Property, Plant and Equipment
12 Months Ended
Dec. 31, 2021
Property, Plant and Equipment PROPERTY, PLANT AND EQUIPMENT
The disclosures in this note apply to all Registrants unless indicated otherwise.

Property, Plant and Equipment is shown functionally on the face of the balance sheets. The following tables include the total plant balances as of December 31, 2021 and 2020:
December 31, 2021AEPAEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
(in millions)
Regulated Property, Plant and Equipment
Generation
$21,196.8 (a)$— $— $6,683.9 $5,531.8 $— $1,802.4 $4,734.5 (a)
Transmission29,866.0 5,849.9 10,886.3 4,322.4 1,783.1 2,992.8 1,107.7 2,316.9 
Distribution24,440.0 4,917.2 — 4,683.3 2,800.1 6,070.6 3,004.9 2,514.3 
Other5,249.8 958.7 427.2 668.9 755.1 982.2 433.5 542.0 
CWIP3,632.4 (a)551.3 1,394.8 469.9 302.8 365.0 156.0 240.7 (a)
Less: Accumulated Depreciation
20,375.5 1,642.9 772.9 5,047.4 3,885.3 2,457.4 1,707.0 3,002.2 
Total Regulated Property, Plant and Equipment - Net
64,009.5 10,634.2 11,935.4 11,781.0 7,287.6 7,953.2 4,797.5 7,346.2 
Nonregulated Property, Plant and Equipment - Net
1,991.8 1.2 0.3 23.3 23.3 9.8 5.3 53.9 
Total Property, Plant and Equipment - Net
$66,001.3 (b)$10,635.4 $11,935.7 (b)$11,804.3 $7,310.9 $7,963.0 $4,802.8 $7,400.1 
December 31, 2020AEPAEP TexasAEPTCoAPCoI&MOPCoPSOSWEPCo
(in millions)
Regulated Property, Plant and Equipment
Generation
$21,587.8 (a)$— $— $6,633.7 $5,264.7 $— $1,480.7 $4,681.4 (a)
Transmission27,841.5 5,279.6 9,593.5 3,900.5 1,696.4 2,831.9 1,069.9 2,165.7 
Distribution23,972.1 4,580.8 — 4,464.3 2,594.6 5,708.3 2,853.0 2,382.5 
Other4,852.4 866.0 328.8 598.0 644.6 888.5 388.1 564.5 
CWIP3,815.0 (a)614.1 1,422.6 484.6 362.4 362.3 128.7 228.3 (a)
Less: Accumulated Depreciation
20,094.2 1,528.1 572.8 4,711.0 3,538.6 2,348.8 1,607.3 3,032.0 
Total Regulated Property, Plant and Equipment - Net
61,974.6 9,812.4 10,772.1 11,370.1 7,024.1 7,442.2 4,313.1 6,990.4 
Nonregulated Property, Plant and Equipment - Net
1,927.0 1.2 0.7 24.0 28.2 9.9 6.9 97.8 
Total Property, Plant and Equipment - Net
$63,901.6 $9,813.6 $10,772.8 $11,394.1 $7,052.3 $7,452.1 $4,320.0 $7,088.2 

(a)AEP and SWEPCo’s regulated generation and regulated CWIP include amounts related to SWEPCo’s Arkansas jurisdictional share of the Turk Plant.
(b)Amount excludes $2.3 billion and $165 million for AEP and AEPTCo, respectively, of Property, Plant and Equipment - Net classified as Assets Held for Sale on the balance sheet. See “Disposition of KPCo and KTCo” section of Note 7 for additional information.
Depreciation, Depletion and Amortization

