposes Alliant Energy and IPL to risk of counterparty non-performance. However, financial risk is mitigated by IPL’s fuel-related cost recovery mechanisms. Refer to Note 16(b) for further discussion of the DAEC PPA.

Based on these credit policies, counterparty diversification and utility cost recovery mechanisms, it is unlikely that counterparty non-performance would have a material effect on financial condition or results of operations. However, there is no assurance that these items will protect against all losses from counterparty non-performance.

Refer to Notes 5(a) and 15 for details of allowances for doubtful accounts and credit risk-related contingent features, respectively.
WPL [Member]  
Commitments And Contingencies
COMMITMENTS AND CONTINGENCIES
(a) Capital Purchase Obligations - Various contractual obligations contain minimum future commitments related to capital expenditures for certain construction projects. IPL’s projects include the construction of Marshalltown and the installation of a scrubber at Lansing Unit 4 to reduce SO2 emissions. WPL’s projects include the installation of a scrubber and baghouse at Edgewater Unit 5 to reduce SO2 and mercury emissions, and generation maintenance and performance improvements at Columbia Units 1 and 2. At December 31, 2014, Alliant Energy’s, IPL’s and WPL’s minimum future commitments related to certain contractual obligations for these projects were $25 million, $6 million and $19 million, respectively.
(b) Operating Expense Purchase Obligations - Various commodity supply, transportation and storage contracts meet obligations to provide electricity and natural gas to utility customers. Other operating expense purchase obligations with various vendors provide other goods and services. At December 31, 2014, minimum future commitments related to these operating expense purchase obligations were as follows (in millions):
Alliant Energy
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a):
 
 
 
 
 
 
 
 
 
 
 
 
 
DAEC (IPL) (b)

$119

 

$125

 

$138

 

$131

 

$143

 

$882

 

$1,538

Other
74

 
46

 
44

 
44

 

 

 
208

 
193

 
171

 
182

 
175

 
143

 
882

 
1,746

Natural gas
175

 
69

 
23

 
5

 
2

 
4

 
278

Coal (c)
124

 
78

 
47

 
34

 
8

 

 
291

SO2 emission allowances (d)
12

 
14

 
8

 

 

 

 
34

Other (e)
10

 
1

 

 

 

 

 
11

 

$514

 

$333

 

$260

 

$214

 

$153

 

$886

 

$2,360

IPL
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a):
 
 
 
 
 
 
 
 
 
 
 
 
 
DAEC (b)

$119

 

$125

 

$138

 

$131

 

$143

 

$882

 

$1,538

Other

 
1

 

 

 

 

 
1

 
119

 
126

 
138

 
131

 
143

 
882

 
1,539

Natural gas
108

 
32

 
5

 
2

 
2

 
4

 
153

Coal (c)
61

 
35

 
20

 
11

 

 

 
127

SO2 emission allowances (d)
12

 
14

 
8

 

 

 

 
34

Other (e)
6

 

 

 

 

 

 
6

 
$306
 

$207

 

$171

 

$144

 

$145

 

$886

 

$1,859

WPL
2015
 
2016
 
2017
 
2018
 
2019
 
Thereafter
 
Total
Purchased power (a)

$74

 

$45

 

$44

 

$44

 

$—

 

$—

 

$207

Natural gas
67

 
37

 
18

 
3

 

 

 
125

Coal (c)
63

 
43

 
27

 
23

 
8

 

 
164

Other (e)
2

 
1

 

 

 

 

 
3

 

$206

 

$126

 

$89

 

$70

 

$8

 

$—

 

$499


(a)
Includes payments required by PPAs for capacity rights and minimum quantities of MWhs required to be purchased. Refer to Note 18 for additional information on purchased power transactions.
(b)
Includes commitments incurred under a PPA, which grants IPL rights to purchase up to 431 MWs of capacity and the resulting energy from DAEC for a term through December 31, 2025. If energy delivered is less than the targeted energy amount, an adjustment payment will be made to IPL, which will be reflected in IPL’s fuel adjustment clause.
(c)
Corporate Services entered into system-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments were assigned to IPL and WPL based on information available as of December 31, 2014 regarding expected future usage, which is subject to change.
(d)
Refer to Note 2 for discussion of $34 million of charges recognized by Alliant Energy and IPL in 2011 for forward contracts to purchase SO2 emission allowances.
(e)
Includes individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 2014.

