9 Months Ended | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sep. 30, 2024 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Commitments, Guarantees and Contingencies | COMMITMENTS, GUARANTEES AND CONTINGENCIES The disclosures in this note apply to all Registrants unless indicated otherwise. The Registrants are subject to certain claims and legal actions arising in the ordinary course of business. In addition, the Registrants’ business activities are subject to extensive governmental regulation related to public health and the environment. The ultimate outcome of such pending or potential litigation against the Registrants cannot be predicted. Management accrues contingent liabilities only when management concludes that it is both probable that a liability has been incurred at the date of the financial statements and the amount of loss can be reasonably estimated. When management determines that it is not probable, but rather reasonably possible that a liability has been incurred at the date of the financial statements, management discloses such contingencies and the possible loss or range of loss if such estimate can be made. Any estimated range is based on currently available information and involves elements of judgment and significant uncertainties. Any estimated range of possible loss may not represent the maximum possible loss exposure. Circumstances change over time and actual results may vary significantly from estimates. For current proceedings not specifically discussed below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the financial statements. The Commitments, Guarantees and Contingencies note within the 2023 Annual Report should be read in conjunction with this report. GUARANTEES Liabilities for guarantees are recorded in accordance with the accounting guidance for “Guarantees.” There is no collateral held in relation to any guarantees. In the event any guarantee is drawn, there is no recourse to third-parties unless specified below. Letters of Credit (Applies to AEP and AEP Texas) Standby letters of credit are entered into with third-parties. These letters of credit are issued in the ordinary course of business and cover items such as natural gas and electricity risk management contracts, construction contracts, insurance programs, security deposits and debt service reserves. In March 2024, AEP increased its $4 billion revolving credit facility to $5 billion and extended the due date from March 2027 to March 2029. Also, in March 2024, AEP extended the due date of its $1 billion revolving credit facility from March 2025 to March 2027. AEP may issue up to $1.2 billion as letters of credit under these revolving credit facilities on behalf of subsidiaries. As of September 30, 2024, no letters of credit were issued under either revolving credit facility. An uncommitted facility gives the issuer of the facility the right to accept or decline each request made under the facility. AEP issues letters of credit on behalf of subsidiaries under six uncommitted facilities totaling $450 million. The Registrants’ maximum future payments for letters of credit issued under the uncommitted facilities as of September 30, 2024 were as follows:
Indemnifications and Other Guarantees Contracts The Registrants enter into certain types of contracts which require indemnifications. Typically these contracts include, but are not limited to, sale agreements, lease agreements, purchase agreements and financing agreements. Generally, these agreements may include, but are not limited to, indemnifications around certain tax, contractual and environmental matters. With respect to sale agreements, exposure generally does not exceed the sale price. As of September 30, 2024, there were no material liabilities recorded for any indemnifications. AEPSC conducts power purchase-and-sale activity on behalf of APCo, I&M, KPCo and WPCo, who are jointly and severally liable for activity conducted on their behalf. AEPSC also conducts power purchase-and-sale activity on behalf of PSO and SWEPCo, who are jointly and severally liable for activity conducted on their behalf. Master Lease Agreements (Applies to all Registrants except AEPTCo) The Registrants lease certain equipment under master lease agreements. Under the lease agreements, the lessor is guaranteed a residual value up to a stated percentage of the equipment cost at the end of the lease term. If the actual fair value of the leased equipment is below the guaranteed residual value at the end of the lease term, the Registrants are committed to pay the difference between the actual fair value and the residual value guarantee. Historically, at the end of the lease term the fair value has been in excess of the amount guaranteed. As of September 30, 2024, the maximum potential loss by the Registrants for these lease agreements assuming the fair value of the equipment is zero at the end of the lease term was as follows:
ENVIRONMENTAL CONTINGENCIES (Applies to all Registrants except AEPTCo) Federal EPA’s Revised CCR Rule In April 2024, the Federal EPA finalized revisions to the CCR Rule to expand the scope of the rule to include inactive impoundments at inactive facilities (“legacy CCR surface impoundments”) as well as to establish requirements for currently exempt solid waste management units that involve the direct placement of CCR on the land (“CCR management units”). The Federal EPA is requiring that owners and operators of legacy surface impoundments comply with all of the existing CCR Rule requirements applicable to inactive CCR surface impoundments at active facilities, except for the location restrictions and liner design criteria. The rule establishes compliance deadlines for legacy surface impoundments to meet regulatory requirements, including a requirement to initiate closure within five years after the effective date of the final rule. The rule requires evaluations to be completed at both active facilities and inactive facilities with one or more legacy surface impoundments. Closure may be accomplished by applying an impermeable cover system over the CCR material (“closure in place”) or the CCR material may be excavated and placed in a compliant landfill (“closure by removal”). Groundwater monitoring and other analysis over the next three years will provide additional information on the planned closure method. AEP evaluated the applicability of the rule to current and former plant sites and recorded incremental ARO in the second quarter of 2024, as shown in the table below, based on initial cost estimates primarily reflecting compliance with the rule through closure in place and future groundwater monitoring requirements pursuant to the CCR Rule.