The Registrants provide for depreciation of Property, Plant and Equipment, excluding coal-mining properties, on a straight-line basis over the estimated useful lives of property, generally using composite rates by functional class.  The following tables provide total regulated annual composite depreciation rates and depreciable lives for the Registrants:
AEP
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate Ranges
Depreciable
Life Ranges
Annual Composite
Depreciation Rate Ranges
Depreciable
Life Ranges
Annual Composite
Depreciation Rate Ranges
Depreciable
Life Ranges
(in years)(in years)(in years)
Generation2.7%-7.8%20-1322.7%-6.3%20-1322.5%-5.5%20-132
Transmission2.0%-2.6%15-752.0%-2.6%15-751.8%-2.6%15-81
Distribution2.8%-3.6%7-802.7%-3.7%7-782.7%-3.7%7-78
Other3.0%-12.5%5-752.8%-11.3%5-752.6%-9.5%5-75
AEP Texas
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Transmission2.2%50-752.0%50-751.8%45-81
Distribution2.9%7-703.1%7-703.5%7-70
Other5.8%5-506.1%5-506.3%5-50
AEPTCo
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Transmission2.5%24-752.4%24-752.0%24-75
Other6.7%5-566.3%5-645.8%5-64
APCo
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Generation3.6%35-1183.3%35-1183.2%35-118
Transmission2.1%15-752.2%15-751.8%15-71
Distribution3.5%12-573.7%12-573.7%12-57
Other8.5%5-557.8%5-557.2%5-55
I&M
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Generation4.7%20-1324.6%20-1324.0%20-132
Transmission2.4%45-702.3%45-701.9%50-73
Distribution3.4%14-713.4%14-713.4%9-75
Other9.0%5-5110.2%5-519.4%5-50
OPCo
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Transmission2.3%39-602.3%39-602.3%39-60
Distribution2.9%11-703.1%14-653.1%14-65
Other6.1%5-505.0%5-504.9%5-50
PSO
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Generation2.8%30-753.1%35-752.9%35-75
Transmission2.4%42-752.2%45-752.4%45-75
Distribution2.9%15-782.9%15-782.9%15-78
Other6.1%5-565.7%5-645.6%5-64
SWEPCo
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
Annual Composite
Depreciation Rate
Depreciable
Life Ranges
(in years)(in years)(in years)
Generation2.7%30-652.7%35-652.5%40-70
Transmission2.4%49-742.3%47-732.4%50-73
Distribution2.8%15-802.7%15-672.7%25-70
Other8.6%5-588.5%5-527.6%5-55

The following table includes the nonregulated annual composite depreciation rate ranges and nonregulated depreciable life ranges for AEP. Depreciation rate ranges and depreciable life ranges are not meaningful for nonregulated property of AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo for 2021, 2020 and 2019.
202120202019
Functional Class of PropertyAnnual Composite
Depreciation Rate Ranges
Depreciable
Life Ranges
Annual Composite
Depreciation Rate Ranges
Depreciable
Life Ranges
Annual Composite
Depreciation Rate Ranges
Depreciable
Life Ranges
(in years)(in years)(in years)
Generation3.8%-10.4%10-593.6%-4.0%15-593.2%-21.2%15-59
Transmission2.6%30-402.5%30-402.5%30-40
DistributionNANANANA2.3%40
Other16.5%5-35(a)16.1%5-5017.6%5-50

(a)In 2020 management announced plans to retire the Pirkey Plant in 2023 and the related depreciable lives have been adjusted accordingly. See Note 5 - Effects of Regulation for additional information.
NA Not applicable.

SWEPCo provides for depreciation, depletion and amortization of coal-mining assets over each asset’s estimated useful life or the estimated life of each mine, whichever is shorter, using the straight-line method for mining structures and equipment.  SWEPCo uses either the straight-line method or the units-of-production method to amortize mine development costs and deplete coal rights based on estimated recoverable tonnages.  SWEPCo includes these costs in fuel expense.

For regulated operations, the composite depreciation rate generally includes a component for non-ARO removal costs, which is credited to Accumulated Depreciation and Amortization on the balance sheets.  Actual removal costs incurred are charged to Accumulated Depreciation and Amortization.  Any excess of accrued non-ARO removal costs over actual removal costs incurred is reclassified from Accumulated Depreciation and Amortization and reflected as a regulatory liability.  For nonregulated operations, non-ARO removal costs are expensed as incurred. 
Asset Retirement Obligations (Applies to all Registrants except AEPTCo)

The Registrants record ARO in accordance with the accounting guidance for “Asset Retirement and Environmental Obligations” for legal obligations for asbestos removal and for the retirement of certain ash disposal facilities, wind farms, solar farms and certain coal-mining facilities.  I&M records ARO for the decommissioning of the Cook Plant.  The Registrants have identified, but not recognized, ARO liabilities related to electric transmission and distribution assets as a result of certain easements on property on which assets are owned.  Generally, such easements are perpetual and require only the retirement and removal of assets upon the cessation of the property’s use.  The retirement obligation is not estimable for such easements since the Registrants plan to use their facilities indefinitely.  The retirement obligation would only be recognized if and when the Registrants abandon or cease the use of specific easements, which is not expected.