Certain contracts are considered leases and are therefore not included here, but are included in Note 10.
(c) Legal Proceedings -
Flood Damage Claims - In June 2013, several plaintiffs purporting to represent a class of residential and commercial property owners filed a complaint against CRANDIC, Alliant Energy and various other defendants in the Iowa District Court for Linn County. Plaintiffs assert claims of negligence and strict liability based on their allegations that CRANDIC (along with other defendants) caused or exacerbated flooding of the Cedar River in June 2008. In July 2013, the case was removed from state court to federal court based on federal jurisdiction. In September 2013, the U.S. District Court for the Northern District of Iowa dismissed the Plaintiffs’ claims and transferred the case for resolution to the Surface Transportation Board, the administrative agency that oversees the Interstate Commerce Commission Termination Act. In October 2013, the Plaintiffs appealed the federal court’s dismissal of the case to the Eighth Circuit Court of Appeals. Alliant Energy and CRANDIC believe the case is without merit and will continue to vigorously contest the case. As a result, Alliant Energy does not currently believe any material losses from these claims are both probable and reasonably estimated, and therefore, has not recognized any material loss contingency amounts for this complaint as of December 31, 2014. Due to the early stages of the claim and the lack of specific damages identified, Alliant Energy is currently unable to provide an estimate of potential loss or range of potential loss.

Other - Alliant Energy, IPL and WPL are involved in other legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although unable to predict the outcome of these matters, Alliant Energy, IPL and WPL believe that appropriate reserves have been established and final disposition of these actions will not have a material effect on their financial condition or results of operations.
(e) Environmental Matters - Alliant Energy, IPL and WPL are subject to environmental regulations as a result of their current and past operations. These regulations are designed to protect public health and the environment and have resulted in compliance, remediation, containment and monitoring obligations, which are recorded as environmental liabilities. At December 31, current environmental liabilities were included in “Other current liabilities” and non-current environmental liabilities were included in “Other liabilities” on the balance sheets as follows (in millions):
 
Alliant Energy
 
IPL
 
WPL
 
2014
 
2013
 
2014
 
2013
 
2014
 
2013
Current environmental liabilities

$2.0

 

$3.6

 

$1.7

 

$2.8

 

$0.3

 

$0.8

Non-current environmental liabilities
13.5

 
15.4

 
11.9

 
13.6

 
1.6

 
1.7

 

$15.5

 

$19.0

 

$13.6

 

$16.4

 

$1.9

 

$2.5



MGP Sites - IPL and WPL have current or previous ownership interests in various sites that are previously associated with the production of gas for which IPL and WPL have, or may have in the future, liability for investigation, remediation and monitoring costs. IPL and WPL are working pursuant to the requirements of various federal and state agencies to investigate, mitigate, prevent and remediate, where necessary, the environmental impacts to property, including natural resources, at and around these former MGP sites in order to protect public health and the environment. IPL and WPL are currently monitoring and/or remediating 25 and 5 sites, respectively. Included in IPL’s sites is a Minnesota site for which responsibility of monitoring and/or remediating the site is expected to be transferred to the buyer as part of the anticipated sale of IPL’s Minnesota natural gas distribution assets.

Environmental liabilities related to these MGP sites are recorded based upon periodic studies. Such amounts are based on the best current estimate of the remaining amount to be incurred for investigation, remediation and monitoring costs for those sites where the investigation process has been or is substantially completed, and the minimum of the estimated cost range for those sites where the investigation is in its earlier stages. There are inherent uncertainties associated with the estimated remaining costs for MGP projects primarily due to unknown site conditions and potential changes in regulatory agency requirements. It is possible that future cost estimates will be greater than current estimates as the investigation process proceeds and as additional facts become known. The amounts recognized as liabilities are reduced for expenditures incurred and are adjusted as further information develops or circumstances change. Costs of future expenditures for environmental remediation obligations are not discounted. At December 31, 2014, estimated future costs expected to be incurred for the investigation, remediation and monitoring of the MGP sites, as well as environmental liabilities recorded on the balance sheets for these sites, were as follows (in millions):
 
Alliant Energy
 
IPL
 
WPL
Range of estimated future costs

$12

-
$31
 

$11

-
$29
 

$1

-
$2
Current and non-current environmental liabilities
16
 
14
 
2


Refer to Note 2 for discussion of regulatory assets recorded by IPL and WPL, which reflect the probable future rate recovery of MGP expenditures. Considering the current rate treatment, and assuming no material change therein, Alliant Energy, IPL and WPL believe that the clean-up costs incurred for these MGP sites will not have a material effect on their financial condition or results of operations. Settlement has been reached with all of IPL’s and WPL’s insurance carriers regarding reimbursement for their MGP-related costs and such amounts have been accounted for as directed by the applicable regulatory jurisdiction.

