Acquisitions, Assets and Liabilities Held for Sale, Dispositions and Impairments
12 Months Ended
Dec. 31, 2021
Mergers, Acquisitions and Dispositions Disclosures ACQUISITIONS, ASSETS AND LIABILITIES HELD FOR SALE, DISPOSITIONS, AND IMPAIRMENTS
The disclosures in this note apply to AEP unless indicated otherwise.

ACQUISITIONS

2021

Dry Lake Solar Project (Generation & Marketing Segment) (Applies to AEP)

In November 2020, AEP signed a Purchase and Sale Agreement with a nonaffiliate to acquire a 75% ownership interest in the entity that owns the 100 MW Dry Lake Solar Project (collectively referred to as Dry Lake) located in southern Nevada for approximately $114 million. In March 2021, AEP closed the transaction and the solar project was placed in-service in May 2021. Approximately $103 million of the purchase price was paid upon closing of the transaction and the remaining $11 million was paid when the project was placed in-service. In accordance with the accounting guidance for “Business Combinations,” management determined that the acquisition of Dry Lake represents an asset acquisition. Additionally, and in accordance with the accounting guidance for “Consolidation,” management concluded that Dry Lake is a VIE and that AEP is the primary beneficiary based on its power as managing member to direct the activities that most significantly impact Dry Lake’s economic performance. As the primary beneficiary of Dry Lake, AEP consolidates Dry Lake into its financial statements. As a result, to account for the initial consolidation of Dry Lake, management applied the acquisition method by allocating the purchase price based on the relative fair value of the assets acquired and noncontrolling interest assumed.  The fair value of the primary assets acquired and the noncontrolling interest assumed was determined using the market approach.  The key input assumptions were the transaction price paid for AEP’s interest in Dry Lake and recent third-party market transactions for similar solar generation facilities. See Note 17 - Variable Interest Entities and Equity Method Investments for additional information.

North Central Wind Energy Facilities (Vertically Integrated Utilities Segment) (Applies to AEP, PSO and SWEPCo)

In 2020, PSO and SWEPCo received regulatory approvals to acquire the NCWF, comprised of three Oklahoma wind facilities totaling 1,484 MWs, on a fixed cost turn-key basis at completion. PSO and SWEPCo will own undivided interests of 45.5% and 54.5% of the NCWF, respectively. In total, the three wind facilities will cost approximately $2 billion and consist of Traverse (998 MW), Maverick (287 MW) and Sundance (199 MW). Output from the NCWF will serve retail load in PSO’s Oklahoma service territory and both retail and FERC wholesale load in SWEPCo’s service territories in Arkansas and Louisiana. The Oklahoma and Louisiana portions of the NCWF revenue requirement, net of PTC benefit, are recoverable through authorized riders beginning at commercial operation and until such time as amounts are reflected in base rates. Recovery of the Arkansas portion of the NCWF revenue requirement is requested in SWEPCo’s pending 2021 Arkansas Base Rate Case. The NCWF are subject to various regulatory performance requirements. If these performance requirements are not met, PSO and SWEPCo would recognize a regulatory liability to refund retail customers. As of December 31, 2021 PSO and SWEPCo have not incurred a material regulatory liability related to performance requirements for NCWF.

In April 2021, PSO and SWEPCo acquired respective undivided ownership interests in the entity that owned Sundance during its development and construction for $270 million, the first of the three NCWF acquisitions. Immediately following the acquisition, PSO and SWEPCo liquidated the entity and simultaneously distributed the Sundance assets in proportion to their undivided ownership interests. Sundance was placed in-service in April 2021.

In September 2021, PSO and SWEPCo acquired respective undivided ownership interests in the entity that owned Maverick during its development and construction for $383 million, the second of the three NCWF acquisitions. Immediately following the acquisition, PSO and SWEPCo liquidated the entity and simultaneously distributed the
Maverick assets in proportion to their undivided ownership interests. Maverick was placed in-service in September 2021.

In accordance with the guidance for “Business Combinations,” management determined that the acquisitions of Sundance and Maverick represent asset acquisitions.  As of December 31, 2021, PSO and SWEPCo had approximately $316 million and $378 million, of gross Property, Plant and Equipment on the balance sheets, respectively, related to the Sundance and Maverick NCWF projects. On an ongoing basis, management further determined that PSO and SWEPCo should apply the joint plant accounting model to account for their respective undivided interests in the assets, liabilities, revenues and expenses of Sundance and Maverick.