The Registrants recorded the following revisions to ARO estimates as of December 31, 2021 and 2020:

As of December 31, 2021 and 2020, I&M’s ARO liability for nuclear decommissioning of the Cook Plant was $1.93 billion and $1.80 billion, respectively.  These liabilities are reflected in Asset Retirement Obligations on I&M’s balance sheets.  As of December 31, 2021 and 2020, the fair value of I&M’s assets that are legally restricted for purposes of settling decommissioning liabilities totaled $3.54 billion and $2.98 billion, respectively.  These assets are included in Spent Nuclear Fuel and Decommissioning Trusts on I&M’s balance sheets. In December 2021, I&M recorded a $58 million revision for Cook Plant as a result of the latest decommissioning cost study. The ARO liability was updated and changes from the previous study were driven primarily by general increases in the projected cost of labor and materials.
In 2020, Virginia’s Governor signed House Bill 443 (HB 443) requiring APCo to close certain ash disposal units at the retired Glen Lyn Station by removal of all coal combustion material. In June 2020, APCo recorded a revision to increase estimated Glen Lyn Station ash disposal ARO liabilities by $199 million due to the enactment of HB 443. In June 2021, management completed fully designed and costed project plans for the Glen Lyn Station site and increased ash disposal ARO liabilities by an additional $79 million. HB 443 provides for the recovery of all costs associated with closure by removal through the Virginia environmental rate adjustment clause. APCo is permitted to record carrying costs on the unrecovered balance of closure costs as a weighted-average cost of capital approved by the Virginia SCC. The legislation provides for regulatory recovery of these costs.
In 2020, SWEPCo recorded a revision to increase estimated ARO liabilities by $21 million primarily due to the revision in the useful life of DHLC. See Note 5 - Effects of Regulation for additional information. In September 2020, SWEPCo recorded an $18 million revision due to a reduction in estimated ash pond closure costs.
In 2020, AEP Texas and PSO recorded a revision to decrease estimated ARO liabilities by $17 million and $5 million, respectively, due to the retirement of the Oklaunion Power Station in September 2020. See “Oklaunion Power Station” section of Note 7 for additional information.
In 2020, AGR derecognized $106 million of Conesville Plant related ARO liabilities as a result of the Environmental Liability and Property Transfer and Asset Purchase Agreement executed with a non-affiliated third-party. See “Conesville Plant” section of Note 7 for additional information.

The following is a reconciliation of the 2021 and 2020 aggregate carrying amounts of ARO by Registrant:
CompanyARO as of December 31, 2020Accretion
Expense
Liabilities
Incurred
Liabilities
Settled
Revisions in
Cash Flow
Estimates (a)
ARO as of December 31, 2021
(in millions)
AEP (b)(c)(d)(e)(f)$2,516.7 $105.0 $22.8 $(41.4)$138.6 $2,741.7 
AEP Texas (b)(e)4.6 0.2 — (0.4)— 4.4 
APCo (b)(e)313.1 13.7 — (6.9)84.7 404.6 
I&M (b)(c)(e)1,813.8 72.9 0.3 (0.1)59.4 1,946.3 
OPCo (e)1.9 0.1 — (0.1)— 1.9 
PSO (b)(e)47.4 3.3 7.6 (0.7)— 57.6 
SWEPCo (b)(d)(e)222.1 9.8 9.2 (20.9)2.5 222.7 
CompanyARO as of December 31, 2019Accretion
Expense
Liabilities
Incurred
Liabilities
Settled
Revisions in
Cash Flow
Estimates (a)
ARO as of December 31, 2020
(in millions)
AEP (b)(c)(d)(e)$2,418.9 $102.4 $0.3 $(188.0)$183.1 $2,516.7 
AEP Texas (b)(e)29.1 0.8 — (8.5)(16.8)4.6 
APCo (b)(e)111.1 8.9 — (7.8)200.9 313.1 
I&M (b)(c)(e)1,748.6 70.2 0.1 (0.2)(4.9)1,813.8 
OPCo (e)1.8 0.1 — — — 1.9 
PSO (b)(e)52.2 3.1 — (3.1)(4.8)47.4 
SWEPCo (b)(d)(e)212.2 10.7 — (10.9)10.1 222.1 

(a)Unless discussed above, primarily related to ash ponds, landfills and mine reclamation, generally due to changes in estimated closure area, volumes and/or unit costs.
(b)Includes ARO related to ash disposal facilities.
(c)Includes ARO related to nuclear decommissioning costs for the Cook Plant of $1.93 billion and $1.80 billion as of December 31, 2021 and 2020, respectively.
(d)Includes ARO related to Sabine and DHLC.
(e)Includes ARO related to asbestos removal.
(f)Includes $18 million of ARO classified as Liabilities Held for Sale on the balance sheet. See “Disposition of KPCo and KTCo” section of Note 7 for additional information.

