XML 85 R45.htm IDEA: XBRL DOCUMENT v3.23.3
Rate Matters Regulated Operations (Details) - USD ($)
$ in Millions
9 Months Ended
Sep. 30, 2023
Sep. 30, 2022
Dec. 31, 2022
Public Utilities, General Disclosures [Line Items]      
Net Investment $ 75,821.1   $ 73,339.1
Regulatory Assets, Noncurrent 4,607.3   4,762.0
Other Asset Impairment Charges 0.0 $ 24.9  
Regulatory Assets, Current 1,087.6   1,310.0
AEP Texas Inc. [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 12,590.8   11,681.6
Regulatory Assets, Noncurrent 307.7   298.3
AEP Transmission Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 14,318.9   13,339.9
Regulatory Assets, Noncurrent 4.4   7.2
Appalachian Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 12,825.1   12,379.2
Regulatory Assets, Noncurrent 978.8   1,058.6
Other Asset Impairment Charges 0.0 $ 24.9  
Regulatory Assets, Current 442.0   473.1
Indiana Michigan Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 7,535.7   7,411.5
Regulatory Assets, Noncurrent 377.7   459.6
Regulatory Assets, Current 13.3   47.1
Ohio Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 9,160.0   8,609.3
Regulatory Assets, Noncurrent 413.2   327.3
Public Service Co Of Oklahoma [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 6,025.1   5,626.5
Regulatory Assets, Noncurrent 477.2   653.7
Regulatory Assets, Current 168.2   178.7
Public Service Co Of Oklahoma [Member] | Northeastern Plant, Unit 3 | Generating Units Probable of Abandonment [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 112.5    
Accelerated Depreciation Regulatory Asset 159.5    
Cost of Removal Regulatory Liability [1] $ 20.4    
Expected Retirement Date [2] 2026    
Depreciation [3] $ 15.0    
Southwestern Electric Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 8,562.5   8,262.2
Regulatory Assets, Noncurrent 1,116.9   1,042.4
Net Under-Recovered Fuel Costs 91.0    
Regulatory Assets, Current 184.4   353.0
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations      
Public Utilities, General Disclosures [Line Items]      
Share of Net Investment in Dolet Hills Power Station 105.0    
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations | Arkansas      
Public Utilities, General Disclosures [Line Items]      
Recovery of 2021 Dolet Hills Fuel Costs 20.0    
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations | Louisiana Jurisdiction [Member]      
Public Utilities, General Disclosures [Line Items]      
Recovery of 2021 Dolet Hills Fuel Costs 20.0    
Approved Deferral of Dolet Hills Fuel Costs 35.0    
Recommended Disallowance from Staff or Intervenors 72.0    
Southwestern Electric Power Co [Member] | Dolet Hills Power Station and Related Fuel Operations | Texas      
Public Utilities, General Disclosures [Line Items]      
Oxbow Mine Related Costs Recovery Request 48.0    
Southwestern Electric Power Co [Member] | Pirkey Power Plant and Related Fuel Operations      
Public Utilities, General Disclosures [Line Items]      
Share of Net Investment in Pirkey Power Plant 180.0    
Southwestern Electric Power Co [Member] | Pirkey Power Plant and Related Fuel Operations | Texas      
Public Utilities, General Disclosures [Line Items]      
Oxbow Mine Related Costs Recovery Request 33.0    
Southwestern Electric Power Co [Member] | Pirkey Generating Station (Unit No. 1) | Texas      
Public Utilities, General Disclosures [Line Items]      
Net Investment 66.0    
Southwestern Electric Power Co [Member] | Welsh Plant Unit 1 and 3 | Generating Units Probable of Abandonment [Member]      
Public Utilities, General Disclosures [Line Items]      
Net Investment 368.8    
Accelerated Depreciation Regulatory Asset 115.5    
Cost of Removal Regulatory Liability [4] $ 58.0    
Expected Retirement Date [5],[6] 2028    
Depreciation [3] $ 38.6    
Southwestern Electric Power Co [Member] | Dolet Hills Power Station | Arkansas      
Public Utilities, General Disclosures [Line Items]      
Other Asset Impairment Charges 2.0    
Southwestern Electric Power Co [Member] | Dolet Hills Power Station | Texas      
Public Utilities, General Disclosures [Line Items]      
Other Asset Impairment Charges 12.0    
Regulatory Assets Pending Final Regulatory Approval [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 886.3   919.3
Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 61.5   67.0
Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 148.4   144.5
Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 32.3   23.7
Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 21.2   33.8
Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 93.0   25.6
Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 446.5   547.3
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 21.0   19.3
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | February 2021 Severe Storm Fuel Costs      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [7] 101.4   121.7
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Pirkey Power Plant Accelerated Depreciation      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 113.0   116.5
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Welsh Unit 1 and 3 Accelerated Depreciation      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 115.5   85.6
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Dolet Hills Power Station Fuel Costs - Louisiana      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 34.7   32.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Mobile Generation Lease Payments      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [8] 0.0   17.6
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Mobile Generation Lease Payments      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [9] 0.0   17.6
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | COVID-19 - Virginia      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 7.0   7.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.2   0.1
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Dolet Hills Power Station Accelerated Depreciation [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 12.0   9.7
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 1.7   2.5
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | February 2021 Severe Storm Fuel Costs      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [10] 101.4   121.7
Regulatory Assets, Current 37.0   37.0
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Pirkey Power Plant Accelerated Depreciation      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 113.0   116.5
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Welsh Unit 1 and 3 Accelerated Depreciation      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 115.5   85.6