(a)ARO is related to a legacy CCR surface impoundment or CCR management unit at an operating generation facility. (b)ARO is related to a legacy CCR surface impoundment or CCR management unit at a retired generation facility and recognition of a regulatory asset in accordance with the accounting guidance for “Regulated Operations” is supported. (c)ARO is related to a legacy CCR surface impoundment or CCR management unit and recognition of a regulatory asset in accordance with the accounting guidance for “Regulated Operations” is not yet supported. As further groundwater monitoring and other analysis is performed, management expects to refine the assumptions and underlying cost estimates used in recording the ARO. These refinements may include, but are not limited to, changes in the expected method of closure, changes in estimated quantities of CCR at each site, the identification of new CCR management units, among other items. These future changes could have a material impact on the ARO and materially reduce future net income and cash flows and further impact financial condition. AEP will seek cost recovery through regulated rates, including proposal of new regulatory mechanisms for cost recovery where existing mechanisms are not applicable. The rule could have an additional, material adverse impact on net income, cash flows and financial condition if AEP cannot ultimately recover these additional costs of compliance. Several parties, including AEP and one of its trade associations, have filed petitions for review of the rule with the U.S. Court of Appeals for the D.C. Circuit. One of the parties also filed a motion to stay the rule pending the outcome of the litigation. In November 2024, the court denied the stay motion. Management cannot predict the outcome of the litigation. The Comprehensive Environmental Response Compensation and Liability Act (Superfund) and State Remediation By-products from the generation of electricity include materials such as ash, slag, sludge, low-level radioactive waste and SNF. Coal combustion by-products, which constitute the overwhelming percentage of these materials, are typically treated and deposited in captive disposal facilities or are beneficially utilized. In addition, the generation plants and transmission and distribution facilities have used asbestos, polychlorinated biphenyls and other hazardous and non-hazardous materials. The Registrants currently incur costs to dispose of these substances safely. For remediation processes not specifically discussed, management does not anticipate that the liabilities, if any, arising from such remediation processes would have a material effect on the financial statements. NUCLEAR CONTINGENCIES (Applies to AEP and I&M) I&M owns and operates the Cook Plant under licenses granted by the Nuclear Regulatory Commission. I&M has a significant future financial commitment to dispose of SNF and to safely decommission and decontaminate the plant. The licenses to operate the two nuclear units at the Cook Plant expire in 2034 and 2037. Management is currently evaluating applying for license extensions for both units. The operation of a nuclear facility also involves special risks, potential liabilities and specific regulatory and safety requirements. By agreement, I&M is partially liable, together with all other electric utility companies that own nuclear generation units, for a nuclear power plant incident at any nuclear plant in the U.S. Should a nuclear incident occur at any nuclear power plant in the U.S., the resultant liability could be substantial. OPERATIONAL CONTINGENCIES Insurance and Potential Losses The Registrants maintain insurance coverage normal and customary for electric utilities, subject to various deductibles. The Registrants also maintain property and casualty insurance that may cover certain physical damage or third-party injuries caused by cybersecurity incidents. Insurance coverage includes all risks of physical loss or damage to nonnuclear assets, subject to insurance policy conditions and exclusions. Covered property generally includes power plants, substations, facilities and inventories. Excluded property generally includes transmission and distribution lines, poles and towers. The insurance programs also generally provide coverage against loss arising from certain claims made by third-parties and are in excess of retentions absorbed by the Registrants. Coverage is generally provided by a combination of the protected cell of EIS and/or various industry mutual and/or commercial insurance carriers. Insurance coverage for certain claims made by third-parties is structured to reimburse the Registrants for the amounts they are legally obligated to pay in excess of the Registrants’ retentions. Such claims, when deemed probable of occurring and reasonably estimable, are reflected as liabilities on the financial statements of the Registrants. Also, when it is deemed probable that these claims, or any portion thereof, will be covered by insurance or otherwise reimbursable to the Registrant, an asset is recognized on the balance sheet. As of September 30, 2024, AEP Texas recorded an Accrued Litigation Settlement within current liabilities and a corresponding Insurance Receivable within current assets on the balance sheet related to an injured contractor claim. In July 2024, the Registrants renewed insurance programs including coverage for wildfire liability. Some potential losses or liabilities may not be insurable or the amount of insurance carried may not be sufficient to meet potential losses and liabilities, including, but not limited to, liabilities relating to a cybersecurity incident, extreme weather or wildfire related liabilities or damage to the Cook Plant and costs of replacement power in the event of an incident at the Cook