The Purchase and Sale Agreement (PSA) includes collective interests in numerous land contracts, as originally executed between the nonaffiliated party and the respective owners of the properties as defined in the contracts. These contracts provide for easement and access rights to the land that Sundance and Maverick were built upon. These interests as lessee in each of the land contracts were transferred to Sundance and Maverick (and subsequently to PSO and SWEPCo) as a part of the closing of the PSA. As of December 31, 2021, the Noncurrent Obligations Under Operating Leases for Sundance are $13 million and $15 million on the balance sheets for PSO and SWEPCo, respectively, and the Noncurrent Obligations Under Operating Leases for Maverick are $18 million and $22 million on the balance sheets for PSO and SWEPCo, respectively.

2020

Desert Sky Wind Farm and Trent Wind Farm (Generation & Marketing Segment) (Applies to AEP)

In August 2020, AEP exercised its call right which required the nonaffiliated member of Desert Sky Wind Farm LLC and Trent Wind Farm LLC (collectively the LLCs) to sell its noncontrolling interest to AEP. The exercise price for the call right was determined using a discounted cash flow model with agreed input assumptions as well as updates to certain assumptions reasonably expected based on the actual results of the LLCs. As a result, the LLCs are wholly-owned by AEP and management has concluded that the LLCs are no longer VIEs. AEP paid $57 million in cash, derecognized $63 million of Redeemable Noncontrolling Interest within Mezzanine Equity and recorded an increase of $6 million of Paid-In Capital on the balance sheets. See Note 17 - Variable Interest Entities and Equity Method Investments for additional information.

Santa Rita East (Generation & Marketing Segment) (Applies to AEP)

In November 2020, AEP acquired an additional 10% interest in Santa Rita East for approximately $44 million resulting in AEP having a total interest of 85%. The acquisition of the incremental ownership interest was accounted for as an equity transaction in accordance with the accounting guidance for "Consolidation" and reduced Noncontrolling Interests on the balance sheets by approximately $44 million. See Note 17 - Variable Interest Entities and Equity Method Investments for additional information.

2019

Sempra Renewables LLC (Generation & Marketing Segment) (Applies to AEP)

In April 2019, AEP acquired Sempra Renewables LLC and its ownership interests in 724 MWs of wind generation and battery assets valued at approximately $1.1 billion. This acquisition is part of AEP’s strategy to grow its renewable generation portfolio and to diversify generation resources. AEP paid $580 million in cash and acquired a 50% ownership interest in five non-consolidated joint ventures with net assets valued at $404 million as of the acquisition date (which includes $364 million of existing debt obligations). Additionally, the transaction included the acquisition of two tax equity partnerships and the associated recognition of noncontrolling tax equity interest of $135 million.
Purchase Price Allocation of Sempra Renewables LLC at Acquisition Date - April 22nd, 2019
Assets:Liabilities and Equity:Net Purchase Price
(in millions)
Current Assets$8.8 Current Liabilities$12.9 
Property, Plant and Equipment238.1 Asset Retirement Obligations5.7 
Investment in Joint Ventures404.0 Total Liabilities18.6 
Other Noncurrent Assets82.9 Noncontrolling Interest134.8 
Total Assets$733.8 Liabilities and Noncontrolling Interest$153.4 $580.4 

Management allocated the purchase price based upon the fair value of the assets acquired and noncontrolling interests assumed. The fair value of the primary assets acquired and the noncontrolling interests assumed was determined using a discounted cash flow method under the income approach. The key input assumptions utilized in the determination of the fair value of these assets were the pricing and terms of the existing PPAs, forecasted market power prices, expected wind farm net capacity and discount rates reflecting risk inherent in the future cash flows and future power prices. Estimating forecasted market power prices involved determining the cost of constructing and operating a new wind plant over an assumed life in the same geographic region as of the acquisition date using third-party market participant assumptions. The expected wind farm net capacity was developed by evaluating each wind farm’s historical and expected generation against historical generation of comparable wind farms in the same locations. Discount rates were evaluated by considering the cost of capital of comparable businesses. Additional key input assumptions for the fair value of the noncontrolling interests include the terms of the limited liability company agreements that dictate the sharing of the tax attributes and cash flows associated with the tax equity partnerships.