Allowance for Funds Used During Construction and Interest Capitalization

The Registrants’ amounts of Allowance for Equity Funds Used During Construction are summarized in the following table:
Years Ended December 31,
Company202120202019
(in millions)
AEP$139.7 $148.1 $168.4 
AEP Texas21.5 19.4 15.2 
AEPTCo67.2 74.0 84.3 
APCo15.6 14.6 16.6 
I&M12.8 11.5 19.4 
OPCo10.8 12.5 18.2 
PSO2.4 4.0 2.7 
SWEPCo7.0 7.7 6.8 

The Registrants’ amounts of allowance for borrowed funds used during construction, including capitalized interest, are summarized in the following table:
Years Ended December 31,
Company202120202019
(in millions)
AEP$53.8 $66.0 $88.7 
AEP Texas10.5 12.5 20.0 
AEPTCo21.0 25.5 32.2 
APCo7.5 7.9 9.3 
I&M5.1 5.7 8.9 
OPCo4.7 6.2 6.7 
PSO0.7 2.0 1.9 
SWEPCo3.0 3.9 4.0 
Jointly-owned Electric Facilities (Applies to AEP, I&M, PSO and SWEPCo)

The Registrants have electric facilities that are jointly-owned with affiliated and nonaffiliated companies.  Using its own financing, each participating company is obligated to pay its share of the costs of these jointly-owned facilities in the same proportion as its ownership interest.  Each Registrant’s proportionate share of the operating costs associated with these facilities is included in its statements of income and the investments and accumulated depreciation are reflected in its balance sheets under Property, Plant and Equipment as follows:
Registrant’s Share as of December 31, 2021
Fuel
Type
Percent of
Ownership
Utility Plant
in Service
Construction
Work in
Progress
Accumulated
Depreciation
(in millions)
AEP
Dolet Hills Power Station, Unit 1 (a)Lignite40.2 %$— $— $— 
Flint Creek Generating Station, Unit 1 (b)Coal50.0 %377.6 6.3 133.5 
Pirkey Power Plant, Unit 1 (b)Lignite85.9 %613.8 — 528.3 
Turk Generating Plant (b)Coal73.3 %1,598.0 10.2 285.6 
Total
$2,589.4 $16.5 $947.4 
I&M
Rockport Generating Plant (c)(d)(e)Coal50.0 %$1,247.2 $13.9 $794.5 
PSO
North Central Wind Energy Facilities (f)(g)Wind45.5 %$313.7 $— $4.2 
SWEPCo
Dolet Hills Power Station, Unit 1 (a)Lignite40.2 %$— $— $— 
Flint Creek Generating Station, Unit 1 (b)Coal50.0 %377.6 6.3 133.5 
Pirkey Power Plant, Unit 1 (b)Lignite85.9 %613.8 — 528.3 
Turk Generating Plant (b)Coal73.3 %1,598.0 10.2 285.6 
North Central Wind Energy Facilities (f)(g)Wind54.5 %376.2 — 5.4 
Total$2,965.6 $16.5 $952.8 
Registrant’s Share as of December 31, 2020
Fuel
Type
Percent of
Ownership
Utility Plant
in Service
Construction
Work in
Progress
Accumulated
Depreciation
(in millions)
AEP
Dolet Hills Power Station, Unit 1 (a)Lignite40.2 %$342.4 $4.6 $295.4 
Flint Creek Generating Station, Unit 1 (b)Coal50.0 %377.2 3.0 116.0 
Pirkey Power Plant, Unit 1 (b)Lignite85.9 %602.8 3.7 441.0 
Turk Generating Plant (b)Coal73.3 %1,594.3 2.8 257.3 
Total
$2,916.7 $14.1 $1,109.7 
I&M
Rockport Generating Plant (c)(d)(e)Coal50.0 %$1,228.5 $19.6 $677.3 
SWEPCo
Dolet Hills Power Station, Unit 1 (a)Lignite40.2 %$342.4 $4.6 $295.4 
Flint Creek Generating Station, Unit 1 (b)Coal50.0 %377.2 3.0 116.0 
Pirkey Power Plant, Unit 1 (b)Lignite85.9 %602.8 3.7 441.0 
Turk Generating Plant (b)Coal73.3 %1,594.3 2.8 257.3 
Total
$2,916.7 $14.1 $1,109.7 

(a)Operated by CLECO, a nonaffiliated company. The Dolet Hills Power Station was retired in December 2021.
(b)Operated by SWEPCo.
(c)Operated by I&M.
(d)Amounts include I&M’s 50% ownership of both Unit 1 and capital additions for Unit 2. Unit 2 is subject to a finance lease with a nonaffiliated company. See the “Rockport Lease” section of Note 13 for additional information.
(e)AEGCo owns 50% of Unit 1 with I&M and 50% of capital additions for Unit 2.
(f)PSO and SWEPCo own undivided interests of 45.5% and 54.5% of the NCWF, respectively. Sundance was placed into service in April 2021. Maverick was placed into service in September 2021. See the “Acquisitions” section of Note 7 for additional information.
(g)Operated by PSO.