WPL Consent Decree - In 2009, the EPA sent a notice of violation to WPL as an owner and the operator of Edgewater, Nelson Dewey and Columbia alleging that the owners of such EGUs failed to comply with appropriate pre-construction review and permitting requirements and as a result violated the PSD program requirements, Title V Operating Permit requirements of the CAA and the Wisconsin SIP. In 2010, the Sierra Club filed complaints against WPL, as owner and operator of Nelson Dewey and Columbia, and separately as owner and operator of Edgewater, based on allegations that modifications were made at the facilities without complying with the PSD program requirements, Title V Operating Permit requirements of the CAA and state regulatory counterparts contained within the Wisconsin SIP designed to implement the CAA.

In April 2013, WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve the claims relating to Edgewater, Columbia and Nelson Dewey, while admitting no liability. In June 2013, the Consent Decree was approved by the Court, thereby resolving all claims against WPL. Under the Consent Decree, WPL is required to install the following emission controls systems:

SCR system at Edgewater Unit 5 by May 1, 2013 (placed in service in 2012);
Scrubbers and baghouses at Columbia Units 1 and 2 by December 31, 2014 (placed in service in 2014);
Scrubber and baghouse at Edgewater Unit 5 by December 31, 2016; and
SCR system at Columbia Unit 2 by December 31, 2018.

WPL is also required to fuel switch or retire Nelson Dewey Units 1 and 2 and Edgewater Unit 3 by December 31, 2015, and Edgewater Unit 4 by December 31, 2018. In addition, the Consent Decree establishes emission rate limits for SO2, NOx and particulate matter for Columbia Units 1 and 2, Nelson Dewey Units 1 and 2, and Edgewater Units 4 and 5. The Consent Decree also includes annual plant-wide emission caps for SO2 and NOx for Columbia, Edgewater and Nelson Dewey. In addition, WPL will complete approximately $7 million in environmental mitigation projects.

Final recovery of the costs expected to be incurred related to the Consent Decree will be decided by the PSCW in future rate cases or other proceedings. Alliant Energy and WPL currently expect to recover any material costs incurred by WPL related to compliance with the terms of the Consent Decree from WPL’s electric customers, except for costs related to certain of the environmental mitigation projects.

Other Environmental Contingencies - In addition to the environmental liabilities discussed above, various environmental rules are monitored that may have a significant impact on future operations. Several of these environmental rules are subject to legal challenges, reconsideration and/or other uncertainties. Given uncertainties regarding the outcome, timing and compliance plans for these environmental matters, the complete financial impact of each of these rules is not able to be determined; however future capital investments and/or modifications to EGUs to comply with certain of these rules could be significant. Specific current, proposed or potential environmental matters are included below, along with a brief description of these environmental rules.

Air Quality -
CSAPR is an emissions trading program that requires SO2 and NOx emissions reductions at certain IPL and WPL fossil-fueled EGUs through installation of emission controls and/or purchases of allowances. Compliance with emissions limits began in 2015, with additional emissions limits reductions beginning in 2017.

CAVR requires states to develop and implement plans to address visibility impairment in designated national parks and wilderness areas. These implementation plans require BART emission controls at certain IPL and WPL fossil-fueled EGUs and other additional measures needed for reducing state contributions to regional haze.

MATS Rule requires compliance with emission limits for mercury and other HAPs and work practice standards for existing coal-fired EGUs. Compliance is required by April 2015; however, an entity can request an additional year for compliance for certain EGUs. The Wisconsin DNR approved an extension to the MATS compliance deadline to April 2016 for WPL’s Edgewater Unit 3 and Nelson Dewey Units 1 and 2.