Plant. Future losses or liabilities, if they occur, which are not completely insured, unless recovered through rate-making process, could reduce future net income and cash flows and impact financial condition. Litigation Related to Ohio House Bill 6 (HB 6) (Applies to AEP and OPCo) In 2019, Ohio adopted and implemented HB 6 which benefits OPCo by authorizing rate recovery for certain costs including renewable energy contracts and OVEC’s coal-fired generating units. OPCo engaged in lobbying efforts and provided testimony during the legislative process in connection with HB 6. In July 2020, an investigation led by the U.S. Attorney’s Office resulted in a federal grand jury indictment of an Ohio legislator and associates in connection with an alleged racketeering conspiracy involving the adoption of HB 6. After AEP learned of the criminal allegations against the Ohio legislator and others relating to HB 6, AEP, with assistance from outside advisors, conducted a review of the circumstances surrounding the passage of the bill. Management does not believe that AEP was involved in any wrongful conduct in connection with the passage of HB 6. In August 2020, an AEP shareholder filed a putative class action lawsuit in the U.S. District Court for the Southern District of Ohio against AEP and certain of its officers for alleged violations of securities laws. In December 2021, the district court issued an opinion and order dismissing the securities litigation complaint with prejudice, determining that the complaint failed to plead any actionable misrepresentations or omissions. The plaintiffs did not appeal the ruling. In January 2021, an AEP shareholder filed a derivative action in the U.S. District Court for the Southern District of Ohio purporting to assert claims on behalf of AEP against certain AEP officers and directors. In February 2021, a second AEP shareholder filed a similar derivative action in the Court of Common Pleas of Franklin County, Ohio. In April 2021, a third AEP shareholder filed a similar derivative action in the U.S. District Court for the Southern District of Ohio and a fourth AEP shareholder filed a similar derivative action in the Supreme Court for the State of New York, Nassau County. These derivative complaints allege the officers and directors made misrepresentations and omissions similar to those alleged in the putative securities class action lawsuit filed against AEP. The derivative complaints (collectively, the “Derivative Actions”) together assert claims for: (a) breach of fiduciary duty, (b) waste of corporate assets, (c) unjust enrichment, (d) breach of duty for insider trading and (e) contribution for violations of sections 10(b) and 21D of the Securities Exchange Act of 1934; and seek monetary damages and changes to AEP’s corporate governance and internal policies among other forms of relief. The court entered a scheduling order in the New York state court derivative action staying the case other than with respect to briefing the motion to dismiss. AEP filed substantive and forum-based motions to dismiss in April 2022. In June 2022, the Ohio state court entered an order continuing the stays of that case until the final resolution of the consolidated derivative actions pending in Ohio federal district court. In September 2022, the New York state court granted the forum-based motion to dismiss with prejudice and the plaintiff subsequently filed a notice of appeal with the New York appellate court. In January 2023, the New York plaintiff filed a motion to intervene in the pending Ohio federal court action and withdrew his appeal in New York. The two derivative actions pending in federal district court in Ohio have been consolidated and the plaintiffs in the consolidated action filed an amended complaint. AEP filed a motion to dismiss the amended complaint and subsequently filed a brief in opposition to the New York plaintiffs’ motion to intervene in the consolidated action in Ohio. In March 2023, the federal district court issued an order granting the motion to dismiss with prejudice and denying the New York plaintiffs’ motion to intervene. In April 2023, one of the plaintiffs filed a notice of appeal to the U.S. Court of Appeals for the Sixth Circuit of the Ohio federal district court order dismissing the consolidated action and denying the intervention. In March 2021, AEP received a litigation demand letter from counsel representing a purported AEP shareholder. The litigation demand letter was directed to the Board of Directors of AEP (AEP Board) and contained factual allegations involving HB 6 that were generally consistent with those in the derivative litigation filed in state and federal court. The shareholder that sent the letter has since withdrawn the litigation demand, which is now terminated and of no further effect. In April 2023, AEP received a litigation demand letter from counsel representing the purported AEP shareholder who had filed the dismissed derivative action in New York state court and unsuccessfully tried to intervene in the consolidated derivative actions in Ohio federal court the (Litigation Demand). The Litigation Demand is directed to the AEP Board and contains factual allegations involving HB 6 that are generally consistent with those in the Derivative Actions. The Litigation Demand requested, among other things, that the AEP Board undertake an independent investigation into alleged legal violations by certain current and former directors and officers, and that AEP commence a civil action asserting claims similar to the claims asserted in the Derivative Actions. The AEP Board considered the Litigation Demand and formed a committee of the Board (the Demand Review Committee) to investigate, review, monitor and analyze the Litigation Demand and make a recommendation to the AEP Board