Upon closing of the purchase, Sempra Renewables LLC was legally renamed AEP Wind Holdings LLC. AEP Wind Holdings LLC develops, owns and operates, or holds interests in wind generation facilities in the United States. The operating wind generation portfolio includes seven wind farms. Five wind farms are jointly-owned with BP Wind Energy, and two wind farms are consolidated by AEP and are tax equity partnerships with nonaffiliated noncontrolling interests. All seven wind farms have long-term PPAs for 100% of their energy production. The PPAs with I&M, OPCo and SWEPCo were executed prior to the acquisition of the wind farms and will be accounted for in accordance with the accounting guidance for “Related Parties.” See “Sempra Renewables LLC PPAs” section of Note 16 for additional information.

The acquired business contributed revenues and net income to AEP that were not material for the period April 22, 2019 to December 31, 2019. The pro-forma revenue and net income related to the acquisition of Sempra Renewables LLC were not material for the year ended December 31, 2019.

See Note 17 - Variable Interest Entities and Equity Method Investments for additional information related to the purchased wind farms.

Santa Rita East (Generation & Marketing Segment) (Applies to AEP)

In July 2019, AEP acquired a 75% interest, or 227 MWs, in Santa Rita East for approximately $356 million. In accordance with the accounting guidance for “Business Combinations,” management determined that the acquisition of Santa Rita East represents an asset acquisition. Additionally, and in accordance with the accounting guidance for “Consolidation,” management concluded that Santa Rita East is a VIE. As a result, to account for the initial consolidation of Santa Rita East, management applied the acquisition method by allocating the purchase price based on the relative fair value of the assets acquired and noncontrolling interest assumed.  The fair value of the primary assets acquired and the noncontrolling interest assumed was determined using the market approach.  The key input assumptions were the transaction price paid for AEP’s interest in Santa Rita East and recent third-party market transactions for similar wind farms. See “Santa Rita East” section of Note 17 for additional information.
ASSETS AND LIABILITIES HELD FOR SALE

2021

Disposition of KPCo and KTCo (Vertically Integrated Utilities and AEP Transmission Holdco Segments) (Applies to AEP and AEPTCo)

In October 2021, AEP entered into a Stock Purchase Agreement to sell KPCo and KTCo to Liberty Utilities Co., a subsidiary of Algonquin Power & Utilities Corp. (Liberty), for approximately a $2.85 billion enterprise value. The sale is subject to regulatory approvals from the FERC and KPSC. Clearance under the Hart-Scott-Rodino Antitrust Improvements Act of 1976 and clearance from the Committee on Foreign Investment in the United States has been received.

KPCo currently operates and owns a 50% interest in the 1,560 MW coal-fired Mitchell Power Plant (Mitchell Plant) with the remaining 50% owned by WPCo. The Stock Purchase Agreement is further contingent upon the issuance by the KPSC, WVPSC and FERC of orders regarding a new proposed Mitchell Plant Operations and Maintenance Agreement and Mitchell Plant Ownership Agreement between KPCo and WPCo pursuant to which WPCo would replace KPCo as the operator of the Mitchell Plant and KPCo employees at the Mitchell Plant would become employees of WPCo. Under the proposed Ownership Agreement, WPCo is obligated to purchase KPCo’s 50% interest in the Mitchell Plant on December 31, 2028 unless KPCo and WPCo have agreed to retire the Mitchell Plant earlier or, absent such agreement, if WPCo elects prior to December 31, 2027 to retire the Mitchell Plant on December 31, 2028. The Ownership Agreement provides that the purchase price for KPCo’s 50% ownership interest in the Mitchell Plant will be determined through the mutual agreement of WPCo and KPCo (subject to approval from the KPSC and WVPSC) or through a fair market valuation determination conducted by independent appraisals, with offsets for estimated decommissioning costs and the cost of ELG investments made by WPCo, if KPCo and WPCo are unable to reach agreement as to the purchase price.

In November 2021, AEP made filings with the KPSC, WVPSC, and FERC seeking approval of the new proposed Mitchell Plant Operations and Maintenance Agreement and Mitchell Plant Ownership Agreement. Subsequently, the KPSC and WVPSC intervened in the FERC proceeding and have recommended that FERC dismiss or reject AEP’s request, or defer ruling on AEP’s request until both the retail commissions have rendered decisions. In February 2022, AEP filed a motion to withdraw its filing with the FERC, noting that AEP intends to re-file its request after the KPSC and WVPSC have reviewed the agreements. In the WVPSC proceeding, intervenor testimony is expected in March 2022 and a hearing is scheduled to occur in April 2022.