Regulatory Assets Currently Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Dolet Hills Power Station Fuel Costs - Louisiana      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 34.7   32.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Plant Retirement Costs - Asset Retirement Obligation Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 25.9   25.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [11],[13] 385.8 [12]   407.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 51.6   55.6
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | 2020-2022 Virginia Triennial Review [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 37.4   37.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 35.9   26.7
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 16.3   13.4
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Texas Retail Electric Provider Bad Debt Expense      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 4.1   4.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | AEP Texas Inc. [Member] | Vegetation Management Programs      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 5.2   5.2
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Plant Retirement Costs - Asset Retirement Obligation Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 25.9   25.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 72.2   72.6
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 5.9   1.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Appalachian Power Co [Member] | 2020-2022 Virginia Triennial Review [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 37.4   37.9
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 29.4   21.6
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Indiana Michigan Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 2.7   2.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent [14] 21.2   33.8
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Ohio Power Co [Member] | Storm-Related Costs Recovery Request [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 34.0    
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 92.8 [15]   25.5
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.2   0.1
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Public Service Co Of Oklahoma [Member] | Storm-Related Costs Recovery Request [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 58.0    
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Storm Related Costs [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 53.4 [16],[17]   151.5
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Asset Retirement Obligation - Louisiana [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 0.0   11.8
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Other Regulatory Assets Not Yet Being Recovered [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 14.8   $ 16.0
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Storm-Related Costs Recovery Request [Member] | Louisiana Jurisdiction [Member]      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent 29.0    
Regulatory Assets Currently Not Earning Return [Member] | Regulatory Assets Pending Final Regulatory Approval [Member] | Southwestern Electric Power Co [Member] | Storm-Related Costs Recovery Request [Member] | Texas      
Public Utilities, General Disclosures [Line Items]      
Regulatory Assets, Noncurrent $ 24.0    
[1] Includes Northeastern Plant, Unit 4, which was retired in 2016. Removal of Northeastern Plant, Unit 4, will be performed with the removal of Northeastern Plant, Unit 3, after retirement.
[2] Northeastern Plant, Unit 3 is currently being recovered through 2040.
[3] Represents the amount of annual depreciation that has been collected from customers over the prior 12-month period.
[4] Includes Welsh Plant, Unit 2, which was retired in 2016. Removal of Welsh Plant, Unit 2, will be performed with the removal of Welsh Plant, Units 1 and 3, after retirement.
[5] Represents projected retirement date of coal assets, units are being evaluated for conversion to natural gas after 2028.
[6] Unit 1 is being recovered through 2027 in the Louisiana jurisdiction and through 2037 in the Arkansas and Texas jurisdictions. Unit 3 is being recovered through 2032 in the Louisiana jurisdiction and through 2042 in the Arkansas and Texas jurisdictions.
[7] Includes $37 million and $37 million of unrecovered winter storm fuel costs recorded as a current regulatory asset as of September 30, 2023 and December 31, 2022, respectively. See the “February 2021 Severe Winter Weather Impacts in SPP” section below for additional information.
[8] In October 2023, the PUCT issued an order approving a rider to recover deferred Texas Mobile Generation Costs. Recovery of deferred costs through the new rider is updated annually, subject to Commission review.
[9] In October 2023, the PUCT issued an order approving a rider to recover deferred Texas Mobile Generation Costs. Recovery of deferred costs through the new rider is updated annually, subject to Commission review.
[10] Includes $37 million and $37 million of unrecovered winter storm fuel costs recorded as a current regulatory asset as of September 30, 2023 and December 31, 2022, respectively. See the “February 2021 Severe Winter Weather Impacts in SPP” section below for additional information.
[11] In April 2023, the LPSC issued an order approving the prudence and future recovery of the Louisiana storm-related regulatory assets. See “2021 Louisiana Storm Cost Filing” section below for additional information.
[12] In June 2023, storms in the Oklahoma, Louisiana and Texas service territories caused power outages and extensive damage resulting in the deferral of $58 million, $29 million and $24 million, respectively. Recovery of these storm costs will be addressed in a future request.
[13] In October 2023, the PUCO issued an order approving recovery of $34 million in Ohio storm-related costs.
[14] In October 2023, the PUCO issued an order approving recovery of $34 million in storm-related costs.
[15] In June 2023, storms caused power outages and extensive damage to the Oklahoma service territory, resulting in the deferral of $58 million. Recovery for these storm costs will be addressed in a future request.
[16] In April 2023, the LPSC issued an order approving the prudence and future recovery of the Louisiana storm-related regulatory assets. See “2021 Louisiana Storm Cost Filing” section below for additional information.
[17] In June 2023, additional storms in the Louisiana and Texas service territories caused power outages and extensive damage resulting in the deferral of $29 million and $24 million, respectively. Recovery of these storm costs will be addressed in a future request.