Industrial Boiler and Process Heater MACT Rule requires compliance with HAPs emission limitations and work practice standards at certain IPL and WPL EGUs and fossil-fueled auxiliary boilers and process heaters located at EGUs by January 2016.

Ozone NAAQS Rule may require a reduction of NOx emissions in certain non-attainment areas based on classifications assigned by the EPA. In 2012, the EPA issued a final rule that classified Sheboygan County in Wisconsin as marginal ozone non-attainment, which requires this area to achieve compliance with the ozone NAAQS by December 2015. WPL operates Edgewater and Sheboygan Falls in Sheboygan County, Wisconsin.

SO2 NAAQS Rule establishes SO2 standards for certain areas of the U.S. currently exceeding the SO2 standard based on ambient monitoring data. IPL and WPL do not currently operate any EGUs in any areas that have non-attainment designations.

CAA Section 111(d) proposal would reduce CO2 emissions from existing fossil-fueled EGUs. The EPA is proposing a two-part goal structure: an “interim goal” that each state meets an average threshold over the period from 2020 through 2029, and a “final goal” based on a three-year rolling average that each state meets beginning in 2030. State plans that provide details of how these guidelines are to be met would be required by June 30, 2016. The EPA’s proposal allows for a one-year extension to submit state-only plans and a two-year extension if a state elects to join a regional multi-state program. The EPA is currently expected to issue final standards in 2015.

CAA Section 111(b) proposal would establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown and WPL’s proposed Riverside expansion are expected to be impacted by these proposed standards and would be constructed to achieve compliance with these standards. The EPA is currently expected to issue final standards in 2015.

Water Quality -
Section 316(b) of the Federal Clean Water Act regulates cooling water intake structures and minimizes adverse environmental impacts to fish and other aquatic life. Compliance will be incorporated during periodic facility permit renewal cycles, with final compliance anticipated by 2022.

Effluent Limitation Guidelines proposal would require changes to discharge limits for wastewater from steam generating facilities. Compliance would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines.

Hydroelectric Fish Passage Device - WPL is currently required to install an agency-approved fish passage device at its Prairie du Sac hydro plant by December 31, 2020.

Land and Solid Waste -
CCR Rule establishes minimum criteria for disposing of CCR in landfills and surface impoundments (ash ponds), and allows for continued operation of ash ponds if they meet certain performance criteria. The schedule for compliance with this rule has not yet been established.
(f) Credit Risk - IPL and WPL provide regulated electricity and natural gas services to residential, commercial, industrial and wholesale customers in the Midwest region of the U.S. The geographic concentration of these customers did not contribute significantly to overall credit risk exposure. In addition, as a result of a diverse customer base, IPL and WPL did not have any significant credit risk concentration for receivables arising from the sale of electricity or natural gas services.

Alliant Energy, IPL and WPL are subject to credit risk related to the ability of counterparties to meet their contractual payment obligations or the potential non-performance of counterparties to deliver contracted commodities and other goods or services at the contracted price. IPL and WPL are typically net buyers of commodities (primarily electricity, coal and natural gas) required to provide regulated electricity and natural gas services to their customers. As a result, IPL and WPL are also subject to credit risk related to their counterparties’ failures to deliver commodities at the contracted price.

Credit policies are maintained to mitigate credit risk. These credit policies include evaluation of the financial condition of certain counterparties, use of credit risk-related contingent provisions in certain commodity agreements that require credit support from counterparties that exceed certain exposure limits, diversification of counterparties to reduce concentrations of credit risk and the use of standardized agreements that facilitate the netting of cash flows associated with certain counterparties.

IPL has a PPA that grants it rights to purchase capacity and the resulting energy from DAEC through December 31, 2025. This PPA exposes Alliant Energy and IPL to risk of counterparty non-performance. However, financial risk is mitigated by IPL’s fuel-related cost recovery mechanisms. Refer to Note 16(b) for further discussion of the DAEC PPA.

Based on these credit policies, counterparty diversification and utility cost recovery mechanisms, it is unlikely that counterparty non-performance would have a material effect on financial condition or results of operations. However, there is no assurance that these items will protect against all losses from counterparty non-performance.

Refer to Notes 5(a) and 15 for details of allowances for doubtful accounts and credit risk-related contingent features, respectively.