In December 2022, Liberty, KPCo and KTCo sought approval from the FERC under Section 203 of the Federal Power Act for the sale. In February 2022 several intervenors in the case filed protests related to whether the sale will negatively impact the wholesale transmission and generation rates of applicants. An order from the FERC is expected in the matter in April 2022.

In January 2022, intervenor testimony was filed with the KPSC, recommending the KPSC either reject the new proposed Mitchell Plant Ownership Agreement or approve the agreement with certain modifications including a revision to the buyout provision that would set WPCo’s Mitchell Plant purchase price at the greater of fair market value or net book value. The intervenor testimony also recommends the KPSC reject the proposed Mitchell Plant Operations and Maintenance Agreement, which the testimony stated should be modified to remove references to the Mitchell Plant Ownership Agreement. In February 2022, AEP filed rebuttal testimony with the KPSC opposing the intervenor testimony filed in January 2022. AEP’s rebuttal testimony also discusses an alternative proposal to the fair market value provision included in the proposed Mitchell Plant Ownership Agreement. Under the alternative proposal, KPCo’s and WPCo’s interest in the Mitchell Plant would be divided by unit if the plant is not retired before the end of 2028 and a mutual agreement cannot be reached on a buyout price. Under the alternative proposal, mutual agreement on the buyout price or unit disposition would need to be finalized by May 2025, with a division of plant ownership by unit effective January 1, 2029, unless otherwise agreed. A hearing on the Mitchell Plant agreements is scheduled with the KPSC in March 2022.
In January 2022, KPCo and Liberty filed a joint application requesting the KPSC authorize the transfer of ownership of KPCo to Liberty. In February 2022, certain intervenors filed testimony recommending that the KPSC not approve the transfer of ownership. If, however, the KPSC does approve the transfer, these intervenors recommend that the KPSC require AEP to compensate KPCo customers $578 million for alleged future increased costs and higher rates that the intervenors claim will exist under Liberty’s ownership. AEP disagrees with the recommendation and will file rebuttal testimony in March 2022. Intervenors also recommended imposing certain conditions on Liberty, including conditions related to recovering certain costs, inter-company agreement filing requirements, KPCo’s capital structure and future generation resource planning processes and analyses. In addition, certain intervenors argue that the commission should not approve the new proposed Mitchell Plant Ownership Agreement and Mitchell Plant Operations and Maintenance Agreement, and that deciding the request to transfer ownership of KPCo should be separated from approval of the Mitchell agreements even though such approval is a condition to the transaction closing. AEP also disagrees with this argument. A hearing is scheduled with the KPSC in March 2022 and a final order is expected in the second quarter of 2022.

The sale is expected to close in the second quarter of 2022 with Liberty acquiring the assets and assuming the liabilities of KPCo and KTCo, excluding pension and other post-retirement benefit plan assets and liabilities. AEP expects to provide customary transition services to Liberty for a period of time after closing of the transaction.

AEP expects to receive approximately $1.45 billion in cash, net of taxes and transaction fees. AEP plans to use the proceeds to eliminate forecasted equity needs in 2022 as the company invests in regulated renewables, transmission and other projects. AEP and AEPTCo expect the sale to have a one-time impact on after tax earnings that is not material.

The Income Before Income Tax Expense (Benefit) and Equity Earnings of KPCo and KTCo were not material to AEP and AEPTCo for the years ended December 31, 2021, 2020 and 2019, respectively.

The major classes of KPCo and KTCo’s assets and liabilities presented in Assets Held for Sale and Liabilities Held for Sale on the balance sheets of AEP and AEPTCo as of December 31, 2021 are shown in the table below.
December 31, 2021
AEPAEPTCo
(in millions)
ASSETS
Accounts Receivable and Accrued Unbilled Revenues$33.2 $1.5 
Fuel, Materials and Supplies30.6 — 
Property, Plant and Equipment, Net2,302.7 165.3 
Regulatory Assets484.7 — 
Other Classes of Assets that are not Major68.5 1.1 
Assets Held for Sale$2,919.7 $167.9 
LIABILITIES
Accounts Payable$53.4 $1.1 
Long-term Debt Due Within One Year200.0 — 
Customer Deposits32.4 — 
Deferred Income Taxes441.6 15.4 
Long-term Debt903.1 — 
Regulatory Liabilities and Deferred Investment Tax Credits148.1 7.6 
Other Classes of Liabilities that are not Major102.3 3.5 
Liabilities Held for Sale$1,880.9 $27.6 
DISPOSITIONS

2021

Disposition of Racine (Generation & Marketing Segment) (Applies to AEP)

In February 2021, AEP signed an agreement to sell Racine to a nonaffiliated party. The sale of Racine closed in the fourth quarter of 2021 resulting in an immaterial gain which is recorded in Other Operation on AEP’s statements of income.