regarding a reasonable and appropriate response to the same. In April 2024, AEP reached an agreement with the four shareholders to fully and finally resolve the Derivative Actions and the Litigation Demand, and all claims asserted or that could have been asserted by any AEP shareholder based on the facts alleged, in the manner and upon the terms and conditions set forth in the settlement documents (the Settlement). In July 2024, the U.S. District Court preliminarily approved the Settlement. The Settlement includes a payment of $450 thousand for attorneys’ fees and the implementation of certain governance changes outlined in the Settlement, many of which have already been put in place. The Settlement does not include any admission of liability. In October 2024, the District Court issued an Order and Judgment approving the Settlement and granted an Order of Dismissal with Prejudice. Under the Settlement, all Derivative Actions have been or will be dismissed, the Litigation Demand has been withdrawn, and those matters and claims have been resolved pursuant to the terms of the Settlement. In May 2021, AEP received a subpoena from the SEC’s Division of Enforcement seeking various documents, including documents relating to the passage of HB 6 and documents relating to AEP’s policies and financial processes and controls. In August 2022, AEP received a second subpoena from the SEC seeking various additional documents relating to its ongoing investigation. AEP is cooperating fully with the SEC’s investigation, which has included taking testimony from certain individuals and inquiries regarding Empowering Ohio’s Economy, Inc., which is a 501(c)(4) social welfare organization, and related disclosures. AEP and the SEC are engaged in discussions about a possible resolution of the SEC’s investigation and potential claims under the securities laws. Based on these discussions, in the third quarter of 2024, AEP recorded a loss contingency of $19 million in Other Operation expenses on AEP’s statements of income and accrued a corresponding liability in Other Current Liabilities on AEP’s balance sheets. A resolution of the investigation or claims may subject AEP to civil penalties in an amount that could differ from the amount recorded; however, management does not believe any such resolution would be material. Claims for Indemnification Made by Owners of the Gavin Power Station (Applies to AEP) In November 2022, the Federal EPA issued a final decision denying Gavin Power LLC’s requested extension to allow a CCR surface impoundment at the Gavin Power Station to continue to receive CCR and non-CCR waste streams after April 11, 2021 until May 4, 2023 (the Gavin Denial). As part of the Gavin Denial, the Federal EPA made several assertions related to the CCR Rule (see “Environmental Issues - CCR Rule” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information), including an assertion that the closure of the 300 acre unlined fly ash reservoir (FAR) is noncompliant with the CCR Rule in multiple respects. The Gavin Power Station was formerly owned and operated by AEP and was sold to Gavin Power LLC and Lightstone Generation LLC in 2017. Pursuant to the PSA, AEP maintained responsibility to complete closure of the FAR in accordance with the closure plan approved by the Ohio EPA which was completed in July 2021. The PSA contains indemnification provisions, pursuant to which the owners of the Gavin Power Station have notified AEP they believe they are entitled to indemnification for any damages that may result from these claims, including any future enforcement or litigation resulting from any determinations of noncompliance by the Federal EPA with various aspects of the CCR Rule consistent with the Gavin Denial. The owners of the Gavin Power Station have also sought indemnification for landowner claims for property damage allegedly caused by modifications to the FAR. Management does not believe that the owners of the Gavin Power Station have any valid claim for indemnity or otherwise against AEP under the PSA. In addition, Gavin Power LLC, several AEP subsidiaries, and other parties have filed Petitions for Review of the Gavin Denial with the U.S. Court of Appeals for the District of Columbia Circuit, which in June 2024, were dismissed for lack of jurisdiction. In January 2024, Gavin Power LLC also filed a complaint with the United States District Court for the Southern District of Ohio, alleging various violations of the Administrative Procedure Act and asserting that the Federal EPA, through its prior inaction, has waived and is estopped from raising certain objections raised in the Gavin Denial. Management cannot predict the outcome of that litigation. Management is unable to determine a range of potential losses that is reasonably possible of occurring. Litigation Regarding Justice Thermal Coal Contract (Applies to AEP and APCo) In December 2023, APCo filed a suit in the Franklin County Ohio Court of Common Pleas seeking a declaratory judgment confirming APCo’s right to terminate a long-term coal contract with Justice Thermal LLC (Justice Thermal) based on Justice Thermal’s failure to perform under the contract. APCo terminated that contract in January 2024, and in April 2024, APCo filed an amended complaint seeking a declaration that the termination was proper and also seeking damages for Justice Thermal’s breach of contract. Justice Thermal filed an answer and counterclaim in April 2024, contesting the validity of the contract termination and asserting counterclaims. The parties entered into a Settlement Agreement and Release pursuant to which the litigation was dismissed with prejudice in September 2024 and each party released the other from all claims relating to the contract or the litigation, and as a result this matter has been resolved.
|