2020

Conesville Plant (Generation & Marketing Segment) (Applies to AEP)

In June 2020, AEP and a nonaffiliated joint-owner executed an Environmental Liability and Property Transfer and Asset Purchase Agreement with a nonaffiliated third-party related to the merchant Conesville Plant site. The purchaser took ownership of the assets and assumed responsibility for environmental liabilities, including ash pond closure, asbestos abatement and decommissioning and demolition of the Conesville Plant site. In consideration of the transfer of the acquired assets to the purchaser and the purchaser’s assumption of liabilities, AEP will pay a total of approximately $98 million over three years, derecognized $106 million in ARO and recorded an immaterial gain on the transaction which is recorded in Other Operation on the statements of income. AEP paid approximately $26 million at closing in June 2020 and made additional payments totaling $57 million in quarterly installments from October 2020 to December 2021. AEP will make the final $15 million payment by July 2022.

Oklaunion Power Station (Transmission and Distribution Segment and Vertically Integrated Utilities Segment) (Applies to AEP, AEP Texas and PSO)

In October 2020, AEP Texas, PSO and a nonaffiliated joint-owner executed an Environmental Liability and Property Transfer and Asset Purchase Agreement with a nonaffiliated third-party related to the Oklaunion Power Station site. The purchaser took ownership of the assets and assumed responsibility for environmental liabilities, including ash pond closure, asbestos abatement and decommissioning and demolition of the Oklaunion Power Station site. The sale had an immaterial impact on the financial statements in the fourth quarter of 2020.

IMPAIRMENTS

2021

2020 Texas Base Rate Case (Vertically Integrated Utilities Segment) (Applies to AEP and SWEPCo)

In January 2022, the PUCT issued a final order adopting the PFD with certain modifications which included a return of investment only for the recovery of the Dolet Hills Power Station. As a result of the final order, SWEPCo recorded a disallowance of $12 million associated with the lack of return on the Dolet Hills Power Station. In February 2022, SWEPCo filed a motion for rehearing with the PUCT challenging the denial of reasonable return or carrying costs on the Dolet Hills Power Station. See “2020 Texas Base Rate Case” section of Note 4 for additional information.

2019

2019 Texas Base Rate Case (Transmission and Distribution Segment) (Applies to AEP and AEP Texas)

In December 2019, AEP Texas recorded a pretax impairment of $33 million in Asset Impairments and Other Related Charges on the statements of income due to regulatory disallowances in the 2019 Texas Base Rate Case.
Virginia Jurisdictional Book Value of Retired Coal-Fired Plants (Vertically Integrated Utilities Segment) (Applies to AEP and APCo)

In December 2019, based on management’s interpretation of Virginia law and more certainty regarding APCo’s triennial revenues, expenses and resulting earnings upon reaching the end of the three-year review period, APCo recorded a pretax expense of $93 million in Asset Impairments and Other Related Charges on the statements of income related to its previously retired coal-fired generation.  As a result, management deemed these costs to be substantially recovered by APCo during the triennial review period. See “2017-2019 Virginia Triennial Review” section of Note 4 for additional information.

Merchant Generating Assets (Generation & Marketing Segment)

Due to a significant increase in the asset retirement costs recorded in December 2019 for the Ash Pond Complex at Conesville Plant, AEP performed an impairment analysis on Conesville Plant in accordance with accounting guidance for impairments of long-lived assets. AEP performed step one and step two of the impairment analysis using a cash flow model for the estimated useful life of Conesville Plant based upon energy and capacity price curves, which were developed internally with both observable Level 2 third-party quotations and unobservable Level 3 inputs, as well as management’s forecasts of operating expenses. The step two analysis resulted in a fair value determination for Conesville Plant of $0 and AEP recorded a $31 million pretax impairment, equal to the net book value of the plant, in Asset Impairments and Other Related Charges on AEP’s statements of income in the fourth quarter of 2019.

SUBSEQUENT EVENT

Planned Disposition of Competitive Contracted Renewable Assets (Generation & Marketing Segment)

In February 2022, AEP management announced the beginning of a process to sell all or a portion of the competitive contracted renewables portfolio included in the Generation & Marketing segment. As of December 31, 2021, the competitive contracted renewable portfolio assets totaled 1.6 gigawatts of generation resources.